My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
718 W Tribella Ct - Plan
PBA
>
Building
>
ProjectDox
>
T
>
Tribella Crt
>
718 W Tribella Crt
>
718 W Tribella Ct - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/1/2025 12:08:24 PM
Creation date
6/1/2025 12:08:05 PM
Metadata
Fields
Template:
Plan
Permit Number
20185356
Full Address
718 W Tribella Crt
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br /> 6'-0" & 6'-6" <br />MANUFACTERED TRUSS <br />1. ROOF MATERIAL: FLAT TILE <br />2. ROOF SLOPE:30 DEGREES <br />3. ROOF STRUCTURE: <br />4. RAFTER SIZE:2X4 <br />5. RAFTER SPACING: 24" O.C. <br />6. RAFTER SPAN (S): <br />APPROX. INSTALLATION AREA: 250.17 SQ. FT. <br />TOTAL SYSTEM WEIGHT:627.60 LBS. <br />DISTRIBUTED WEIGHT OF ARRAY: 2.51 PSF. <br />WEIGHT PER MOUNT:34.87 LBS <br />LOAD CALCULATIONS <br />ROOF INFORMATION <br />MODULE INFORMATION <br />7. PV MODULE: PANASONIC <br /> EVPV420HK2 <br />8. DIMENSION: 73.4" H X 40.9" W X 1.18" D <br />9. WEIGHT 47.6 LBS <br />10. MODULE CLEARANCE: 3IN. MIN / 6 IN. MAX <br />ATTACHMENT & RAILING <br />11. ATTACHMENT:(18) SRH FLAT TILE HOOK <br />12. MAX. HORIZONTAL STANDOFF: 72 IN. <br />13. STANDOFF STAGGERING: YES <br />14. MAX. VERTICAL STANDOFF: PER INSTALLATION INSTRUCTIONS <br />15. RAILING:EVEREST RACKING-48-X RAILS <br />16. MAX RAIL CANTILEVER: PER INSTALLATION INSTRUCTIONS <br />17. LAG BOLT SIZE:4-1/4 IN. X 5/16 IN. DIA <br />18. LAG BOLT EMBEDMENT: 3-1/4 IN. <br />INFINITY SOLAR <br />TLP ELECTRIC INTEGRATIONS, INC. <br />749 N MAIN ST. <br />ORANGE, CA 92868 <br />PHONE: (714) 880-8089 <br />LIC NO.: C10 - 824287 <br />TIM POLUJANCEWICZ <br />D1 <br />11 <br />15 16 <br />17 18 <br />NOTE: PILOT HOLES <br />REQUIRED FOR 5/16" <br />DIA. LAG BOLTS <br />D1 <br />SEE <br />10789 <br />5453 <br />1 2 <br />6 6 <br />STRUCTURAL PLAN PV.03 <br />STRUCTURAL NOTES <br />2X4 RAFTERS @24" CENTERS <br />FLAT TILE <br />SCALE: 3/16" = 1'-0" <br />ATTACHMENT DETAIL N DRAWN BY: <br />PAPER: 11X17 (ANSI B)DATE: <br />DESIGN LEAD: <br />DESIGNED BY SOLAR DEPLOYED, LLC. <br />931 10TH ST #114, MODESTO, CA 95354 <br />209-671-2001 | HELLO@SOLARDEPLOYED.COM <br />SIGNATURE: <br />CHECKED BY: <br />1/29/2025 <br />A.R. <br />D.A.A.B. <br />SHEET NAME: <br />NEW PV SYSTEM <br /> 5.040 kW DC (STC-DC) | 4.719 kW (CEC-AC) <br />GRAHAM BERGER <br />718 W TRIBELLA CT, <br />SANTA ANA, CA 92703 <br />APN: 19835227 <br />SHEET NO.: <br />ENGINEER OF RECORD <br />A. ALL HARDWARE, INCLUDING MOUNTING <br />AND RACKING, TO BE INSTALLED PER <br />MANUFACTURER SPECIFICATIONS. <br />B. ALL PV RELATED RACKING ATTACHMENTS <br />WILL BE SPACED NO GREATER THAN THE <br />SPAN DISTANCE SPECIFIED BY THE <br />RACKING MANUFACTURER; FINAL <br />ATTACHMENT LOCATIONS MAY BE <br />ADJUSTED IN THE FIELD AS NECESSARY. <br />C. ROOFTOP PENETRATIONS PERTAINING <br />TO SOLAR RACKING WILL BE COMPLETED <br />AND SEALED W/ APPROVED CHEMICAL <br />SEALNT PER CODE BY A LICENSED <br />CONTRACTOR. <br />D. MAXIMUM VERTICAL STANDOFF BETWEEN <br />RAILS & MAXIMUM RAIL CANTILEVER PER <br />MANUFACTURER'S INSTALLATION <br />INSTRUCTIONS <br />18'-7"20'-7"3'-0" <br />718 W Tribella Ct <br />3/17/2025
The URL can be used to link to this page
Your browser does not support the video tag.