My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2329 N Fairmont Ave - Plan
PBA
>
Building
>
ProjectDox
>
F
>
Fairmont Ave
>
2329 N Fairmont Ave
>
2329 N Fairmont Ave - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/1/2025 12:02:20 PM
Creation date
6/1/2025 12:01:50 PM
Metadata
Fields
Template:
Plan
Permit Number
20182176
101118370
Full Address
2329 N Fairmont Ave
Document Relationships
101118370 - Permit
(Permit - Plan)
Path:
\Building\Permits\F\Fairmont Ave\2329 N Fairmont Ave
20182176 - Permit
(Permit - Plan)
Path:
\Building\Permits\F\Fairmont Ave\2329 N Fairmont Ave
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
01/02/2024 <br />RE: Structural Certification for Installation of Residential Solar <br /> COLIN WATERSON:2329 FAIRMONT AVE, SANTA ANA, CA 92706 <br />Attn: To Whom It May Concern <br />Design Criteria <br />Code 2022 California Building Code (ASCE 7-16) <br />Risk category II Wind Load (component and Cladding) <br />Roof Dead Load Dr 10 psf V 95 mph <br />PV Dead Load DPV 3 psf Exposure B <br />Roof Live Load Lr 20 psf <br />Ground Snow S 0 psf <br />If you have any questions on the above, please do not hesitate to call. <br />Sincerely, <br />Eugene Munyanziza, P.E.Signed 01/02/2024 <br />EV Engineering, LLC <br />projects@evengineersnet.com <br />http://www.evengineersnet.com <br />Exp: 06/30/2024 <br />This Letter is for the existing roof framing which supports the new PV modules as well as the attachment of the PV <br />system to existing roof framing. From the field observation report, the roof is made of Composition shingle <br />roofing over roof plywood supported by 2X4 Rafters at 24 inches. The slope of the roof was approximated to be <br />16 degrees. <br />After review of the field observation data and based on our structural capacity calculation, the existing roof <br />framing has been determined to be adequate to support the imposed loads without structural upgrades. <br />Contractor shall verify that existing framing is consistent with the described above before install. Should they find <br />any discrepancies, a written approval from SEOR is mandatory before proceeding with install. Capacity <br />calculations were done in accordance with applicable building codes. <br />projects@evengineersnet.com <br />http://www.evengineersnet.com <br />2329 N Fairmont Ave - <br />201821764/3/2024
The URL can be used to link to this page
Your browser does not support the video tag.