·EXISTING MULTI-FAMILY DWELLING BUILDING REMODEL.
<br />·PROVIDE NEW LIGHTING FIXTURES/CONNECTIONS TO THE RENOVATED AREAS.
<br />·PROVIDE NEW POWER FIXTURES/CONNECTIONS TO THE RENOVATED AREAS.
<br />·INSTALLATION OF NEW MAIN SERVICE/EQUIPMENT AND SERVICE/DISTRIBUTION EQUIPMENT.
<br />SHEET INDEX
<br />E000
<br />E001
<br />E002
<br />E100
<br />E101
<br />ELECTRICAL SPECIFICATIONS (AS APPLICABLE)ELECTRICAL SYMBOLS LIST
<br />WALLCLG.DESCRIPTIONFLR.
<br />DUPLEX RECEPTACLE AT +15" FOR WALL MOUNTED U.O.N.
<br />DOUBLE DUPLEX RECEPTACLE AT + 15" FOR WALL MOUNTED U.O.N.
<br />DUPLEX RECEPTACLE WITH USB 2.0 PORT
<br />GROUND CONNECTOR
<br />MAIN SWITCHBOARD OR POWER DISTRIBUTION BOARD. VERIFY DIMENSION WITH VENDER/MANUFACTURER.
<br />ELECTRICAL PANEL. REFER TO PANEL SCHEDULE FOR DETAILS.
<br />INDICATES PLAN NOTE NUMBER "1", SEE PLAN
<br />JUNCTION BOX
<br />CONDUIT STUB OUT, 3/4" MINIMUM - SEE PLANS FOR NOTES
<br />CONDUIT CONCEALED ABOVE CEILING OR IN WALLS
<br />HOMERUN TO PANEL "A", CIRCUITS #1A-1
<br />SPECIAL NEMA RECEPTACLE. SEE EQUIPMENT PLAN/INSTALLATION MANUAL FOR SPECS AND DETAILS.
<br />COMBINATION TELEPHONE, DATA AND CABLE OUTLET AT +18" U.O.N.
<br />PROVIDE 1/2"C.O. STUBBED TO ACCESSIBLE CEILING SPACE
<br />TELEPHONE OUTLET; CAT5E CABLE. RJ11 TERMINATION MOUNTED AT +18"
<br />PROVIDE 1/2"C.O. STUBBED TO ACCESSIBLE CEILING SPACE
<br />DATA OUTLET; CAT5E CABLE, RJ45 TERMINATION MOUNTED AT +18" U.O.N.
<br />PROVIDE 1/2"C.O. STUBBED TO ACCESSIBLE CEILING SPACE
<br />CABLE OUTLET; RG-6 COAXIAL CABLE. MOUNTED AT +18" U.O.N.
<br />PROVIDE 1/2"C.O. STUBBED TO ACCESSIBLE CEILING SPACE
<br />LIGHTING FIXTURE WITH 90 MIN. EMER. BATTERY PACK OR ON INVERTER
<br />SEE LIGHT FIXTURE SCHEDULE FOR DETAILS AND SPECS
<br />DENOTES EQUIPMENT #1, SEE EQUIPMENT SCHEDULE FOR THE DETAILS AND EXACT SPECIFICATIONS.
<br />DENOTES MECHANICAL EQUIPMENT #1 SEE MECHANICAL DRAWINGS FOR THE DETAILS AND SPECIFICATIONS.
<br />SINGLE POLE SWITCH AT 48" U.O.N.
<br />DIMMER SWITCH/DIMMING WALL CONTROL STATION AT +48" U.O.N.
<br />THREE-WAY SWITCH AT +48" U.O.N.
<br />THREE-WAY DIMMER SWITCH AT +48" U.O.N.
<br />MANUAL MOTOR STARTER
<br />VS
<br />DL
<br />S/C
<br />MOTOR OUTLET - IDENTIFICATION
<br />ABBREVIATION FOR NEW / EXISTING / RELOCATED
<br />SYMBOL NOTES:
<br />NON-FUSED/FUSED SWITCH, SIZE AS SHOWN IN THE PLAN
<br />OS
<br />GAS SOLENOID-SEE PLUMBING PLAN FOR EXACT LOCATION.
<br />(N) / (E) / (R)
<br />OCCUPANCY AUTOMATIC WALL SWITCH SENSOR WITH SINGLE LEVEL
<br />SWITCHING AT +48" U.O.N./MANUFACTURER TO BE DETERMINED
<br />VACANCY AUTOMATIC WALL SWITCH SENSOR WITH SINGLE LEVEL
<br />SWITCHING AT +48" U.O.N./MANUFACTURER TO BE DETERMINED
<br />OCCUPANCY SENSOR SINGLE POLE SWITCH WITH DIMMER CONTROL
<br />FEATURE AT +48" U.O.N./MANUFACTURER TO BE DETERMINED
<br />CEILING MOUNTED OCCUPANCY SENSOR
<br />MANUFACTURER TO BE DETERMINED
<br />CEILING MOUNTED VACANCY SENSOR
<br />MANUFACTURER TO BE DETERMINED
<br />CEILING MOUNTED DAYLIGHT SENSOR
<br />MANUFACTURER TO BE DETERMINED
<br />TIME CLOCK WITH MANUAL BY-PASS SWITCH
<br />SEE LIGHTING CONTROL DIAGRAM FOR DETAILS
<br />SYMBOL LIST SHOW IN FOR GENERAL REFERENCE ONLY. A PRESENCE OF A SYMBOL DOES NOT IMPLY ITS USE ON THIS PROJECT.
<br />REFER TO DRAWING FOR SPECIFIC SYMBOLS USED.
<br />S C HARD WIRED, WITH BATTERY BACKUP, SMOKE DETECTOR/CARBON MONOXIDE DETECTOR/MULTI-PURPOSE
<br />CARBON MONIXIDE & SMOKE DETECTOR.
<br />T C
<br />F
<br />M
<br />ELECTRICAL SPECIFICATION
<br />SINGLE LINE DIAGRAM/ SCHEDULES
<br />PANEL SCHEDULES
<br />ELECTRICAL PLAN - GROUND FLOOR
<br />ELECTRICAL PLAN - 2ND FLOOR
<br />D
<br />D
<br />OS
<br />VS
<br />OS/D
<br />J J J
<br />S
<br />S
<br />S
<br />3
<br />3
<br />S
<br />EXHAUST AIR GRILLE - REFER TO MECHANICAL PLAN
<br />1
<br />GROUND FAULT INTERRUPTING PROTECTED CIRCUIT DUPLEX RECEPTACLE
<br />PROVIDE GFCI BREAKER INSTEAD OF GFCI OUTLET AS NECESSARY
<br />E003 ELECTRICAL DETAILS
<br />SCOPE OF WORK
<br />5.UNLESS OTHERWISE NOTED ON DRAWINGS OR OTHERWISE REQUIRED BY THE NATIONAL ELECTRICAL CODE,
<br />HANDICAP CODES OR LOCAL CODES, OUTLET HEIGHTS SHALL BE AS FOLLOWS:
<br />3.
<br />4.
<br />6.
<br />7.
<br />5.
<br />8.
<br />9.
<br />10.
<br />120/208 VOLT SYSTEM
<br />NEUTRAL - WHITE
<br />PHASE A OR L1 - BLACK
<br />PHASE B 0R L2 - RED
<br />PHASE C OR L3 - BLUE
<br />GROUND - GREEN
<br />FINAL CONNECTIONS INTO AND OUT OF THE TRANSFORMER.
<br />FINAL CONNECTIONS WHERE RIGID CONDUIT IN NOT PRACTICAL.
<br />FINAL CONNECTIONS TO VIBRATING EQUIPMENT.
<br />FINAL CONNECTIONS TO MOTORS.
<br />IN WALLS (FOR LIGHT SWITCHES AND 120 VOLT POWER RECEPTACLES AND HVAC CONTROL EQUIPMENT).
<br />INTER-CONNECTIONS BETWEEN ALL LIGHT FIXTURES AND HOMERUNS TO PANELS WHERE CODE ALLOWS.
<br />THE USE OF ROMEX, BX, ETC. IS PERMITTED ONLY IN RESIDENTIAL CONSTRUCTION NOT HIGHER THAN THREE
<br />STORIES.
<br />ALL WIRING TO BE COLOR-CODED AS FOLLOWS:
<br />ON ALL 20 AMP BRANCH CIRCUITS, CONDUCTORS LARGER THAN #10 AWG SHALL BE REDUCED TO #10 AWG WITHIN
<br />10 FEET OF PANEL BOARD AND DEVICE IN JUNCTION BOXES ON RATED TERMINAL STRIPS.
<br />CONDUCTORS MAY BE STRANDED FOR SIZES #10 AWG AND LARGER. CONDUCTORS SIZE #12 SHALL BE SOLID (NOT
<br />STRANDED).
<br />ALUMINUM CONDUCTORS ARE NOT PERMITTED, EXCEPT AT SERVICE ENTRANCE, WHERE REQUIRED BY LANDLORD.
<br />CONDUCTOR CONNECTION MUST BE PER MANUFACTURER'S REQUIREMENTS. CONTRACTOR MUST OBTAIN WRITTEN
<br />PERMISSION FROM GENERAL CONTRACTOR AND PROJECT MANAGER WHEN USED.
<br />ALL WIRING (120V AND ABOVE) SHALL BE IN CONDUIT, UNLESS SPECIFICALLY NOTED OTHERWISE. ALL LOW
<br />VOLTAGE WIRING CONDUIT REQUIREMENTS TO BE COORDINATED WITH OWNER.
<br />THE USE OF SHARED NEUTRALS IS REQUIRED FOR LIGHTING CIRCUITS AND SHALL BE INSTALLED IN ACCORDANCE
<br />WITH THE NATIONAL ELECTRICAL CODE AND LOCAL CODES. ALL OTHER EQUIPMENT REQUIRING A NEUTRAL
<br />CONDUCTOR SHALL HAVE A DEDICATED FULL SIZE NEUTRAL.
<br />WIRE CONNECTORS SHALL BE EQUAL TO "SCOTCH LOCK" FOR #8 AWG WIRE AND SMALLER AND EQUAL TO T & B
<br />"LOCKTIGHT" FOR #6 AWG AND LARGER.
<br />277/480 VOLT SYSTEM
<br />NEUTRAL - GRAY
<br />PHASE A OR L1 - YELLOW
<br />PHASE B 0R L2 - ORANGE
<br />PHASE C OR L3 - BROWN
<br />GROUND - GREEN WITH YELLOW TRACER
<br />A.
<br />2.
<br />a.
<br />b.
<br />c.
<br />d.
<br />PHASING REQUIREMENTSJ.
<br />1.
<br />1.
<br />DEMOLITION
<br />2.
<br />K.
<br />THIS CONTRACTOR IS TO INCLUDE IN HIS BID ALL NECESSARY SERVICE REQUIRED TO KEEP THE OPERATING PHASE
<br />OF THE STORE'S ELECTRICAL SERVICE IN OPERATION. CONTRACTOR MUST SCHEDULE IN WRITING WITH
<br />TENANT/ARCHITECTS AND THE LANDLORD ONE WEEK PRIOR TO ANY SHUT DOWN OF THE ELECTRICAL SYSTEM.
<br />THIS CONTRACTOR SHALL BE RESPONSIBLE FOR THE COORDINATION OF THE DEMOLITION OF EXISTING WORK AND
<br />THE DEMOLITION PROVIDED BY THE GENERAL CONTRACTOR. COORDINATE WITH THE GENERAL CONTRACTOR ANY
<br />EXISTING EQUIPMENT REQUIRED TO BE LEFT INTACT.
<br />SECTION 16000
<br />DIVISION 16 - ELECTRICAL
<br />1.
<br />2.
<br />NOTEA.
<br />BASIC ELECTRICAL REQUIREMENTS
<br />4.
<br />3.
<br />5.
<br />1.
<br />B.GENERAL REQUIREMENTS
<br />2.
<br />3.
<br />5.
<br />4.ALL WORK IN THIS SECTION SHALL BE INSTALLED SO AS TO BE READILY ACCESSIBLE FOR OPERATING, SERVICING,
<br />MAINTAINING, AND REPAIRING. THIS CONTRACTOR IS RESPONSIBLE FOR PROVIDING SUFFICIENT SERVICE ACCESS
<br />TO ALL EQUIPMENT.
<br />WHERE THE DRAWINGS OR SPECIFICATIONS CALL FOR ITEMS WHICH EXCEED CODES OR THE LANDLORD'S TENANT
<br />CRITERIA, THE CONTRACTOR IS RESPONSIBLE FOR FURNISHING AND INSTALLING THE SYSTEM WITH THE MORE
<br />STRINGENT REQUIREMENTS AS DESIGNED AND DESCRIBED ON THESE DRAWINGS, UNLESS SPECIFICALLY NOTED
<br />OTHERWISE.
<br />THE DRAWINGS AND SPECIFICATIONS ARE INTENDED TO SUPPLEMENT EACH OTHER AND ANY MATERIAL OR LABOR
<br />CALLED FOR IN ONE SHALL BE FURNISHED AND INSTALLED EVEN THOUGH NOT SPECIFICALLY MENTIONED IN BOTH.
<br />ANY MATERIAL OR LABOR WHICH IS NEITHER SHOWN ON THE DRAWINGS NOR CALLED FOR IN THE SPECIFICATIONS,
<br />BUT WHICH IS OBVIOUSLY NECESSARY TO COMPLETE THE WORK, AND WHICH IS USUALLY INCLUDED IN WORK OF
<br />SIMILAR CHARACTER, SHALL BE FURNISHED AND INSTALLED AS PART OF THE CONTRACT.
<br />THIS CONTRACTOR SHALL PROVIDE ALL LABOR, MATERIALS, EQUIPMENT, SERVICES, TOOLS, TRANSPORTATION,
<br />INCIDENTALS AND DETAILS NECESSARY TO PROVIDE A COMPLETE ELECTRICAL SYSTEM AS SHOWN ON THE
<br />DRAWINGS, CALLED FOR IN THE SPECIFICATIONS, AND AS REQUIRED BY JOB CONDITIONS. ALL WORK NOT
<br />SPECIFICALLY NOTED AS BEING BY THE LANDLORD OR ARCHITECTS SHALL BE PROVIDED BY THIS CONTRACTOR.
<br />CLOSELY COORDINATE THE ENTIRE INSTALLATION WITH THE LANDLORD AND ARCHITECTS, AS REQUIRED.
<br />REFER TO RESPONSIBILITY SCHEDULE FOR INFORMATION IN REGARD TO RESPONSIBILITY OF WORK OR ITEMS
<br />WHICH MAY AFFECT THE BID.
<br />THIS CONTRACTOR SHALL VISIT THE SITE PRIOR TO SUBMITTAL OF BID TO DETERMINE CONDITIONS AFFECTING THE
<br />WORK. ANY DISCREPANCIES OR ITEMS WHICH ARE NOT COVERED IN THE BID DOCUMENTS OR ANY PROPOSED
<br />SUBSTITUTIONS SHALL BE LISTED SEPARATELY AND QUALIFIED IN THE CONTRACTORS BID. SUBMITTAL OF BID
<br />SHALL SERVE AS EVIDENCE OF KNOWLEDGE OF EXISTING CONDITIONS AND ANY MODIFICATIONS WHICH ARE
<br />REQUIRED TO MEET THE INTENT OF THE DRAWINGS AND SPECIFICATIONS. FAILURE TO VISIT THE SITE DOES NOT
<br />RELIEVE THE CONTRACTOR OF RESPONSIBILITY IN PERFORMANCE OF HIS WORK.
<br />THIS ELECTRICAL CONTRACTOR IS RESPONSIBLE FOR SCHEDULING THE COMPLETION AND INSPECTION OF THIS
<br />WORK TO COMPLY WITH TENANT/ARCHITECT'S SCHEDULE AND THE PROJECT COMPLETION DATE.
<br />THE CONTRACTOR FOR THIS DIVISION OF WORK IS REQUIRED TO READ THE SPECIFICATIONS AND REVIEW
<br />DRAWINGS FOR ALL DIVISIONS OF WORK AND IS RESPONSIBLE FOR THE COORDINATION OF THIS WORK AND THE
<br />WORK OF HIS SUBCONTRACTORS WITH ALL DIVISIONS OF WORK. IT IS THIS CONTRACTORS RESPONSIBILITY TO
<br />PROVIDE HIS SUBCONTRACTORS WITH A COMPLETE SET OF BID DOCUMENTS.
<br />DRAWINGS AND GENERAL PROVISIONS OF CONTRACT, INCLUDING GENERAL AND SUPPLEMENTARY CONDITIONS
<br />AND ALL OTHER SPECIFICATION SECTIONS, APPLY TO THIS AND THE OTHER SECTIONS OF DIVISION 16.
<br />2.
<br />d.
<br />c.
<br />4.
<br />5.
<br />SLEEVES
<br />1.
<br />2.
<br />HANGERS
<br />3.
<br />M.
<br />L.
<br />1.
<br />2.
<br />1.
<br />3.
<br />FINAL ELECTRICAL INSPECTIONSN.
<br />ASIDE FROM NORMAL INTERIM INSPECTIONS OF WORK IN PLACE, TENANT/ARCHITECTS MAY HAVE AN INDEPENDENT
<br />ELECTRICAL CONTRACTOR INSPECT THE FINISHED ELECTRICAL INSTALLATION UPON COMPLETION FOR
<br />COMPLIANCE WITH THE PLANS, SPECIFICATIONS AND CODES. THE INSTALLING CONTRACTOR WILL BE RESPONSIBLE
<br />TO BRING ALL ITEMS REPORTED BY THE INDEPENDENT ELECTRICAL CONTRACTOR UP TO PLANS AND
<br />SPECIFICATION REQUIREMENTS.
<br />HANGERS AND PIPING OF DISSIMILAR METALS SHALL BE DIELECTRICALLY SEPARATED.
<br />HANGERS SHALL BE FASTENED TO BUILDING STEEL, CONCRETE, OR MASONRY, BUT NOT TO PIPING. HANGING
<br />FROM METAL DECK IS NOT PERMITTED. HANGERS MUST BE ATTACHED TO UPPER CHORD OF BAR JOIST. WHERE
<br />INTERFERENCES OCCUR, AND IN ORDER TO SUPPORT DUCTWORK OR PIPING, THE CONTRACTOR MUST INSTALL
<br />TRAPEZE TYPE HANGERS OR SUPPORTS WHICH SHALL BE LOCATED WHERE THEY DO NOT INTERFERE WITH
<br />ACCESS TO FIRE DAMPERS, VALVES, AND OTHER EQUIPMENT. HANGER TYPES AND INSTALLATION METHODS ARE
<br />ALSO SUBJECT TO LANDLORD CRITERIA.
<br />HANGERS SHALL INCLUDE ALL MISCELLANEOUS STEEL SUCH AS ANGLE IRON, BANDS, C-CLAMPS WITH RETAINING
<br />CLIPS, CHANNELS, HANGER RODS, ETC., NECESSARY FOR THE INSTALLATION OF WORK.
<br />SLEEVES IN BEARING AND MASONRY WALLS, FLOORS, AND PARTITIONS SHALL BE STANDARD WEIGHT STEEL PIPE
<br />FINISHED WITH SMOOTH EDGES. FOR OTHER THAN MASONRY PARTITIONS, THROUGH SUSPENDED CEILINGS, OR
<br />FOR CONCEALED VERTICAL PIPING, SLEEVES SHALL BE NO. 22 U.S.G. GALVANIZED STEEL MINIMUM.
<br />ALL SLEEVES AND OPENINGS THROUGH FIRE RATED WALLS AND/OR FLOORS SHALL BE FIRE SEALED WITH CALCIUM
<br />SILICATE, SILICONE "RTV" FOAM, "3M" FIRE RATED SEALANTS OR EQUAL, SO AS TO RETAIN THEIR FIRE RATING.
<br />THIS CONTRACTOR SHALL PROVIDE SLEEVES TO PROTECT EQUIPMENT OR FACILITIES IN THE INSTALLATION. EACH
<br />SLEEVE SHALL EXTEND THROUGH IT'S RESPECTIVE FLOOR, WALL OR PARTITION AND SHALL BE CUT FLUSH WITH
<br />EACH SURFACE EXCEPT SLEEVES THAT PENETRATE THE FLOOR, WHICH SHALL EXTEND 2" ABOVE THE FLOOR.
<br />CONTRACTOR MUST COORDINATE THROUGH THE LANDLORD ANY CORE DRILLING OR CUTTING OF OPENINGS IN
<br />MASONRY FLOORS OR WALLS.
<br />a.
<br />6.
<br />END OF SECTION 16000
<br />6.
<br />7.
<br />1.
<br />8.
<br />C.
<br />2.
<br />TEMPORARY LIGHT AND POWER
<br />1.
<br />CODESD.
<br />1.
<br />E.
<br />2.
<br />F.TRADE NAMES, MANUFACTURERS AND SHOP DRAWINGS
<br />LICENSES, PERMITS, INSPECTIONS & FEES
<br />1.
<br />2.
<br />ALL WORK SHALL CONFORM TO THE LANDLORD'S CRITERIA, THE STATE'S, COUNTY'S, CITY'S AND LOCAL CODES AND
<br />ORDINANCES, SAFETY AND HEALTH CODES, NFPA CODES, ENERGY CODES AND ALL OTHER APPLICABLE CODES
<br />AND REQUIREMENTS. THIS CONTRACTOR SHALL INQUIRE INTO AND COMPLY WITH ALL APPLICABLE CODES,
<br />ORDINANCES, AND REGULATIONS. THIS CONTRACTOR SHALL INCLUDE ANY CHANGES REQUIRED BY CODES IN THE
<br />BID AND IF THESE CHANGES ARE NOT INCLUDED IN THE BID, THEY MUST BE QUALIFIED AS A SEPARATE LINE ITEM IN
<br />THE BID. AFTER CONTRACT IS AWARDED, CHANGE ORDERS FOR INCREASED COSTS DUE TO CODE ISSUES WILL NOT
<br />BE ACCEPTED BY OWNER, UNLESS ALLOWANCES HAVE PREVIOUSLY BEEN AGREED UPON.
<br />GENERAL CONTRACTOR SHALL SUBMIT ONLY SUBSTITUTION REQUESTS TO ARCHITECTS/ENGINEERS FOR
<br />APPROVAL. SUBMISSIONS SHALL BE MADE EARLY ENOUGH IN PROJECT TO ALLOW FOUR (4) WORKING DAYS FOR
<br />ARCHITECTS/ENGINEERS REVIEW WITHOUT CAUSING DELAYS OR CONFLICTS TO THE JOB'S PROGRESS.
<br />SUBMITTALS SHALL BEAR THE STAMP AND/OR THE SIGNATURE OF THE GENERAL CONTRACTOR AND THE
<br />SUB-CONTRACTOR SHOWING THAT HE HAS REVIEWED AND CONFIRMED THAT THE SUBMITTALS ARE IN
<br />CONFORMANCE WITH THE CONTRACT DRAWINGS AND SPECIFICATIONS OR INDICATE WHERE EXCEPTIONS HAVE
<br />BEEN TAKEN.
<br />WHERE TRADE NAMES AND MANUFACTURERS ARE USED ON THE DRAWINGS OR IN THE SPECIFICATIONS, THE
<br />EXACT EQUIPMENT SHALL BE USED AS A MINIMUM FOR THE BASE BID. MANUFACTURERS CONSIDERED AS AN EQUAL
<br />OR BETTER IN ALL ASPECTS TO THAT SPECIFIED WILL BE SUBJECT TO APPROVAL IN WRITING BY
<br />ARCHITECTS/ENGINEERS THROUGH SHOP DRAWING SUBMITTAL PROCESS FOR ACCEPTANCE PRIOR TO
<br />INSTALLATION. THE USE OF ANY UNATHORIZED EQUIPMENT SHALL BE REPLACED AT THE CONTRACTOR'S EXPENSE.
<br />FURNISH TO ARCHITECTS ALL CERTIFICATES OF INSPECTION AND FINAL INSPECTION APPROVAL AT COMPLETION OF
<br />PROJECT.
<br />THIS CONTRACTOR SHALL OBTAIN AND PAY FOR ALL LICENSES, PERMITS, INSPECTIONS, AND FEES REQUIRED OR
<br />RELATED TO HIS WORK.
<br />THE ELECTRICAL CONTRACTOR SHALL MAKE ALL FINAL ELECTRICAL CONNECTIONS AS REQUIRED FOR A COMPLETE
<br />AND OPERATING SYSTEM.
<br />THIS CONTRACTOR SHALL DO ALL CUTTING, CHASING AND CHANNELING REQUIRED FOR ANY WORK UNDER THIS
<br />DIVISION. CUTTING SHALL HAVE PRIOR APPROVAL BY THE ARCHITECTS AND THE LANDLORD. ALL PATCHING SHALL
<br />BE BY G.C. AND SHALL MATCH THE SURROUNDING SURFACES.
<br />UNLESS SPECIFICALLY NOTED OTHERWISE, MATERIALS, PRODUCTS, AND EQUIPMENT, INCLUDING ALL
<br />COMPONENTS THEREOF, SHALL BE NEW, UNDERWRITERS LABORATORIES LISTED AND LABELED AND SIZED IN
<br />CONFORMITY WITH REQUIREMENTS OF STATE AND LOCAL CODES, WHICHEVER IS MORE STRINGENT.
<br />THIS CONTRACTOR SHALL FURNISH AND INSTALL ALL TEMPORARY WIRING AND RELATED GROUND FAULT
<br />INTERRUPTION PROTECTION FOR LIGHT AND POWER FOR ALL CONTRACTORS AND SHALL BE RESPONSIBLE FOR
<br />THE REMOVAL OF ALL TEMPORARY WIRING.
<br />THE GENERAL CONTRACTOR SETS UP ALL ELECTRICAL UTILITIES IN THE NAME OF THE TENANT. TENANT PAYS FOR
<br />ALL UTILITIES THROUGHOUT CONSTRUCTION.
<br />ALL WORK SHALL BE PERFORMED IN A NEAT PROFESSIONAL MANNER USING GOOD CONSTRUCTION PRACTICES.
<br />THIS CONTRACTOR SHALL INCLUDE, AND WILL BE HELD RESPONSIBLE FOR, THE REMOVAL OF ALL EXISTING
<br />ELECTRICAL EQUIPMENT, CONDUITS, ETC. NOT TO BE REUSED ON THIS PROJECT, UNLESS SPECIFICALLY NOTED
<br />OTHERWISE. CONTRACTOR MUST VERIFY WITH THE LANDLORD ALL PRESUMED ABANDONED EQUIPMENT PRIOR TO
<br />REMOVAL. ALL EXTRANEOUS ITEMS IN THE SPACE OR ON THE ROOF NOT APPLICABLE TO THE NEW WORK MUST BE
<br />REMOVED AND ROOF/WALL/FLOOR PATCHED/REPAIRED TO MATCH EXISTING STRUCTURE. EXISTING ABANDONED
<br />CONDUIT OR EQUIPMENT IN THE FLOOR, EMBEDDED IN CONCRETE OR OTHERWISE INACCESSIBLE ARE TO BE CUT
<br />OFF AND SEALED BELOW OR WITHIN FLOOR OR WALL LEVEL WHEN THEY ARE NOT TO BE REUSED IN THIS PROJECT.
<br />IF REQUIRED BY LANDLORD OR CODES, ABANDONED CONDUIT MUST BE REMOVED TO POINT OF ORIGIN. CONFIRM
<br />THE EXTENT OF DEMOLITION PRIOR TO BID AND INCLUDE IN BID PROPOSAL.
<br />FLEXIBLE METAL CONDUIT OR MC TYPE CABLE:
<br />GENERALLY, ALL CONDUIT SHALL BE CONCEALED EXCEPT FOR UNFINISHED AREAS, SUCH AS EQUIPMENT ROOMS.
<br />EXPOSED CONDUIT SHALL BE ALLOWED ONLY AS NOTED ON PLAN AND AS APPROVED BY PROJECT MANAGER.
<br />PAINTING OF CONDUITS, NOTED ON DRAWINGS OR SPECIFICATIONS WILL BE BY GENERAL CONTRACTOR.
<br />A COMPLETE ELECTRICAL DISTRIBUTION SYSTEM INCLUDING THE INSTALLATION OF SAFETY AND DISCONNECT
<br />SWITCHES, MOTOR STARTERS AND LIGHTING. IT IS THE ELECTRICAL CONTRACTOR'S RESPONSIBILITY TO
<br />INCLUDE IN HIS BID FOR PROVIDING SERVICE EQUIPMENT NECESSARY FOR TIE-IN TO LANDLORD'S
<br />DISTRIBUTION EQUIPMENT OR TO OBTAIN SERVICE FROM LOCAL UTILITY COMPANY. REFER TO ELECTRICAL
<br />RESPONSIBILITY SCHEDULE AND ELECTRICAL POWER RISER DIAGRAM FOR ADDITIONAL INFORMATION.
<br />ALL CONDUITS SHALL BE GALVANIZED IMC OR EMT UNLESS OTHERWISE SPECIFIED IN SPECIFICATIONS OR ON
<br />DRAWINGS. ALL CONDUIT IS TO BE UL LABELED. EMT CONNECTORS SHALL BE STEEL COMPRESSION OR SET SCREW
<br />TYPE. CONDUIT UNDER SLAB ON GRADE SHALL BE RIGID STEEL, OR SCHEDULE 40 PVC WITH RIGID STEEL ELLS
<br />WHERE PERMITTED BY LANDLORD OR CODE. EMT FOR WET LOCATIONS TO BE PERMITTED ONLY WHEN ALL
<br />SUPPORTS, BOLTS, STRAPS, SCREWS AND SO FORTH ARE CORRISION-RESISTANT MATERAILS PER 358.10.
<br />ALL IN/UNDER FLOOR CONDUIT SHALL BE OF MINIMUM 3/4" SIZE.
<br />IF HVAC CONTROL WIRING IS REQUIRED TO BE RUN IN CONDUIT, IT SHALL BE A MINIMUM OF 3/4", UNLESS
<br />NOTED OTHERWISE ON DRAWINGS.
<br />SUPPORT ALL CONDUIT, INCLUDING SEISMIC AND SWAY BRACING, IN ACCORDANCE WITH THE NEC AND LOCAL
<br />CODES.
<br />THE WIRING OF MECHANICAL EQUIPMENT AS OUTLINED ON THE BID SET DRAWINGS AND IN THE
<br />SPECIFICATIONS. WORK SHALL INCLUDE WIRING OF ALL STARTERS, DISCONNECTS, AND POWER WIRING OF
<br />MECHANICAL EQUIPMENT EXCEPT AS SPECIFICALLY NOTED OTHERWISE. ALL LOW VOLTAGE (24 VOLT) EMS
<br />TEMPERATURE CONTROL WIRING SHALL BE THE RESPONSIBILITY OF THE ELECTRICAL CONTRACTOR UNLESS
<br />NOTED SPECIFICALLY ON DRAWING.
<br />METERING AND CURRENT TRANSFORMERS AS REQUIRED BY DRAWINGS, UTILITY COMPANY, AND/OR
<br />LANDLORD.
<br />CONTRACTOR MUST ALSO INCLUDE IN BID ALL NECESSARY MATERIALS REQUIRED TO COMPLETE THE SYSTEM
<br />INCLUDING, BUT NOT LIMITED TO, FEEDERS, BRANCH CIRCUITS, JUNCTION BOXES, OUTLET BOXES, WIRING
<br />DEVICES, COVER PLATES, CONDUITS, ETC.
<br />THIS CONTRACTOR SHALL FURNISH ALL LABOR, MATERIALS, EQUIPMENT, SERVICES, TOOLS, TRANSPORTATION,
<br />AND FACILITIES NECESSARY FOR, REASONABLY IMPLIED AND INCIDENTAL TO, THE FURNISHING, INSTALLATION,
<br />COMPLETION AND TESTING OF ALL THE WORK FOR THE ELECTRICAL SYSTEMS AS SHOWN ON THE DRAWINGS,
<br />CALLED FOR IN THE SPECIFICATIONS, AND AS REQUIRED BY JOB CONDITIONS, TO INCLUDE, BUT NOT BE LIMITED TO
<br />THE FOLLOWING:
<br />CONTRACTOR NOTES
<br />2.
<br />6.
<br />5.
<br />4.
<br />3.
<br />FLEXIBLE CONDUIT OR MC TYPE CABLE SHALL BE USED FOR THE FOLLOWING APPLICATIONS ONLY:
<br />1.
<br />1.
<br />GUARANTEEG.
<br />THE EQUIPMENT MANUFACTURER SHALL PROVIDE A 12 MONTH GUARANTEE TO TENANT FROM THE DATE OF
<br />ACCEPTANCE. THIS CONTRACTOR SHALL WARRANTY THE INSTALLATION OF THIS EQUIPMENT AND WILL BE
<br />RESPONSIBLE FOR ANY DAMAGE AND/OR MALFUNCTION CAUSED BY THE INSTALLATION. THIS CONTRACTOR SHALL
<br />NOT BEAR ADDITIONAL WARRANTIES BEYOND A COMPLETE WORKING SYSTEM.
<br />b.
<br />c.
<br />d.
<br />7.
<br />8.
<br />9.
<br />10.
<br />1.
<br />OUTLET BOXESC.
<br />2.
<br />4.
<br />3.
<br />ALL CONDUITS MUST BE SIZED PER NEC AND LOCAL CODES.
<br />ALL SENSORMATIC WIRING MUST BE PLACED IN CONDUIT (PVC PIPE NOT PERMITTED).
<br />EXTERIOR BOXES SHALL BE CAST RUST-RESISTING METAL WITH GASKETED COVERS.
<br />PROVIDE PULL-WIRE IN ALL EMPTY CONDUITS EXCEPT AS NOTED OTHERWISE ON DRAWINGS.
<br />HOME RUNS AND MAIN CONDUIT RUNS ARE TO BE HELD TIGHT TO STRUCTURE ABOVE OR AS REQUIRED TO ALLOW
<br />PROPER SERVICE ACCESS AND OTHER TRADES WORK. CONDUIT MUST BE TRAPEZED TO ALLOW 3 FEET MINIMUM
<br />CLEARANCE ABOVE CEILING.
<br />ALL OUTLET BOXES SHALL BE GALVANIZED PRESSED STEEL OF THE STANDARD KNOCKOUT TYPE. NO ROUND
<br />OUTLET BOXES SHALL BE PERMITTED UNLESS INDICATED AND FOR LIGHTING THAT REQUIRE SUCH
<br />CONFIGURATION. CONCEALED BOXES SHALL NOT BE LESS THAN 4" SQUARE AND 1 1/2" DEEP, WITH PLASTER RINGS.
<br />ALL KNOCKOUT BOXES, UPON WHICH LIGHTING FIXTURES ARE TO BE INSTALLED, SHALL BE EQUIPPED WITH 3/8"
<br />FIXTURE STUDS.
<br />INSTALL BOXES RIGIDLY FROM BUILDING STRUCTURE AND SUPPORT INDEPENDENTLY OF THE CONDUIT SYSTEM.
<br />ALSO PROVIDE SUITABLE BOX EXTENSIONS TO EXTEND BOXES TO FINISHED FACES OF FLOORS, CEILINGS, WALLS
<br />ETC. ALL OUTLET BOXES TO BE PROVIDED WITH CADDY "QUICK-MOUNT BOX SUPPORT" TO MINIMIZE THE DEFLECTION
<br />THAT OCCURS WHEN PLUGGING/UNPLUGGING INTO THESE DEVICES.
<br />FLEXIBLE METAL CONDUIT OR MC TYPE CABLE MUST BE THE SAME SIZE AS THE IMC OR EMT CONDUIT TO
<br />WHICH IT IS CONNECTED. BOTH THE FLEXIBLE METAL CONDUIT AND IT'S FITTINGS ARE TO BE LISTED FOR
<br />GROUNDING. A GREEN GROUNDING CONDUCTOR SHALL BE INSTALLED. ALL CONNECTORS ARE TO BE OF A
<br />NEMA APPROVED TYPE.
<br />THE USE OF ROMEX, BX, ETC. IS PERMITTED ONLY IN RESIDENTIAL CONSTRUCTION NOT HIGHER THAN THREE
<br />STORIES.
<br />CONNECTION TO ANY OUTDOOR EQUIPMENT MUST BE WEATHERPROOF.
<br />1.
<br />c.
<br />b.
<br />a.
<br />RECORD DRAWINGSH.
<br />THIS CONTRACTOR SHALL MAINTAIN ONE SET OF DRAWINGS ON THE JOB SITE UPDATED WEEKLY TO RECORD ALL
<br />DEVIATIONS FROM CONTRACT DRAWINGS, SUCH AS:
<br />REVISIONS, ADDENDUMS, AND CHANGE ORDERS.
<br />LOCATION OF CONCEALED CONDUIT AND EQUIPMENT.
<br />2.
<br />1.
<br />DISCREPANCIES IN DOCUMENTSI.
<br />AT COMPLETION OF THE PROJECT AND BEFORE FINAL APPROVAL, THIS CONTRACTOR SHALL MAKE ANY FINAL
<br />CORRECTIONS TO DRAWINGS AND CERTIFY THE ACCURACY OF EACH PRINT BY SIGNATURE THEREON. FAILURE TO
<br />KEEP THESE RECORDS WILL ALLOW TENANT/ARCHITECTS TO DIRECT THE GENERAL CONTRACTOR TO PROVIDE
<br />THESE RECORDS AT HIS EXPENSE PRIOR TO FINAL PAYMENT.
<br />DRAWINGS (PLANS, SPECIFICATIONS, AND DETAILS) ARE DIAGRAMMATIC AND INDICATE THE GENERAL LOCATION
<br />AND INTENT OF THE ELECTRICAL SYSTEMS. WHERE DRAWINGS, EXISTING SITE CONDITIONS, SPECIFICATIONS OR
<br />OTHER TRADES CONFLICT OR ARE UNCLEAR, ADVISE THE GENERAL CONTRACTOR IN WRITING, PRIOR TO
<br />SUBMITTAL OF BID. THE GENERAL CONTRACTOR IS RESPONSIBLE TO ADVISE PROJECT MANAGER, IN WRITING, OF
<br />VARIATIONS TO CONTRACT DOCUMENTS PRIOR TO SUBMISSION OF BID. OTHERWISE, TENANT/ARCHITECT'S
<br />INTERPRETATION OF CONTRACT DOCUMENTS OR CONDITIONS SHALL BE FINAL WITH NO ADDITIONAL
<br />COMPENSATION PERMITTED.
<br />SIGNIFICANT DEVIATIONS MADE NECESSARY BY FIELD CONDITIONS, APPROVED EQUIPMENT SUBSTITUTIONS,
<br />AND CONTRACTOR'S COORDINATION WITH OTHER TRADES.
<br />e.
<br />g.
<br />f.
<br />h.
<br />i.
<br />k.
<br />j.
<br />l.
<br />n.
<br />3.
<br />a.
<br />b.
<br />4.
<br />m.
<br />TELEPHONE INSTRUMENTS AND WIRING UNLESS NOTED OTHERWISE.
<br />AS-BUILTS, PANEL DESCRIPTION AND CIRCUIT BREAKER SPECIFIC LABELING.
<br />THE FOLLOWING ITEMS OF ELECTRICAL CONSTRUCTION ARE NOT INCLUDED IN THIS CONTRACT:
<br />BEFORE STARTING WORK, THIS CONTRACTOR SHALL EXAMINE THE ARCHITECTURAL, STRUCTURAL, FIRE
<br />PROTECTION, MECHANICAL AND PLUMBING PLANS, SHOP DRAWINGS AND SPECIFICATIONS TO SEQUENCE,
<br />COORDINATE, AND INTEGRATE THE VARIOUS ELEMENTS OF THE ELECTRICAL SYSTEM, MATERIALS AND EQUIPMENT
<br />WITH OTHER CONTRACTORS TO AVOID INTERFERENCES AND CONFRONTATIONS.
<br />DATA CABLE WIRING UNLESS NOTED OTHERWISE.
<br />INSTALLATION OF CONDUITS STUBBED TO ABOVE CEILING FOR HVAC. ALSO, ANY ADDITIONAL CONDUIT FOR
<br />HVAC CONTROL EQUIPMENT WHERE PLENUM RATED CABLES ARE NOT PERMITTED.
<br />SMOKE/FIRE ALARM WIRING, DEVICES AND CONDUIT, AS SHOWN OR DESCRIBED ON DRAWINGS OR AS
<br />NECESSARY TO MEET LANDLORD, STATE, LOCAL, INSURANCE AND FIRE DEPARTMENT REQUIREMENTS.
<br />IF INDICATED ON DRAWINGS, INSTALLATION AND WIRING OF SPEAKERS, AMPLIFIERS, CONDUIT AND FINAL
<br />CONNECTIONS FOR SOUND SYSTEM AS SHOWN.
<br />FINAL CONNECTIONS TO ALL SIGNS, CORNICE LIGHTING, CASE LIGHTING, ETC. AS SHOWN ON DRAWINGS.
<br />TEMPORARY SERVICE AS INDICATED IN THE SPECIFICATIONS, INCLUDING ITS REMOVAL.
<br />A COMPLETE EMERGENCY AND EXIT LIGHTING SYSTEM AS SHOWN ON THE DRAWINGS.
<br />A COMPLETE CONDUIT SYSTEM FOR TELEPHONE/DATA INCLUDING BRANCH CONDUITS, OUTLET BOXES, PULL
<br />WIRES, GROUND CONDUCTORS, COVER PLATES, ETC. OR AS SPECIFICALLY NOTED OTHERWISE ON THE
<br />DRAWINGS.
<br />INSTALLATION OF LIGHT FIXTURES AND LAMPS AS SHOWN ON THE DRAWINGS INCLUDING ALL DEVICES,
<br />EQUIPMENT, ETC. REQUIRED FOR MOUNTING.
<br />BALANCING LOADS.
<br />1.
<br />B.
<br />THIS CONTRACTOR SHALL FURNISH AND INSTALL ALL CONDUITS SERVING ALL EQUIPMENT, INCLUDING BUT NOT
<br />LIMITED TO, LIGHTING, RECEPTACLES, HEATING, AIR CONDITIONING, PLUMBING EQUIPMENT, TELEPHONE, DATA,
<br />SPEAKERS, SECURITY, PAGER, TRAFFIC COUNTING SYSTEM AND ELECTRICAL EQUIPMENT.
<br />CONDUIT
<br />b.
<br />a.
<br />c.
<br />1.
<br />2.
<br />D.JUNCTION AND PULL BOXES
<br />CONVENIENCE OUTLETS:
<br />BOXES AND COVERS SHALL BE GALVANIZED STEEL OF CODE GAUGE SIZE.
<br />THE PLANS INDICATE ONLY SCHEMATIC ROUTINGS FOR CONDUIT RUNS. THIS CONTRACTOR SHALL FURNISH AND
<br />INSTALL ADDITIONAL BOXES WHERE REQUIRED BY FIELD CONDITIONS OR BY CODE.
<br />MOUNTED ON WALL NO MORE THAN 48-INCHES, MEASURED FROM TO TOP OF THE RECEPTACLE OUTLET BOX
<br />OR RECEPTACLE HOUSING AND; NO LESS THAN 15-INCHES, MEASURED FROM THE BOTTOM OF THE
<br />RECEPTACLE OUTLET BOX OR RECEPTACLE HOUSING, TO THE LEVEL OF THE FINISHED FLOOR OR WORKING
<br />PLATFORM UNLESS OTHERWISE INDICATED OR HORIZONTALLY MOUNTED IN BASEBOARD BENEATH CABINETS,
<br />AS SHOWN ON DRAWINGS, OR AS REQUIRED BY LOCAL CODES, SEE DRAWINGS.
<br />SWITCH HEIGHT 48" FROM FINISHED FLOOR TO TOP OF OUTLET.
<br />TELEPHONE OUTLETS SHALL BE LOCATED AS NOTED ON DRAWINGS.
<br />4.
<br />3.
<br />WIRING
<br />5.
<br />E.
<br />1.
<br />2.
<br />b.
<br />a.
<br />#10 BETWEEN 100-150 FEET
<br />#12 LESS THAN 100 FEET
<br />d.
<br />c.
<br />#6 OVER 250 FEET
<br />#8 BETWEEN 150 - 250 FEET
<br />INSTALL BOXES RIGIDLY SUPPORTED FROM THE BUILDING STRUCTURE AND SUPPORTED INDEPENDENT OF THE
<br />CONDUIT SYSTEM.
<br />ARRANGE CIRCUITS TO AVOID THE USE OF JUNCTION BOXES IN INACCESSIBLE LOCATIONS. THE USE OF JUNCTION
<br />BOXES ABOVE DRYWALL CEILINGS SHOULD BE LIMITED TO LOCATIONS NEAR ACCESS FRAMES USED FOR
<br />DIFFUSERS AND RETURN AIR GRILLES OR ACCESS PANELS AS LOCATED ON PLANS.
<br />JUNCTION AND PULL BOXES MUST BE LABELED WITH CIRCUIT NUMBER IDENTIFICATION AND SYSTEM TYPE ON
<br />COVER.
<br />CONDUCTORS FOR FEEDERS AND BRANCH CIRCUITS SHALL BE COPPER AND THE AWG SIZE AND TYPE AS SHOWN
<br />ON DRAWINGS. MINIMUM WIRE SIZE #12. THE CONDUCTORS SHALL BE 600 VOLT INSULATION, TYPE THW, THWN OR
<br />THHN.
<br />MINIMUM WIRE SIZE - 20 AMP BRANCH CIRCUIT SHALL BE AWG LISTED SIZE PER DISTANCE SHOWN BELOW.
<br />DISTANCE SHALL BE MEASURED FROM THE PANELBOARD CIRCUIT BREAKER TO THE FURTHEST OUTLET.
<br />3.
<br />b.
<br />a.
<br />1/2" FOR INDIVIDUAL LIGHTING FIXTURE CONNECTIONS OR TO INDIVIDUAL LIGHT SWITCHES (IF ACCEPTABLE BY
<br />THE LANDLORD AND LOCAL CODE OFFICIALS) AND 3/4" FOR ALL OTHER LOCATIONS.
<br />MAIN FEEDER CONDUIT 2" OR LARGER FOR ALL APPLICATIONS.
<br />MINIMUM SIZE OF CONDUIT SHALL BE:
<br />1.IT IS CONTRACTOR/ELECTRICIANS' RESPONSIBILITY TO FIELD VERIFY ACTUAL SITE CONDITION AND SHALL NOTIFY
<br />EOR(S) ANY DISCREPANCIES WITH THE PLAN THAT IMPACTS ON THE BID PRIOR TO BIDDING.
<br />TE00 TITLE24 - INDOOR
<br />TE01 TITLE24 - OUTDOOR
<br />RE
<br />V
<br />I
<br />S
<br />I
<br />O
<br />N
<br />SHEET TITLE:
<br />DATE: SCALE:
<br />GA
<br />R
<br />F
<br />I
<br />E
<br />L
<br />D
<br />
<br />R
<br />E
<br />S
<br />T
<br />O
<br />R
<br />A
<br />T
<br />I
<br />O
<br />N
<br />
<br />/
<br />
<br />R
<br />E
<br />M
<br />O
<br />D
<br />E
<br />L
<br />03/05/2023
<br />PLOT DATE: 7/2/2024 3:06:08 PM
<br />CD
<br />I
<br />
<br />Ci
<br />r
<br />c
<br />a
<br />
<br />D
<br />o
<br />m
<br />i
<br />n
<br />i
<br />
<br />I
<br />n
<br />t
<br />e
<br />r
<br />n
<br />a
<br />t
<br />i
<br />o
<br />n
<br />a
<br />l
<br />,
<br />
<br />I
<br />n
<br />c
<br />.
<br />En
<br />g
<br />i
<br />n
<br />e
<br />e
<br />r
<br />i
<br />n
<br />g
<br />
<br />-
<br />
<br />C
<br />o
<br />n
<br />s
<br />u
<br />l
<br />t
<br />i
<br />n
<br />g
<br />98
<br />9
<br />0
<br />
<br />R
<br />e
<br />s
<br />e
<br />a
<br />r
<br />c
<br />h
<br />
<br />D
<br />r
<br />.
<br />
<br />S
<br />u
<br />i
<br />t
<br />e
<br />
<br />1
<br />0
<br />0
<br />,
<br />
<br />I
<br />r
<br />v
<br />i
<br />n
<br />e
<br />,
<br />
<br />C
<br />A
<br />
<br />9
<br />2
<br />6
<br />1
<br />8
<br />Ph
<br />o
<br />n
<br />e
<br />
<br />(
<br />9
<br />4
<br />9
<br />)
<br />
<br />5
<br />3
<br />3
<br />-
<br />4
<br />1
<br />1
<br />7
<br />
<br />|
<br />
<br />d
<br />k
<br />a
<br />n
<br />g
<br />@
<br />c
<br />d
<br />i
<br />e
<br />n
<br />g
<br />.
<br />c
<br />o
<br />m
<br />82
<br />9
<br />
<br />N
<br />
<br />G
<br />A
<br />R
<br />F
<br />I
<br />E
<br />L
<br />D
<br />
<br />S
<br />T
<br />SA
<br />N
<br />T
<br />A
<br />
<br />A
<br />N
<br />A
<br />,
<br />
<br />C
<br />A
<br />
<br />9
<br />2
<br />7
<br />0
<br />1
<br />DRAWN: CHECKED:
<br />PL
<br />A
<br />N
<br />
<br />C
<br />H
<br />E
<br />C
<br />K
<br />
<br />R
<br />E
<br />V
<br />.
<br />
<br />0
<br />4
<br />/
<br />2
<br />7
<br />/
<br />2
<br />0
<br />2
<br />3
<br />PL
<br />A
<br />N
<br />
<br />C
<br />H
<br />E
<br />C
<br />K
<br />
<br />R
<br />E
<br />V
<br />.
<br />
<br />0
<br />9
<br />/
<br />2
<br />8
<br />/
<br />2
<br />0
<br />2
<br />3
<br />IN
<br />S
<br />P
<br />E
<br />C
<br />T
<br />I
<br />O
<br />N
<br />
<br />R
<br />E
<br />V
<br />.
<br />
<br />0
<br />6
<br />/
<br />1
<br />9
<br />/
<br />2
<br />0
<br />2
<br />4
<br />N.T.S.
<br />E000
<br />ELECTRICAL
<br />SPECIFICATION
<br />J.L.L.N.
<br />HOLD- 829 N
<br />Garfield St1/15/2025
|