Laserfiche WebLink
McPherson Engineering By: T.B. <br />Date: 5/17/23 <br />Gravity Loads: <br />DEMAND DECREASED BY 3.83% = OK! <br />Lateral Loads: <br />DEMAND INCREASED BY 1.79% < 10% = OK! <br />Anchorage: <br />DEMAND OF 462.8LB. < CAPACITY OF 1106.6LB. = OK! <br />USE (1) 5/16IN. DIA. LAG SCREW(S) AT 6FT. MAX. O.C. W/ 3.3IN. MIN. PENETRATION <br />Summary: <br />STRUCTURE IS ADEQUATE FOR THE PROPOSED PV ARRAY <br />ANCHORS ON EAVES/OVERHANGS ARE OK! <br />Summary <br />5/17/2023 2:25 PM <br />7 of 7 <br />©McPherson Engineering <br />1535 W Pomona St <br />06/26/23