Laserfiche WebLink
Structural Letter for PV Installation <br />Date:01/02/2024 <br />Job Address:2329 FAIRMONT AVE <br />SANTA ANA, CA 92706 <br />Job Name:COLIN WATERSON <br />Job Number:010224CW <br />Scope of Work <br />2 Cover <br />3 Attachment Uplift checks <br />4 Roof Framing Check <br />5 Seismic Check and Scope of work <br />Engineering Calculations Summary <br />Code 2022 California Building Code (ASCE 7-16) <br />Risk category II <br />Roof Dead Load Dr 10 psf <br />PV Dead Load DPV 3 psf <br />Roof Live Load Lr 20 psf <br />Ground Snow S 0 psf <br />Wind Load (component and Cladding) <br />V 95 mph <br />Exposure B <br />References <br />NDS for Wood Construction <br />Sincerely, <br />Signed 01/02/2024 <br />Eugene Munyanziza, P.E. <br />EV Engineering, LLC <br />projects@evengineersnet.com <br />http://www.evengineersnet.com Exp: 06/30/2024 <br />e PV <br />r's <br />This Letter is for the existing roof framing which supports the new PV modules as well as the attachment of the PV <br />system to existing roof framing. All PV mounting equipment shall be designed and installed per manufacturer's <br />approved installation specifications. <br />Table of Content <br />Sheet <br />projects@evengineersnet.com <br />http://www.evengineersnet.com <br />2329 N Fairmont Ave - <br />201821764/3/2024