Laserfiche WebLink
SHEET INDEX <br />·NEW COMMERCIAL BUILDING. <br />·PROVIDE NEW HVAC UNITS AND REUSE THE EXISTING HVAC UNITS. <br />·PROVIDE DUCTWORKS AND AIR DEVICES THROUGHOUT THE SPACE. <br />M000 <br />M001 <br />M002 <br />M100 <br />M101 <br />TM00 <br />MECHANICAL NOTES <br />MECHANICAL SCHEDULES <br />MECHANICAL DETAILS <br />MECHANICAL PLAN - 2ND FLOOR <br />MECHANICAL TITLE 24 - 1 <br />M102 MECHANICAL PLAN - CONDENSATE PIPE 1ST FLOOR <br />TM01 <br />TM02 <br />MECHANICAL PLAN - 1ST FLOOR <br />M103 <br />TM03 <br />MECHANICAL PLAN - CONDENSATE PIPE 2ND FLOOR <br />MECHANICAL TITLE 24 - 2 <br />MECHANICAL TITLE 24 - 3 <br />MECHANICAL TITLE 24 - 4 <br />SYMBOLS AND ABBREVIATIONS <br />T <br />RETURN AIR PLENUM CROSS-SECTION <br />SUPPLY AIR PLENUM CROSS-SECTION <br />EXHAUST AIR <br />CUBIC FEET PER MINUTE <br />EXTERNAL STATIC PRESSURE <br />SIDE WALL RETURN GRILLE <br />THERMOSTAT <br />SUPPLY DIFFUSER <br />SIDE WALL SUPPLY REGISTER <br />RETURN AIR GRILLE <br />EXHAUST AIR GRILLE / CEILING EXHAUST FAN <br />ESP <br />CFM <br />EA <br />EXISTING <br />FIRE DAMPER <br />HORSEPOWER <br />HERTZ <br />RETURN AIR <br />TYPICAL <br />SUPPLY AIR <br />MANUAL VOLUME DAMPER <br />OUTSIDE SUPPLY AIR <br />SMOKE DETECTOR <br />STATIC PRESSURE <br />FULL LOAD AMPERES <br />VOLT <br />UNDERCUT DOOR <br />UP THRU ROOF <br />MVD <br />V <br />TYP <br />U.T.R. <br />SD <br />SA <br />SP <br />RA <br />OSA <br />FLA <br />HP <br />HZ <br />EXIST <br />FD <br />SD NOTE: <br />REFER TO PLAN <br />SHEETS FOR ANY <br />ADDITIONAL <br />LEGEND, <br />SYMBOLS AND <br />RELATED <br />ABBREVIATIONS. <br />D <br />U <br />S SENSOR <br />EF <br />(E) <br />ROOF MOUNTED EXHAUST FAN <br />NEWNEW(N) <br />U/C <br />CO2 SENSORCO2 <br />1 <br />RTU MECHANICAL EQUIPMENT TAG <br />POC <br />NEW DUCT <br />EXISTING DUCT <br />CONDENSATE DRAINCD <br />REFRIGERANT LINEREF <br />OSA INTAKE <br />OSA DUCTOSA <br />FD <br />CO SENSORCO <br />FIRE SMOKE DAMPERFSDFSD <br />ABBR.SYMBOL DESCRIPTION <br />CONDENSATE DRAIN CLEANOUT <br />HVAC SPECIFICATIONS <br />PIPE INSULATION THICKNESS <br />4. <br />5. <br />6. <br />1. <br />7. <br />2. <br />3. <br />CONCEALED SPACES, CIRCULATION AIR <br />INSULATION OF DUCTS <br />FLUID <br />TEMP. <br />RANGE <br />(°F) <br />CONDUCTIVITY <br />RANGE <br />(BTU-"/HR PER <br />SQFT/°F) <br />INSULATION <br />MEAN <br />RATING <br />TEMP. (°F) <br />NOMINAL PIPE DIAMETER (") <br />INSULATION THICKNESS REQUIRED (") <br /><1 1 TO <br /><1.5 <br />1.5 TO <br /><4 <br />4 TO <8 8 AND <br />LARGER <br />251-350 <br />350< <br />201-250 <br />141-200 <br />105-140 <br />40-60 <br /><40 <br />SPACE COOLING SYSTEMS (CHILLED WATER, REFRIGERANT AND BRINE) <br />SPACE HEATING, HOT WATER SYSTEMS AND SERVICE WATER HEATING SYSTEMS <br />0.32-0.34 <br />0.29-0.31 <br />0.27-0.30 <br />0.25-0.29 <br />0.22-0.28 <br />0.21-0.27 <br />0.20-0.26 <br />250 <br />200 <br />150 <br />125 <br />100 <br />75 <br />50 <br />4.5 <br />3.0 <br />2.5 <br />1.5 <br />1.0 <br />1.0 <br />5.0 <br />4.0 <br />2.5 <br />1.5 <br />1.5 <br />1.5 <br />5.0 <br />4.5 <br />2.5 <br />2.0 <br />1.5 <br />1.5 <br />5.0 <br />4.5 <br />3.0 <br />2.0 <br />1.5 <br />1.5 <br />5.0 <br />4.5 <br />3.0 <br />2.0 <br />1.5 <br />1.5 <br />A MAINTENANCE LABEL SHALL BE AFFIXED TO MECHANICAL EQUIPMENT AND <br />A MAINTENANCE MANUAL SHALL BE PROVIDED TO THE OWNER PER <br />STANDARDS. <br />EXCEPT AS ALLOWED, THESE CONTROLS SHALL BE ADJUSTABLE TO <br />PROVIDE A DEAD BAND OF 5 DEGREES F BETWEEN FULL HEATING AND FULL <br />COOLING. CONTROLS SHALL HAVE THE CAPABILITY OF TERMINATING ALL <br />HEATING AT A TEMPERATURE NO MORE THAN 70 DEGREES F AND OF <br />TERMINATING ALL COOLING AT A TEMPERATURE NOT LESS THAN 78 <br />DEGREES F. <br />EACH HVAC SYSTEM SHALL BE PROVIDED WITH AT LEAST ONE AUTOMATIC <br />TEMPERATURE CONTROL DEVICE FOR THE REGULATION OF TEMPERATURE <br />THESE AUTOMATIC TEMPERATURE CONTROL DEVICES SHALL BE CAPABLE <br />OF BEING SET TO MAINTAIN SPACE TEMPERATURE SET POINTS FROM 55 <br />DEGREES F TO 85 DEGREES F, SHALL BE CAPABLE OF OPERATING THE <br />SYSTEM HEATING AND/OR COOLING IN SEQUENCE. <br />EXCEPTIONS: <br />(1)FACTORY-INSTALLED PIPING WITHIN SPACE CONDITIONING EQUIPMENT; <br />(2)PIPING THAT CONVEYS FLUIDS THAT HAVE A DESIGN OPERATING <br />TEMPERATURE RANGE BETWEEN 60 DEGREES AND 105 DEGREES <br />FAHRENHEIT; <br />(3)WHERE THE HEAT GAIN OR HEAT LOSS TO OR FROM PIPING WITHOUT <br />INSULATION WILL NOT INCREASE BUILDING SOURCE ENERGY USE; <br />(4)PIPING THAT PENETRATES FRAMING MEMBERS SHALL NOT BE <br />REQUIRED TO HAVE PIPE INSULATION FOR THE DISTANCE OF THE <br />FRAMING PENETRATION. METAL PIPING THAT PENETRATES METAL <br />FRAMING SHALL USE GROMMETS, PLUGS, WRAPPING OR OTHER <br />INSULATING MATERIAL TO ASSURE THAT NO CONTACT IS MADE WITH <br />THE METAL FRAMING. <br />INSPECTION TO BE MADE AND DUCTWORK APPROVED BEFORE COVERING <br />WITH INSULATION. <br />TRANSVERSE SUPPLY DUCTS, TAPED OR SEALED WITH MASTIC EXCEPT FOR <br />DUCTS EXPOSED TO CONDITIONED SPACE, WHERE DUCT STATIC PRESSURE <br />EXCEEDS 3/4" WATER, LONGTITUDINAL JOINTS, TAPED OR SEALED WITH <br />MASTIC. <br />SEALING <br />INSPECTION <br />PIPE INSULATION <br />SPACE-CONDITIONING AND SERVICE WATER-HEATING SYSTEM SHALL BE <br />INSULATED IN ACCORDANCE WITH THE FOLLOWING TABLE: <br />INSULATED WIRES, PLASTIC TUBING OR PIPING, PIPE INSULATION, <br />CONDENSATE PAN INSULATION, WOOD, PVC, ABS AND OTHER PLASTICS) TO <br />BE IN CONCEALED SPACES USED TO CONVEY CIRCULATING AIR SUPPLY. <br />WHEN COMBUSTIBLE MATERIAL IS TO BE LOCATED IN THE ABOVE SPACES, IT <br />SHALL BE APPROVED FOR SUCH INSULATION. <br />TEMPERATURE CONTROLS <br />PORTIONS OF SUPPLY-AIR AND RETURN-AIR DUCTS CONVEYING HEATED OR <br />COOLED AIR LOCATED IN ONE OR MORE OF THE FOLLOWING SPACES SHALL <br />BE INSULATED TO A MINIMUM INSTALLED LEVEL OF R-8: <br />1.OUTDOORS; OR <br />2.IN A SPACE BETWEEN THE ROOF AND AN INSULATED CEILING; OR <br />3.IN A SPACE DIRECTLY UNDER A ROOF WITH FIXED VENTS OR <br />OPENINGS TO THE OUTSIDE OR UNCONDITIONED SPACES; OR <br />4.IN AN UNCONDITIONED CRAWL SPACE; OR <br />5.IN OTHER UNCONDITIONED SPACES. <br />PORTIONS OF SUPPLY-AIR DUCTS THAT ARE NOT IN ONE OF THESE SPACES, <br />INCLUDING DUCTS BURIED IN CONCRETE SLAB, SHALL BE INSULATED TO A <br />MINIMUM INSTALLED LEVEL OF R-4.2 OR BE ENCLOSED IN DIRECTLY <br />CONDITIONED SPACE. <br />NONRES 0.5 <br />RES 0.75 <br />1.01.0 1.0 <br />1.ALL WORK SHALL CONFORM TO MECHANICAL CODE, BUILDING CODE AND <br />ALL OTHER APPLICABLE CITY CODES AND REGULATIONS. <br />2.THE CONTRACTOR SHALL PAY FOR ALL PERMITS AND FEES. <br />3.CONTROL LOW VOLTAGE WIRING BY MECHANICAL CONTRACTOR AND <br />CONDUIT BY ELECTRICAL CONTRACTOR. <br />4.CONDENSATE DRAIN PIPING AND FINAL CONNECTION TO UNIT BY PLUMBING <br />CONTRACTOR. <br />5.G.C. TO VERIFY CURRENT ELECTRICAL POWER CONDITION IN FIELD BEFORE <br />PURCHASING ANY MECHANICAL EQUIPMENT. <br />6.CONTRACTOR TO VERIFY MECHANICAL HEATING EQUIPMENT TO BE <br />CONFORM TO LOCAL EPA STANDARD BEFORE PURCHASING EQUIPMENT. <br />7.ACCURATE AS-BUILT DRAWINGS SHALL BE MADE DURING CONSTRUCTION <br />AND SUBMITTED FOR APPROVAL UPON COMPLETION OF INSTALLATION. <br />8.THE CONTRACTOR SHALL COORDINATE WITH GENERAL CONTRACTOR FOR <br />SIZE AND LOCATION OF DUCTWORK ROOF OPENINGS AND WITH ELECTRICAL <br />CONTRACTOR FOR ELECTRICAL REQUIREMENTS OF ALL MECHANICAL <br />EQUIPMENT AND ARCHITECTURAL DRAWINGS FOR AIR DISTRIBUTION <br />LOCATION. <br />9.THE CONTRACTOR SHALL SUBMIT BID BASED ON THE DRAWINGS AND <br />ALTERNATE FOR COST SAVING. THESE DRAWINGS ARE FOR BIDDING <br />PURPOSES. <br />10.THE CONTRACTOR SHALL FURNISH ALL MATERIALS, LABOR, EQUIPMENT, <br />TRANSPORTATION AND SERVICES NECESSARY FOR COMPLETION OF THE <br />WORK. ALL MATERIALS AND WORK SHALL COMPLY WITH APPLICABLE <br />CODES AND GOVERNING REGULATIONS AND MEET THE APPROVAL OF THE <br />LOCAL JURISDICTION. <br />11.TAKE ALL PRECAUTIONS NECESSARY TO PROTECT THE MATERIALS BEFORE, <br />DURING AND AFTER INSTALLATION. IN THE EVENT OF DAMAGE, <br />IMMEDIATELY REPAIR ALL DAMAGED AND DEFECTIVE WORK TO THE <br />APPROVAL OF THE ARCHITECT AT NO ADDITIONAL COST TO THE OWNER. <br />12.THESE DRAWINGS ARE DIAGRAMMATIC. THE CONTRACTOR SHALL BE <br />RESPONSIBLE FOR COORDINATING HIS WORK WITH ALL OTHER TRADES. <br />THIS INCLUDES COORDINATING THE LOCATION AND SIZE OF ALL OPENINGS, <br />LOCATIONS OF EQUIPMENT PADS AND CHANGES OF ELEVATIONS OF <br />DUCTWORK, PIPING AND OTHER EQUIPMENT. <br />13.ANY MATERIAL, ARTICLE OR PIECE OF EQUIPMENT OTHER THAN THAT <br />INDICATED SHALL NOT BE USED UNLESS APPROVED IN WRITING BY THE <br />ENGINEER AND ANY CHANGES IN MECHANICAL, ELECTRICAL AND/OR OTHER <br />SYSTEMS REQUIRED DUE TO SUCH SUBSTITUTION SHALL BE THE <br />RESPONSIBILITY OF THE HVAC CONTRACTOR; AND AT NO ADDITIONAL COST <br />TO THE OWNER. <br />14.THE CONTRACTOR SHALL VISIT SITE PRIOR TO BIDDING TO VERIFY <br />LOCATIONS AND SIZES OF ALL EXISTING EQUIPMENT AND INFORM THE <br />ARCHITECT AND ENGINEER OF ANY DISCREPANCIES. <br />15.CONTRACTOR TO VERIFY ADEQUATE PLUMBING CONNECTIONS ARE <br />READILY AVAILABLE FOR EVAPORATIVE COOLERS AND GAS HEATING <br />SYSTEMS BEFORE PURCHASING EQUIPMENT. <br />16.COORDINATE ENTIRE INSTALLATION OF THE H.V.A.C. SYSTEM WITH THE <br />WORK OF ALL OTHER TRADES PRIOR TO ANY FABRICATION OR <br />INSTALLATION. PROVIDE ALL FITTINGS, OFFSETS, AND TRANSITIONS AS <br />REQUIRED FOR A COMPLETE WORKABLE INSTALLATION. <br />17.CONTRACTOR SHALL SUBMIT A COMPLETE BALANCE REPORT FOR <br />APPROVAL. SYSTEMS AIR BALANCE SHALL BE PERFORMED BY AN <br />INDEPENDENT AIR BALANCE CONSULTANT. A CERTIFIED AABC OR NEBB. <br />THE REPORT SHALL INCLUDE THE FOLLOWING: <br />a.AIR QUANTITIES AT EACH REGISTER. <br />b.STATIC PRESSURE READINGS AT INLET AND DISCHARGE OF EACH <br />AIR HANDLING SYSTEM AND AT INLET OF EACH EXHAUST AIR <br />SYSTEM. <br />c.COOLING AND HEATING SUPPLY AND RETURN AIR TEMPERATURES <br />AT EACH AIR CONDITIONING UNIT. <br />18.WARRANTIES; 1-YEAR WARRANTY FOR EQUIPMENT, 5-YEAR COMPRESSORS. <br />REFER TO CONSTRUCTION CONTRACT FOR OTHER APPLICABLE <br />WARRANTIES. <br />19.EQUIPMENT SPECIFICATION AND INTERLOCK DIAGRAM SHALL BE <br />SUBMITTED FOR APPROVAL PRIOR TO PURCHASE OF EQUIPMENT FOR <br />INSTALLATION. <br />20.ALL EQUIPMENT SHALL BE INSTALLED IN STRICT ACCORDANCE WITH THE <br />EQUIPMENT MANUFACTURER'S RECOMMENDATIONS. PROVIDE ALL <br />FITTINGS, TRANSITIONS, DAMPERS, VALVES AND OTHER DEVICES REQUIRED <br />FOR A COMPLETE WORKABLE INSTALLATION. <br />21.HEATING, VENTILATING, AND AIR-CONDITIONING SYSTEMS SHALL BE <br />BALANCED BY A LICENSED T&B CONTRACTOR IN ACCORDANCE WITH ONE <br />OF THE FOLLOWING METHODS (CMC 314.1): <br />·AABC NATIONAL STANDARDS FOR TOTAL SYSTEM BALANCE <br />·ACCA MANUAL B <br />·ASHRAE 111 <br />·NEBB PROCEDURAL STANDARDS FOR TESTING ADJUSTING BALANCING <br />OF ENVIRONMENTAL SYSTEMS <br />·SMACNA HVAC SYSTEMS TESTING, ADJUSTING AND BALANCING <br />22.PROVIDE FILTER FOR AIR CONDITIONING AND/OR AIR SIDE UNITS AS <br />REQUIRED PER ASHRAE AND MECHANICAL CODE. <br />23.THERMOSTAT SHALL BE 24 VOLT, ONE STAGE HEATING AND ONE OR TWO <br />STAGE COOLING WITH MATCHING SUBBASE AND TAMPER PROOF COVER. <br />24.CONDENSATE PIPING SHALL BE SIZED IN ACCORDANCE WITH MECHANICAL <br />CODE. <br />CA GREEN BUILDING NOTES <br />HVAC GENERAL NOTES <br />MECHANICAL CODE <br />·2022 CMC <br />·2022 BUILDING ENERGY EFFICIENCY STANDARDS <br />26.CONDENSATE WASTE SHALL CONNECT INDIRECTLY TO THE DRAINAGE <br />SYSTEM THROUGH AN AIR GAP OR AIR BREAK TO PROPERLY TRAPPED <br />AND VENTED RECEPTORS, DRY WELLS, OR THE TAILPIECE OF A PLUMBING <br />FIXTURE. <br />27.WHERE CONDENSATE WASTE FROM AIR CONDITIONING COILS <br />DISCHARGES BY DIRECT CONNECTION TO A LAVATORY TAILPIECE OR TO <br />AN APPROVED ACCESSIBLE INLET ON A BATHTUB OVERFLOW, THE <br />CONNECTION SHALL BE LOCATED IN AN AREA CONTROLLED BY THE SAME <br />PERSON CONTROLLING THE AIR-CONDITIONED SPACE. <br />28.THE REFRIGERATION EQUIPMENT REFRIGERANT SERVICE PORTS <br />LOCATED OUTDOORS SHALL BE FITTED WITH LOCKING TYPE TAMPER <br />RESISTANT CAPS OR SHALL BE PROTECTED FROM UNAUTHORIZED <br />ACCESS BY A MEANS ACCEPTABLE TO THE ENFORCING AGENCY. <br />29.THE HEATING AND COOLING DUCT SYSTEM IS SIZED IN ACCORDANCE WITH <br />ASHRAE. <br />30.G.C. TO VERIFY SUFFICIENCY OF DUCT SPACE BEFORE PURCHASING ANY <br />MECHANICAL EQUIPMENT. <br />31.DUCTWORK SHALL BE INSULATED OR LINED AS NOTED ON DRAWINGS. ALL <br />DUCTWORK EXPOSED ON ROOF SHALL BE INTERNALLY LINED UNLESS <br />OTHERWISE INDICATED OR SPECIFIED. ALL DUCT SIZES ARE SHEET METAL <br />SIZES. ALL DUCT JOINTS SHALL BE SEALED PER SPECIFICATIONS. <br />32.CONNECT MAIN DUCT TO AIR CONDITIONING UNIT WITH WEATHERPROOF <br />FLEXIBLE CONNECTION. SUN SHIELD OVER ENTIRE FLEXIBLE <br />CONNECTIONS REQUIRED IF FLEXIBLE CONNECTION IS EXPOSED TO <br />WEATHER. <br />33.ALL LINED DUCT DIMENSIONS ARE NET CLEAR DIMENSION AFTER LINING <br />HAS BEEN INSTALLED. <br />34.ALL DUCTWORK SIZE SHOWN ON PLAN ARE INTERIOR DIAMETER. <br />CONTRACTOR SHALL ADD INSULATION THICKNESS INTO CONSIDERATION <br />BEFORE INSTALLATION. <br />35.DUCTS SHALL BE SUPPORTED WITH 1" WIDE 16-GAUGE HANGER STRAPS <br />AND SHALL BE SPACED AT NO MORE THAN 7'-0" ON CENTERS AND SHALL <br />BE SECURED TO STRUCTURAL MEMBER. EXPOSED DUCTWORK ON ROOF <br />SHALL BE SUPPORTED BY GALVANIZED STEEL ANGLE & SHALL BE PER <br />LOCAL CODE. <br />36.ROUND AND RECTANGULAR DUCTWORK ARE INTERCHANGEABLE IF CROSS <br />SECTION AREAS ARE EQUIVALENT. CONTRACTOR IS TO VERIFY THE <br />EXACT CEILING SPACE AND INTERCHANGE THE DUCT SIZE TO FIT THE <br />CEILING SPACE WITHOUT ADDITIONAL FEE CHARGE. <br />37.ALL FACTORY-FABRICATED DUCT SYSTEMS SHALL COMPLY WITH UL 181 <br />FOR DUCTS AND CLOSURE SYSTEMS, INCLUDING COLLARS, <br />CONNECTIONS, AND SPLICES, AND BE LABELED AS COMPLYING WITH UL <br />181. <br />38.INSTALL VOLUME CONTROL DAMPERS AT EACH SUPPLY DIFFUSER TO <br />AFFORD COMPLETE CONTROL OF THE AIR FLOW IN THE VARIOUS DUCT <br />SYSTEMS. INSTALL SPLITTER DAMPER AT DUCT TAKEOFFS AND DAMPER <br />AS REQUIRED. <br />39.AUTOMATIC FIRE DAMPER REQUIREMENTS ARE AS FOLLOWS: <br />a.PROVIDE AUTOMATIC FIRE DAMPERS AT ALL PENETRATIONS <br />OF FIRE-RATED CEILINGS AND WALLS THROUGHOUT. <br />CONTRACTOR SHALL COORDINATE WITH FIRE-RATED CEILING <br />AREAS AND WALLS AS INDICATED ON ARCHITECTURAL <br />DRAWINGS. THIS NOTE SHALL TAKE PRECEDENCE OVER ANY <br />OMISSIONS ON THE DRAWINGS. SEE SPECIFICATIONS. <br />b.LOCATION OF FIRE-RATED CEILINGS AND WALLS ARE AS <br />INDICATED ON THE ARCHITECTURAL DRAWINGS. <br />40.COORDINATE THE LOCATION OF ALL CEILING DIFFUSERS, REGISTERS AND <br />GRILLES WITH THE ARCHITECTURAL REFLECTED CEILING PLAN, <br />ELECTRICAL LIGHTING LAYOUT AND ARCHITECTURAL ROOM ELEVATIONS. <br />41.ALL CEILING DIFFUSERS ARE 4-WAY UNLESS OTHERWISE NOTED. <br />42.PROVIDE BACK-DRAFT DAMPER FOR ALL EXHAUST AIR DUCT UNLESS <br />OTHERWISE NOTED PER CODE. <br />43.EXHAUST TERMINATION SHALL BE MINIMUM 10'-0" AWAY OR 3'-0" ABOVE <br />FROM ANY FRESH AIR INTAKE, OPERABLE WINDOWS, DOORS AND 10'-0" <br />MINIMUM ABOVE GRADE. <br />44.PROVIDE ALL FRESH AIR INTAKES AND EXHAUST OUTLETS WITH HOOD, 1/2" <br />GALVANIZED MESH SCREENS AND OUTSIDE AIR BACK-DRAFT DAMPERS. <br />45.ALL HVAC UNITS OR SYSTEMS SERVING A COMMON AIR SPACE MUST BE <br />INTERCONNECTED TO SHUT DOWN IMMEDIATELY UPON ALARM CONDITION <br />FROM DUCT DETECTORS (OR FIRE ALARM SYSTEM WHEN USING AREA <br />SMOKE DETECTORS IN LIEU OF DUCT DETECTORS) WITHOUT <br />INTERFERENCE FROM EMS OR ANY OTHER SYSTEMS. ALL CONTROL <br />RELAYS USED FOR SHUT DOWN MUST BE APPROVED BY STATE OR LOCAL <br />JURISDICTION FOR RELEASING SERVICE. <br />46.PURCHASING PARTY SHALL ENSURE THE MOTOR SPECS PRIOR TO <br />ORDERING EXHAUST SYSTEM TO ENSURE THE PANEL IS BUILT <br />CORRECTLY. <br />47.REDWOOD SLEEPER OR PLATFORM FOR ROOF MOUNTED UNIT, DUCT <br />PENETRATION, CUTTING AND PATCHING BY GENERAL CONTRACTOR, <br />UNLESS OTHERWISE NOTED ON PLAN. <br />48.42" MINIMUM GUARDS TO BE PROVIDED WHEN ROOF MOUNTED OR ROOF <br />ACCESS EQUIPMENT THAT REQUIRE SERVICE ARE LOCATED WITHIN 10' OF <br />A ROOF EDGE OR OPEN SIDE OF A WALKING SURFACE AND SUCH EDGE <br />OR OPEN SIDE IS LOCATED MORE THAN 30" ABOVE THE ROOF SURFACE. <br />5.504.1 TEMPORARY VENTILATION: <br />IF THE HVAC SYSTEM IS USED DURING CONSTRUCTION, USE RETURN AIR <br />FILTERS WITH A MERV OF 8, BASED ON ASHRAE 52.2-1999, OR AN AVERAGE <br />EFFICIENCY OF 30% BASED ON ASHRAE 52.1-1992. REPLACE ALL FILTERS <br />IMMEDIATELY PRIOR TO OCCUPANCY. APPLIES TO ADDITIONS OR <br />ALTERATIONS. <br />5.504.3 COVERING OF DUCT OPENINGS AND PROTECTION OF MECHANICAL <br />EQUIPMENT DURING CONSTRUCTION: <br />AT THE TIME OF ROUGH INSTALLATION AND DURING STORAGE ON THE <br />CONSTRUCTION SITE AND UNTIL FINAL STARTUP OF THE HEATING, <br />COOLING AND VENTILATING EQUIPMENT, ALL DUCT AND OTHER RELATED <br />AIR DISTRIBUTION COMPONENT OPENINGS SHALL BE COVERED WITH TAPE, <br />PLASTIC,SHEET METAL OR OTHER METHODS ACCEPTABLE TO THE <br />ENFORCING AGENCY TO REDUCE THE AMOUNT OF DUST, WATER AND <br />DEBRIS WHICH MAY ENTER THE SYSTEM. <br />5.504.5.3 FILTERS: <br />IN MECHANICALLY VENTILATED BUILDINGS, PROVIDE REGULARLY <br />OCCUPIED AREAS OF THE BUILDING WITH AIR FILTRATION MEDIA FOR <br />OUTSIDE AND RETURN AIR PRIOR TO OCCUPANCY THAT PROVIDES AT <br />LEAST A MERV OF 13. <br />5.506.1 OUTSIDE AIR DELIVERY: <br />FOR MECHANICALLY OR NATURALLY VENTILATED SPACES IN BUILDINGS, <br />MEET THE MINIMUM REQUIREMENTS OF SECTION 120.1 OF THE CALIFORNIA <br />ENERGY CODE AND CHAPTER 4 OF CCR, TITLE 8, OR THE APPLICABLE <br />LOCAL CODE, WHICHEVER IS MORE STRINGENT. <br />5.508.1.1.CHLOROFLUOROCARBONS ( CFCs): <br />INSTALL HVAC, REFRIGERATION AND FIRE SUPPRESSION EQUIPMENT THAT <br />DO NOT CONTAIN CFCs. <br />5.508.1.2.HALONS: <br />INSTALL HVAC, REFRIGERATION AND FIRE SUPPRESSION EQUIPMENT THAT <br />DO NOT CONTAIN HALONS. <br />ADIMINISTRATIVE REQUIREMENTS: <br />A.THE PERSON WITH OVERALL RESPONSIBILITY FOR CONSTRUCTION OR THE <br />PERSON RESPONSIBLE FOR THE INSTALLATION OF REGULATED FEATURES, <br />MATERIALS, COMPONENTS, OR MANUFACTURED DEVICES SHALL POST, OR <br />MAKE AVAILABLE WITH THE BUILDING PERMIT(S) ISSUED FOR THE BUILDING, <br />THE REQUIRED INSTALLATION CERTIFICATE(S) FOR FEATURES, MATERIALS, <br />COMPONENTS, OR MANUFACTURED DEVICES REGULATED BY THE <br />APPLIANCE EFFICIENCY REGULATIONS OR PART 6. SUCH INSTALLATION <br />CERTIFICATE(S) SHALL BE MADE AVAILABLE TO THE ENFORCEMENT <br />AGENCY FOR ALL APPROPRIATE INSPECTIONS. THESE CERTIFICATES SHALL: <br />A.1.IDENTIFY FEATURES, MATERIALS, COMPONENTS, OR <br />MANUFACTURED DEVICES REQUIRED TO VERIFY COMPLIANCE <br />WITH THE APPLIANCE EFFICIENCY REGULATIONS AND PART 6. <br />A.2.INCLUDE A STATEMENT INDICATING THAT THE FEATURES, <br />MATERIALS, COMPONENTS, OR MANUFACTURED DEVISE <br />CONFORM TO THE APPLIANCE EFFICIENCY REGULATIONS AND <br />PART 6 AND THE REQUIREMENTS FOR SUCH FEATURES, <br />MATERIALS, COMPONENTS, OR MANUFACTURED DEVICES <br />GIVEN IN THE PLANS AND SPECIFICATIONS APPROVED BY THE <br />LOCAL ENFORCEMENT AGENCY. <br />A.3.STATE THE NUMBER OF THE BUILDING PERMIT UNDER WHICH <br />THE CONSTRUCTION OR INSTALLATION WAS PERFORMED. <br />B.WITHIN 90 DAYS AFTER ISSUANCE OF CERTIFICATE OF OCCUPANCY <br />RECORD DRAWINGS SHALL BE PROVIDED TO THE OWNER. IF A BUILDING <br />DESIGN FEATURE, MATERIAL, COMPONENT OR MANUFACTURED DEVICE IS <br />CHANGED BEFORE FINAL CONSTRUCTION AND INSTALLATION, SUCH THAT <br />THE BUILDING MAY NO LONGER COMPLY WITH PART 6, THE BUILDING MUST <br />BE BROUGHT INTO COMPLIANCE, AND SO INDICATED ON AMENDED PLANS <br />AND CERTIFICATE OF COMPLIANCE(S) THAT SHALL BE SUBMITTED FOR <br />APPROVAL. <br />C.THE BUILDER SHALL PROVIDE THE BUILDING OWNER OR THE PERSON(S) <br />RESPONSIBLE FOR BUILDING MAINTENANCE (IN CASE OF MULTI-TENANT OR <br />CENTRALLY OPERATED BUILDINGS) AT OCCUPANCY THE FOLLOWING: <br />C.1.OPERATING INFORMATION: THE APPROPRIATE CERTIFICATE(S) <br />OF COMPLIANCE AND A LIST OF THE FEATURES, MATERIALS, <br />COMPONENTS, AND MECHANICAL DEVICES INSTALLED IN THE <br />BUILDING AND INSTRUCTIONS ON HOW TO OPERATE THEM <br />EFFICIENTLY. <br />C.2.MAINTENANCE INFORMATION: REQUIRED ROUTINE <br />MAINTENANCE ACTIONS SHALL BE CLEARLY STATED AND <br />INCORPORATED ON A READILY ACCESSIBLE LABEL. THE LABEL <br />MAY BE LIMITED TO IDENTIFYING THE OPERATION AND <br />MAINTENANCE MANUAL. <br />C.3.VENTILATION INFORMATION: A DESCRIPTION OF THE <br />QUANTITIES OF OUTDOOR AND RECIRCULATED AIR THAT THE <br />VENTILATION SYSTEMS ARE DESIGNED TO PROVIDE TO EACH <br />AREA. <br />MANDATORY MEASURES: <br />A.(IF APPLICABLE) MANUFACTURED FENESTRATION AND EXTERIOR DOORS <br />SHALL MEET ALL LISTED REQUIREMENTS IN SEC 10-111-(A) UNDER SECTION <br />110.6(A) OF PART 6. TEMPORARY LABELS FOR MANUFACTURED <br />FENESTRATION SHALL HAVE A CLEARLY VISIBLE TEMPORARY LABEL AND <br />SHALL COMPLY WITH LABELING REQUIREMENTS OF NFRC 700. NO OTHER <br />VALUES FOR U-FACTOR, SHGC, VT AND AIR LEAKAGE ARE ALLOWED ON THE <br />TEMPORARY LABEL ATTACHED TO THE MANUFACTURED FENESTRATION <br />PRODUCT OR EXTERIOR DOOR. <br />B.(IF APPLICABLE) RATED FENESTRATION SHALL HAVE A PERMANENT LABEL <br />CONSISTENT WITH THEIR RATING AND CERTIFICATION THAT IS EITHER A <br />STAND-ALONE LABEL, AN EXTENSION OR TAB OF AN EXISTING PERMANENT <br />CERTIFICATION LABEL BEING USED BY THE MANUFACTURER/RESPONSIBLE <br />PARTY, OR A SERIES OF MARKS OR ETCHINGS ON THE PRODUCT. <br />C.JOINTS, PENETRATIONS AND OTHER OPENINGS IN THE BUILDING ENVELOPE <br />THAT ARE POTENTIAL SOURCES OF AIR LEAKAGE SHALL BE CAULKED, <br />GASKETED, WEATHER STRIPPED, OR OTHERWISE SEALED TO LIMIT <br />INFILTRATION AND EXFILTRATION. <br />D.ALL INSULATING MATERIAL SHALL BE INSTALLED IN COMPLIANCE WITH THE <br />FLAME-SPREAD RATING AND SMOKE DENSITY REQUIREMENTS OF THE CBC. <br />E.NON-CENTRALIZED ENERGY MANAGEMENT SYSTEMS SHALL HAVE SETBACK <br />THERMOSTATS; CAPABLE TO PROGRAM TEMPERATURE SETPOINTS FOR AT <br />LEAST FOUR PERIODS WITHIN A 24-HR. PERIOD. <br />F.ALL RECIRCULATED AIR OR OUTDOOR AIR SUPPLIED TO OCCUPIABLE <br />SPACES IS FILTERED (MINIMUM MERV 13) BEFORE PASSING THROUGH ANY <br />AIR CONDITIONING COMPONENT; THE LESSER OF THE MINIMUM RATE OF <br />OUTDOOR AIR REQUIRED BY SEC. 120.1 (C), OR THREE COMPLETE AIR <br />CHANGES SHALL BE SUPPLIED TO THE ENTIRE BUILDING DURING THE <br />ONE-HOUR PERIOD IMMEDIATELY BEFORE THE BUILDING IS NORMALLY <br />OCCUPIED. <br />G.ALL MECHANICAL VENTILATION AND SPACE-CONDITIONING SYSTEMS SHALL <br />BE DESIGNED WITH DUCTWORK, DAMPERS, AND CONTROLS WHICH ALLOWS <br />OUTSIDE AIR RATES TO BE OPERATED AT THE LARGER OF (1) THE MINIMUM <br />LEVELS SPECIFIED IN SECTION 120.1(C)3 OR (2) THE RATE REQUIRED FOR <br />MAKE-UP OF EXHAUST SYSTEMS THAT ARE REQUIRED FOR AN EXEMPT OR <br />COVERED PROCESS, FOR CONTROL OF ODORS, OR FOR THE REMOVAL OF <br />CONTAMINANTS WITHIN THE SPACE. MEASURED OUTSIDE AIR RATES OF <br />CONSTANT AND VARIABLE VOLUME MECHANICAL VENTILATION SYSTEMS <br />SHALL BE WITHIN 10% OF OUTSIDE AIR RATE SHOWN ON TABLE 120.1-A. <br />H.THE THERMOSTATIC CONTROLS FOR HVAC SYSTEMS SHALL BE CAPABLE OF <br />BEING SET LOCALLY OR REMOTELY BY TO CONTROL COMFORT HEATING <br />DOWN TO 55 °F OR LOWER AND COOLING UP TO 85°F OR HIGHER. THE <br />THERMOSTATIC CONTROLS SHALL BE CAPABLE OF PROVIDING A DEAD <br />BAND RANGE OF AT LEAST 5 °F WITHIN WHICH HEATING AND COOLING <br />ENERGY TO THE ZONE IS SHUT OFF OR REDUCE TO A MINIMUM. <br />I.OUTDOOR AIR SUPPLY AND EXHAUST EQUIPMENT SHALL BE INSTALLED <br />WITH DAMPERS THAT AUTOMATICALLY CLOSE UPON FAN SHUTDOWN. <br />J.AIR DISTRIBUTION SYSTEM DUCTS AND PLENUMS, INCLUDING, BUT NOT <br />LIMITED TO, BUILDING CAVITIES, MECHANICAL CLOSETS, AIR-HANDLER <br />BOXES AND SUPPORT PLATFORMS USED AS DUCTS OR PLENUMS, SHALL BE <br />INSTALLED, SEALED AND INSULATED TO MEET THE REQUIREMENTS OF <br />CHAPTER 6 CMC CODE AND ANSI/SMACNA -006-2006 HVAC DUCT <br />CONSTRUCTION STANDARDS METAL AND FLEXIBLE. SUPPLY-AIR DUCTS <br />CONVEYING HEATED OR COOLED AIR SHALL BE INSULATED TO A MINIMUM <br />INSTALLED LEVEL OF R-4.2 (R-8 IN UNCONDITIONED SPACE), UNLESS DUCTS <br />ARE IN CONDITIONED SPACE. <br />K.MAXIMUM LENGTH OF FLEXIBLE DUCT AND CONNECTORS SHALL NOT BE <br />MORE THAN 5 FEET. FLEXIBLE DUCTS SHALL NOT BE USED IN LIEU OF RIGID <br />ELBOWS. <br />L.EACH SPACE-CONDITIONING SYSTEM SHALL BE INSTALLED WITH CONTROLS <br />(1) CAPABLE OF AUTOMATICALLY SHUTTING OFF THE SYSTEM DURING <br />PERIODS OF NON-USE AND SHALL HAVE (A) 4-HR TIMER OR; (B) OCCUPANCY <br />SENSORS OR; (C) AUTO TIME SWITCH CONTROLS AND ACCESSIBLE MANUAL <br />OVERRIDE FOR UP TO 4-HRS. (2) AUTOMATICALLY RESTART AND <br />TEMPORARILY OPERATE THE SYSTEM TO MAINTAIN SETBACK THERMOSTAT <br />SETPOINTS FOR MECHANICAL HEATING AND COOLING. (3) MULTIPURPOSE, <br />CLASSROOMS CONFERENCE, CONVENTION, AUDITORIUM AND MEETING <br />CENTER ROOMS OF CERTAIN SIZE WHICH DO NOT HAVE PROCESSES OR <br />OPERATIONS THAT GENERATE DUSTS, FUMES, VAPORS OR GASSES SHALL <br />BE EQUIPPED WITH OCCUPANT SENSOR(S) TO ACCOMPLISH THE <br />FOLLOWING DURING UNOCCUPIED PERIODS (A) AUTOMATICALLY SETUP THE <br />OPERATING COOLING TEMPERATURE SET POINT BY 2°F OR MORE AND <br />SETBACK THE OPERATING HEATING TEMPERATURE SET POINT BY 2˚F OR <br />MORE AND; (B) AUTOMATICALLY RESET THE MINIMUM REQUIRED <br />VENTILATION RATE WITH AN OCCUPANT SENSOR VENTILATION CONTROL <br />DEVICE ACCORDING TO SECTION 120.1(C)5. (4) HOTEL AND MOTEL GUEST <br />ROOMS SHALL HAVE CAPTIVE CARD KEY CONTROLS, OCCUPANCY SENSING <br />CONTROLS, OR AUTOMATIC CONTROLS SUCH THAT, NO LONGER THAN 30 <br />MINUTES AFTER THE GUEST ROOM HAS BEEN VACATED, SETPOINTS ARE <br />SETUP AT LEAST +5°F (+3°C) IN COOLING MODE AND SET-DOWN AT LEAST <br />-5°F (-3°C) IN HEATING MODE. <br />CA TITLE 24 NOTES <br />LESS THAN 12 26/.022 .025 <br />13-30 26/.022 .025 <br />31-36 24/.023 .026 <br />FOOTNOTES: <br />FOR GALVANIZED STEEL (SMACNA TABLE 1-4/E5) <br />MAXIMUM 1" W.G. STATIC POSITIVE AND NEGATIVE <br />DUCT GAUGE SELECTIONS <br />MINIMUM THICKNESS <br />ALUMINUM (INCHES) <br />MINIMUM THICKNESS <br />GALVANIZED IRON (U.S. <br />GAUGE/INCHES) <br />DUCT DIAMETER <br />(INCHES) <br />1. HEATING AND AIR CONDITIONING UNITS NOT EXCEEDING 2000 CFM OR ONE INCH <br />WATER GAUGE (WG) POSITIVE OR NEGATIVE PRESSURE. DUCT FITTINGS SHALL <br />BE CONSTRUCTED OF MATERIAL NOT LESS THAN THE GAUGE OF THE DUCT. <br />2. DUCTWORK AND FITTINGS LARGER THAN TWENTY INCHES SHALL BE <br />CONSTRUCTED TO THE GAUGING REQUIREMENTS OF ANSI SMACNA 006-2006 <br />HVAC DUCT CONSTRUCTION STANDARDS. <br />SCOPE OF WORK <br />CA TITLE 24 NOTES <br />MANDATORY MEASURES: <br />M.ALL DUCTWORK AND PLENUMS WITH PRESSURE CLASS RATINGS SHALL BE <br />CONSTRUCTED TO SEAL CLASS A. JOINTS AND SEAMS OF DUCT SYSTEMS <br />AND THEIR COMPONENTS SHALL NOT BE SEALED WITH CLOTH-BACK <br />RUBBER ADHESIVE DUCT TAPES UNLESS SUCH TAPE IS USED IN <br />COMBINATION WITH MASTIC AND DRAWBANDS. EXCEPTION TO SECTION <br />120.4(B)1D: DUCTWORK LOCATED IN OCCUPIED SPACE AND EXPOSED TO <br />VIEW IS NOT REQUIRED TO MEET SEAL CLASS A. <br />N. DUCT SYSTEMS SHALL COMPLY WITH SUBSECTION 1 OR 2 BELOW: <br />1.NEW DUCT SYSTEMS THAT MEET THE CRITERIA IN SUBSECTIONS A, B, C <br />AND D BELOW SHALL BE SEALED TO A LEAKAGE RATE NOT TO EXCEED 6 <br />PERCENT OF THE NOMINAL AIR HANDLER AIRFLOW RATE AS CONFIRMED <br />THROUGH HERS FIELD VERIFICATION AND DIAGNOSTIC TESTING, IN <br />ACCORDANCE WITH REFERENCE NONRESIDENTIAL APPENDIX NA7.5.3; <br />N.1.THE DUCT SYSTEM DOES NOT SERVE A HEALTHCARE FACILITY; AND <br />N.2.THE DUCT SYSTEM PROVIDES CONDITIONED AIR TO AN OCCUPIABLE <br />SPACE FOR A CONSTANT VOLUME, SINGLE ZONE, SPACE-CONDITIONING <br />SYSTEM; AND <br />N.3.THE SPACE-CONDITIONING SYSTEM SERVES LESS THAN 5,000 <br />SQUARE FEET OF CONDITIONED FLOOR AREA; AND <br />N.4.THE COMBINED SURFACE AREA OF THE DUCTS LOCATED OUTDOORS <br />OR IN UNCONDITIONED SPACE IS MORE THAN 25 PERCENT OF THE TOTAL <br />SURFACE AREA OF THE ENTIRE DUCT SYSTEM. <br />2.NEW DUCT SYSTEMS THAT ARE NOT SUBJECT TO TESTING UNDER <br />SECTION 120.4(G)1 SHALL INSTEAD MEET THE DUCT LEAKAGE TESTING <br />REQUIREMENTS OF CMC SECTION 603.9.2. <br />P. OCCUPANT SENSOR VENTILATION CONTROL DEVICES. <br />OCCUPANT SENSING OR VENTILATION CONTROLS ARE REQUIRED FOR <br />SPACE CONDITIONING ZONES THAT ARE BOTH PERMITTED TO HAVE THEIR <br />VENTILATION AIR REDUCED TO ZERO WHILE IN OCCUPIED STANDBY MODE <br />PER TABLE 120.1-A AND REQUIRED TO INSTALL OCCUPANT SENSORS TO <br />COMPLY WITH SECTION 130.1(C)5, 6, AND 7. OCCUPANT SENSOR <br />VENTILATION CONTROL DEVICES USED TO REDUCE THE RATE OF OUTDOOR <br />AIRFLOW WHEN OCCUPANTS ARE NOT PRESENT SHALL COMPLY WITH THE <br />FOLLOWING: <br />P.1.OCCUPANT SENSORS SHALL HAVE SUITABLE COVERAGE AND <br />PLACEMENT TO DETECT OCCUPANTS IN THE ENTIRE SPACE VENTILATED. <br />IN 20 MINUTES OR LESS AFTER NO OCCUPANCY IS DETECTED BY ANY <br />SENSORS COVERING THE ROOM, OCCUPANT SENSING CONTROLS SHALL <br />INDICATE A ROOM IS VACANT. <br />P.2.WHEN OCCUPANT SENSORS CONTROLLING LIGHTING ARE ALSO <br />USED FOR VENTILATION, THE VENTILATION SIGNAL SHALL BE <br />INDEPENDENT OF DAYLIGHTING, MANUAL LIGHTING OVERRIDES OR <br />MANUAL CONTROL OF LIGHTING. <br />P.3.WHEN A SINGLE ZONE DAMPER OR A SINGLE ZONE SYSTEM SERVES <br />MULTIPLE ROOMS, THERE SHALL BE AN OCCUPANT SENSOR IN EACH <br />ROOM AND THE ZONE SHALL NOT BE CONSIDERED VACANT UNTIL ALL <br />ROOMS IN THE ZONE ARE VACANT. <br />P.4.ONE HOUR PRIOR TO NORMAL SCHEDULED OCCUPANCY, THE <br />OCCUPANT SENSOR VENTILATION CONTROL SHALL ALLOW <br />PRE-OCCUPANCY PURGE AS DESCRIBED IN SECTION 120.1(D)2. <br />P.5.WHEN THE ZONE IS SCHEDULED TO BE OCCUPIED AND OCCUPANT <br />SENSING CONTROLS IN ALL ROOMS AND AREAS SERVED BY THE ZONE <br />INDICATE THE SPACES ARE UNOCCUPIED, THE ZONE SHALL BE PLACED IN <br />OCCUPIED STANDBY MODE. <br />P.6.IN 5 MINUTES OR LESS AFTER ENTERING OCCUPIED-STANDBY MODE, <br />MECHANICAL VENTILATION TO THE ZONE SHALL BE SHUT OFF UNTIL THE <br />SPACE BECOMES OCCUPIED OR UNTIL VENTILATION IS NEEDED TO <br />PROVIDE SPACE HEATING OR CONDITIONING. WHEN MECHANICAL <br />VENTILATION IS SHUT OFF TO THE ZONE, THE VENTILATION SYSTEM <br />SERVING THE ZONE SHALL REDUCE THE SYSTEM OUTSIDE AIR RATE BY <br />THE AMOUNT OF OUTSIDE AIR REQUIRED FOR THE ZONE. <br />P.7.WHERE THE SYSTEM PROVIDING SPACE CONDITIONING ALSO <br />PROVIDES VENTILATION TO THE ZONE, IN 5 MINUTES OR LESS AFTER <br />ENTERING OCCUPIED-STANDBY MODE, SPACE CONDITIONING ZONE <br />SETPOINTS SHALL BE RESET IN ACCORDANCE WITH SECTION 120.2(E)3. <br />RE <br />V <br />I <br />S <br />I <br />O <br />N <br />SHEET TITLE: <br />DATE: SCALE: <br />AN <br />C <br />E <br />N <br />A <br />Y <br /> <br />C <br />O <br />M <br />M <br />E <br />R <br />C <br />I <br />A <br />L <br /> <br />O <br />F <br />F <br />I <br />C <br />E <br />01/11/2024 <br />PLOT DATE: 7/12/2024 11:01:48 AM <br />CD <br />I <br /> <br />Ci <br />r <br />c <br />a <br /> <br />D <br />o <br />m <br />i <br />n <br />i <br /> <br />I <br />n <br />t <br />e <br />r <br />n <br />a <br />t <br />i <br />o <br />n <br />a <br />l <br />, <br /> <br />I <br />n <br />c <br />. <br />En <br />g <br />i <br />n <br />e <br />e <br />r <br />i <br />n <br />g <br /> <br />- <br /> <br />C <br />o <br />n <br />s <br />u <br />l <br />t <br />i <br />n <br />g <br />98 <br />9 <br />0 <br /> <br />R <br />e <br />s <br />e <br />a <br />r <br />c <br />h <br /> <br />D <br />r <br />. <br /> <br />S <br />u <br />i <br />t <br />e <br /> <br />1 <br />0 <br />0 <br />, <br /> <br />I <br />r <br />v <br />i <br />n <br />e <br />, <br /> <br />C <br />A <br /> <br />9 <br />2 <br />6 <br />1 <br />8 <br />Ph <br />o <br />n <br />e <br /> <br />( <br />9 <br />4 <br />9 <br />) <br /> <br />5 <br />3 <br />3 <br />- <br />4 <br />1 <br />1 <br />7 <br /> <br />| <br /> <br />d <br />k <br />a <br />n <br />g <br />@ <br />c <br />d <br />i <br />e <br />n <br />g <br />. <br />c <br />o <br />m <br />21 <br />0 <br />W <br />. <br /> <br />1 <br />9 <br />T <br />H <br /> <br />S <br />T <br />R <br />E <br />E <br />T <br />, <br />SA <br />N <br />T <br />A <br /> <br />A <br />N <br />A <br />, <br /> <br />C <br />A <br /> <br />9 <br />2 <br />7 <br />0 <br />6 <br />DRAWN: CHECKED: <br />PL <br />A <br />N <br /> <br />C <br />H <br />E <br />C <br />K <br /> <br />R <br />E <br />V <br />. <br /> <br />0 <br />6 <br />/ <br />2 <br />8 <br />/ <br />2 <br />0 <br />2 <br />4 <br />M000 <br />MECHANICAL <br />NOTES <br />K.T.R.C. <br />210 W 19th St <br />4/14/2025