Laserfiche WebLink
A-0.0 <br />COVER SHEET <br />SHEET NO. <br />2402 <br />REVISIONS: <br />4/12/2024DATE: <br />PROJECT NO. <br />PERMIT NO. <br />Dr <br />. <br /> <br />B <br />e <br />s <br />h <br />a <br />i <br /> <br />A <br />S <br />C <br />20 <br />1 <br />0 <br /> <br />E <br />. <br /> <br />1 <br />s <br />t <br /> <br />S <br />t <br />r <br />e <br />e <br />t <br />, <br /> <br />S <br />t <br />e <br />. <br /> <br />2 <br />0 <br />0 <br /> <br />& <br /> <br />2 <br />1 <br />0 <br />, <br /> <br />S <br />a <br />n <br />t <br />a <br /> <br />A <br />n <br />a <br />, <br /> <br />C <br />A <br /> <br />9 <br />2 <br />7 <br />0 <br />5 <br />Ne <br />w <br /> <br />A <br />m <br />b <br />u <br />l <br />a <br />t <br />o <br />r <br />y <br /> <br />C <br />a <br />r <br />e <br /> <br />F <br />a <br />c <br />i <br />l <br />i <br />t <br />y <br /> <br />T <br />e <br />n <br />a <br />n <br />t <br /> <br />I <br />m <br />p <br />r <br />o <br />v <br />e <br />m <br />e <br />n <br />t <br />10/31/25 <br />REN. DATE <br /> C-26955 <br />OIFNRI <br />LOFCA <br />SAUNDERS <br />TATS <br />E <br />CETIHCADESRCILEN <br />NIALL F. <br />A <br />T <br />PROJECT TITLE / ADDRESS: <br />DR BESHAI ASC <br />2010 E. 1ST. ST. #200 & #210 <br />SANTA ANA, CA 92705 <br />APN: <br />#200 937-91-202 <br />#210 937-91-203 <br />PROJECT DESCRIPTION: <br />AMBULATORY CARE FACILITY AND MEDICAL OFFICE: <br />SUITE SPLIT AND INTERIOR TENANT IMPROVEMENT IN AN <br />EXISTING 2 STORY OFFICE BUILDING. <br />PROJECT VALUATION: <br />$192,336 <br />BASE BLDG. CONSTRUCTION TYPE: <br />EXISTING BUILDING TYPE V-B (SPRINKLERED). <br />EXISTING BLDG. HT. APPROX. 30'-0" (1 STORY) <br />FLOOR AREA OF SUITES: <br />EXIST. SUITE 200:4019 S.F. <br />NEW SUITE 200:1308 S.F. <br />NEW SUITE 210 (SUITE SPLIT):2711 S.F. <br />OCCUPANCY: <br />SUITE 200: B (MEDICAL OFFICE) <br />SUITE 210: B (AMBULATORY CARE FACILITY - THIS MEDICAL <br />OFFICE MAY SERVE NO MORE THAN 3 PATIENTS AT ANY <br />TIME, WHO MAY BE INCAPABLE OF UNASSISTED <br />SELF-PRESERVATION IN THE EVENT OF AN EMERGENCY). <br />THIS FACILITY IS NOT REQUIRED TO UNDERGO OSHPD <br />REVIEW, NOR WILL THIS PROJECT BE SUBJECT TO STATE <br />LICENSING. APPLICABLE CODE: CBC SECTION 1226. <br />CITY REVIEW AND APPROVAL IS NOT FOR OSHPD3 <br />OCCUPANCY LOAD: <br />SUITE 210 (ASC):19 <br />OFFICE (2711 S.F.):18.1 (BUSINESS: <br />150 GROSS) <br />SUITE 200 (MEDICAL OFFICE):9 <br />OFFICE (1308 S.F.):8.7 (BUSINESS: <br />150 GROSS) <br />EXITS: <br />SUITE 210: <br />EXITS REQUIRED: 1 <br />EXITS PROVIDED: 2 <br />SUITE 200: <br />EXITS REQUIRED: 1 <br />EXITS PROVIDED: 1 <br />OWNER/TENANT: <br />ALFRED BESHAI, M.D. <br />16405 SAND CANYON AVE, SUITE #210 <br />LAKEWOOD, CA 90712 <br />(949) 441 5445 <br />ARCHITECT: <br />SAUNDERS + WIANT ARCHITECTS, INC. <br />2700 WEST COAST HIGHWAY, #200, <br />NEWPORT BEACH, CA. 92663 <br />(949) 721 0730 <br />STRUCTURAL/MECHANICAL/ELECTRICAL/PLUMBING: <br />ABSOLUTE CONSULTING ENGINEERS <br />3839 BIRCH STREET <br />NEWPORT BEACH, CA 92660 <br />(949) 852 8700 <br />PROJECT DIRECTORY PROJECT DATA <br />APPLICABLE CODES <br />INTERIOR TENANT IMPROVEMENT IN AN EXISTING MEDICAL OFFICE BUILDING. PROJECT <br />INCLUDES AMBULATORY CARE FACILITY (SUITE #210) & MEDICAL OFFICE (SUITE #200). <br />NEW MECHANICAL HVAC SYSTEMS, NEW ELECTRICAL LIGHTING AND DISTRIBUTION <br />SYSTEMS AND NEW PLUMBING INSTALLATIONS. ALSO, NEW MEDICAL GAS SYSTEM, NEW <br />FIRE ALARM SYSTEM, AND NEW BACK-UP POWER SYSTEM. <br />THE TENANT IMPROVEMENT SHALL INCLUDE THE FOLLOWING: <br />1. 3 NEW ACCESSIBLE RESTROOMS <br />2. NEW INTERIOR NON-LOAD BEARING PARTITION WALLS <br />3. NEW SUSPENDED CEILING SYSTEM <br />4. ALL NEW FINISHES THROUGHOUT <br />5. ALL NEW PLUMBING FIXTURES AND PIPING <br />6. NEW MEDICAL GAS SYSTEMS <br />7. HVAC MODIFICATIONS <br />8. NEW ELECTRICAL & LIGHTING <br />9. FIRE ALARM SYSTEM <br />10. FIRE SPRINKLER SYSTEM <br />11. NEW/LEGALIZE DEMISING WALL TO CREATE UNIT #210 <br />SCOPE OF WORK <br />2022 BUILDING STANDARDS ADMINISTRATIVE CODE, PART 1, TITLE 24 C.C.R. <br />2022 CALIFORNIA BUILDING CODE (CBC), PART 2, TITLE 24 C.C.R. <br />2022 CALIFORNIA ELECTRICAL CODE (CEC), PART 3, TITLE 24 C.C.R <br />2022 CALIFORNIA MECHANICAL CODE (CMC), PART 4, TITLE 24 C.C.R <br />2022 CALIFORNIA PLUMBING CODE (CPC), PART 5, TITLE 24 C.C.R <br />2022 CALIFORNIA FIRE CODE (CFC), PART 9, TITLE 24 C.C.R <br />2022 CALIFORNIA GREEN BUILDING CODE (CGBC), PART 11, TITLE 24 C.C.R <br />2022 NATIONAL FIRE PROTECTION ASSOCIATION (NFPA) 99 (MED-GAS SYSTEMS <br />2022 CALIFORNIA BUILDING ENERGY EFFICIENCY STANDARDS <br />DEFERRED SUBMITTALS <br />1. FIRE ALARM/FIRE SPRINKLER SYSTEM NFPA 13 <br />PER 2022 CGBSC 301.3, BUILDING ALTERATIONS WITH A PERMIT VALUATION OF LESS <br />THAN $200,000 SHALL BE EXEMPT. PER 301.3.1, EXISTING NONCOMPLIANT PLUMBING <br />FIXTURES SHALL BE BROUGHT INTO COMPLIANCE. <br />PLUMBING <br />CALGREEN <br />GENERAL NOTES <br />1. ALL WORK SHALL BE PER STATE, FEDERAL & LOCAL CODES, ORDINANCES, ETC. INCL.THE 2022 EDITION OF THE CALIFORNIA BUILDING CODE (TITLE 24) WHICH <br />ADOPTS THE 2022 CBC, CMC, AND CPC AND THE 2022 CEC. <br />1a. ALL WORK SHALL BE PER 2022 CALIFORNIA ENERGY EFFICIENCY STANDARDS AS ADOPTED BY THE CITY. <br />2. EACH SUB-CONTRACTOR SHALL VISIT THE SITE, VERIFY ALL DIMENSIONS AND EXISTING CONDITIONS. NOTIFY THE ARCHITECT OF ANY DISCREPANCIES OR <br />INCONSISTENCIES FOUND. DO NOT SCALE DRAWINGS. <br />3. CONSTRUCTION, DEMOLITION AND REMODEL SHALL COMPLY WITH C.F.C. SECTION 203. CONTRACTOR SHALL PATCH & REPAIR NEIGHBORING FINISHES IF <br />DAMAGED DURING DEMOLITION OR CONSTRUCTION. <br />4. THE CONTRACTOR SHALL DISPOSE OF ALL DEMOLITION AND CONSTRUCTION DEBRIS OFF SITE AND IN AN APPROVED MANNER, ACCORDING TO STATE AND CITY <br />CODES. <br />5. ALL EXIT DOORS SHALL BE OPENABLE FROM THE INSIDE WITHOUT THE USE OF A KEY OR ANY SPECIAL KNOWLEDGE OR EFFORT. NO DEADBOLTS, SLIDING BOLTS, <br />ETC. PROVIDE SELF RELEASING LOCKING DEVICES ON EXIT DOORS. EXIT DOORS SHALL SWING OPEN IN DIRECTION OF EXIT TRAVEL. <br />6. WHERE NO CONSTRUCTION DETAILS ARE SHOWN OR NOTED FOR ANY PART OF THE WORK TO BE DONE, DETAILS SHALL BE SAME AS FOR OTHER SIMILAR WORK. <br />7. FIRE EXTINGUISHERS SHALL BE PROVIDED PER C.F.C. SECTION 906. EXTINGUISHERS TO BE TYPE 2A10BC WITH CURRENT STATE FIRE MARSHALL SERVICE TAG, <br />MOUNTED IN VISIBLE LOCATIONS, NOT MORE THAN 75' WALKING DISTANCE FROM ANY POINT IN THE SPACE. UNITS TO BE INSTALLED IN SEMI-RECESSED WALL <br />CABINETS. <br />8. ALL POWER ACTUATED PINS/ANCHORS SHALL BE "RAMSET" #2330 AT 32" O.C. FOR INTERIOR, NON-LOAD BEARING PARTITIONS PER ICC ESR-1799. <br />9. WALL, FLOOR AND CEILING MATERIALS SHALL BE TESTED AS SPECIFIED IN CBC TABLE 803.1.3. CLASS C CLASSIFICATION SHALL BE USED PER CBC TABLE 803.13. <br />10. IF REQUESTED BY INSPECTOR, CONTRACTOR TO POST OCCUPANT LOAD SIGN COMPLYING WITH C.F.C. SEC. 1003 AND C.B.C. SEC. 1004.3. POST IN WAITING <br />AREA. <br />12. ENSURE ALL EXIT AISLEWAYS AND CORRIDORS ARE MAINTAINED AT 36" MINIMUM CLEAR WIDTH IN OFFICE AREA. <br />14. ENSURE ALL FINISHES ARE MAINTAINED IN FIRE RETARDANT CONDITION. ALL NEW FINISHES SHALL BE PER CHAPTER 8 (TABLE 803.11) OF THE CBC, CLASS III, FLAME <br />SPREAD INDEX 200 MAX. (INCLUDES CARPETS, ETC.) <br />16. IF REQUESTED A STATEMENT IN WRITING SHALL BE GIVEN TO THE BUILDING OFFICIAL, STATING THAT THE ARCHITECT / ENGINEER SITE OBSERVATION AND SITE <br />VISITS HAVE BEEN MADE AND WHETHER OR NOT ANY OBSERVED DEFICIENCIES HAVE BEEN CORRECTED TO CONFORM TO THE APPROVED PLANS AND <br />SPECIFICATIONS. <br />17. GENERAL CONTRACTOR SHALL OBTAIN AND PAY FOR ALL REQUIRED PERMITS. <br />18. PROTECT IN PLACE ALL EXISTING FINISHES WHICH ARE TO REMAIN. REPAIR OR REPLACE ANY SUCH FINISHES DAMAGED DURING CONSTRUCTION. <br />19. REFER TO SPECIFICATIONS ON SHEET A-5 FOR ADDITIONAL STANDARDS AND REQUIREMENTS. <br />20. NO HAZARDOUS MATERIALS WILL BE STORED ON SITE OR EXCEED QUANTITIES LISTED IN CBC TABLE 307.1(1) AND 307.1(2). <br />21. EXIT SIGNS SHALL BE READILY VISIBLE FROM ANY DIRECTION OF APPROACH AND SHALL CLEARLY INDICATE THE DIRECTION OF TRAVEL. NO POINT SHALL BE <br />MORE THAN 100 FEET (30480 MM) FROM THE NEAREST VISIBLE SIGN. ALL SIGNS SHALL BE ILLUMINATED AT ALL TIMES AND CONNECTED TO AN EMERGENCY <br />ELECTRICAL SYSTEM. (CBC 1011.1, 1011.5). EXIT SIGNS ILLUMINATED BY AN EXTERNAL SOURCE SHALL HAVE AN INTENSITY OF NOT LESS THAN 5 FOOT CANDLES <br />(54LUX). INTERNALLY ILLUMINATED SIGNS SHALL BE LISTED AND LABELED AND SHALL BE INSTALLED IN ACCORDANCE WITH THE MANUF. INSTRUCTIONS AND SECTION <br />2702 (CBC 1013.5). <br />22. CONSTRUCTION SHALL BE SUPERVISED AS REQUIRED BY TENANT/LANDLORD LEASE REQUIREMENTS. WHERE REQUIRED BY THESE DOCUMENTS, PROVIDE <br />CONTINUOUS INSPECTION OF THE WORK. THE DUTIES OF THE INSPECTOR ARE DEFINED IN SECTION 4-342 PART 1, TITLE 24, CCR; CLASS 3. <br />23. THE MEANS OF EGRESS, INCLUDING THE EXIT DISCHARGE, SHALL BE ILLUMINAED AT ALL TIMES THE BUILDING SPACE SERVED BY THE MEANS OF EGRESS IS <br />OCCUPIED. THE MEANS OF EGRESS ILLUMINATION LEVEL SHALL NOT BE LESS THAN 1-FOOT CANDLEAT THE WALKING SURFACE. THE POWER SUPPLY FOR MEANS OF <br />EGRESS ILLUMINATIONSHALL NORMALLY BE PROVIDED BY THE PREMISES ELECTRICAL SUPPLY. IN THE EVENT OF POWER SUPPLY FAILURE, AN EMERGENCY <br />ELECTRICAL SYSTEM SHALL AUTOMATICALLY ILLUMINATE PATHS OF EGRESS. THE EMERGENCY POWER SYSTEM SHALL PROVIDE POWER FOR A DURATION OF NOT <br />LESS THAN 90 MINUTES. THE INSTALLATION OF THE EMERGENCY POWER SYSTEM SHALL BE IN ACCORDANCE WITH SECTION 2702. EMERGENCY LIGHTING FACILITIES <br />SHALL BE ARRANGED TO PROVIDE INITIAL ILLUMINATION THAT IS AT LEAST AN AVERAGE OF 1 FOOT-CANDLE (11 LUX) AND A MINIMUM AT ANY POINT OF 0.1 <br />FOOT-CANDLE (1 LUX) MEASURED ALONG THE PATH OF EGRESS AT FLOOR LEVEL. ILLUMINATION LEVELS SHALL BE PERMITTED TO DECLINE TO 0.6 FOOT-CANDLE (6 <br />LUX) AVERAGE AND A MINIMUM AT ANY POINT OF 0.06 FOOT-CANDLE (0.6 LUX) AT THE END OF THE EMERGENCY LIGHTING TIME DURATION. A <br />MAXIMUM-TO-MINIMUM ILLUMINATION UNIFORMITY RATIO OF 40 TO 1 SHALL NOT BE EXCEEDED. <br />24. IF NEW HVAC SYSTEM IS USED DURING CONSTRUCTION, USE RETURN AIR FILTERS WITH A MERV OF 8. REPLACE ALL FILTERS IMMEDIATELY PRIOR TO OCCUPANCY. <br />(CGBC 5.504.1.3) <br />2. ALL NEW DOORS SHALL COMPLY WITH CBC 1008 AND 11B-302. DOOR HARDWARE SHALL BE LEVER OR PUSH TYPE, MOUNTED 34" TO 44" ABOVE THE FLOOR, PER CBC SEC. 11B-404.2.7. ALL DOORS SHALL <br />BE 3'-0" WIDE MIN. <br />3. MAXIMUM EFFORT TO OPERATE DOORS SHALL NOT EXCEED 5 POUNDS FOR EXTERIOR DOORS AND 5 POUNDS FOR INTERIOR DOORS. SUCH PUSH OR PULL EFFORT SHALL BE APPLIED AT RIGHT ANGLES TO <br />HINGED DOORS. AT REQUIRED FIRE DOORS, MAX. OPERATING EFFORT MAY BE INCREASED TO 15 LBS. <br />4. PER CBC 11B-302 AND 11B-404.2.5, REGARDLESS OF THE OCCUPANT LOAD, THERE SHALL BE A LEVEL FLOOR OR LANDING ON EACH SIDE OF THE DOOR. THE FLOOR OR LANDING SHALL NOT BE MORE <br />THAN 1/2" LOWER THAN THE THRESHOLD OR THE DOORWAY. <br />5. THE LOWER 10" OF ALL DOORS SHALL BE SMOOTH AND UNINTERRUPTED TO ALLOW THE DOOR TO BE OPENED BY A WHEELCHAIR FOOTREST WITHOUT CREATING A TRAP OR HAZARDOUS <br />CONDITION. NARROW FRAME DOORS MAY USE A 10" HIGH SMOOTH PANEL ON THE PUSH SIDE OF THE DOOR. <br />6. NEW ACCESSIBLE RESTROOMS WILL BE PROVIDED IN THE SUITE: <br />7. WATER-CLOSET / FAUCET CONTROLS SHALL BE OPERABLE WITH ONE HAND AND DO NOT REQUIRE TIGHT GRASPING. PINCHING OR TWISTING OF THE WRIST. <br />8. LAVATORIES SHALL COMPLY WITH THE FOLLOWING: <br />a) A MINIMUM OF 30" x 48" CLEAR SPACE IS PROVIDED IN FRONT OF THE LAVATORY . <br />b) THE CLEAR SPACE BENEATH LAVATORIES IS A MINIMUM OF 29" HIGH x 30" WIDE x 8" DEEP AT THE TOP AND 9" HIGH x 30" WIDE x 17" DEEP AT THE BOTTOM. THE MAXIMUM HEIGHT OF THE BASIN / <br />COUNTER TOP IS 34" HEIGHT MAX. <br />c) ALL HOT WATER AND DRAIN PIPES UNDER THE LAVATORY ARE INSULATED. <br />d) FAUCET CONTROLS HAVE AN OPERATING FORCE OF NOT GREATER THAN 5 POUNDS. <br />9. FLOORS ARE TO BE SLIP-RESISTANT. <br />10. GRAB BARS SHALL BE PROVIDED. FASTENERS AND MOUNTING SUPPORT MUST BE ABLE TO WITHSTAND 250 POUNDS POINT LOAD BEARING SHEAR AND TORSION. <br />11. DOORS TO THE TOILET ROOMS SHALL BE IDENTIFIED BY A 12" X 1/4" THICK SIGN WITH ETCHED UNISEX SYMBOL: 12" DIAMETER CIRCULAR WITH EQUALITERAL TRIANGLE VERTEX POINTING UP. <br />SANITARY FACILITIES <br />SITE ACCESS <br />1. ACCESSIBLE SIGNAGE SHALL BE PROVIDED AT ALL NEW TOILET FACILITIES AND EXITS. SEE SIGNAGE SCHEDULE. SIGNS TO HAVE RAISED LETTERS PLUS BRAILLE, AND ARE TO BE INSTALLED 48" MIN. TO <br />60" MAX. AFF, ADJACENT TO LATCH SIDE OF DOOR. <br />ACCESSIBILITY NOTES <br />GENERAL ACCESSIBILITY <br />DOORS <br />1. THE BUILDING AND SITE ARE EXISTING AND ARE FULLY ACCESSIBLE <br />2. PRIMARY ENTRANCES TO THE BUILDING ARE ON AN ACCESSIBLE ROUTE. GROUND SURFACES ALONG THIS ROUTE, INCLUDING CURB RAMPS, ARE ON AN ACCESSIBLE ROUTE. <br />3. ACCESSIBLE PARKING SPACES, INCLUDING VAN SPACES ARE PROVIDED, LOCATED ON SITE AT THE PARKING LOT SERVING THIS BUILDING. ACCESSIBLE SPACES COMPLY IN REGARD TO QUANTITY, <br />SPACE, STRIPING AND SIGNAGE, WITH EXISTING CURB RAMPS. <br />4. PROVIDE TEXT "MIN. FINE $250.00" ON SIGNS AT STALLS (MIN. 1" HIGH LETTERS AND A PERMANENT PART OF THE SIGN). ENSURE SIGN MIN. 6'-8" A.F.F. <br />5. ACCESS AISLES SHALL BE PAINTED PER 11B-502.3. <br />6. STRIPING: PERIMETER SHALL BE BLUE COLOR (105090) PER FED. STD. 595B AND CROSSHATCHING TO BE WHITE. <br />7. DOORS ALONG PEDESTRIAN PATH OF TRAVEL ARE REQUIRED TO MEET ALL REQUIREMENTS FOR EXITS DOORS, AS FOLLOWS: <br />A. 36"-48" LEAF WIDTH <br />B. WHERE PANIC HARDWARE IS USED, MOUNT ABOVE 36" A.F.F. OR SHOW MIN. 32" CLEAR WIDTH WHEN GATE IS OPEN 90 DEGREES. <br />C. MAX. 5LB. OPERATING PRESSURE <br />D. BOTTOM 10" OF DOORS TO BE SMOOTH FROM SIDE TO SIDE <br />E. LEVER OR ACCESSIBLE PULL FROM PULL SIDE OF DOOR <br />F. REQUIRED MANEUVERING CLEARANCES PER FIG. 11B-404.2.4.1 <br />G. MIN. HEADROOM 6'-8" <br />H. NO CANE BOLTS OR PADLOCKS ON DOORS WITH PANIC HARDWARE <br />FIRE DEPT. NOTES <br />1. BUILDINGS UNDERGOING CONSTRUCTION, ALTERATION OR DEMOLITION SHALL BE IN ACCORDANCE WITH CFC ARTICLE 87 (CFC 8701) AND CFC CHAPTER 33. <br />WELDING, CUTTING, AND OTHER HOT WORK SHALL BE IN CONFORMANCE WITH CHC CAPTER 35. <br />2. AT LEAST ONE FIRE EXTINGUISHER WITH A MINIMUM RATING OF 2-A-10B:C SHALL BE PROVIDED WITHIN 75 FEET MAXIMUM TRAVEL DISTANCE FOR EACH 6,000 <br />SQUARE FEET OR PORTION THEREOF ON EACH FLOOR. (CFC 1002, CFC STANDARD 10-1, CAL. CODE REGS., TIT. 19, 3.29) <br />3. COMPLETE PLANS AND SPECIFICATIONS FOR FIRE ALARM SYSTEMS (IF INSTALLED) AND OTHER FIRE-PROTECTION SYSTEMS AND APPURTENANCES THERETO SHALL <br />BE SUBMITTED TO FIRE AND LIFE SAFETY FOR REVIEW AND APPROVAL PRIOR TO INSTALLATION. (CFC 1001.3) <br />4. DURING CONSTRUCTION, AT LEAST ONE EXTINGUISHER SHALL BE PROVIDED ON EACH FLOOR LEVEL AT EACH STAIRWAY, IN ALL STORAGE AND CONSTRUCTION <br />SHEDS, IN LOCATIONS WHERE FLAMMABLE OR COMBUSTIBLE LIQUIDS ARE STORED OR USED, AND WHERE OTHER SPECIAL HAZARDS ARE PRESENT PER CFC SECTION <br />3315.1. <br />5. ADDRESS IDENTIFICATION SHALL BE PROVIDED FOR ALL NEW AND EXISTING BUILDINGS IN A LOCATION THAT IS PLAINLY VISIBLE AND LEGIBLE FROM THE STREET OR <br />ROAD FRONTING THE PROPERTY. WHERE ACCESS IS BY WAY OF A PRIVATE ROAD AND THE BUILDING ADDRESS CANNOT BE VIEWED FROM THE PUBLIC WAY, AN <br />APPROVED SIGN OR MEANS SHALL BE USED TO IDENTIFY THE STRUCTURE. PREMISES IDENTIFICATION SHALL CONFORM TO CBC SECTION 501.2. <br />6. WALL, FLOOR AND CEILING FINISHES AND MATERIALS SHALL NOT EXCEED THE INTERIOR FINISH CLASSIFICATIONS IN CBC SECTION 803.1 AND TABLE 803.11 AND <br />SHALL MEET THE FLAME PROPAGATION PERFORMANCE CRITERIA OF THE CALIFORNIA CODE OF REGULATIONS, TITLE 19, DIVISION 1. DECORATIVE MATERIALS SHALL <br />BE PROPERLY TREATED BY A PRODUCT OR PROCESS APPROVED BY THE STATE FIRE MARSHAL WITH APPROPRIATE DOCUMENTATION PROVIDED TO THE CITY. <br />I. INTERIOR EXIT STAIRWAYS, RAMPS, AND PASSAGEWAYS: CLASS B <br />II. CORRIDORS AND ENCLOSURE EXIT ACCESS STAIRWAYS/RAMPS: CLASS C <br />III. ROOMS AND ENCLOSED SPACES: CLASS C <br />7. DUMPSTERS AND TRASH CONTAINERS EXCEEDING 1.5 CUBIC YARDS SHALL NOT BE STORED IN BUILDINGS OR PLACED WITHIN 5 FEET OF COMBUSTIBLE WALLS, <br />OPENINGS OR COMBUSTIBLE ROOF EAVE LINES UNLESS PROTECTED BY AN APPROVED SPRINKLER SYSTEM OR LOACTED IN A TYPE 1 OR 2A STRUCTURE SEPARATED <br />BY 10 FEET FROM OTHER STRUCTURES. CONTAINERS LARGER THAN 1 CUBIC YARD SHALL BE OF NON- OR LIMITED-COMBUSTIBLE MATERIALS OR SIMILARLY <br />PROTECTED OR SEPARATED. CFC 304.3. <br />8. EXITS, EXIT SIGNS, FIRE ALARM PANELS, HOSE CABINETS, FIRE EXTINGUISHER LOCATIONS, AND STANDPIPE CONNECTIONS SHALL NOT BE CONCEALED BY <br />CURTAINS, MIRRORS, OR OTHER DECORATIVE MATERIAL. <br />9. OPEN FLAMES, FIRE, AND BURNING ON ALL PREMISES IS PROHIBITED EXCEPT AS SPECIFICALLY PERMITTED BY THE CITY OF LOS ANGELES AND CFC 308. <br />10. THE EGRESS PATH SHALL REMAIN FREE AND CLEAR OF ALL OBSTRUCTIONS AT ALL TIMES. NO STORAGE IS PERMITTED IN ANY EGRESS PATHS. <br />11. STORAGE, DISPENSING, OR USE OF HAZARDOUS MATERIALS SHALL COMPLY WITH CBC SECTION 414 AND CFC REGULATIONS. THE STORAGE AND USE OF <br />HAZARDOUS MATERIALS SHALL BE REVIEWED AND APPROVED BY THE CITY PRIOR TO SUCH MATERIALS BEING BROUGHT ON SITE. <br />12. LOCATIONS AND CLASSIFICATIONS OF EXTINGUISHERS SHALL BE IN ACCORDANCE WITH CFC 906 AND CALIFORNIA CODE OF REGULATIONS (CCR), TITLE 19. <br />13. THIS BUIDING MUST BE EQUIPPED WITH AN AUTOMATIC FIRE EXTINGUISHER SYSTEM, COMPYING WITH NFPA-13. SPRINKLER SYSTEM SHALL BE APPROVED PRIOR TO <br />INSTALLATION. (PER CBC 903.2) <br />14. PER NFPA 99 SECTION 4.2 AND 4.2.2.1 RISK ASSESSMENT: THIS IS A CATEGORY 1 SYSTEM FACILITY. <br />(CBC ACCESSIBILITY STANDARDS SHALL TAKE PRECEDENCE) <br />PER 2022 CPC 422.2 EXCEPTION 3, ANY BUSINESS OR MERCANTILE WITH <br />OCCUPANT LOAD OF 50 OR LESS IS ALLOWED TO HAVE 1 ALL GENDER <br />RESTROOM. WE HAVE PROVIDED 3 FULLY ACCESSIBLE ALL GENDER RESTROOMS <br />IN THIS SUITE. <br />PER CPC 415: DRINKING FOUNTAINS SHALL NOT BE REQUIRED FOR AN <br />OCCUPANT LOAD OF 30 OR LESS. <br />ABBREVIATIONS <br />Dr. Beshai ASC <br />NEW AMBULATORY CARE FACILITY TENANT IMPROVEMENT <br />KEY PLAN <br />SITE LOCATION MAP <br />N <br />FOR EXISTING SITE ACCESSIBILITY CONFORMANCE & ACTUAL SITE CONDITIONS, SEE SHEET A-0.1 <br />FOR SITE ACCESSIBILITY CONFORMANCE DETAILS, SEE SHEET A-7.0 <br />1. CARRY OUT ALL DEMOLITION WORK INDICATED IN ACCORDANCE WITH STATE AND LOCAL CODES. <br />2. REMOVE ALL DEBRIS FROM SITE AS WORK PROCEEDS AND DISPOSE OF AS PER CODE AND THE BUILDING MANAGEMENT <br />REQUIREMENTS. INFORM ARCHITECT IMMEDIATELY IF ANY HAZARDOUS MATERIALS ARE ENCOUNTERED. <br />3. PROVIDE TEMPORARY BARRICADES AND PROTECT EXISTING FINISHES IN PLACE. <br />4. 65% OF CONSTRUCTION WASTE SHALL BE RECYCLED AND/OR SALVAGED FOR REUSE PER 2022 CBGSC 5.408 <br />DEMOLITION NOTES <br />COMPLY WITH REQUIREMENTS OF SEC. 5.408 CGBSC FOR MIN. 75% <br />OF NON-HAZARDOUS CONSTRUCTION AND DEMOLITION WASTE <br />DIVERSION. DOCUMENTATION OF COMPLIANCE IS REQUIRED. <br />AB Anchor Bolt <br />AFF Above Finished Floor <br />AGG Aggregate <br />ALT Alternative <br />ALUM Aluminum <br />ANOD Anodized <br />ARCH Architect <br />ASPH Asphalt <br />BD Board <br />BIT Bitumen <br />BLDG Building <br />BLK Block <br />BLKG Blocking <br />BM Beam <br />B M Benchmark <br />BOT Bottom <br />BTWN Between <br />BUR Built-up Roofing <br />CHAN Channel <br />CI Cast Iron <br />CLG Ceiling <br />CMU Concrete Masonry Unit <br />COL Column <br />CONST Construction <br />CONT Continuous <br />CONTR Contractor <br />CPT Carpet <br />CS Countersunk <br />CT Ceramic Tile <br />DBL Double <br />DET Detail <br />DIFF Diffuser <br />DIM Dimension <br />DN Down <br />DPM Damp-Proof Membrane <br />DR Door <br />DS Downspout <br />DWG Drawing <br />E Existing <br />EA Each <br />ELEV Elevation <br />ELEC Electrical <br />EMER Emergency <br />EML Expanded Metal Lath <br />EQ Equal <br />EQUIP Equipment <br />EXP Expansion <br />EXT Exterior <br />FAI Fresh Air Inlet <br />FD Floor Drain <br />FDN Foundation <br />FIN Finish(ed) <br />FLR Floor <br />FLUOR Fluorescent <br />FO Finished opening <br />FOF Face of Finish <br />FOS Face of Stud <br />FTG Footing <br />FR Fire Resistant <br />GA Gauge <br />GALV Galvanized <br />GC General Contractor <br />GFRC Glass Fiber Reinforced Concrete <br />GL Glass <br />GMMU Glass Mesh Mortar Unit <br />GYP Gypsum <br />HB Hose Bib <br />HC Hollow Core <br />HDCP Handicapped <br />HDWR Hardware <br />HM Hollow Metal <br />HORIZ Horizontal <br />HR Hour HT Height <br />HTG Heating <br />HVAC Heating Vent & Air Conditioning <br />ID Inside Diameter <br />INSUL Insulation <br />INT Interior <br />INV Invert <br />JAN Janitor <br />JST Joist <br />JNT Joint <br />LAM Laminated <br />LAV Lavatory <br />LHS Left Hand Side <br />LL Live Load <br />LTWT Lightweight <br />MATL Material <br />MAX Maximum <br />MECH Mechanical <br />MANUF Manufacturer <br />MDF Medium Density Fiberboard <br />MH Manhole <br />MIN Minimum <br />MISC Miscellaneous <br />MTL Metal <br />N North <br />NIC Not In Contract <br />NOM Nominal <br />NTS Not To Scale <br />NR Non-rated <br />OC On Center <br />OD Overflow Drain/ Outside Diameter <br />OPNG Opening <br />OPP Opposite <br />OSB Oriented Strand Board <br />OVHD Overhead PC Precast Concrete <br />PL Plate <br />P LAM Plastic Laminate <br />PLYWD <br />Plywood <br />PNL Panel <br />PR Pair <br />PSF Pounds per Square Foot <br />PSI Pounds per Square Inch <br />PT Post Tensioned <br />QT Quarry Tile <br />QTY Quantity <br />R Radius <br />RA Return Air <br />RD Roof Drain <br />RE: Refer/ Reference <br />REFL Reflected <br />REINF Reinforcing <br />REQ'D Required <br />RET Retaining <br />REV Revision <br />RF Roof <br />RHS Right Hand Side <br />RM Room <br />RO Rough Opening <br />SB Splash Block <br />SC Solid Core <br />SD Storm Drain <br />SECT Section <br />SIM Similar <br />SHTG Sheathing <br />SPECS Specifications <br />SS Stainless Steel <br />STD Standard <br />STL Steel <br />STRUC Structural <br />SUSP Suspended <br />T & G Tongue and Groove <br />TEL Telephone <br />TEMP Tempered <br />TJ Tooled Joint <br />TOC Top of Concrete <br />TOM Top of Masonry <br />TOS Top of Steel <br />TOW Top of Wall <br />T-STAT Thermostat <br />TRANSF Transformer <br />TYP Typical <br />U/S Underside <br />VT Vinyl Tile <br />VB Vapor Barrier <br />VERT Vertical <br />VIF Verify In Field <br />VWC Vinyl Wall Covering <br />W/ With <br />W/O Without <br />WC Water Closet <br />WD Wood <br />WH Water Heater <br />WP Waterproofing <br />WWF Welded Wire Fabric <br />THE SITE <br />EXISTING BLDG. <br />SHEET INDEX <br />A-0.0 COVER SHEET <br />A-0.1 SITE PLAN <br />A-1.0 FLOOR PLAN <br />A-1.1 DIMENSION PLAN <br />A-1.2 DEMOLITION PLAN <br />A-1.3 EQUIPMENT PLAN <br />A-1.4 FINISH PLAN <br />A-2.0 REFLECTED CEILING PLAN <br />A-3.0 CABINET/INTERIOR ELEVATIONS <br />A-3.1 CABINET/INTERIOR ELEVATIONS <br />A-3.2 RESTROOM ELEVATIONS <br />A-3.3 ROOF PARAPET ELEVATION <br />A-4.0 SCHEDULES <br />A-5.0 SPECIFICATIONS <br />A-6.0 DETAILS <br />A-6.1 DETAILS <br />A-6.2 DETAILS <br />A-7.0 ACCESSIBILITY DETAILS <br />E-1.0 GEN. NOTES, LEGEND <br />E-1.1 SINGLE LINE DIAGRAM <br />E-1.2 PANEL SCHEDULES <br />E-1.3 PANEL SCHEDULES <br />E-1.4 PANEL SCHEDULES <br />E-1.5 LT. FIXTURE SCHED'S CONTROLS <br />E-1.6 PANEL SCHEDULES <br />E-2.0 ELECTRICAL PLANS <br />E-3.0 ELECTRICAL PLANS <br />E-4.0 LIGHTING TITLE 24 <br />E-4.1 LIGHTING TITLE 24 <br />E-4.2 LIGHTING TITLE 24 <br />E-4.3 LIGHTING TITLE 24 <br />M-1.0 GEN. NOTES, LEGEND <br />M-1.1 MECH. SPECS. AIR BALANCE <br />M-1.2 DUCT, AIR DISTRIBUTION DETAILS <br />M-1.3 SCHED'S TALBES, DIAG., DETAILS <br />M-2.0 MECHANICAL PLAN <br />M-3.0 DETAILS <br />M-3.1 DETAILS <br />M-4.0 MECHANICAL TITLE 24 <br />M-4.1 MECHANICAL TITLE 24 <br />P-1.0 GEN, NOTES, LEGENDS <br />P-1.1 PLUMBING FIXT. <br />P-1.2 PLUMBING RISER DIAGRAM <br />P-2.0 PLUMBING PLAN <br />P-3.0 PLUMBING PLAN <br />P-4.0 DETAILS <br />P-4.1 DETAILS <br />P-4.2 DETAILS <br />P-5.0 PLUMBING TITLE 24 <br />P-5.1 PLUMBING TITLE 24 <br />P-5.2 PLUMBING TITLE 24 <br />MG-1.0 GENERAL NOTES <br />MG-2.0 MED GAS PIPING PLAN <br />MG-2.1 MED GAS PIPING PLAN <br />MG-3.0 NFPA 99 NOTES <br />MG-4.0 NFPA 99 NOTES <br />MG-5.0 DETAILS <br />MG-5.1 DETAILS <br />MG-5.2 DETAILS <br />MG-5.3 DETAILS <br />MG-5.4 DETAILS <br />A BUILDING REVIEW <br />REVISIONS 11-21-24 <br />Bldg #101121099-100 <br />Elect #20184195-96 <br />Plumb #30147872-72 <br />Mech #40139593-94 <br /> <br />APPROVALS: <br />PLNG - C. Santana <br />BLDG - T. Le <br />POLICE - B. Martin <br />PUBLIC WORKS - Y. Soto <br />ELECT - M. Smith <br />PLUMB/MECH - T. Luka <br />2010 E First St Units #200 <br />& 2102/19/2025