Laserfiche WebLink
0 <br />REVISIONS <br />DOC ID: <br />PROJECT <br />SUMMARY <br />GR <br />I <br />D <br />- <br />T <br />IE <br />D <br /> <br />S <br />O <br />L <br />A <br />R <br /> <br />P <br />O <br />W <br />E <br />R <br /> <br />S <br />Y <br />ST <br />EM <br />SSPR-013 <br />94 <br />1 <br /> <br />W <br />E <br />S <br />T <br /> A <br />L <br />T <br />ON <br /> <br />A <br />V <br />E <br />N <br />U <br />E <br />, <br />DATE: 03/22/23 <br />CONTRACTOR: PAUL NAKHLE <br />COMPANY: SOLECTRIC SOLUTION <br />SA <br />N <br />T <br />A <br />A <br />N <br />A <br />, <br /> <br />C <br />A <br /> <br />9 <br />2 <br />7 <br />0 <br />7 <br />AP <br />P <br />E <br />N <br />D <br />I <br />X <br />DIRECTORY PAGE <br />PV-0.0 SITE PLAN AND FIRE SETBACKS <br />E-1.0 SINGLE-LINE DIAGRAM <br />PV-1.0 SAFETY LABELS <br />S-1.0 ATTACHMENT PLAN <br />S-1.1 ATTACHMENT DETAILS <br />MODULE DATASHEET <br />MICROINVERTER DATASHEET <br />DISCONNECT DATASHEET <br />COMBINER DATASHEET <br />MOUNTING SYSTEM DATASHEET <br />MOUNTING SYSTEM ENGINEERING LETTER <br />UL 1703 CLASS A FIRE CERTIFICATION <br />UL 2703 GROUND AND BONDING CERTIFICATION <br />ANCHOR DATASHEET <br />PROJECT DETAILS <br />PROPERTY <br />ADDRESS <br />941 WEST ALTON AVENUE. SANTA ANA, <br />CA. 92707 <br />ZONING RESIDENTIAL <br />USE AND <br />OCCUPANCY <br />CLASSIFICATION <br />ONE OR TWO-FAMILY DWELLING GROUP <br />(GROUP R3) <br />UTILITY <br />COMPANY SOUTHERN CALIFORNIA EDISON CO. <br />ELECTRIC CODE 2022 CEC <br />FIRE CODE 2022 CFC <br />OTHER BUILDING <br />CODES <br />2022 CA BUILDING CODE <br />2022 CA RES. BUILDING CODE <br />2022 CA PLUMBING CODE <br />2022 CA MECHANICAL CODE <br />2022 CA FUEL GAS CODE <br />2022 CA ENERGY CODE <br />CONTRACTOR INFORMATION <br />COMPANY SOLECTRIC SOLUTION <br />ADDRESS 6083 ANDREWS CT, <br />FONTANA, CA 92336 <br />CONTRACTOR <br />SIGNATURE <br />CONTRACTOR <br />LICENSE C10 1006294 <br />SCOPE OF WORK <br />THIS PROJECT INVOLVES THE INSTALLATION OF A PHOTOVOLTAIC <br />POWER SYSTEM. SOLAR PANELS WILL BE RACKED USING A <br />PREENGINEERED RACKING SYSTEM. THE RACKED MODULES WILL BE <br />ELECRTICALLY CONNECTED WITH DC TO AC POWER INVERTERS AND <br />INTERCONNECTED TO THE LOCAL UTILITY USING MEANS AND <br />METHODS CONSISTENT WITH THE RULES ENFORCED BY THE LOCAL <br />UTILITY AND PERMITTING JURISDICTION. UPGRADE THE SERVICE <br />PANEL FROM 100A TO 200A SOLAR READY PANEL. <br />THIS DOCUMENT HAS BEEN PREPARED FOR THE PURPOSE OF <br />DESCRIBING THE DESIGN OF A PROPOSED PV SYSTEM WITH ENOUGH <br />DETAL TO DEMONSTRATE THE COMPLIANCE WITH APPLICABLE <br />CODES AND REGULATIONS. THE DOCUMENT SHALL NOT BE RELIED <br />UPON AS A SUBSTITUTE FOR FOLLOWING MANUDACTURER <br />INSTALLATION INSTRUCTIONS. THE SYSTEM SHALL COMPLY WITH ALL <br />MANUFACTURERS LISTING AND INSTALLATION INSTRUCTIONS. AS <br />WELL AS ALL APPLICABLE CODES. NOTHING IN THIS DOCUMENT <br />SHALL BE INTERPRETED IN A WAT THAT OVERRIDES THEM. <br />CONTRACTOR IS RESPONSIBLE FOR VERIFICATION OF ALL <br />CONDITIONS, DIMENSIONS, AND DETAILS IN THIS DOCUMENT. <br />SYSTEM DETAILS <br />DESCRIPTION NEW GRID INTERACTIVE PV SYSTEM <br />DC RATING OF SYSTEM 16 KW <br />AC RATING OF SYSTEM 13.96 KW <br />INVERTER(S)40 ENPHASE IQ8A-72-2-US <br />MODULE 40 APTOS SOLAR TECHNOLOGY LLC, <br />DNA-108-BF10-400W <br />ARRAY WIRING 4 STRINGS OF 10 <br />INTERCONNECTION DETAILS <br />POINT OF CONNECTION NEW LOAD-SIDE AC CONNECTION <br />PER CEC 705.12(B)(2)(3) AT MSP <br />UTILITY SERVICE 120/240V 1Φ <br />LOCATION UPGRADE MSP FROM 100A W/100A <br />BUSBAR TO 200A MSB W/225A BUSBAR. <br />SITE DETAILS <br />ASHRAE EXTREME LOW -6°C <br />ASHRAE 2% HIGH 39°C <br />WIND SPEED 95 MPH <br />RISK CATEGORY II <br />WIND EXPOSURE <br />CATEGORY C <br />GROUND SNOW LOAD 0 PSF <br />1 <br />PV-1 <br />LOCAL <br />NTS <br />03/30/2023 <br />VSE Project Number: U3998.0066.231 <br />Vector Structural Engineering has reviewed the existing <br />structure with loading from the solar array and screw <br />connections to the existing framing. The design of the <br />racking system, racking connections, and all other <br />structural is by others. Mechanical, architectural, and all <br />other nonstructural aspects of the design are by others. <br />Electrical is by others, unless stamped by Dean Levorsen. <br />The scope of the plans is for the installation of the solar <br />photovoltaic system only and the approval is subject to compliance <br />with all applicable city and state codes and regulations regarding <br />construction. The approval of the plans does not constitute any <br />certification of the accuracy, completeness, or building permit <br />status of the existing buildings and structures as shown. <br />Bldg# 101115123 <br />Issued 06/26/23 <br />Elec# 20179669 <br />MSmith <br />Issued 06/15/23 <br />941 W Alton Ave - <br />2017966906/27/23