My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2301 N Tustin Ave Unit #A - Plan
PBA
>
Building
>
ProjectDox
>
T
>
Tustin Ave
>
2301 N Tustin Ave Unit# A
>
2301 N Tustin Ave Unit #A - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/5/2025 7:33:09 AM
Creation date
6/5/2025 7:32:55 AM
Metadata
Fields
Template:
Plan
Permit Number
20182680
30147191
101119116
101119117
Full Address
2301 N Tustin Ave Unit# A
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
76
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
1. THE DRAWINGS CONSTITUTE THE CONTRACT DOCUMENTS FOR CONSTRUCTION. <br />ALL GENERAL REQUIREMENTS ARE TO BE MET AND ALL MATERIALS, FINISHES AND <br />SYSTEMS ARE TO BE INSTALLED AND PERFORM PER SPECIFICATIONS UNLESS <br />OTHERWISE NOTED. <br />2. GENERAL CONTRACTOR SHALL VISIT THE SITE, REVIEW THE BUILDING DRAWINGS <br />AS SUBMITTED BY STARBUCKS AND BECOME THOROUGHLY FAMILIAR WITH THE <br />SITE CONDITIONS PRIOR TO CONSTRUCTION. <br />3. GENERAL CONTRACTOR SHALL CONSULT WITH STARBUCKS CONSTRUCTION <br />MANAGER TO RESOLVE ANY CHANGES, OMISSIONS OR PLAN DISCREPANCIES <br />PRIOR TO CONSTRUCTION. <br />4. ALL WORK SHALL BE PERFORMED IN STRICT COMPLIANCE WITH LOCAL, COUNTY, <br />STATE AND FEDERAL CODES AND ORDINANCES. <br />5. GENERAL CONTRACTOR SHALL VERIFY THE LOCATION OF ALL UTILITIES. <br />6. GENERAL CONTRACTOR TO VERIFY ALL DIMENSIONS, INCLUDING CLEARANCES <br />REQUIRED BY OTHER TRADES AND NOTIFY STARBUCKS CONSTRUCTION MANAGER <br />OF ANY DISCREPANCIES PRIOR TO PROCEEDING WITH THE WORK. ALL <br />DIMENSIONS ARE TO THE FACE OF THE FINISHED SURFACE UNLESS NOTED <br />OTHERWISE. ALL DIMENSIONS TO BE TAKEN FROM DESIGNATED DATUM POINT. DO <br />NOT SCALE DRAWINGS. <br />7. GENERAL CONTRACTOR SHALL PATCH AND REPAIR ALL EXISTING WALLS, FLOORS, <br />CEILINGS, OR OTHER SURFACES IDENTIFIED TO REMAIN THAT MAY BECOME <br />DAMAGED DURING THE COURSE OF THE WORK. <br />8. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR OBTAINING PERMITS FOR FIRE <br />PROTECTION. PLUMBING, MECHANICAL, AND ELECTRICAL SYSTEMS (IF SEPARATE <br />FROM BUILDING) PRIOR TO INSTALLATION OF SUCH SYSTEMS. <br />9. GENERAL CONTRACTOR SHALL RETAIN ONE SET OF PERMIT PLANS ON-SITE TO <br />DOCUMENT ALL CHANGES MADE DURING CONSTRUCTION. THE RECORD DRAWINGS <br />SHALL BE ISSUED TO THE OWNER AT PROJECT CLOSE-OUT AS DESCRIBED IN THE <br />GENERAL REQUIREMENTS OF THE PROJECT MANUAL. <br />10. GENERAL CONTRACTOR IS RESPONSIBLE FOR COORDINATING DELIVERY OF <br />MATERIALS FROM STARBUCKS CONTRACTED THIRD PARTY LOGISTICS <br />DISTRIBUTION SERVICES AND VENDOR DIRECT SHIPMENTS. SEE THE PROJECT <br />MANUAL FOR ADDITIONAL INFORMATION. <br />11. RESPONSIBILITY FOR SUPPLY AND DELIVERY OF MATERIALS AND EQUIPMENT IS <br />IDENTIFIED IN THE DRAWING SCHEDULE SHEETS UNDER THE COLUMN LABELED <br />"FURNISHED BY/RESPONSIBILITY". <br />12. FOR THE PURPOSE OF THE DOCUMENTS, TO “INSTALL”, SHALL MEAN TO <br />PROVIDE ALL FASTENERS, MISCELLANEOUS HARDWARE, BLOCKING, ELECTRICAL <br />CONNECTIONS, PLUMBING CONNECTIONS AND OTHER ITEMS REQUIRED FOR A <br />COMPLETE AND OPERATIONAL INSTALLATION, UNLESS OTHERWISE NOTED. <br />13. ALL ITEM SUBSTITUTIONS MUST BE APPROVED BY THE STARBUCKS CONSTRUCTION <br />MANAGER. <br />MAILING <br />ADDRESS: <br />DESIGN <br />MANAGER: <br />STARBUCKS COFFEE COMPANY <br />CONTACT: ISCOLINA DELGADO - <br />CHARLIE CHANG <br />starbuckspc@hestiaatelier.com <br />STARBUCKS COFFEE COMPANY <br />2401 UTAH AVENUE SOUTH <br />MS STOP: S-SD10 <br />SEATTLE, WASHINGTON 98134 <br />(206) 318-1575 <br />CONSTRUCTION <br />MANAGER: <br />STARBUCKS COFFEE COMPANY <br />CONTACT: MATT ROBITAILLE <br />mrobitai@starbucks.com <br />ARCHITECT <br />OF RECORD: <br />MEP <br />CONSULTANT <br />OF RECORD: <br />PIVOT ENGINEERING CONSULTANTS <br />CONTACT: MOSTAFA ZUBAIR <br />(909) 610-5364 <br />MZUBAIR@PECCUSA.COM <br />PROJECT <br />MANAGER: <br />HESTIA ATELIER, LLP <br />CONTACT: ISCOLINA DELGADO <br />(626) 222-7669 <br />starbuckspc@hestiaatelier.com <br />HESTIA ATELIER, LLP <br />CONTACT: HIDENORI IWAGAMI <br />3 PETERS CANYON RD. STE:110 <br />IRVINE, CA 92606 <br />(626) 222-7669 <br />starbuckspc@hestiaatelier.com <br />PROJECT <br />SPECIALIST: <br />STARBUCKS COFFEE COMPANY <br />MICHELE GURLEY <br />(714) 477-2850 <br />mgurley@starbucks.com <br />LEGEND: X - SHEET ISSUED <br />R - SHEET ISSUED FOR REFERENCE AND COORDINATION ONLY <br />SEE TITLEBLOCK FOR REVISION ISSUE DATE(S) <br />SCOPE OF WORK <br />INTERIOR REMODEL OF EXISTING STARBUCKS COFFEE TENANT IMPROVEMENT. <br />SCOPE INCLUDES: <br />- NEW CASEWORK <br />- NEW NON-LOAD BEARING INTERIOR PARTITIONS <br />- NEW BEVERAGE PREP EQUIPMENT <br />- NEW PLUMBING FIXTURES <br />- NEW FLOOR FINISH <br />- NEW WALL FINISH <br />- CEILING MODIFICATIONS <br />- NEW INTERIOR LIGHTING <br />- NEW ARTWORK <br />- NEW INTERIOR FURNITURE <br />- UPGRADE DRIVE-THRU WAY FINDING SIGNAGE LIKE FOR LIKE (UNDER <br />SEPARATE PERMIT) <br />THERE ARE NO CHANGES TO OCCUPANCY TYPE OR TOTAL SQUARE FOOTAGE <br />OF EXISTING TENANT SPACE. <br />CODE AUTHORITIES: CITY OF SANTA ANA MUNICPAL CODE <br />BUILDING CODE: 2022 California Building Code <br />PLUMBING CODE: 2022 California Plumbing Code <br />MECHANICAL CODE: 2022 California Mechanical Code <br />ELECTRICAL CODE: 2022 California Electrical Code <br />ENERGY CODE:2022 California Energy Code <br />FIRE CODE:2022 California Fire Code <br />HEALTH CODE:2022 California Retail Food Code <br />ACCESSIBILITY CODE: CH 11B OF 2022 CBC <br />ZONING INFORMATION: <br />PARCEL NUMBER: 396-141-01, 396 - 141 - 07 <br />LEGAL DISCRIPTION: CHAPMAN TR LOT 5 BLK B E 172 FT W 202 FT S 192 FT -EX STS- TR 175 <br />PERMITTED LAND USE: COMMERCIAL <br />ZONING:ARTERIAL COMMERCIAL (C5) <br />CURRENT USE:COFFEE SHOP <br />SEPARATE SUBMITTALS: - DRIVE-THRU WAY FINDING SIGNAGE <br />E SANTA CLARA AVE. <br />N <br />T <br />U <br />S <br />T <br />I <br />N <br /> <br />A <br />V <br />E <br />. <br />HI <br />G <br />H <br />W <br />A <br />Y <br /> <br />5 <br />5 <br />A/C AIR CONDITIONING <br />ACT ACOUSTICAL CEILING TILE <br />ADJ ADJUSTABLE <br />AFF ABOVE FINISHED FLOOR <br />AMP AMPERE <br />ARCH ARCHITECT <br />BOH BACK OF HOUSE <br />CAB CABINET <br />CL CENTER LINE <br />CLG CEILING <br />CM STARBUCKS <br />CONSTRUCTION MANAGER <br />CTR CENTER <br />CX COMMISSIONING <br />CXA COMMISSIONING AGENT <br />DEG DEGREE <br />DET DETAIL <br />DIA DIAMETER <br />DIM DIMENSION <br />DM STARBUCKS <br />DESIGN MANAGER <br />DN DOWN <br />EA EACH <br />EL ELEVATION <br />EQ EQUAL <br />EXIST EXISTING <br />EXT EXTERIOR <br />FF&E FURNITURE, <br />FIXTURE, AND EQUIPMENT <br />FLR FLOOR <br />FOH FRONT OF HOUSE <br />FOIC FURNISHED BY OWNER, <br />INSTALLED BY CONTRACTOR <br />FOIO FURNISHED BY OWNER <br />INSTALLED BY OWNER <br />FT FOOT/FEET <br />G GROUND <br />GC GENERAL CONTRACTOR <br />GWB GYPSUM WALLBOARD <br />HC HOLLOW CORE <br />HDW HARDWARE <br />HM HOLLOW METAL <br />HORIZ HORIZONTAL <br />HR HOUR <br />HT HEIGHT <br />HVAC HEATING, VENTILATING <br />AND AIR CONDITIONING <br />I.D. INSIDE DIAMETER <br />LEED LEADERSHIP IN ENERGY <br />AND ENVIRONMENTAL DESIGN <br />LL LANDLORD <br />LV LOW VOLTAGE <br />MAX MAXIMUM <br />MEP "MECHANICAL, ELECTRICAL <br />AND PLUMBING" <br />MFR MANUFACTURER <br />MIN MINIMUM <br />NIC NOT IN CONTRACT <br />NL NIGHT LIGHT <br />NTS NOT TO SCALE <br />OC ON CENTER <br />O.D. OUTSIDE DIAMETER <br />PIR PASSIVE INFRARED SENSOR <br />PLC PLACE <br />R RADIUS <br />REF REFERENCE <br />REQ‘D REQUIRED <br />REV REVISION <br />RND ROUND <br />SB STARBUCKS <br />SC SOLID CORE <br />SF SQUARE FEET <br />SHT SHEET <br />SIM SIMILAR <br />SPEC SPECIFICATION <br />SQ SQUARE <br />TEMP TEMPORARY <br />TYP TYPICAL <br />UC UNDER COUNTER <br />UNO UNLESS NOTED OTHERWISE <br />VERT VERTICAL <br />VIF VERIFY IN FIELD <br />X' XX" <br />X <br />N <br />NORTH <br />ARROW <br />XXXX AFF <br />XXXXXW <br />XX <br />Scale: X =X <br />0 2 4 8 <br />GRAPHIC <br />SCALE <br />DATUM <br />POINT <br />EXTERIOR <br />ELEVATION <br />CALL-OUT <br />INTERIOR <br />ELEVATION <br />CALL-OUT <br />SECTION <br />CALL-OUT <br />DETAIL <br />CALL-OUT <br />REVISION <br />TAG <br />PAINT <br />TAG <br />DESIGN ID <br />TAG <br />DOOR <br />TAG <br />WINDOW <br />TAG <br />SHEET <br />NOTE <br />CALLOUT <br />ABOVE FINISH <br />FLOOR <br />HEIGHT TAG <br />FINISH FACE TO <br />FINISH FACE <br />DIMENSION <br />REVISION <br />CLOUD <br />X-X-XP <br />T XXXXX XXXXXX XXXXX D XX <br />INTERIOR <br />WALL TAG <br />RESPONSIBILITY ABBREVIATIONS <br />SB - SUPPLIED BY STARBUCKS INSTALLED BY GENERAL CONTRACTOR <br />GC - SUPPLIED AND INSTALLED BY GENERAL CONTRACTOR <br />CW - SUPPLIED BY CASEWORK VENDOR - INSTALLED BY VENDOR / GENERAL <br />CONTRACTOR <br />VD - SUPPLIED BY VENDOR - INSTALLED BY GENERAL CONTRACTOR <br />OCCUPANCY TYPE:B <br />TENANT AREA:1,607 S.F. <br />CONSTRUCTION TYPE:V-B <br />FIRE SPRINKLER:NO <br />NUMBER OF STORIES:1 <br />STORAGE SHELVING REQUIRED: <br />96' LINEAR FEET, MIN. 18" DEEP. <br />* 3'W X TIERS HIGH <br />* LOWEST SHELF MIN. 6" FROM FLOOR <br />* UNITS MOUNTED A MIN. 1" FROM ALL WALL SURFACES. <br />* MUST MEET ALL REQUIREMENTS OF THE ORANGE COUNTY DEPARTMENT <br />OF ENVIRONMENTAL HEALTH. <br />PROVIDED CALCULATIONS: <br />* 3' LINEAR FEET, MIN. 18" DEEP. <br />* LENGTH OF SHELVING UNIT X # OF TIERS X # OF UNITS = MIN. 96' OR GREATER <br />3LF X 5 TIERS UNITS X 11 UNITS = 165 LF > 96 LF (COMPLIES) <br />SHEET SHEET TITLE B <br />I <br />D <br /> <br />S <br />E <br />T <br /> P <br />E <br />R <br />M <br />I <br />T <br /> <br />S <br />E <br />T <br /> R <br />E <br />V <br />I <br />S <br />I <br />O <br />N <br /> <br />1 <br /> R <br />E <br />V <br />I <br />S <br />I <br />O <br />N <br /> <br />2 <br /> R <br />E <br />V <br />I <br />S <br />I <br />O <br />N <br /> <br />3 <br /> R <br />E <br />V <br />I <br />S <br />I <br />O <br />N <br /> <br />4 <br />GENERAL <br />G001 GENERAL INFORMATION <br />G002 COMPOSITE PLAN <br />G002A ENLARGED COMPOSITE PLAN <br />G003 LIFE SAFETY AND ACCESSIBILITY PLAN <br />G004 ACCESSIBILITY DETAILS <br />G004A ACCESSIBILITY NOTES <br />G004B ACCESSIBILITY NOTES <br />DEMOLITION <br />D001 ARCHITECTURAL DEMO SITE PLAN <br />D101 DEMOLITION FLOOR PLAN <br />D102 DEMO REFLECTED CEILING PLAN <br />ARCHITECTURAL <br />A001 ARCHITECTURAL SITE PLAN <br />A002 ARCHITECTURAL SITE ACCESSIBILITY DETAILS <br />A101 BUILDING FLOOR PLAN <br />A102 BUILDING FLOOR PENETRATION PLAN <br />INTERIORS <br />I101 FF & E PLAN <br />I102 CASEWORK PLAN <br />I103 REFLECTED CEILING PLAN <br />I103A REFLECTED CEILING DIMENSION PLAN <br />I103B ENLARGED SOFFIT DIMENSION PLAN <br />I104 FLOOR FINISH PLAN <br />I105 WALL FINISH PLAN <br />I201 INTERIOR FINISH ELEVATIONS <br />I202 INTERIOR FINISH ELEVATIONS <br />I203 INTERIOR FINISH ELEVATIONS <br />I204 INTERIOR FINISH ELEVATIONS <br />I205 INTERIOR FINISH ELEVATIONS <br />I400 ENLARGED ENGINE PLAN <br />I401 ENLARGED CASEWORK PLAN <br />I401A ENLARGED CASEWORK PLAN <br />I402 ENLARGED RESTROOM ACCESSIBILITY PLAN <br />I501 INTERIOR DETAILS <br />I501A INTERIOR DETAILS <br />I501B INTERIOR DETAILS <br />I501C INTERIOR DETAILS <br />I502 CASEWORK DETAILS <br />I502A CASEWORK DETAILS <br />I502B CASEWORK DETAILS <br />I502C CASEWORK DETAILS <br />I503 FLOOR AND WALL FINISH DETAILS <br />I504 ELECTRICAL DETAILS <br />I504A ELECTRICAL DETAILS <br />I504B ELECTRICAL DETAILS <br />I504C ELECTRICAL DETAILS <br />I504D ELECTRICAL DETAILS <br />I505 PLUMBING DETAILS <br />I505A PLUMBING DETAILS <br />I505B PLUMBING DETAILS <br />I505C PLUMBING DETAILS <br />I601 CASEWORK AND FF&E SCHEDULES <br />I602 INTERIOR FINISHES SCHEDULES <br />ELECTRICAL <br />E001 ELECTRICAL NOTES <br />E002 ELECTRICAL SPECIFICATIONS <br />E200 LIGHTING PLAN <br />E210 LUTRON ONE-LINE DIAGRAM <br />E220 LUTRON LOOP LAYOUT <br />E300 POWER PLAN <br />E310 ENLARGED ENGINE PLAN <br />E320 ELECTRICAL DETAILS <br />E330 ELECTRICAL DETAILS <br />E500 SINGLE LINE DIAGRAM AND PANEL SCHEDULES <br />E600 INTERIOR LIGHTING COMPLIANCE CERT <br />E610 INTERIOR LIGHTING COMPLIANCE CERT <br />E620 INTERIOR LIGHTING COMPLIANCE CERT <br />MECHANICAL <br />M001 MECHANICAL GENERAL NOTES & LEGENDS <br />M002 MECHANICAL SCHEDULES <br />M100 MECHANICAL FLOOR PLAN <br />M200 MECHANICAL ROOF PLAN <br />M300 MECHANICAL DETAILS <br />M400 MECHANICAL T-24 <br />MD100 MECHANICAL DEMO FLOOR PLAN <br />PLUMBING <br />P001 PLUMBING GENERAL NOTES & LEGENDS <br />P002 PLUMBING SCHEDULES & CALCULATIONS <br />P003 PLUMBING SCHEDULES & CALCULATIONS <br />P100 PLUMBING WATER PLAN <br />P200 PLUMBING WASTE PLAN <br />P400 PLUMBING WATER ISOMETRIC <br />P401 PLUMBING WASTE & VENT ISOMETRIC <br />P500 PLUMBING DETAILS <br />P501 PLUMBING DETAILS <br />P502 PLUMBING DETAILS <br />P503 PLUMBING DETAILS <br />P504 PLUMBING DETAILS <br />PS100 PLUMBING SITE PLAN <br />NUMBER OF SHEETS: 83 <br />SHEET INDEXSYMBOLS LEGEND GENERAL NOTES ABBREVIATIONS LIST PROJECT CONTACTS <br />SITE INFORMATION <br />BUILDING INFORMATION <br />VICINITY PLAN <br />STATE OF CALI F RNIA <br />O <br />REN.09/30/25 <br />S <br />LICEN <br />D ARCHITECT <br />E <br />H <br />I <br />DENO R I I WAGAM <br />I <br />C-34970 <br />3 PETERS CANYON RD. STE 110 <br />IRVINE, CA 92606 <br />D <br />G <br />ESI <br />N <br />| <br />A RC H I T EC TU RE <br />H E S T I A A T E L I E R <br />SHEET NUMBER: <br />SHEET TITLE: <br />SCALE: AS SHOWN <br />STORE #: <br />PROJECT #: <br />PR <br />O <br />J <br />E <br />C <br />T <br /> <br />N <br />A <br />M <br />E <br />: <br />PR <br />O <br />J <br />E <br />C <br />T <br /> <br />A <br />D <br />D <br />R <br />E <br />S <br />S <br />: <br />C 2020 STARBUCKS COFFEE COMPANY <br />R <br />ISSUE DATE: <br />2401 UTAH AVENUE SOUTH <br />SEATTLE, WASHINGTON 98134 <br />(206) 318-1575 <br />THESE DRAWINGS AND THE PROJECT MANUAL <br />ARE CONFIDENTIAL AND SHALL REMAIN THE <br />SOLE PROPERTY OF STARBUCKS <br />CORPORATION, WHICH IS THE OWNER OF THE <br />COPYRIGHT IN THIS WORK. THEY SHALL NOT <br />BE REPRODUCED (IN WHOLE OR IN PART), <br />SHARED WITH THIRD PARTIES OR USED IN ANY <br />MANNER ON OTHER PROJECTS OR <br />EXTENSIONS TO THIS PROJECT WITHOUT THE <br />PRIOR WRITTEN CONSENT OF STARBUCKS <br />CORPORATION. THESE DRAWINGS AND <br />SPECIFICATIONS ARE INTENDED TO EXPRESS <br />DESIGN INTENT FOR A PROTOTYPICAL <br />STARBUCKS STORE (WHICH IS SUBJECT TO <br />CHANGE AT ANYTIME) AND DO NOT REFLECT <br />ACTUAL SITE CONDITIONS. NEITHER PARTY <br />SHALL HAVE ANY OBLIGATION NOR LIABILITY TO <br />THE OTHER (EXCEPT STATED ABOVE) UNTIL A <br />WRITTEN AGREEMENT IS FULLY EXECUTED BY <br />BOTH PARTIES. <br />STARBUCKS R <br />DESIGN MANAGER: <br />PRODUCTION DESIGNER: <br />CHECKED BY: <br />STARBUCKS TEMPLATE VERSION: i2021.04.23 <br />7/ <br />5 <br />/ <br />2 <br />0 <br />2 <br />4 <br /> <br />1 <br />0 <br />: <br />2 <br />1 <br />: <br />2 <br />7 <br /> <br />A <br />M <br /> <br />W: <br />\ <br />P <br />r <br />o <br />j <br />e <br />c <br />t <br />s <br />\ <br />S <br />t <br />a <br />r <br />b <br />u <br />c <br />k <br />s <br />\ <br />T <br />u <br />s <br />t <br />i <br />n <br /> <br />& <br /> <br />S <br />a <br />n <br />t <br />a <br /> <br />C <br />l <br />a <br />r <br />a <br /> <br />5 <br />1 <br />9 <br />6 <br />9 <br />\ <br />C <br />D <br />\ <br />T <br />u <br />s <br />t <br />i <br />n <br /> <br />a <br />n <br />d <br /> <br />S <br />a <br />n <br />t <br />a <br /> <br />C <br />l <br />a <br />r <br />a <br /> <br />- <br /> <br />R <br />e <br />v <br />i <br />t <br /> <br />M <br />o <br />d <br />e <br />l <br />. <br />r <br />v <br />t <br />G001 <br />76085-018 <br />07-02-2024 <br />TU <br />S <br />T <br />I <br />N <br /> <br />& <br /> <br />S <br />A <br />N <br />T <br />A <br />CL <br />A <br />R <br />A <br />23 <br />0 <br />1 <br /> <br />N <br /> <br />T <br />U <br />S <br />T <br />I <br />N <br /> <br />A <br />V <br />E <br />, <br /> <br />S <br />U <br />I <br />T <br />E <br /> <br />A <br />SA <br />N <br />T <br />A <br /> <br />A <br />N <br />A <br />, <br /> <br />C <br />A <br />, <br /> <br />9 <br />2 <br />7 <br />0 <br />5 <br />51969 <br />CHARLIE CHANG <br />SEPIDEH SHARIFI <br />MAGED GERGES <br />GENERAL INFORMATION <br />2N <br />D <br /> <br />P <br />E <br />R <br />M <br />I <br />T <br /> <br />S <br />U <br />B <br />M <br />I <br />T <br />T <br />A <br />L <br /> <br />0 <br />7 <br />/ <br />0 <br />2 <br />/ <br />2 <br />0 <br />2 <br />4 <br />RESPONSIBILITY LEGEND <br />DRY STORAGE REQUIREMENTS <br />Revision Schedule <br />Rev Date By Description <br />A 06-13-24 SS 1st Round Comments <br />A <br />Bldg# 101119116-17 <br />Elec# 20182680 <br />Plmg# 30147191 <br /> <br />APPROVALS: <br />PLNG - PRaj <br />BLDG - CSG Consultants <br />ELEC - CSG Consultants <br />PLMG - TLuka <br />2301 N Tustin Ave <br />#A8/22/2024
The URL can be used to link to this page
Your browser does not support the video tag.