Laserfiche WebLink
<br /> <br /> <br />Rev: 08/30//2019 Page 1 of 2 <br /> <br />CEC 2019 <br /> ELECTRICAL VEHICLE (EV) <br />CHARGING SYSTEMS <br />Non-residential Buildings and Facilities <br />Building Safety Division <br />20 Civic Center Plaza <br />P.O. Box 1988 (M-19) <br />Santa Ana, CA 92702 <br />(714) 647-5800 <br /> <br />Eligibility Checklist for Expedited EV Charging Station Permit: <br />Non-Residential Buildings and Facilities <br /> <br />Type of Charging Station(s) Power Levels (proposed circuit rating) Check one <br />Level 1 110/120 volt alternating current (VAC) at 15 or 20 Amps <br />Level 2 - 3.3 kilowatt (kW) (low) 208/240 VAC at 20 or 30 Amps <br />Level 2 – 6.6kW (medium) 208/240 VAC at 40 Amps <br />Level 2 – 9.6kW (high) 208/240 VAC at 50 Amps <br />Level 2 – 19.2kW (highest) 208/240 VAC at 100 Amps <br />Other (provide <br />detail): <br />Provide rating: <br /> <br />Permit Application Requirements: <br /> <br /> <br />A. Does the application include EVCS manufacturer's specs and installation guidelines? Y N <br />Electrical Load Calculation Worksheet: <br /> <br />A. Is an electrical load calculation worksheet included? () Y N <br />B. Based on the load calculation worksheet, is a new electrical service panel upgrade <br />required? Y N <br />Amps or higher, is a completed panel schedule with electrical calculations included <br /> <br />Y <br /> <br />N <br /> <br />Site Plan and Single Line Drawing: <br /> <br />A. Is a site plan and separate electrical plan with a single-line diagram included <br />with the permit application? Y N <br />requirements (CEC 625.52 (B)), is a mechanical plan included with the <br /> <br />Y <br /> <br />N <br />DC Fast Charger <br />480VAC <br />N/A <br />N/A <br />N/A <br />3300 S Bristol St <br />11/13/2024