Laserfiche WebLink
TRANG DO RESIDENCE <br />5402 W LEHNHARDT AVE., SANTA ANA, CA 92704 <br />SIGNED & STAMP BY <br />DATE 10/14/2024 <br />PROJECT ID OPS 034-874 <br />CREATED BY SS <br />CHECKED BY RB <br />SCALE <br />SHEET SIZE <br />11"X 17" <br />ANSI B <br /># REVISION/UPDATE DATE <br />B REVISION 11/04/2024 <br />SHEET INFORMATIONHOMEOWNER INFO <br />SHEET NO. <br />APN NUMBER: 10859132 <br />PV-0 <br />PHONE NO: (714) 548-0899 <br />Luxor Energy, Inc <br />11740 Sterling Ave, Riverside, CA 92503 <br />C10 LICENSE <br />Lic No. #1102673 <br />www.myluxorenergy.com <br />SATELLITE VIEW (SCALE: NTS) <br />· PROPOSED PROJECT TO INSTALL GRID- TIED PV + ESS SYSTEM <br />ON AN EXISTING ROOFTOP STRUCTURE AT A RESIDENTIAL <br />LOCATION: 5402 W LEHNHARDT AVE., SANTA ANA, CA 92704. <br />COORDINATES: 33.732840, -117.939564 <br />· THE PV MODULES WILL BE SECURED ON ROOF USING <br />PRE-ENGINEERED ROOF RACKING SYSTEM. <br />· INSTALLED PV SYSTEM WILL BE THEN CONCECTED TO <br />HOMEOWNER'S SERVICE EQUIPMENT USING APPLICABLE <br />INTERCONCECTION METHOD (AS PER AHJ). <br />· THE ENERGY PRODUCED BY PV SYSTEM WILL BE USED TO <br />POWER THE HOME APPLIANCES. EXCESS POWER IS SENT BACK <br />TO THE UTILITY GRID. <br />SCOPE OF WORK <br />SHEET INDEX <br />PROJECT LOCATION (SCALE: NTS) <br />DESIGN CRITERIA <br />·CONSTRUCTION: SINGLE FAMILY DWELLING (SFD) <br />·NO. OF STORIES: DOUBLE STORY <br />·EXPOSURE CATEGORY : B, RISK CATEGORY : II <br />·WIND SPEED (ASCE 7-16) : 95 MPH <br />·GROUND SNOW LOAD (ASCE 7-16) : 0 lb/sqft <br />·ASHRAE EXTREME LOW: 2°C <br />·ASHRAE HIGH TEMP (2% AVG.) : 31°C <br />·ASHRAE DISTANCE ABOVE ROOF (7/8") : 53°C <br />PV-0 PROJECT SUMMARY <br />PV-1 SITE PLAN <br />PV-2 ROOF ATTACHMENT DETAILS <br />PV-3 BOM & STRING LAYOUT <br />S-1 STRUCTURAL DETAILED DIAGRAM <br />S-2 EQUIPMENT ELEVATION DIAGRAM <br />E-1 ELECTRICAL DIAGRAM & CALCULATION <br />E-2 PLACARDS <br />E.S EQUIPMENT SPECIFICATIONS <br />[ DC ] SYSTEM SIZE [ AC ] SYSTEM SIZE <br />(15) MODULES x 425W (1) INVERTER x 5760W <br />6.375 kW 5.760 kW <br />PROJECT: PV SYSTEM DETAILS <br />PROJECT <br />SUMMARY <br />· THE EQUIPMENT AND ALL ASSOCIATED <br />WIRING AND INTERCONCECTION SHALL BE <br />INSTALLED ONLY BY QUALIFIED PEOPLE. A <br />QUALIFIED PERSON IS ONE WHO HAS <br />SKILLS AND KNOWLEDGE RELATED TO THE <br />CONSTRUCTION AND OPERATION OF THE <br />ELECTRICAL EQUIPMENT AND <br />INSTALLATIONS AND HAS RECEIVED <br />SAFETY TRAINING TO RECOGNIZE AND <br />AVOID THE HAZARDS INVOLVED. <br />(CEC690.4(E) AND 705.6) <br />·LOCAL UTILITY PROVIDER SHALL BE <br />NOTIFIED PRIOR TO USE AND ACTIVATION <br />OF ANY SOLAR PHOTOVOLTAIC <br />INSTALLATION. FOR A LINE SIDE TAP <br />CONCECTION, UTILITY NEEDS TO BE <br />NOTIFIED WELL IN ADVANCE TO <br />COORDINATE BUILDING ELECTRICAL <br />SHUT OFF. <br />·NEW CONDUIT ROUTING SHOWN IS <br />ESSENTIALLY SCHEMATIC. <br />SUBCONTRACTOR SHALL LAY OUT RUNS <br />TO SUIT FIELD CONDITIONS AND THE <br />COORDINATION REQUIREMENTS OF <br />OTHER TRADES. <br />·ARRAY WIRING SHOULD NOT BE READILY <br />ACCESSIBLE EXCEPT TO QUALIFIED <br />PERSONNEL. <br />·ALL EXTERIOR CONDUIT, FITTINGS, AND <br />BOXES SHALL BE WATERTIGHT AND <br />APPROVED FOR USE IN WET LOCATIONS . <br />·WIRING METHODS FOR PV SYSTEM <br />CONDUCTORS AREN'T PERMITTED WITHIN <br />10 IN. OF THE ROOF DECKING OR <br />SHEATHING EXCEPT WHERE LOCATED <br />DIRECTLY BELOW THE ROOF SURFACE <br />THAT'S COVERED BY PV MODULES AND <br />ASSOCIATED EQUIPMENT WIRING <br />·BACK-FED BREAKER MUST BE AT THE <br />OPPOSITE END OF BUS BAR FROM THE <br />MAIN BREAKER OR MAIN LUG SUPPLYING <br />CURRENT FROM THE UTILITIES. <br />·ALL CONDUCTORS AND WIRE TIES <br />EXPOSED TO SUNLIGHT ARE LISTED AS UV <br />RESISTANT. <br />·CONTRACTOR SHALL FOLLOW ALL <br />ELECTRICAL EQUIPMENT LABELING <br />REQUIREMENTS ACCORDING TO CEC. <br />·MEASURE THE LINE-TO-LINE AND <br />LINE-TO-NEUTRAL VOLTAGE OF ALL <br />SERVICE ENTRANCE CONDUCTORS PRIOR <br />TO INSTALLING ANY SOLAR EQUIPMENT. <br />THE VOLTAGES FOR THE 240VAC RATED. <br />·ALL EXTERIOR CONDUIT TO BE PAINT <br />MATCHED TO THE HOMES COLORS <br />ELECTRICAL NOTES <br />NTS <br />· ALL COMPONENTS ARE UL LISTED & CEC CERTIFIED, WHERE WARRANTED <br />· A DISCONNECTING MEANS SHALL BE INSTALLED AT A READILY ACCESSIBLE <br />LOCATION EITHER OUTSIDE OF THE BUILDING OR STRUCTURE OR INSIDE <br />NEAREST POINT OF ENTRANCE OF THE SYSTEM CONDUCTORS. <br />· HEIGHT OF THE INTEGRATED AC/DC DISCONNECT SHALL NOT EXCEED 6'-7" PER <br />CEC CODE 240.24. <br />· A GROUNDING ELECTRODE SYSTEM IN ACCORDANCE WITH CEC 690.47 AND <br />250.50 THROUGH 60 AND 250-166 SHALL BE PROVIDED. PER CEC <br />· GROUNDING ELECTRODE SYSTEM OF EXISTING BUILDING MAY BE USED AND <br />BONDED TO THE SERVICE ENTRANCE. IF EXISTING SYSTEM IS INACCESSIBLE OR <br />INADEQUATE A SUPPLEMENTAL GROUNDING ELECTRODE WILL BE USED AT THE <br />INVERTER LOCATION CONSISTING OF A UL LISTED 8 FT. GROUND ROD WITH <br />ACORN CLAMP. GROUNDING ELECTRODE CONDUCTORS SHALL BE NO LESS <br />THAN #8 AWG AND NO LARGER THAN #6 AWG COPPER AND BONDED TO THE <br />EXISTING GROUNDING ELECTRODE TO PROVIDE FOR A COMPLETE SYSTEM. <br />· PHOTOVOLTAIC MODULES ARE TO BE CONSIDERED NON-COMBUSTIBLE. <br />· PHOTOVOLTAIC INSTALLATION WILL NOT OBSTRUCT ANY PLUMBING. <br />MECHANICAL, OR BUILDING ROOF VENTS. <br />· WATER PROOF CONCECTORS AND HUBS SHALL BE USED WHERE APPLICABLE <br />PER CEC 312.2 AND 314.15. <br />· GROUNDING/BONDING BUSHINGS SHALL BE INSTALLED WHERE APPLICABLE <br />PER CEC 250.92. <br />· ALL EXTERIOR RACEWAYS ON WALLS SHOULD BE EMT UNLESS NOTED <br />OTHERWISE. <br />· CONTRACTOR SHALL INSTALL EQUIPMENT IN ACCORDANCE WITH <br />MANUFACTURER INSTRUCTIONS & NOTHING IN THIS DOCUMENT SHALL BE <br />INTERPRETED IN A WAY THAT OVERRIDES THEM. <br />· CONTRACTOR IS RESPONSIBLE FOR VERIFICATION OF ALL CONDITIONS, <br />DIMENSIONS & DETAILS IN THIS DOCUMENT. ALL DIMENSIONS SHALL BE <br />VERIFIED BY SUBCONTRACTOR BEFORE INSTALLATION. <br />PHOTOVOLTAIC SYSTEM FIRE CLASSIFICATION LISTING IN ACCORDANCE WITH <br />UL1703 STANDARD. <br />GENERAL NOTES <br />APPLICABLE GOVERNING CODES & NOTES <br />THIS PROJECT SHALL COMPLY WITH THE FOLLOWING CODES: <br />· 2022 CALIFORNIA BUILDING CODE <br />· 2022 CALIFORNIA RESIDENTIAL CODE <br />· 2022 CALIFORNIA MECHANICAL CODE <br />· 2022 CALIFORNIA PLUMBING CODE <br />· 2022 CALIFORNIA ENERGY CODE <br />· 2022 CALIFORNIA FIRE CODE <br />· 2022 CALIFORNIA ELECTRICAL CODE <br />ALL OTHER RELATED STATE, LOCAL & AHJ AMENDMENTS. <br />PROJECT INFORMATION <br />(#) PV MODULES (15) JINKO SOLAR JKM425N-54HL4-B <br />(#)OPTIMIZERS (15) SOLAREDGE POWER OPTIMIZER S500B <br />(#)INVERTER (1) SOLAREDGE ENERGY HUB SE5700H-US INVERTER <br />(#)BATTERY (01) SOLAREDGE ENERGY BANK BATTERY (10KW) <br />(BAT-10K1PS0B-02) <br />SYSTEM OUTPUT <br />CURRENT 24.00A <br />STRING 1 STRING OF 08 MODULES & 1 STRINGS OF 07 <br />MODULES <br />ROOF RACKING <br />SYSTEM <br />IRONRIDGE QUICKMOUNT HALO ULTRAGRIP W/ <br />IRONRIDGE XR-10 <br />POINT OF <br />INTERCONNECTION <br />30A LOAD SIDE BREAKER IN EXTERIOR NEW <br />METER-MAIN SERVICE PANEL WITH 200A MAIN <br />BREAKER, 200A BUSBAR, 120/240V, 3W, 1ΙΈ <br />UTILITY SCE <br />AHJ SANTA ANA CITY <br />REV_A : 11/04/2024 <br />The scope of the plans is for the installation of the solar photovoltaic system only and the approval is subject to compliance with all applicable city and state codes and <br />regulations regarding construction. The approval of the plans does not constitute any certification of the accuracy, completeness, or building permit status of the <br />existing buildings and structures as shown. <br />Bldg#:101121618 <br />Elec#:20184505 <br /> <br />Approvals: <br />Elec: M Smith <br />5402 W Lehnhardt <br />Ave11/25/2024