Laserfiche WebLink
278" <br />2.5" <br />MIN <br />INV <br />D <br />SP <br />JB <br />1 <br />2 <br />3'3'3' <br />3' <br />1 <br />' <br />-6" <br />1 '-6" <br />1 '-6" <br />1 <br />' <br />-6" <br />MS <br />P <br />PROJECT NAME <br />SHEET TITLE <br />SHEET NUMBER <br />PROJECT TITLE <br />JOBSITE ADDRESS <br />SERRANO <br />RESIDENCE <br />1 0.800 DC kW <br />9.930 KW CEC-AC RATING <br />STRING INVERTER SYSTEM <br />21 09 <br />WEST FLORA ST <br />SANTA ANA, CA <br />92704 <br />CONTRACTOR <br />TITAN SOLAR POWER CA INC <br />525 W BASELINE ROAD <br />MESA, AZ 8521 0 <br />(855) 729-7652 <br />WWW.TITANSOLARPOWER.COM <br />PROJECT ID# TSP1 47901 <br />DATE DESCRIPTION <br />REVISION <br />DATE <br />DRAWN1 1 -30-22 REVISION <br />DESIGN BY: RD <br />CAD <br />F O R C A L I I N C . <br />SHELLEY V CALUAG <br />FDGIRUFDOL@JPDLO.FRP <br />323-68-4207 <br />SP: Green Life Home <br />Improvement <br />A2 <br />MOUNTING <br />PLAN <br />58 TOTAL ROOF <br />ATTACHMENTS <br />@ 4FT ON CENTER <br />(N) 27 - Q.PEAK DUO BLK ML-G1 0 400 <br />HANWHA Q CELL MODULES WITH <br />P401 SOLAREDGE OPTIMI=ERS <br />STRING A - 14 MODULES <br />STRING B - 13 MODULES <br />ROOF ATTACHMENT DETAIL <br />COMP SHINGLE ROOF <br />SCALE: 2" = 1 '-0" <br />MOUNTING PLAN <br />SCALE: 3/32" = 1 ' <br />FIRE ACCESS POINT AREA <br />NOT TO BE OVER ANY DOORS <br />WINDOWS OR OTHER <br />OBSTRUCTIONS. <br />MIN. 2 ACCESS POINTS <br />MODULE <br />SIDE VIEW <br />EVEREST <br />CROSSRAIL 44-X <br />EVEREST SPLICE <br />FOOT X <br />NOTE: <br />MODULES WILL BE INSTALLED <br />FLUSHED TO EXISTING ROOF SLOPE <br />END CLAMP <br />ASSEMBLY <br />EVEREST K2 SOLAR <br />SEAL BUTYL PAD <br />M5 X 60 LAG SCREWS <br />5/1 6" ‘ <br />2 LAGS PER ATTACHMENT <br />2.5" MIN EMBEDMENT <br />3FT FIRE <br />PATHWAY <br />1 <br />8 <br />" <br /> FIRE <br /> SE <br />TB <br />A <br />C <br />K <br />A <br />8ƒ A=IMUTH <br />1 7.1 ƒ SLOPE <br />SOLAR PANEL DEAD WEIGHT CALCULATION <br />MODULE HANWHA Q CELLS <br />WIDTH (IN) LENGTH (IN) AREA (SQFT) WEIGHT (LBS) QTY <br />TOTAL <br />MODULE <br />AREA <br />TOTAL <br />MODULE <br />WEIGHT <br />41 .1 74.00 21 .1 2 48.50 27 570.26 1 30.50 <br />RACKING EVEREST <br />RACKING <br />WEIGHT <br />LBS/LNFT <br />MOUNTING <br />SYSTEM <br />WEIGHT <br />TOTAL <br />SYSTEM <br />WEIGHT <br />TOTAL <br />ATTACHMENT <br />POINTS <br />POINT <br />LOAD <br />CALCS <br />DISTRIBUTED LOAD <br />CALCULATION <br />.75 1 63.61473.158 25.40 2.58 PSF <br />NOTE: THE POINT LOADING AND DISTRIBUTED LOADING SHOULD BE MAX 5 LBS/FT2 <br />ROOF COVERAGE <br />TOTAL <br />MODULE <br />AREA <br />ROOF FACE <br />AREA (SQFT) <br />ROOF <br />COVERAGE COMPLIANCE WITH R324.6.2 SET BACK AT RIDGE <br />570.26 3841 1 5 </= 33 = OK <br />ROOF INFORMATION <br />ROOF TYPE COMP SHINGLE ROOF - 2 LAYERS <br />RAFTERS TRUSS RAFTER SPACING (IN) ATTACHMENT SPACING <br />2 X 4 N/A 24" OC 48" OC <br />(E) 1 00A MAIN SERVICE PANEL <br />SCE METER 222013-506053 <br />(E) 125A SUBPANEL "POI" <br />FIRE ACCESS POINT AREA <br />NOT TO BE OVER ANY DOORS <br />WINDOWS OR OTHER <br />OBSTRUCTIONS. <br />MIN. 2 ACCESS POINTS <br />A A A AA A A A <br />A <br />A <br />A A A <br />B B B B B <br />B <br />B <br />B <br />B <br />B <br />B <br />B <br />B <br />3FT FIRE <br />PATHWAY <br />3F <br />T <br /> FIRE <br />PA <br />T <br />HW <br />A <br />Y <br />3F <br />T <br /> <br />FI <br />RE <br />PA <br />TH <br />W <br />A <br />Y <br />1 <br />8 <br />" <br /> FI <br />RE <br /> <br />SE <br />T <br />BA <br />C <br />K <br />1 8" FIRE SETBACK 1 8"FIRE SETBACK <br />1 8" FIRE SETBACK <br />272ƒ A=IMUTH <br />1 6.5 ƒ SLOPE <br />1 <br />7ƒ <br />A=IMU <br />TH <br />1 <br />6 <br />. <br />1 <br />ƒ S <br />LO <br />P <br />E <br />1 <br />7 <br />3 <br />ƒ A <br />=IMU <br />T <br />H <br />1 <br />.6 <br />ƒ <br />S <br />LO <br />P <br />E <br />(N) SE1 0000H-US (240V) <br />SOLAREDGE HD INVERTER <br />(N) 60A AC DISCONNECT <br />(N) 200A SUBPANEL "POI" <br />(N) 3/4" EMT CONDUIT <br />RUN ABOVE ROOF OR UNDER EAVES WHERE <br />POSSIBLE; WIRING/CONDUIT RACEWAY WILL <br />BE 7/8'' MINIMUM ABOVE THE ROOFTOP PER <br />CEC 31 0.1 5(B)(3)(C) <br />LEGEND <br />(E) EXISTING <br />(N) NEW <br />(P) PROPOSED <br />CONDUIT RUN <br />VIF VERIFY IN FIELD <br />JUNCTION BOX <br />MAIN SERVICE PANEL <br />AC COMBINER <br />INVERTER <br />AC DISCONNECT <br />SUBPANEL <br />SOLAR METER <br />FIRE ACCESS POINTS <br />FIRE PATHWAY/SETBACKS <br />JB <br />MSP <br />D <br />SP <br />INV <br />AC <br />M <br />x <br />STRUCTURAL ONLY <br />www.vincise.com <br />S T R U C T U R A L E N G I N E E R S <br />12.12.2022 <br />2109 W Flora St <br />01/27/23