Laserfiche WebLink
CITADEL EHS <br />2525 CHERRY AVENUE, SUITE 105 <br />SIGNAL HILL, CALIFORNIA 90755 <br />PREPARED FOR: <br />INDUSTRIAL ENTERPRISES <br />3535 INLAND EMPIRE BOULEVARD <br />ONTARIO, CALIFORNIA 91764 <br />PROJECT ADDRESS: <br />420 - 430 EAST DYER ROAD <br />SANTA ANA, CALIFORNIA 92707 <br />SITE DEMOLITION <br />AND INTERIM <br />REDEVLOPMENT PLANS <br />VERSION SUMMARY <br />DRAFTER: <br />PROJECT MANAGER: <br />PRINCIPAL: <br />DATE: <br />PROJECT NUMBER: <br />C. JONES <br />C. JONES <br />12/04/2023 <br />1398.1009.0 <br />M. DROLLINGER <br />SHEET TITLE: SHEET NUMBER: <br />FULL PLOT SIZE: ARCH D (24" x 36") <br />SHEET OF 4NOT FOR CONSTRUCTION <br />VERSION DESCRIPTIONDATE <br />DRAFT 2 DRAFT - PLAN CHECK / NOT FOR CONSTRUCTION12/04/2023 <br />DRAFT 1 DRAFT - PLAN CHECK / NOT FOR CONSTRUCTION10/20/2023 <br />GENERAL NOTES <br />COVER SHEET AND <br />1 <br />C-1 <br />C: <br />\ <br />U <br />S <br />E <br />R <br />S <br />\ <br />C <br />J <br />O <br />N <br />E <br />S <br />\ <br />D <br />E <br />S <br />K <br />T <br />O <br />P <br />\ <br />C <br />A <br />D <br />D <br /> <br />L <br />O <br />C <br />A <br />L <br />\ <br />1 <br />3 <br />9 <br />8 <br />. <br />1 <br />0 <br />0 <br />9 <br />. <br />0 <br />\ <br />1 <br />3 <br />9 <br />8 <br />. <br />1 <br />0 <br />0 <br />9 <br />. <br />0 <br /> <br />P <br />R <br />O <br />P <br />O <br />S <br />E <br />D <br /> <br />D <br />E <br />M <br />O <br />L <br />I <br />T <br />I <br />O <br />N <br /> <br />F <br />I <br />G <br />U <br />R <br />E <br />S <br />. <br />D <br />W <br />G <br />420 - 430 EAST DYER ROAD <br />SANTA ANA, CALIFORNIA 92707 <br />SITE DEMOLITION AND INTERIM REDEVELOPMENT PLANS <br />SITE ADDRESS:420 - 430 EAST DYER ROAD, SANTA ANA, CALIFORNIA 92707 <br />PARCEL NUMBER:411-031-01 <br />SITE AREA:0.57 ACRES <br />TOTAL BUILDING FOOTPRINT: 9,235 SQUARE FEET <br />420 EAST DYER: 2,235 SQUARE FEET <br />430 EAST DYER: 7,000 SQUARE FEET <br />SITE INFORMATION: <br />VICINITY MAP <br />1" = 100' <br />SITE EAST DYER ROAD <br />OA <br />K <br /> <br />S <br />T <br />R <br />E <br />E <br />T <br />SO <br />U <br />T <br />H <br /> <br />K <br />I <br />L <br />S <br />O <br />N <br /> <br />D <br />R <br />I <br />V <br />E <br />SHEET INDEX: <br />1. THESE PLANS INDICATE THE GENERAL SCOPE AND LAYOUT OF THE PROPOSED DEMOLITION AND INTERIM REDEVELOPMENT PLANS FOR THE <br />PROPERTY LOCATED AT 420 - 430 EAST DYER ROAD, SANTA ANA, CALIFORNIA 92707. <br />2. ALL WORK SHALL BE PERFORMED IN ACCORDANCE WITH ALL APPLICABLE CODES, STANDARDS, AND REGULATIONS. <br />3. ALL ACTIVE OPERATIONS, INCLUDING CONSTRUCTION, DEMOLITION, AND EARTHWORK SHALL COMPLY WITH SOUTH COAST AIR QUALITY <br />MANAGEMENT DISTRICT (SCAQMD) RULE 401 FOR VISIBLE EMISSIONS, 402 FOR NUISANCE, RULE 403 FOR FUGITIVE DUST, AND ANY OTHER <br />APPLICABLE SCAQMD REGULATIONS. <br />4. PLANS SHOWN ARE SCHEMATIC IN NATURE AND ARE BASED UPON CURRENTLY AVAILABLE INFORMATION. PLANS MAY NOT ACCURATELY <br />REFLECT CURRENT SITE CONDITIONS. THE CONTRACTOR SHALL VERIFY JOB SITE CONDITIONS AND DIMENSIONS BEFORE BEGINNING WORK. <br />IF A DISCREPANCY BETWEEN THE PLANS AND SITE CONDITIONS IS OBSERVED THAT MAY ALTER OR IMPACT THE SCOPE OF WORK, THE <br />CONTRACTOR SHALL IMMEDIATELY STOP WORK AND CONTACT THE ENGINEER OF RECORD (ENGINEER). <br />5. ALL WORK AT THE SITE SHALL BE PERFORMED IN ACCORDANCE WITH THE SITE-SPECIFIC HEALTH AND SAFETY PLAN (HASP) AND THE SOIL <br />MANAGEMENT PLAN (SMP), AND BE PERFORMED BY QUALIFIED AND TRAINED PERSONNEL. <br />6. THE CONTRACTOR SHALL CLEARLY MARK THE WORK AREA, INCLUDING ANY PROPOSED EXCAVATIONS. THE WORK ARES SHALL BE <br />CLEARED BY UNDERGROUND SERVICE ALERT OF SOUTHERN CALIFORNIA (USA) AND THE OWNERS OF KNOWN UTILITIES IN THE AREA. <br />SUBSURFACE WORK SHALL NOT COMMENCE UNTIL AN AREA HAS BEEN CLEARED. <br />7. THE CONTRACTOR SHALL KEEP THEIR GENERAL WORK AREA CLEAN AND ORDERLY AND FREE OF LITTER AND DEBRIS. UNLESS OTHERWISE <br />ALLOWED BY THE CONTRACT DOCUMENTS, THE CONTRACTOR IS RESPONSIBLE FOR REMOVING THEIR OWN WASTE MATERIALS AND DEBRIS <br />IN A TIMELY MANNER. <br />8. THE CONTRACTOR SHALL KEEP AT LEAST ONE COPY OF THE LATEST APPROVED VERSION OF THESE DOCUMENTS AND THE DEMOLITION <br />PERMIT ON-SITE AT ALL TIMES. CITADEL SHALL HAVE ACCESS TO THE CONTRACTOR'S DOCUMENTS AT ALL TIMES. <br />9. THE CONTRACTOR SHALL MAINTAIN A SET OF AS-BUILT PLANS. THE CONTRACTOR SHALL PERIODICALLY REVIEW THE AS-BUILT PLANS W(ITH <br />THE ENGINEER TO ENSURE THAT CHANGES ARE KEPT UP TO DATE. <br />10. THE CONTRACTOR SHALL PERFORM ALL WORK NECESSARY TO COMPLETE THE PROJECT IN A SATISFACTORY AND TIMELY MANNER. UNLESS <br />EXPLICITLY STATED, THE CONTRACTOR SHALL FURNISH ALL MATERIALS, EQUIPMENT, TOOLS, LABOR, AND INCIDENTALS NECESSARY TO <br />COMPLETE THE PROJECT. <br />11. ALL MATERIALS, EQUIPMENT, AND TOOLS FURNISHED BY THE CONTRACTOR SHALL BE WELL-MAINTAINED, IN GOOD WORKING CONDITION, <br />AND FREE FROM DEFECTS. <br />12. QUALITY OF WORK SHALL BE TO GENERALLY ACCEPTED STANDARDS; MATERIAL AND WORK QUALITY ARE SUBJECT TO THE ENGINEER'S <br />APPROVAL. MATERIAL AND WORK NOT CONFORMING THE REQUIREMENTS OF THIS PLANS OR ANY OTHER CONTRACT DOCUMENT SHALL BE <br />CONSIDERED DETECTIVE AND SUBJECT TO REJECTION. DEFECTIVE MATERIALS OR WORK, WHETHER IN PLACE OR NOT, SHALL BE REMOVED <br />FROM THE SITE BY THE CONTRACTOR, AT THEIR EXPENSE, AT THE DIRECTION OF THE ENGINEER. <br />13. DEMOLISHED MATERIALS SHALL BE SEGREGATED AND BE REMOVED FROM THE SITE BY THE CONTRACTOR IN A PROMPT AND TIMELY MATTER. <br />MATERIALS SHALL BE DISPOSED OF IN ACCORDANCE WITH ALL APPLICABLE FEDERAL, STATE, AND LOCAL REGULATIONS. <br />14. UNLESS SPECIFIED OTHERWISE, SUBMITTALS WILL BE REQUIRED FOR ALL MATERIALS TO BE USED FOR CONSTRUCTION. SHOP DRAWINGS WILL <br />BE REQUIRED FOR ITEMS THAT WILL BE FABRICATED FOR THE WORK. CITADEL CAN WAIVE THIS REQUIREMENT FOR MINOR ITEMS AT THEIR <br />DISCRETION. <br />15. THE CONTRACTORS SHALL BE RESPONSIBLE FOR SITE MANAGEMENT DURING THE COURSE OF WORK OF THIS PROJECT, INCLUDING SAFETY <br />OF ALL PERSONS AND PROPERTY. THIS REQUIREMENT SHALL APPLY CONTINUOUSLY AND NOT BE LIMITED TO NORMAL WORKING HOURS, <br />AND THAT THE CONTRACTOR SHALL DEFEND, INDEMNIFY, AND HOLD THE OWNER AND ENGINEER HARMLESS FROM ANY AND ALL LIABILITY, <br />REAL AND ALLEGED, IN CONNECTION WITH THE PERFORMANCE OF WORK ON THIS PROJECT, EXCEPT FOR LIABILITY ARISING FROM THE SOLE <br />AND DIRECT NEGLIGENCE OF THE OWNER OR ENGINEER. <br />GENERAL NOTES: <br />CITADEL EHS (CITADEL), ON BEHALF OF INDUSTRIAL ENTERPRISES (OWNER) HAS PREPARED <br />THESE PLANS TO SHOW THE GENERAL SCOPE OF THE PROPOSED DEMOLITION AND <br />REDEVELOPMENT OF THE PROPERTY LOCATED AT 420 - 430 EAST DYER ROAD, SANTA ANA, <br />CALIFORNIA 92707 (SITE). ALL ABOVEGROUND FEATURES OF THE SITE, INCLUDING <br />STRUCTURES, HARDSCAPE, AND LANDSCAPE ARE PROPOSED TO BE DEMOLISHED. <br />ADDITIONALLY, UTILITY CONNECTIONS, SUCH AS ELECTRIC, WATER, SEWER, GAS, AND <br />TELECOMMUNICATIONS WILL BE DISCONNECTED AND CAPPED. THE SURFACE WILL BE <br />REPAVED WITH ASPHALT PENDING FUTURE REDEVELOPMENT PLANS. <br />PROJECT OVERVIEW: <br />SHEET NUMBER:SHEET TITLE: <br />C-1 COVER SHEET AND GENERAL NOTES <br />C-2 SITE DEMOLITION PLAN <br />C-3*INTERIM SITE REDEVELOPMENT PLAN <br />C-4*DETAILS <br />* SHEETS C-3 AND C-4 ARE NOT PART OF THE CITY OF SANTA ANA BUILDING PERMIT; FOR CONTRACTOR <br />ONLY. <br />Bldg#'s 101117682-83 <br /> <br />APPROVALS: <br />PLNG: CSantana <br />420-430 E Dyer Rd - <br />101117682-831/9/2024