Laserfiche WebLink
SM SOLAR <br />MOUNT INSTALLATION GUIDE PAGE <br />BAPPENDIX C <br />MIDCLAMP <br />1. Position clamp to align T-bolt with rail <br />slot. Lower clamp and insert T-bolt into <br />rail slot <br />5. Tighten bolt and torque to 15 ft-lbs. <br />2. Rotate clamp clockwise 2/3 of a turn <br />to engage T-bolt inside rail slot. <br />NOTE: If excessive force is applied in <br />step 2, the cap may over-rotate causing <br />it to be mis-aligned with the module <br />frame. If this occurs, keep rotating the <br />cap clockwise until it returns to the <br />original position. <br />3. Slide clamp into position against <br />module. <br />4. Place second module. <br />2110 W 7th St - <br />2017778512/28/22