REVISIONS:
<br />2.
<br />4
<br />0
<br />0
<br />
<br />k
<br />W
<br />
<br />(
<br />D
<br />C
<br />)
<br />
<br />/
<br />
<br />2
<br />.
<br />1
<br />6
<br />9
<br />
<br />k
<br />W
<br />
<br />(
<br />C
<br />E
<br />C
<br />-
<br />A
<br />C
<br />)
<br />
<br />PH
<br />O
<br />T
<br />O
<br />V
<br />O
<br />L
<br />T
<br />A
<br />I
<br />C
<br />
<br />S
<br />Y
<br />S
<br />T
<br />E
<br />M
<br />
<br />15
<br />1
<br />0
<br />
<br />N
<br />
<br />B
<br />E
<br />W
<br />L
<br />E
<br />Y
<br />
<br />S
<br />T
<br />R
<br />E
<br />E
<br />T
<br />UN
<br />I
<br />T
<br />
<br />2
<br />SA
<br />N
<br />T
<br />A
<br />
<br />A
<br />N
<br />A
<br />,
<br />
<br />C
<br />A
<br />
<br />9
<br />2
<br />7
<br />0
<br />3
<br />AP
<br />N
<br />:
<br />
<br />1
<br />9
<br />8
<br />0
<br />9
<br />1
<br />2
<br />6
<br />DA
<br />T
<br />E
<br />:
<br />12
<br />.
<br />2
<br />9
<br />.
<br />2
<br />0
<br />2
<br />2
<br />
<br />DR
<br />A
<br />W
<br />N
<br />
<br />B
<br />Y
<br />:
<br />
<br />ZM
<br />
<br />Co
<br />n
<br />t
<br />r
<br />a
<br />c
<br />t
<br />o
<br />r
<br />s
<br />
<br />S
<br />i
<br />g
<br />n
<br />a
<br />t
<br />u
<br />r
<br />e
<br />:
<br />
<br />PR
<br />E
<br />M
<br />I
<br />E
<br />R
<br />
<br />B
<br />U
<br />I
<br />L
<br />D
<br />E
<br />R
<br />S
<br />
<br />&
<br />
<br />H
<br />A
<br />R
<br />D
<br />S
<br />C
<br />A
<br />P
<br />E
<br />
<br />I
<br />N
<br />C
<br />88
<br />3
<br />2
<br />
<br />L
<br />A
<br />
<br />G
<br />R
<br />A
<br />N
<br />D
<br />
<br />A
<br />V
<br />E
<br />GA
<br />R
<br />D
<br />E
<br />N
<br />
<br />G
<br />R
<br />O
<br />V
<br />E
<br />,
<br />
<br />C
<br />A
<br />
<br />9
<br />2
<br />8
<br />4
<br />1
<br />PH
<br />O
<br />N
<br />E
<br />:
<br />
<br />(
<br />7
<br />1
<br />4
<br />)
<br />
<br />4
<br />6
<br />7
<br />-
<br />9
<br />0
<br />1
<br />8
<br />LI
<br />C
<br />E
<br />N
<br />S
<br />E
<br />:
<br />
<br />#
<br />9
<br />9
<br />5
<br />0
<br />6
<br />8
<br />
<br />/
<br />
<br />B
<br />,
<br />
<br />C
<br />5
<br />3
<br />
<br />R1 01.06.2023 (MED)
<br />R2 01.26.2023 (MED)
<br />1
<br />2
<br />Page
<br />SHEET 24x36
<br />Pr
<br />o
<br />j
<br />e
<br />c
<br />t
<br />
<br />N
<br />a
<br />m
<br />e
<br />1
<br />CO
<br />V
<br />E
<br />R
<br />
<br />P
<br />A
<br />G
<br />E
<br />
<br />CONTRACTOR INFORMATION
<br />CONTRACTOR:
<br />PREMIER BUILDERS &
<br />HARDSCAPE INC
<br />ADDRESS:
<br />8832 LA GRAND AVE,
<br />GARDEN GROVE, CA 92841
<br />PHONE: (714) 467-9018
<br />LICENSE #/TYPE: #995068 / B, C53
<br />TABLE OF CONTENTS
<br />PAGE 1 COVER PAGE
<br />PAGE 2 SITE PLAN
<br />PAGE 3 PLOT PLAN
<br />PAGE 4 SINGLE LINE DIAGRAM
<br />PAGE 5 STRUCTURAL ATTACHMENT DETAIL
<br />PAGE 6 LABELS AND WARNING SIGNAGE
<br />PAGE 7 PV MODULE SPEC SHEET
<br />PAGE 8 INVERTER SPEC SHEET
<br />PAGE 9 UL LISTING
<br />PAGE 10 GROUNDING
<br />PAGE 11 RAPID SHUTDOWN
<br />PROJECT INFORMATION
<br />NAME:1510 N BEWLEY STREET
<br />ADDRESS:
<br />UNIT 2,
<br />SANTA ANA, CA 92703
<br />APN:19809126
<br />JURISDICTION: SANTA ANA
<br />OCCUPANCY GROUP: R3
<br />CONSTRUCTION TYPE: V-B
<br />SYSTEM INFORMATION
<br />SIZE(kw):2.400
<br />MODULE TYPE:6
<br />URE SOLAR
<br />FBM400MFG-BB
<br />INVERTERS(S):6 ENPHASE IQ7PLUS-72-2-US
<br />INVERTER TYPE: MICRO-INVERTER
<br />SCOPE OF WORK:
<br />INSTALL
<br />(6) ROOF MOUNTED PV SOLAR MODULES,
<br />(6) ENPHASE IQ7PLUS-72-2-US INVERTER(S)(240V).
<br />(DC) / 2.169 (CEC-AC)
<br />2
<br />PHOTOVOLTAIC MODULES AND PANEL SYSTEMS INSTALLED ON
<br />OR INTEGRAL WITH BUILDINGS, OR TO BE FREESTANDING (NOT
<br />ATTACHED TO BUILDINGS) SHALL BE TESTED, LISTED, AND
<br />IDENTIFIED WITH A FIRE CLASSIFICATION (CLASS C MINIMUM) IN
<br />ACCORDANCE WITH UL1703. WHERE CLASS A OR B ROOFING IS
<br />REQUIRED, THE PV SOLAR SYSTEM (PV PANEL & RACK) SHALL
<br />HAVE THE SAME CLASS/TYPE RATING OR BETTER.
<br />1A OF 11
<br />NOTE:
<br />1. IN CASE OF EMERGENCY, CALL _______________________________________ AT WORK PHONE #_________________________________________ OR HOME PHONE#________________________________.
<br />2. SEDIMENT FROM AREAS DISTURBED BY CONSTRUCTION SHALL BE RETAINED ON SITE USING STRUCTURAL CONTROLS TO THE MAXIMUM EXTENT PRACTICABLE.
<br />3. STOCKPILES OF SOIL SHALL BE PROPERLY CONTAINED TO MINIMIZE SEDIMENT TRANSPORT FROM THE SITE TO STREETS, DRAINAGE FACILITIES OR ADJACENT PROPERTIES VIA RUNOFF, VEHICLE
<br />TACKING, OR WIND.
<br />4. APPROPRIATE BMP'S FOR CONSTRUCTION-RELATED MATERIALS, WASTES, SPILLS SHALL BE IMPLEMENTED TO MINIMIZE TRANSPORT FROM THE SITE TO STREETS, DRAINAGE FACILITIES, OR ADJOINING
<br />PROPERTIES BY WIND OR RUNOFF.
<br />5. RUNOFF FROM EQUIPMENT AND VEHICLE WASHING SHALL BE CONTAINED AT CONSTRUCTION SITES UNLESS TREATED TO REDUCE OR REMOVE SEDIMENT AND OTHER POLLUTANTS.
<br />6. ALL CONSTRUCTION CONTRACTOR AND SUBCONTRACTOR PERSONNEL ARE TO BE MADE AWARE OR THE REQUIRED BEST MANAGEMENT PRACTICES AND GOOD HOUSEKEEPING MEASURES FOR THE
<br />PROJECT SITE AND ANY ASSOCIATED CONSTRUCTION STAGING AREAS.
<br />7. AT THE END OF EACH DAY OF CONSTRUCTION ACTIVITY ALL CONSTRUCTION DEBRIS AND WASTE MATERIALS SHALL BE COLLECTED AND PROPERLY DISPOSED IN TRASH OR RECYCLE BINS.
<br />8. CONSTRUCTION SITES SHALL BE MAINTAINED IN SUCH A CONDITION THAT AN ANTICIPATED STORM DOES NOT CARRY WASTES OR POLLUTANTS OFF THE SITE. DISCHARGES OF MATERIAL OTHER THAN
<br />STORMWATER ONLY WHEN NECESSARY FOR PERFORMANCE AND COMPLETION OF CONSTRUCTION PRACTICES AND WHERE THEY DO NOT: CAUSE OR CONTRIBUTE TO A VIOLATION OF ANY WATER
<br />QUALITY STANDARD; CAUSE OR THREATEN TO CAUSE POLLUTION, CONTAMINATION, OR NUISANCE; OR CONTAIN A HAZARDOUS SUBSTANCE IN A QUANTITY REPORTABLE UNDER FEDERAL REGULATIONS
<br />40 CFR PARTS 117 AND 302.
<br />9. POTENTIAL POLLUTANTS INCLUDE BUT ARE NOT LIMITED TO: SOLID OR LIQUID CHEMICAL SPILLS; WASTES FROM PAINTS, STAINS, SEALANTS, GLUES, LIMES, PESTICIDES, HERBICIDES, WOOD
<br />PRESERVATIVES AND SOLVENTS; ASBESTOS FIBERS, PAINT FLAKES OR STUCCO FRAGMENTS; FUELS, OILS, LUBRICANTS, AND HYDRAULIC, RADIATOR OR BATTERY FLUIDS; FERTILIZERS,
<br />VEHICLE/EQUIPMENT WASH WATER AND CONCRETE WASH WATER; CONCRETE, DETERGENT OR FLOATABLE WASTES; WASTES FROM ANY ENGINE/EQUIPMENT STEAM CLEANING OR CHEMICAL
<br />DEGREASING AND SUPERCHLORINATED POTABLE WATER LINE FLUSHING. DURING CONSTRUCTION, PERMITTEE SHALL DISPOSE OF SUCH MATERIALS IN A SPECIFIED AND CONTROLLED TEMPORARY AREA
<br />ON-SITE, PHYSICALLY SEPARATED FROM POTENTIAL STORMWATER RUNOFF, WITH ULTIMATE DISPOSAL IN ACCORDANCE WITH LOCAL, STATE AND FEDERAL REQUIREMENTS.
<br />10. DEWATERING OF CONTAMINATED GROUNDWATER, OR DISCHARGING CONTAMINATED SOILS VIA SURFACE EROSION IS PROHIBITED. DEWATERING OF NON-CONTAMINATED GROUNDWATER REQUIRES
<br />A NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM PERMIT FROM THE RESPECTIVE STATE REGIONAL WATER QUALITY CONTROL BOARD.
<br />11. GRADED AREAS ON THE PERMITTED AREA PERIMETER MUST DRAIN AWAY FROM THE FACE OF SLOPES AT THE CONCLUSION OF EACH WORKING DAY. DRAINAGE IS TO BE DIRECTED TOWARD
<br />DESILTING FACILITIES.
<br />12. THE PERMITTEE AND CONTRACTOR SHALL BE RESPONSIBLE AND SHALL TAKE NECESSARY PRECAUTIONS TO PREVENT PUBLIC TRESPASS ONTO AREAS WHERE IMPOUNDED WATER CREATES A
<br />HAZARDOUS CONDITION.
<br />13. THE PERMITTEE AND CONTRACTOR SHALL INSPECT THE EROSION CONTROL WORK AND INSURE THAT THE WORK IS IN ACCORDANCE WITH THE APPROVED PLANS.
<br />14. THE PERMITTEE SHALL NOTIFY ALL GENERAL CONTRACTORS, SUBCONTRACTORS, MATERIAL SUPPLIERS, LESSEES, AND PROPERTY OWNERS: THAT DUMPING OF CHEMICALS INTO THE STORM DRAIN
<br />SYSTEM OR THE WATERSHED IS PROHIBITED.
<br />15. EQUIPMENT AND WORKERS FOR EMERGENCY WORK SHALL BE MADE AVAILABLE AT ALL TIMES DURING THE RAINY SEASON. NECESSARY MATERIALS SHALL BE AVAILABLE ON SITE AND STOCKPILED AT
<br />CONVENIENT LOCATIONS TO FACILITATE RAPID CONSTRUCTION OF TEMPORARY DEVICES WHEN RAIN IS IMMINENT.
<br />16. ALL REMOVABLE EROSION PROTECTIVE DEVICES SHALL BE IN PLACE AT THE END OF EACH WORKING DAY WHEN THE 5-DAY RAIN PROBABILITY FORECAST EXCEEDS 40%.
<br />17. SEDIMENTS FROM AREAS DISTURBED BY CONSTRUCTION SHALL BE RETAINED ON SITE USING AN EFFECTIVE COMBINATION OF EROSION AND SEDIMENT CONTROLS TO THE MAXIMUM EXTENT
<br />PRACTICABLE, AND STOCKPILES OF SOIL SHALL BE PROPERLY CONTAINED TO MINIMIZE SEDIMENT TRANSPORT FROM THE SITE TO STREETS, DRAINAGE FACILITIES OR ADJACENT PROPERTIES VIA
<br />RUNOFF, VEHICLE TRACKING, OR WIND.
<br />18. APPROPRIATE BMPS FOR CONSTRUCTION-RELATED MATERIALS, WASTES, SPILLS OR RESIDUES SHALL BE IMPLEMENTED AND RETAINED ON SITE TO MINIMIZE TRANSPORT FROM THE SITE TO STREETS,
<br />DRAINAGE FACILITIES, OR ADJOINING PROPERTY BY WIND OR RUNOFF.
<br />COUNTY ELECTRONIC STAMP
<br /> ***The scope of the plans is for the
<br />installation of the solar photovoltaic system
<br />only and the approval is subject to
<br />compliance with all applicable city and state
<br />codes and regulations regarding
<br />construction. The approval of the plans does
<br />not constitute any certification of the
<br />accuracy, completeness, or building permit
<br />status of the existing buildings and
<br />structures as shown.***
<br />Bldg permit #101113758
<br />Elect permit #20178649
<br />Issued on 2/7/23
<br />1510 N Bewley St
<br />Unit #202/13/23
|