Laserfiche WebLink
PV - 3.1 <br />ELEVATION <br />DATE: <br />SHEET NAME: <br />SHEET NUMBER: <br />DESIGNED BY: <br />DATE/DESIGNERREV. <br />1 <br />2 <br />3 <br />CUSTOMER INFORMATION: <br />SERGIO SEGURA <br />1817 MERIDAY LN <br />SANTA ANA, CA 92706 <br />(714) 904-4946 <br />12/12/2023 <br />TDAUPRAT <br />PVDC ­ 210211 <br />- <br />- <br />- <br />3' WORKING CLEARANCE IN FRONT OF ALL ELECTRICAL EQUIPMENT <br />PER CEC 110.26(A)(3), THE HEIGHT OF THE WORKING SPACE IN FRONT OF EQUIPMENT MUST NOT BE LESS THAN 6-1/2 <br />FT, MEASURED FROM THE GRADE, FLOOR, PLATFORM, OR THE EQUIPMENT HEIGHT, WHICHEVER IS GREATER. <br />x________________ <br />JOHN RADLEIGH <br />VOLTAIC CONSTRUCTION, <br />LLC25186 HANCOCK AVE UNIT <br />230 MURRIETA, CA 92562 <br />(310) 709-0059 <br />CONSTRUCTION@VOLTAICNOW.COM <br />CSLB# 1096383 (B/C10) <br />ESS UNITS SHALL BE SEPARATED 3 FEET FROM ALL WINDOWS, DOORS, AND HVAC INLETS BY 5 FEET IN ANY DIRECTION. <br />(N) MAIN <br />SERVICE PANEL <br />& METER <br />(N) RAPID <br />SHUTDOWN <br />SWITCH <br />(N) IQ <br />CONTROLLER 2 <br />6'-6" MAX <br />(N) AC <br />DISCONNECT <br />(N) AC <br />COMBINER <br />36" MIN - <br />60" MAX <br />NORTH FACING EXTERIOR <br />EQUIPMENT ELEVATION <br />(N) BACKUP LOAD <br />PANEL <br />(N) <br />ENPHASE <br />ENCHARGE <br />10T <br />50.5" <br />30.5" <br />48" MAX. <br />(E) WINDOW <br />1817 W Meriday Ln- <br />201819032/22/2024