Laserfiche WebLink
RACKING DETAILS -2 <br />REVISION <br />REV DATE DESCRIPTION <br />A 9/11/2024 PERMIT PLANS <br />DATE: 9/11/2024 <br />DRAFTED BY: PRIYANGA <br />CHECKED BY: JOHN <br />NAME: VIETNAMESE ALLIANCE CHURCH OF ORANGE <br />PROJECT NO: 2308-02 <br />ADDRESS: 2130 N GRAND AVE, SANTA ANA, CA 92705. <br />COORDINATES: 33.764726, -117.852604 <br />APN: 396-191-44 <br />AHJ: CITY OF SANTA ANA <br />UTILITY: SCE <br />58.85kW DC (STC) SYSTEM, 55.16kW DC (PTC) VALUE, <br />50.00kW AC (NAMEPLATE) SYSTEM, 54.34 kW AC (CEC) VALUE <br />MODULES: (107) ZNSHINE SOLAR ZXM7-SHLD144-550W <br />INVERTER(S): (1) CHINT CPS SCA50KTL-DO/US-480 <br />MLPE: (56) AP SMART RSD-D-20 <br />PAGE NO: R-1.1 <br />PROJECT INFORMATIONSYSTEM INFORMATIONCONTRACTOR INFORMATION <br />THE INFORMATION CONTAINED IN THIS DRAWING IS PROPRIETARY AND <br />CONFIDENTIAL AND SHALL ONLY BE USED FOR THE PURPOSES OF THIS <br />PROJECT. <br />SCALE: 3/32" = 1'-0" <br />RACKING DETAILS: <br />UNITS mm <br />inches <br />CAM SPACING <br />60 <br />2 3/8 <br />CAM SPACING <br />ORIENTATION <br />MARKER <br />BASE HOLE "1" <br />ORIENTATION <br />MARKER <br />BASE HOLE "1" <br />CAM SPACING DETAIL <br />BASE HOLE "3" <br />STANDARD ASSEMBLY QUANTITY <br />NORTH ASSEMBLY <br />SOUTH ASSEMBLY <br />MIDDLE ASSEMBLY <br />NORTH SOUTH ASSEMBLY <br />NOTE: ASSEMBLIES IN THIS TABLE USE THE STANDARD 2-PAD BASE <br />40 <br />40 <br />134 <br />0 <br />NORTH ASSEMBLY <br />ORIENTATION <br />MARKER <br />MIDDLE ASSEMBLY <br />ORIENTATION <br />MARKER <br />ORIENTATION <br />MARKER <br />BASE HOLE "2" <br />BASE HOLE "3" <br />SOUTH ASSEMBLY NORTH SOUTH ASSEMBLY <br />ORIENTATION <br />MARKER <br />BASE HOLE "2" <br />CAM CLAW <br />CAM BRACKET <br />BASE <br />DEFLECTOR RAIL <br />MODULE CONNECTOR <br />NOTE: <br />EXAMPLE BALLASTING SHOWN ON THIS <br />PAGE IS FOR REFERENCE ONLY AND DO NOT <br />REFLECT TYPICAL BALLAST PLACEMENT. <br />REFER TO BALLAST MAP SHEETS FOR ARRAY <br />SPECIFIC BALLAST REQUIREMENTS. <br />BASE <br />CAM BRACKET <br />AND CAM CLAW <br />RAIL <br />EXAMPLE RAIL AND BLOCK CONFIGURATION <br />MODULE CONNECTOR <br />DEFLECTOR <br />TRANSPARENT MODULE <br />2130 N Grand Ave <br />10/1/2024