Laserfiche WebLink
JE <br />F <br />F <br /> <br />F <br />I <br />S <br />H <br />E <br />R <br />RE <br />S <br />I <br />D <br />E <br />N <br />C <br />E <br />91 <br />2 <br /> <br />F <br />R <br />E <br />E <br />M <br />A <br />N <br /> <br />S <br />T <br />, <br />SA <br />N <br />T <br />A <br /> <br />A <br />N <br />A <br />, <br /> <br />C <br />A <br /> <br />9 <br />2 <br />7 <br />0 <br />3 <br />Project Name & Address <br />Sheet Number <br />PV 2.0 <br />Sheet Name <br />DRAWN BY <br />MD <br />AH <br />J <br /> <br />- <br /> <br />C <br />I <br />T <br />Y <br /> <br />O <br />F <br /> <br />I <br />R <br />V <br />I <br />N <br />E <br />DATE: 04/07/2023 <br />ATTACHMENT DETAIL <br />GENERAL STRUCTURAL NOTES: <br />SCALE: NTS <br />1 ATTACHMENT DETAIL (SIDE VIEW) <br />PV 2.0 <br />1. THE SOLAR PANELS ARE TO BE MOUNTED TO THE <br />ROOF FRAMING USING THE UNIRAC STANDARD <br />PRE-MANUFACTURED ALUMINUM MOUNTING RAIL WITH <br />FLASHLOC RM ATTACHMENT. THE MOUNTING FEET ARE <br />TO BE SPACED AS SHOWN IN THE DETAILS, AND MUST <br />BE STAGGERED TO ADJACENT FRAMING MEMBERS TO <br />SPREAD OUT THE ADDITIONAL LOAD. <br />2. UNLESS NOTED OTHERWISE, MOUNTING ANCHORS <br />SHALL BE 5/16" LAG SCREWS WITH A MINIMUM OF 2-1/2" <br />PENETRATION INTO ROOF FRAMING. <br />3. THE PROPOSED PV SYSTEM ADDS 2.6 PSF TO THE <br />ROOF FRAMING SYSTEM. <br />4. ROOF LIVE LOAD = N/A PSF TYPICAL, 0 PSF UNDER NEW <br />PV SYSTEM. <br />5. ROOF SNOW LOAD = 0 PSF <br />6. WIND SPEED = 95 MPH <br />7. EXPOSURE CATEGORY = C <br />8. MAX SPACING BETWEEN ATTACHMENTS (INCHES) = 48" <br />UNIRAC MODULE <br />CLAMP w/5 <br />16" BOLT <br />AND LOCK WASHER <br />BOTTOM MOUNTING CLIP <br />UNIRAC RAIL <br />MODULE <br />(4)2"x 1/4" STAINLESS STEEL <br />DIA LAG BOLTS <br />(E) PLYWOOD <br />ROOF DECKING <br />(E) ROOFING MATERIAL <br />(3 <br />8" X 3 <br />4") BOLT <br />FLASHLOC RM <br />(E) 2"X4" RAFTERS @ 24" O.C. <br />>6" <br />Signed: 06/19/2023 <br />Structural <br />Only <br />912 N. Freeman <br />Street08/29/23