My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
525 S Marine St - Plan
PBA
>
Building
>
ProjectDox
>
M
>
Marine St
>
525 S Marine St
>
525 S Marine St - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/1/2025 12:08:23 PM
Creation date
6/1/2025 12:07:57 PM
Metadata
Fields
Template:
Plan
Permit Number
20280256
102115780
Full Address
525 S Marine St
Document Relationships
102115780 - Permit
(Permit - Plan)
Path:
\Building\Permits\M\Marine St\525 S Marine St
20280256 - Permit
(Permit - Plan)
Path:
\Building\Permits\M\Marine St\525 S Marine St
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
N <br />KE <br />L <br />L <br />Y <br /> <br />N <br />G <br />U <br />Y <br />E <br />N <br />RE <br />S <br />I <br />D <br />E <br />N <br />C <br />E <br />52 <br />5 <br /> <br />S <br /> <br />M <br />A <br />R <br />I <br />N <br />E <br /> <br />S <br />T <br />, <br />SA <br />N <br />T <br />A <br /> <br />A <br />N <br />A <br />, <br /> <br />C <br />A <br /> <br />9 <br />2 <br />7 <br />0 <br />4 <br />Project Name & Address <br />Sheet Number <br />PV 1.0 <br />Sheet Name <br />DRAWN BY <br />YG <br />CO <br />U <br />N <br />T <br />Y <br />- <br />S <br />A <br />N <br />T <br />A <br /> <br />A <br />N <br />A <br />DATE: 04/13/2023 <br />AH <br />J <br />- <br /> <br />O <br />R <br />A <br />N <br />G <br />E <br /> <br />C <br />O <br />U <br />N <br />T <br />Y <br />32203 VIA BENABARRE, TEMECULA <br />CA USA 92592 <br />CSLB # : 978840 <br />EMAIL: <br />JEREMY@POWERCONSULTATIONS.COM <br />TIME SAVER ELECTRIC <br />SITE PLAN <br />ROOF SECTIONS <br />SCALE: 1/8" = 1'-0" <br />1 SITE PLAN <br />PV 1.0 <br />SYSTEM LEGEND <br />51 NEW HANWHA Q.PEAK DUO BLK <br />ML-G10+(400W) WITH NEW 51 - ENPHASE <br />IQ8PLUS-72-2-US, 240V INVERTERS, MOUNTED ON <br />THE BACK OF EACH MODULES. <br />= EXTERIOR RUN <br />= ATTIC RUN <br />= CONDUIT ROOF TOP JUNCTION BOX <br />= CONDUIT ATTIC RUN JUNCTION BOX <br />= ATTACHMENT POINTS <br />= ROOF OBSTRUCTIONS, VENT, CHIMNEY <br />CIRCUIT #4 - 12 MODULES <br />CIRCUIT #3 - 13 MODULES <br />CIRCUIT #2 - 13 MODULES <br />CIRCUIT #1 - 13 MODULES <br />CIRCUIT(S) <br />NEW JUNCTION BOXJB <br />= RAFTER <br />MODULE, ARRAY WEIGHT (LOAD CALC'S) <br />Number of Modules 51 <br />Module Weight 48.5 LBS <br />Total Module (Array) Weight 2473.50 LBS <br />Number of Attachment point 32 <br />Mounting System Weight <br />(Per Module)1.5 LBS <br />Mounting System Weight 48.00 LBS <br />Total System Weight <br />(Module Weight + Mounting System Weight)2521.50 LBS <br />Weight at Each Attachment Point <br />(Array Weight / Number of Attachment Point)77.30 LBS <br />Module Area (74.0"x41.1")21.12 SqFt <br />Total Array Area 1077.16 SqFt <br />Distributed Load <br />(Total System Weight / Total Array Area)2.37 Per SqFt <br />Total Roof Area 3252 SqFt <br />Total Percentage or Roof Covered <br />Total Array Area / Total Roof Area)*100 33.12% <br />= FIRE SETBACK & PATHWAY <br />ATTACHMENT SPACING : 4'-0" <br />EXISTING EXTERIOR METER/MAIN SERVICE PANEL & <br />POINT OF INTERCONNECTION. TIED TO EXTERIOR <br />UTILITY METER. <br />NEW DEDICATED PV SYSTEM COMBINER PANEL.C <br />NEW 100A NON-FUSED AC DISCONNECTAC <br />M <br />MODULE - 08 <br />SLOPE - 21° <br />AZIMUTH - 90° <br />MATERIAL - COMP SHINGLE <br />RAFTER SIZE & SPACING - 2"X4" @ 24" O.C. <br />MODULE - 10 <br />SLOPE - 26° <br />AZIMUTH - 90° <br />MATERIAL - COMP SHINGLE <br />RAFTER SIZE & SPACING - 2"X4" @ 24" O.C. <br />MODULE - 29 <br />SLOPE - 26° <br />AZIMUTH - 270° <br />MATERIAL - COMP SHINGLE <br />RAFTER SIZE & SPACING - 2"X4" @ 24" O.C. <br />MODULE - 04 <br />SLOPE - 21° <br />AZIMUTH - 180° <br />MATERIAL - COMP SHINGLE <br />RAFTER SIZE & SPACING - 2"X4" @ 24" O.C. <br />ROOF #01 <br />ROOF #02 <br />ROOF #03 <br />ROOF #04 <br />ROOF #04 <br />36" FIRE PATHWAY <br />C <br />AC <br />M <br />JB <br />BA <br />C <br />K <br /> <br />O <br />F <br /> <br />H <br />O <br />U <br />S <br />E <br />36" FIRE PATHWAY <br />RO <br />O <br />F <br /> <br /># <br />0 <br />1 <br />RO <br />O <br />F <br /> <br /># <br />0 <br />2 <br />RO <br />O <br />F <br /> <br /># <br />0 <br />3 <br />36" FIRE SETBACK <br />36" FIRE PATHWAY <br />36" FIRE PATHWAY <br />36 <br />" <br /> <br />F <br />I <br />R <br />E <br /> <br />S <br />E <br />T <br />B <br />A <br />C <br />K <br />52 <br />5 <br /> <br />S <br /> <br />M <br />A <br />R <br />I <br />N <br />E <br /> <br />S <br />T <br />FR <br />O <br />N <br />T <br /> <br />O <br />F <br /> <br />H <br />O <br />U <br />S <br />E <br />36 <br />" <br /> <br />F <br />I <br />R <br />E <br /> <br />S <br />E <br />T <br />B <br />A <br />C <br />K <br />36 <br />" <br /> <br />F <br />I <br />R <br />E <br /> <br />S <br />E <br />T <br />B <br />A <br />C <br />K <br />36 <br />" <br /> <br />F <br />I <br />R <br />E <br /> <br />S <br />E <br />T <br />B <br />A <br />C <br />K <br />36" <br />F <br />I <br />RE P <br />A <br />T <br />H <br />W <br />A <br />Y <br />JB <br />JB <br />JB JB <br />Signed 07/11/2023 <br />525 S Marine St <br />07/28/23
The URL can be used to link to this page
Your browser does not support the video tag.