Laserfiche WebLink
CONTRACTOR <br />SHEET DESCRIPTION: <br />COVER PAGE <br />DRAWN DATE 10.01.2025 <br />DRAWN BY EMMANUEL <br />REVIEWED BY DESIGN TEAM <br />REVISIONS <br />REV DESCRIPTION DATE <br />SHEET INDEX <br />UTILITY : SCE <br />PROJECT INFORMATION <br />AHJ : SANTA ANA <br />ADDRESS : 2727 N MAINPLACE DR, <br />SANTA ANA, CA 92705 <br />NAME : PALOMA AT MAIN PLACE <br />APN : 002-221-52,002-221-46 <br />SYSTEM INFORMATION: <br />(75)LITEON <br />CHARGING STATIONS <br />PROJECT INFORMATION: <br />CHARGIE TO DESIGN AND <br />INSTALL THE CHARGING <br />SYSTEM. <br />Δ AHJ CORRECTIONS 04.08.24A <br />Δ Site Plan details update 05.28.24B <br />ΔC AHJ CORRECTIONS 07.22.24 <br />Δ D AHJ CORRECTIONS 10.09.24 <br />ΔE AHJ CORRECTIONS 10.22.24 <br />ΔF AHJ CORRECTIONS 11.22.24 <br />Δ AHJ CORRECTIONS 01.10.25G <br />PALOMA AT MAIN PLACE - NEW WALL MOUNTED EV CHARGING SYSTEM <br />2727 N MAINPLACE DR, SANTA ANA, CA 92705 <br />Know what's below. <br />CALL before you dig. <br />CALL AT LEAST TWO WORKING <br />DAYS BEFORE YOU DIG <br />USA <br />Nor t h <br />DIG ALERT <br />CONTRACTOR SHALL VERIFY ALL PLANS & EXISTING LOCATIONS, <br />CONDITIONS ON THE JOB SITE & SHALL IMMEDIATELY NOTIFY THE <br />ENGINEER IN WRITING OF ANY DISCREPANCIES BEFORE <br />PROCEEDING WITH THE WORK OR BE RESPONSIBLE FOR SAME <br />SATELLITE VIEW: <br />VICINITY VIEW: <br />SITE <br />SYSTEM INFORMATION <br />MANUFACTURER LITEON <br />CONNECTOR SAE J1772 <br />LEVEL AC LEVEL 2 <br />MOUNTING WALL <br />MAX OUTPUT 32A;7.68KW MAX OUTPUT <br />SITE <br />SHEET INDEX <br />INDEX <br />00-EV-01 COVER PAGE <br />01-EV-02 SITE PLAN <br />01-EV-03 PARKING LEVEL B <br />01-EV-04 PARKING LEVEL G1 <br />01-EV-05 PARKING LEVEL G2 <br />01-EV-06 PARKING LEVEL G3 <br />01-EV-07 PARKING LEVEL G4 <br />01-EV-08 PARKING LEVEL G5 <br />05-EV-09 EXISTING SLD I <br />05-EV-10 EXISTING SLD II <br />05-EV-11 SINGLE LINE DIAGRAM <br />05-EV-12 PANEL SCHEDULE <br />00-EV-13 NOTES <br />00-EV-14 PLACARD <br />09-EV-15 SPEC SHEET 1 <br />09-EV-16 SPEC SHEET 2 <br />09-EV-17 EQUIPMENT MOUNTING SPEC <br />09-EV-18 EXHIBIT SHEET 1 <br />09-EV-19 EXHIBIT SHEET 2 <br />09-EV-20 EXHIBIT SHEET 3 <br />09-EV-21 EXHIBIT CONDUIT RUNS <br />09-EV-22 EXHIBIT ACCESSIBILITY <br />00-EV-01 <br />SCOPE OF WORK: <br />INSTALL AND ELECTRICALLY CONNECT EVSE <br />INFRASTRUCTURE AS SHOWN. CONTRACTOR <br />TO PROVIDE AND INSTALL THE WIRING <br />DEVICES INCLUDING ALL REQUIRED <br />ASSOCIATED ITEMS FOR A COMPLETE AND <br />OPERATIONAL SYSTEM INCLUDING THE <br />REQUIRED TESTING SPEED IN THE <br />ELECTRICAL SPEC PACKAGE. CONTRACTOR <br />SHALL ALSO PROVIDE THE REQUIRED SAW <br />CUTTING, TRENCHING, BACKFILLING AND <br />FINISHING OF THE AFFECTED LOT SURFACE <br />AND RESTORE TO ORIGINAL CONDITION. <br />PROVIDE AND INSTALL ALL ITEMS SHOWN ON <br />THE DRAWINGS AND AS SPECIFIED UNLESS <br />OTHERWISE NOTED AS NOT IN CONTRACT OR <br />EXISTING TO REMAIN. <br />TOTAL NUMBER OF EV CHARGERS: 75 <br />UTILITY: SCE <br />EXISTING MAIN BREAKER RATING "MS3": 208Y/120V,4000A <br />EXISTING MAIN BREAKER RATING "SBG": 208Y/120V,2000A <br />EXISTING HOUSE METER <br />TOTAL MAX EV LOAD DEMAND: 624.000KW <br />MS-EV BRAND: SIEMENS <br />MS-EV EXISTING OR NEW: EXISTING <br />BUILDING TYPE: MULTIFAMILY APT COMPLEX <br />CHARGING MAX KW CAPACITY: 7.680KW <br />SYSTEM VOLTAGE: 208 <br />SINGLE OR THREE PHASE: THREE PHASE <br />EVSE LOCATION: PARKING GARAGE <br />GENERAL CONSTRUCTION NOTES: <br />a. THE JOB SHALL BE MAINTAINED IN A CLEAN, ORDERLY CONDITION FREE OF DEBRIS <br />AND LITTER SHALL NOT BE UNREASONABLY ENCUMBERED WITH ANY MATERIALS OR <br />EQUIPMENT AND SHALL BE CLEANED AT THE END OF EACH WORKING DAY. <br />b. CONTRACTOR SHALL VERIFY ALL DIMENSIONS PRIOR TO CONSTRUCTION. THE <br />OWNER'S REPRESENTATIVE SHALL BE NOTIFIED OF ANY DISCREPANCIES OF <br />INCONSISTENCIES. <br />c. IT SHALL BE CONTRACTORS RESPONSIBILITY TO DESIGN AND PROVIDE ACCURATE <br />SHORING AND BACKING REQUIRED FOR THE PROTECTION OF LIFE AND PROPERTY <br />DURING INSTALLATION. <br />d. ELECTRICAL EQUIPMENT AND APPARATUS INCLUDING BUT NOT LIMITED TO, <br />SWITCHBOARDS, MOTORS AND CONTROL CENTERS, PANEL BOARDS AND <br />TRANSFORMERS MUST BE SEISMIC-CERTIFIED AND ANCHORED ACCORDING TO <br />EQUIPMENT MANUFACTURER'S INSTALLATION INSTRUCTIONS (CEC 110.3 (B), CBC <br />1613.1, AMERICAN SOCIETY OF CIVIL ENGINEERS (ASCE) 7-10, CHAPTER 13 SEISMIC <br />DESIGN REQUIREMENTS FOR NON-STRUCTURAL COMPONENTS. <br />e. DUST SHALL BE CONTROLLED AT ALL THE TIMES. WASTE WATER GENERATED DURING <br />CONSTRUCTION SHALL NOT BE DISCHARGED INTO THE STORM DRAIN SYSTEM. THIS <br />INCLUDES WASTE FROM PAINTING, SAW CUTTING, CONCRETE WORK, ETC. THE <br />CONTRACTOR SHALL MAKE ARRANGEMENTS TO ELIMINATE DISCHARGES INTO THE <br />STORM DRAIN SYSTEM AND, IF NECESSARY, PROVIDE AN AREA FOR ON-SITE WASHING <br />ACTIVITIES DURING CONSTRUCTION. MATERIALS THAT COULD CONTAMINATE STORM <br />RUNOFF SHALL BE STORED IN AREAS THAT ARE DESIGNED TO PREVENT EXPOSURE TO <br />RAINFALL AND NOT ALLOW STORM WATER TO RUN ON TO THE AREA <br />f. CONSTRUCTION MATERIAL SHALL BE SPECIFIED AND REQUIRED BY THE LATEST <br />EDITION OF THE BUILDING CODE CURRENTLY ADOPTED BY THE AHJ INCLUDING <br />ANY/ALL LOCALLY ENFORCED CODES AND AUTHORITIES.ALL MATERIALS AND <br />EQUIPMENT SHALL BE INSTALLED, APPLIED AND CONNECTED AS DIRECTED BY THE <br />MANUFACTURERS LATEST WRITTEN SPECIFICATIONS EXPECT WHERE OTHERWISE <br />NOTED. MATERIALS NOTED ON THE DRAWINGS SHALL TAKE PRECEDENCE OVER THESE <br />SPECIFICATIONS. <br />APPLICABLE CODES: <br />2023 NATIONAL ELECTRICAL CODE <br />2022 BUILDING ENERGY EFFICIENCY STANDARDS <br />2022 CALIFORNIA BUILDING CODE (11B-228.3.1) <br />2022 CALIFORNIA ELECTRICAL CODE <br />2022 CALIFORNIA GREEN BUILDING STANDARDS <br />CODE (4.106.4.2.2.1, 5.106.5.3) <br />PROJECT INFORMATION: <br />CHARGIE WILL DESIGN AND INSTALL THE ENTIRE CHARGING SYSTEM. <br />PARKING AND EVCS PROFILE <br />LOCATION <br />TOTAL EV <br />PARKING <br />STALLS <br />EVCS ALLOCATION IN PERMIT <br />CBC 11B-812.6.1 <br />GUEST ACCESSIBLE <br />EVCS <br />CALGREEN <br />4.106.4.2.2.1.1 <br />ACCESSIBLE EVCS <br />Parking Level B1 2 2 TENANT-ASSIGNED -- <br />Parking Level G1 12 5 TENANT-ASSIGNED, 7 GUEST 1 - <br />Parking Level G2 15 15 TENANT-ASSIGNED -1 <br />Parking Level G3 16 16 TENANT-ASSIGNED -1 <br />Parking Level G4 15 15 TENANT-ASSIGNED -1 <br />Parking Level G5 15 15 TENANT-ASSIGNED -- <br />TOTAL 75 68 TENANT-ASSIGNED, 7 GUEST 1 3 <br />43 TOTAL GUEST PARKING SPACES <br />REQUIRE 8 EV CAPABLE SPACES <br />(CALGREEN TABLE 5.106.5.3.1). IN <br />THIS SCOPE OF WORK, AN EVSE <br />WILL BE PROVIDED FOR 7 OF THE <br />EXISTING EV CAPABLE SPACES. <br />NOTE: <br />CALIFORNIA GREEN BUILDING STANDARDS CODE SECTION 4.106.4.2.2.1.1 <br />REQUIRES ONE ACCESSIBLE EVCS PER 25 CHARGING STATIONS. 3 ACCESSIBLE <br />EVCS WILL BE PROVIDED FOR THE 68 RESIDENTIAL EVCS. THE 3 ACCESSIBLE EVCS <br />ARE REQUIRED TO BE 9 FEET WIDE AND ADJACENT TO AN 8 FOOT WIDE ACCESS <br />AISLE, OR 12 FEET WIDE AND ADJACENT TO A 5 FOOT WIDE ACCESS AISLE. <br />REFERENCE SHEET 09-EV-22 FOR CBC 11B-228.3 TABLE AND CALGREEN SECTION <br />4.106.4.2.2.1.1. <br />NOTE: <br />GUEST EVCS LAYOUT IS BASED ON THE PERMITTED ARCHITECTURAL 4TH <br />PLAN CHECK SUBMITTAL DATED 09-09-2021. <br />Bldg #101118335 <br />APPROVALS: <br />PLNG - C. Santana <br />BLDG - K. Ahangian <br />PUBLIC WORKS - B. Sarlak <br />ELECT - M. Smith <br />Elect #20182155 <br />2727 N Main Place Dr <br />#MTR011/28/2025