Laserfiche WebLink
VICINITY MAP <br />NTS <br />SHEET INDEX:CODE INFORMATIONGENERAL NOTES: <br />1. THE SYSTEM WILL NOT BE TURNED-ON UNTIL THE SERVING UTILITY COMPANY HAS BEEN <br />NOTIFIED. <br />2. THE INSTALLED SOLAR SYSTEM HAS A DISTRIBUTED WEIGHT LESS THAN 4 PSF. <br />3. THE CONCENTRATED LOAD FOR EACH VERTICAL SUPPORT IS LESS THAN 40 LBS. <br />4. ALL PV EQUIPMENT IS LISTED BY A RECOGNIZED TESTING LAB. INVERTERS ARE UL 1741 <br />COMPLIANT. <br />5. THE BACKFED BREAKER WILL BE LOCATED AT THE OPPOSITE END OF THE BUS FROM THE <br />MAIN BREAKER. <br />6. CONDUCTORS ARE 90° C RATED COPPER WIRE. <br />7. ANY CONDUCTORS EXPOSED TO SUNLIGHT ARE LISTED AS SUNLIGHT <br />RESISTANT. <br />8. IF DC CONDUCTORS ARE RUN INSIDE THE BUILDING, THEY WILL BE CONTAINED IN A <br />METAL RACEWAY. <br />9. ANY CONDUCTORS BETWEEN SEPARATE ARRAYS ON THE ROOF WILL BE PROTECTED IN <br />CONDUIT. <br />10. THE EQUIPMENT GROUNDING CONDUCTOR ON THE ROOF WILL BE PROTECTED FROM <br />PHYSICAL DAMAGE. IT WILL BE TUCKED NEATLY UNDER THE MODULES AND RAILS AND <br />SECURED IN PLACE. <br />11. IN ACCORDANCE WITH THE MANUFACTURER'S INSTRUCTIONS, THE MODULES WILL BE <br />ATTACHED TO THE EQUIPMENT GROUNDING CONDUCTOR. <br />12. ALL EXTERIOR CONDUIT, FITTINGS AND BOXES ARE RAIN-TIGHT AND APPROVED FOR USE <br />IN WET LOCATIONS. <br />13. ALL ELECTRICAL EQUIPMENT WILL HAVE CLEARANCES AROUND IT MAINTAINED IN <br />ACCORDANCE WITH CEC 110.26. <br />14. SOLAR MODULES WON'T BLOCK ANY MECHANICAL, PLUMBING, OR BUILDING ROOF <br />VENTS. <br />15. A GROUNDING ELECTRODE SYSTEM WILL BE INSTALLED ACCORDING TO CEC 250.50 IF <br />THE EXISTING MAIN SERVICE PANEL DOES NOT HAVE A VERIFIABLE GROUNDING <br />ELECTRODE SYSTEM. ACCORDING TO CEC SECTION 250.104, THE ELECTRICAL SERVICE <br />WILL BE BONDED TO THE WATER AND GAS PIPING. <br />16. IN ACCORDANCE WITH CAL-OSHA REGULATIONS, A LADDER WILL BE IN PLACE FOR THE <br />INSPECTION. <br />2022 CALIFORNIA BUILDING CODE (CBC) <br />2022 CALIFORNIA RESIDENTIAL CODE (CRC) <br />2022 CALIFORNIA FIRE CODE (CFC) <br />2022 CALIFORNIA ELECTRICAL CODE (CEC) <br />2022 CALIFORNIA MECHANICAL CODE (CMC) <br />2022 CALIFORNIA PLUMBING CODE (CPC) <br />ANY OTHER LOCAL AND MUNICIPAL CODES <br />PHOTOVOLTAIC SOLAR PROJECT INFORMATION: <br />SYSTEM SIZE: 9.450kW (DC), 8.505kW (AC) <br />MODULES: (27) SUNPOWER X21-350-BLK-E-AC <br />AC MODULES <br />PEAK POWER = 320W <br />MAX CONT. OUTPUT POWER = 315W <br />MAX OUTPUT CURRENT = 1.31A <br />MAX OCPD = 20A <br />MAX NUMBER IN SERIES = 12 <br />TEMP. COEFF. OF POWER = -0.29%/°C <br />DIMENSIONS = 61.3" x 41.2" x 1.8" <br />WEIGHT = 42.9LBS <br />ARRAY: INSTALLED WEIGHT = 2.45 PSF <br />ROOF COVERAGE = 473.55 SQ. FT. <br />ARRAYS COVER 20.63% OF TOTAL ROOF AREA <br />MOUNTING HARDWARE: INVISIMOUNT RAIL <br />UNIRAC FLASHLOC <br />5/16" STAINLESS STEEL LAG BOLTS <br />@72" OC OR LESS WITH A MINIMUM OF <br />3 1 <br />4" PENETRATION INTO ROOF RAFTERS <br />EXISTING ROOF INFO: 1 STORY, COMP SHINGLE <br />2"X6"@24" RAFTERS <br />ECOSOLAR USA <br />ELECTRICAL LLC <br />13962 SEABOARD CIRCLE <br />GARDEN GROVE, CA 92840 <br />PH: 714.265.9077 <br />DAVID Q HOANG <br />C10 - 1045300 <br />DATE: __________ <br />ENGINEER OF RECORD <br />9. <br />4 <br />5 <br />0 <br />k <br />W <br /> <br />( <br />D <br />C <br />) <br />, <br /> <br />8 <br />. <br />5 <br />0 <br />5 <br />k <br />W <br /> <br />( <br />A <br />C <br />) <br />REV <br />S <br />Y <br />S <br />T <br />E <br />M <br /> <br />S <br />I <br />Z <br />E <br />DESCRIPTION DATE <br />DRAWN BY: <br />CHECKED BY: <br />R.A. <br />S.C. <br />REVISIONS <br />PA <br />P <br />E <br />R <br /> <br />S <br />I <br />Z <br />E <br />: <br /> <br />1 <br />1 <br />" <br /> <br />x <br /> <br />1 <br />7 <br />" <br /> <br />( <br />A <br />N <br />S <br />I <br /> <br />B <br />) <br />SA <br />N <br />T <br />A <br /> <br />A <br />N <br />A <br />, <br /> <br />C <br />A <br /> <br />9 <br />2 <br />7 <br />0 <br />4 <br />, <br /> <br />U <br />S <br />A <br />61 <br />5 <br /> <br />S <br /> <br />M <br />O <br />H <br />A <br />W <br />K <br /> <br />D <br />R <br />, <br />04.03.2023 <br />(6 <br />5 <br />7 <br />) <br /> <br />2 <br />8 <br />2 <br />- <br />9 <br />0 <br />9 <br />8 <br />PH <br />U <br />O <br />N <br />G <br /> <br />N <br />G <br />U <br />Y <br />E <br />N <br />/ <br />H <br />I <br />E <br />U <br /> <br />N <br />G <br />U <br />Y <br />E <br />N <br />AP <br />N <br />: <br /> <br />1 <br />0 <br />9 <br />8 <br />3 <br />1 <br />0 <br />4 <br />PV0 <br />SCOPE OF WORK <br />PV0 COVER SHEET <br />PV1 SITE/ROOF PLAN <br />PV2 ELEVATION DETAIL <br />PV3 ELECTRIC LINE DRAWING, GROUNDING DETAIL <br />PV4 BILL OF MATERIALS <br />PV5 CALCULATIONS, SIGN <br />PV6 MICROINVERTER MAP <br />ATTACHED SPECIFICATION SHEETS <br />INSTALL (27) SUNPOWER X21-350-BLK-E-AC ELECTRIC MODULES ON THE EXISTING 1 STORY, COMP SHINGLE ROOF. <br />INSTALL ASSOCIATED MOUNTING HARDWARE, JUNCTION BOXES, CONDUIT, CONDUCTORS AND GROUNDING. <br />INSTALL (1)125A AC LOAD CENTER AND CONNECT TO THE NEW 225A MAIN SERVICE PANEL. <br />UPGRADE THE EXISTING 100A/100A MAIN PANEL TO NEW 225A/200A MAIN PANEL. <br />This item has been digitally signed <br />and sealed on May 09, 2023 <br />The scope of the plans is for the installation of the solar photovoltaic <br />system only and the approval is subject to compliance with all <br />applicable city and state codes and regulations regarding construction. <br />The approval of the plans does not constitute any certification of the <br />accuracy, completeness, or building permit status of the existing <br />buildings and structures as shown. <br />Bldg# 101116305 <br />Elec# 20180670 <br />Issued 08/23/23 <br />615 S Mohawk Dr <br />08/24/23