Laserfiche WebLink
(3) Site Pro 1 Stacked 10'-10" T-Arms - Structural Evaluation Site USID #: 214755 <br /> <br />3/1/2023 Page 2 of 4 <br />SUMMARY & RESULTS <br /> <br />The purpose of this analysis was to verify whether the existing mounts are capable of carrying the proposed loading <br />configuration as specified by AT&T Mobility and commissioned by Smartlink Group. <br /> <br />This analysis has been performed in accordance with the 2022 CBC based upon a 3-second gust wind speed of 95 mph. <br />Applicable Standard references and design criteria are listed in Appendices A & B. <br /> <br />This analysis considers maintenance loads of 500 lbs concurrent with 30-mph wind speeds at mounting pipe <br />locations (Lₘ) and 250 lbs at horizontal members (Lᵥ). <br /> <br /> <br /> MOUNT SUMMARY AND RESULTS <br /> <br />Notes Components Centerline % Capacity Results <br />- Face Horizontal 50.0 35.9 Pass <br />- Standoff Arm 50.0 49.4 Pass <br />- Mount Pipe 50.0 45.7 Pass <br />- Mount to Tower Connection 50.0 30.6 Pass <br /> <br /> <br />RECOMMENDATIONS <br /> <br />The mount has sufficient capacity to carry the proposed loading configuration. No modifications are required at this time. <br /> <br /> <br /> <br />4111 3%4 S Main St Unit <br />#WCC0112/13/2024