SYMBOLS DESCRIPTION <br />01/A-2.00 <br />01 <br />A-4.00 <br />N <br />NORTH ARROW <br />ENLARGE FLOOR PLAN REFERENCE <br />01 <br />A-4.00 DETAIL SECTION <br />INTERIOR ELEVATION <br />11 5/8" <br />5" <br />DIMENSIONS <br />1 REVISION NUMBER & <br />AFFECTED AREA <br />WINDOW TYPE22 <br />ROOM NAME, ABBREVIATION, <br />& NUMBER IDENTIFICATION <br />1001A DOOR/OPENING IDENTIFICATION <br />SEE SCHEDULE ON A6-01 <br />A3 <br />1 <br />PARTITION <br />DESIGNATION <br />HOURLY "FIRE <br />RESISTIVE RATING" <br />IF APPLICABLE <br />PARTITION TYPE <br />ROOM NAME <br />ROOM ABBREV <br />1001 <br />A D 1 - 1 1 <br />LEVEL 1 DESIGNATOR <br />LEVEL 2 DESIGNATOR (OPTIONAL) <br />SHEET TYPE DESIGNATOR <br />FLOOR LEVEL (FOR PLANS ONLY) <br />SHEET SEQUENCE NUMBER <br />LEVEL 1 DESIGNATORS <br />G GENERAL <br />H HAZARDOUS MATERIALS <br />V SURVEY / MAPPING <br />B GEOTECHNICAL <br />C CIVIL <br />L LANDSCAPE <br />S STRUCTURAL <br />A ARCHITECTURAL <br />I INTERIORS <br />Q EQUIPMENT <br />F FIRE PROTECTION <br />P PLUMBING <br />M MECHANICAL <br />E ELECTRICAL <br />T SECURITY <br />R RESOURCES <br />X OTHER DISCIPLINES <br />Z CONTRACTOR SHOP <br />DRAWINGS <br />O OPERATIONS <br />LEVEL 2 DESIGNATORS (OPTIONAL) <br /> S SITE <br /> D DEMOLITION <br /> E ELEMENT <br /> P POWER <br /> L LIGHTING <br />SHEET TYPE DESIGNATORS <br />0 GENERAL (OPTIONAL USE AS DEMO) <br />1 PLANS <br />2 ELEVATIONS <br />3 SECTIONS <br />4 ENLARGED PLANS <br />5 DETAILS <br />6 SCHEDULES <br />7 USER DEFINED <br />8 USER DEFINED <br />9 3D VIEWS <br />OWNER'S REPRESENTATIVE: <br />KAISER FOUNDATION HEALTH PLAN INC. <br />1707 BARCELONA CIRCLE <br />PLACENTIA, CA 92870 <br />CONTACT: JEFFREY S. MONTERO <br /> SENIOR PROJECT MANAGER <br />E-MAIL JEFF.S.MONTERO@KP.ORG <br />ARCHITECT: <br />HUITT-ZOLLARS <br />555 W 5TH ST., SUITE 2950 <br />LOS ANGELES, CA 90013 <br />CONTACT: STEVE WHITE, AIA, LEED AP <br /> PROJECT ARCHITECT <br />E-MAIL SWHITE@HUITT-ZOLLARS.COM <br /> 310.447.7466 <br />ELECTRICAL ENGINEER: <br />DPB ENGINEERS, INC. <br />150 EL CAMINO REAL, SUITE 106 <br />TUSTIN, CA 92780 <br />CONTACT: MARCO REBOLLEDO <br /> ELECTRICAL ENGINEER <br />E-MAIL: MARCO.REBOLLEDO@SALASOBRIEN.COM <br />MECHANICAL ENGINEER: <br />ATC INC. <br />5755 OBERLIN DR., SUITE 112 <br />SAN DIEGO, CA 92121 <br />CONTACT: JUSTIN NGUYEN <br /> MECHANICAL ENGINEER <br />E-MAIL JNGUYEN@ATCONSULTANTS.NET <br />PLUMBING ENGINEER: <br />ATC INC. <br />5755 OBERLIN DR., SUITE 112 <br />SAN DIEGO, CA 92121 <br />CONTACT: JUSTIN NGUYEN <br /> MECHANICAL ENGINEER <br />E-MAIL JNGUYEN@ATCONSULTANTS.NET <br />STRUCTURAL ENGINEER: <br />WPM <br />633 W. 5TH ST. SUITE 7200 <br />LOS ANGELES, CA 90071 <br />CONTACT: DANIEL TRAUB <br /> STRUCTURAL ENGINEER <br />E-MAIL DTRAUB@WALTERPMOORE.COM <br />GENERAL NOTES <br />1. U.O.N., SPECIFIC NOTES AND DETAILS ON DRAWINGS SHALL TAKE PRECEDENCE <br />OVER GENERAL NOTES AND TYPICAL DETAILS. SPECIFIC NOTES ON DETAILS APPLY <br />TO SIMILAR CONDITIONS. <br />2. THE STRUCTURAL, MECHANICAL, PLUMBING, AND ELECTRICAL DRAWINGS AS <br />WELL AS THE DRAWINGS OF OTHER CONSULTANTS ARE SUPPLEMENTARY TO <br />THE ARCHITECTURAL DRAWINGS. IT SHALL BE THE RESPONSIBILITY OF THE <br />GENERAL CONTRACTOR TO CHECK WITH THE ARCHITECTURAL DRAWINGS <br />BEFORE THE INSTALLATION OF THE WORK SHOWN ON THE DRAWINGS OF <br />CONSULTANTS. THE CONTRACTOR SHALL BRING ANY DISCREPANCIES <br />BETWEEN THE ARCHITECTURAL DRAWINGS AND THE DRAWINGS OF THE <br />CONSULTING ENGINEERS TO THE ATTENTION OF THE ARCHITECT FOR <br />CLARIFICATIONS. ANY WORK INSTALLED IN CONFLICT THE ARCHITECTURAL <br />DRAWINGS AND NOT BROUGHT TO THE ARCHITECTS ATTENTION SHALL BE <br />CORRECTED BY THE CONTRACTOR AT THE CONTRACTORS' EXPENSE AND AT <br />NO EXPENSE TO THE OWNER OR THE ARCHITECT. <br />3. REFERENCE TO ANY DETAIL OR DRAWING IS FOR CONVENIENCE ONLY AND DOES <br />NOT LIMIT THE APPLICATION OF SUCH A DRAWING OR DETAIL. <br />4. U.O.N., OR REFERENCED ON ARCHITECTURAL DRAWINGS, ALL DETAILS ARE TYPICAL. <br />5. THE CONTRACT DOCUMENTS INDICATED THE CONCEPT AND POTENTIAL METHOD OF <br />EXECUTING THE WORK. FIELD MODIFICATIONS MAY BE REQUIRED AND SHALL BE <br />PART OF THE SCOPE OF WORK. <br />6. THE INTENTION OF THE CONTRACT DOCUMENTS IS TO INCLUDE ALL <br />LABOR AND MATERIALS, EQUIPMENT AND TRANSPORTATION <br />NECESSARY FOR THE COMPLETE AND PROPER EXECUTION OF THE WORK. <br />7. NO MODIFICATIONS FROM THE DOCUMENTS SHALL BE CONDUCTED <br />PRIOR TO THE APPROVAL OF THE OWNER AND ARCHITECT. <br />8. DISCREPANCIES IN DRAWINGS OR SPECIFICATIONS, OR BETWEEN <br />DRAWINGS, SPECIFICATIONS AND OR SITE CONDITIONS SHALL BE <br />REVIEWED WITH THE ARCHITECT PRIOR TO PROCEEDING WITH THE WORK. <br />9. REFER TO STRUCTURAL, MECHANICAL, PLUMBING, AND ELECTRICAL DRAWINGS FOR <br />EQUIPMENT ANCHORAGE, HVAC, PLUMBING, LIGHTING, COMMUNICATION, DATA AND <br />POWER REQUIREMENTS. <br />10. THE DESIGN, ADEQUACY AND SAFETY OF ERECTION, BRACING, SHORING, TEMPORARY <br />SUPPORTS, ETC., IS THE SOLE RESPONSIBILITY OF THE CONTRACTOR. THE CONTRACTOR <br />SHALL BE RESPONSIBLE FOR THE STABILITY OF THE STRUCTURE AND PROVIDE NECESSARY <br />BRACING PRIOR TO THE APPLICATION OF ALL SHEAR WALLS, ROOF, AND FLOOR DIAPHRAGMS, <br />AND FINISH MATERIALS. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE INITIATING, <br />MANUFACTURING AND SUPERVISING ALL SAFETY PRECAUTIONS AND PROGRAMS IN <br />CONNECTION WITH THE WORK. <br />11. THE ARCHITECT AND ARCHITECT'S CONSULTANTS SHALL HAVE NO RESPONSIBILITY FOR THE <br />DISCOVERY, PRESENCE, HANDLING, REMOVAL OR DISPOSAL OF OR EXPOSURE OF PERSONS <br />TO HAZARDOUS MATERIALS IN ANY FORM AT THE PROJECT SITE, INCLUDING BUT NOT LIMITED <br />TO ASBESTOS, ASBESTOS PRODUCTS, POLYCHLORINATED BIPHENYL (PCB) OR OTHER TOXIC <br />SUBSTANCES. <br />12. IF THE CONTRACTOR ASCERTAINS AT ANY TIME THAT REQUIREMENTS OF THE CONTRACT <br />DOCUMENTS CONFLICT WITH, OR ARE IN VIOLATION OF APPLICABLE LAWS, CODES, <br />REGULATIONS AND ORDINANCES, THE CONTRACTOR SHALL NOT PROCEED WITH WORK IN <br />QUESTION, EXCEPT AT THE CONTRACTOR'S OWN RISK, UNTIL THE ARCHITECT HAS BEEN <br />NOTIFIED IN WRITING AND WRITTEN DETERMINATION IS MADE BY THE ARCHITECT. WHERE <br />COMPLETED OR PARTIALLY COMPLETED WORK IS DISCOVERED TO BE IN VIOLATION WITH <br />APPLICABLE LAWS, CODES, REGULATIONS AND ORDINANCES, CONTRACTOR SHALL BE <br />REQUIRED TO REMOVE THAT WORK FROM THE PROJECT AND REPLACE SUCH WORK WITH ALL <br />NEW COMPLYING WORK AT NO ADDITIONAL COST TO THE OWNER. <br />DIMENSIONING NOTES <br />1. THE DRAWINGS REFLECT GENERAL ARRANGEMENT, DESIGN AND EXTENT OF WORK, <br />AND ARE NOT TO BE SCALED FOR MEASUREMENTS. THE DRAWINGS ARE PARTLY <br />DIAGRAMMATIC AND ARE NOT INTENDED TO BE AN EXACT REPRESENTATION OF <br />FIELD CONDITIONS OR TO SERVE AS THE CONTRACTOR'S SHOP DRAWINGS. <br />2. DO NOT SCALE DRAWINGS. WRITTEN DIMENSIONS TAKE PRECEDENCE. DIMENSIONS <br />SHALL GOVERN AND LARGE SCALE DETAILS SHALL GOVERN OVER SMALLER SCALE <br />DRAWINGS. <br />3. "EXISTING", "(+/-)", "SIZE TO FIT", F.V. AND SIMILAR PHRASES REQUIRE THE CONTRACTOR <br />TO VERIFY AND COORDINATE DIMENSIONS AND CONDITIONS INDICATED IN THE <br />DRAWINGS WITH THE ACTUAL FIELD CONDITIONS. DISCREPANCIES SHALL BE REPORTED <br />TO THE ARCHITECT FOR DIRECTION ON HOW TO PROCEED. <br />4. U.O.N., DIMENSIONS ARE SHOWN TO CENTERLINE OF COLUMNS, TO FACE OF <br />CONCRETE, OR TO FACE OF FINISH OF EXTERIOR AND INTERIOR PARTITION. ALL CEILING <br />HEIGHTS INDICATED ARE FROM FINISH OF FLOOR TO FINISH OF CEILING. <br />5. DOORS NOT DIMENSIONED AND SHOWN JAMB TIGHT SHALL BE SET 4" <br />FROM PERPENDICULAR WALL TO OUTER EDGE OF DOOR JAMB. <br />6. U.O.N., RECEPTACLES APPEARING NEXT TO EACH <br />OTHER ON THE PLAN BUT NOT DIMENSIONED SHALL BE EIGHT (8") APART <br />AS MEASURED FROM CENTERLINE TO CENTERLINE. <br />7. UNLESS OTHERWISE NOTED, RECEPTACLES SHALL BE FIFTEEN <br />(15") INCHES IN HEIGHT ABOVE THE FINISHED FLOOR (AS MEASURED <br />FROM THE RECEPTACLE CENTERLINE TO THE FLOOR DATUM) <br />8. U.O.N., ADJACENT COVERPLATES WITH DIFFERING <br />SIZES SHALL BE CONFIGURED SO THAT THE TOPS ALIGN AS FOLLOWS: <br />9. WHEN ADJACENT COVERPLATES ARE THE SAME SIZE, THE <br />CONFIGURATIONS SHALL BE AS FOLLOWS: <br />10. U.O.N. CEILING FIXTURES AND EQUIPMENT ARE TO BE CENTERED ON CEILING TILES <br />WHEN IN LAY-IN CEILINGS. <br />11. U.O.N. LIGHT FIXTURES ON HARD SURFACE CEILINGS SHALL BE CENTER IN THE ROOM. <br />12. U.O.N. SCONCE LIGHTING AT PLUMBING FIXTURES SHALL BE CENTER ON THE <br />FIXTURE. <br />13. ALL UNDERCABINET TASK LIGHTING SHALL BE INSTALLED AS CLOSE AS POSSIBLE TO <br />THE BACK WALL AND CENTERED BELOW THE CABINETS. <br />14. WALLS NOT DIMENSIONED SHALL ALIGN WITH EXISTING WALLS OR BE ABUTTED OR <br />APPLIED TO EXISTING WALLS PER DRAWINGS. <br />CONTRACTOR'S RESPONSIBILITY <br />1. CONTRACTOR SHALL CONTACT THE OWNER 48 HOURS IN ADVANCE OF ANY RESTRICTION OF <br />OWNER ACCESS OR UTILITY OUTAGES. AUTHORIZATION FROM OWNER TO BE RECEIVED IN <br />WRITING. <br />2. IN THE EVENT THE UTILITY SERVICE IS INTERRUPTED WITHOUT THE REQUIRED 48 HOURS <br />NOTICE, THEN THE CONTRACTOR SHALL BE FINANCIALLY LIABLE FOR ALL DAMAGES SUFFERED <br />BY THE OWNER DUE TO THE UNAUTHORIZED INTERRUPTION. RECONNECTION SHALL BE MADE <br />IMMEDIATELY. <br />3. CONTRACTOR SHALL VISIT THE SITE TO AS TO FAMILIARIZE WITH EXISTING CONDITIONS <br />AND SATISFY THEMSELVES TO THE NATURE AND SCOPE OF THE WORK. SUBMISSIONS OF <br />PROPOSALS SHALL BE CONSTRUED AS EVIDENCE THAT SUCH EXAMINATION HAS BEEN MADE <br />AND LATER CLAIMS FOR LABOR, EQUIPMENT OR MATERIALS REQUIRED, OR FOR DIFFICULTIES <br />ENCOUNTERED WHICH COULD HAVE BEEN FORESEEN WITH SUCH EXAMINATION WILL NOT BE <br />RECOGNIZED. <br />4. CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND CONDITIONS PRIOR TO BEGINNING WORK. <br />AT ANY TIME SHOULD CONDITIONS ARISE WHEREIN THE INTENT OF THE DRAWINGS IS IN DOUBT <br />OR WHERE THERE IS A DISCREPANCY BETWEEN THE DRAWINGS AND FIELD CONDITIONS THE <br />ARCHITECT SHALL BE NOTIFIED IMMEDIATELY IN WRITING FOR CLARIFICATION. <br />5. THESE DRAWINGS DO NOT INCLUDE NECESSARY COMPONENTS FOR CONSTRUCTION SAFETY. <br />SAFETY OF ALL PARTIES PRESENT ON THE JOB SITE IS SOLELY THE CONTRACTOR'S <br />RESPONSIBILITY. <br />6. THE CONTRACTOR SHALL HAVE FULL RESPONSIBILITY AND CHARGE OF AND SHALL BE <br />RESPONSIBLE FOR CONSTRUCTION MEANS, METHODS, TECHNIQUES, SEQUENCES OR <br />PROCEDURES, FOR SAFETY PRECAUTIONS AND PROGRAMS IN CONNECTION WITH THE WORK, <br />FOR THE ACTS OR OMISSIONS OF THE CONTRACTOR, SUBCONTRACTOR OR ANY OTHER <br />PERSONS PERFORMING ANY WORK IN ACCORDANCE WITH THE CONTRACT DOCUMENTS. <br />7. PROVIDE CONTINUOUS INSPECTION IN ACCORDANCE WITH THE BUILDING CODE FOR <br />REINFORCED CONCRETE. PLACEMENT OF REINFORCING STEEL, STRUCTURAL STEEL, <br />WELDING, STRUCTURAL MASONRY, FIELD WELDING AND HIGH STRENGTH BOLTS. <br />8. CONTRACTOR TO SCHEDULE CONSTRUCTION ACTIVITIES TO HAVE THE LEAST IMPACT ON <br />EXISTING FUNCTIONS, CONTAIN ACTIVITIES SUCH AS THE USE OF JACKHAMMERS SHALL BE <br />SCHEDULED AT SPECIAL TIMES. CONTACT THE DESIGNATED NOISE DISTURBANCE <br />COORDINATOR FOR SCHEDULING OF ALL ACTIVITIES. <br />9. CONTRACTOR SHALL BE RESPONSIBLE FOR PROTECTION OF EXISTING HVAC FILTERS WITHIN <br />AREAOF WORK. <br />10. CONTRACTOR SHALL BE RESPONSIBLE FOR THE PROTECTION OF AND WHERE REQUIRED BY THE <br />FIRE MARSHAL, THE OPERATIONAL MAINTENANCE OF FIRE LIFE SAFETY DEVICES WITHIN <br />THE AREA OF WORK. <br />EXISTING CONDITIONS <br />1. U.N.O. SURFACES ADJOINING AREAS OF DEMOLITIONS AND/OR NEW WORK SHALL BE <br />PATCHED AND REFINISHED AS REQUIRED TO MATCH ADJACENT SURFACES IN ALL ASPECTS, <br />INCLUDING FINISH MATERIAL, COLOR, TEXTURE, FIRE RATING AND SUBSTRATE. <br />2. PATCH SURFACES WHERE AFFECTED BY INSTALLATION OF NEW MECHANICAL, ELECTRICAL <br />AND STRUCTURAL ITEMS. MATCH EXISTING ADJACENT SURFACES AND FINISHES EXCEPT <br />WHERE OTHERWISE NOTED OR INDICATED. <br />3. WHERE NEW WALL OR CEILING CONTINUES EXISTING WALL OR CEILING, ALIGN VISIBLE NEW <br />SURFACE WITH EXISTING. ADJUST AND STAGGER STUDS IF REQUIRED TO ALIGN STUDS IF <br />REQUIRED TO ALIGN FACE OF WALLS. <br />4. THE CONTRACTOR SHALL SUPERVISE ALL CUTTING, PATCHING, REPAIRING, RESTORING, AND <br />ANY NECESSARY ACTION TO COMPLETE THE WORK. THE CONTRACTOR SHALL RESTORE <br />AND MATCH ANY DAMAGED WORK TO THE ORIGINAL CONDITION TO THE ARCHITECT'S <br />SATISFACTION. <br />5. EXISTING CONDITIONS AND OPERATIONS SHALL BE DOCUMENTED PRIOR TO INITIATION OF <br />RENOVATION AND/ OR NEW CONSTRUCTION PROJECTS. THIS SHALL INCLUDE <br />DOCUMENTATION OF EXISTING MECHANICAL/ELECTRICAL/ STRUCTURAL CAPACITIES AND <br />QUANTITIES. DOCUMENTATION OF EXISTING CONDITIONS SHOULD INCLUDE THE FOLLOWING: <br />A. FIRE SUPPRESSION, DETECTION, AND ALARM SYSTEMS <br />B. VARIOUS COMMUNICATIONS SYSTEMS (INCLUDING TELEPHONE, NURSE CALL, <br /> OVERHEAD PAGING, TELEMETRY, DICTATION, ELECTRONIC IMAGING) <br /> VARIOUS PLUMBING SYSTEMS (INCLUDING DOMESTIC WATER, TREATED WATER, <br /> WASTEWATER, PNEUMATIC TUBE, PNEUMATIC CONTROLS, MEDICAL GASES/ <br /> VACUUM) <br />C. EXISTING AIRFLOW OF AFFECTED AREAS <br />D. MAIN ELECTRICAL SERVICE AND ELECTRICAL SERVICE AFFECTED BY <br /> CONSTRUCTION (INCLUDING RATING AND ACTUAL LOAD/PEAK AND FEEDER SIZES <br /> AS APPLICABLE AND POWER FACTOR) <br />E. EMERGENCY POWER SYSTEM (INCLUDING RATING AND ACTUAL LOAD/PEAK AND <br /> FEEDER SIZES, AS APPLICALE, FOR LIFE SAFETY, EMERGENCY/CRITICAL, AND <br /> EQUIPMENT BRANCHES) <br />DEMOLITION <br />1. CONTRACTOR SHALL VERIFY THE LOCATION OF ALL EXISTING UTILITIES PRIOR TO <br />COMMENCING CONSTRUCTION AND SHALL TAKE STEPS TO PROTECT SUBJECT UTILITIES, <br />PERSONNEL AND PROPERTY AGAINST DAMAGE OR INJURY. <br />2. CONTRACTOR SHALL VERIFY LOCATION OF ALL REINFORCING STEEL AND CONDUIT IN <br />EXISTING CONCRETE SLABS AND AVOID SAME. CONTRACTOR SHALL PREPARE SHOP <br />DRAWINGS FOR REVIEW BY THE ARCHITECT AND/OR SEOR PRIOR TO PROCEEDING WITH <br />CORE OR SAW-CUTTING. <br />3. ALL REMOVED FIXTURES, EQUIPMENT, ACCESSORIES AND DOORS SHALL BE SALVAGED TO <br />THE OWNER. ITEMS NOT WANTED BY OWNER SHALL BE DISCARDED OFF-SITE BY THE <br />CONTRACTOR. <br />4. TEMPORARY STORAGE OF EQUIPMENT SHALL BE PROTECTED FROM VANDALISM. STORE IN <br />A LOCATION THAT IS ACCEPTABLE TO THE OWNER. <br />5. PROTECT ALL ADJACENT AREAS FROM DUST, FUMES, SMOKE, WATER, WEATHER AND <br />NOISE. <br />6. PROTECT ALL ADJACENT BUILDING COMPONENTS - FINISHES AND EQUIPMENT. SHOULD <br />DAMAGE OCCUR, REPAINT, PATCH OR REPLACE AT NO ADDITIONAL COST TO THE OWNER. <br />7. THE CONTRACTOR SHALL BE RESPONSIBLE FOR CONTINUOUS CLEAN UP OF THE SITE OF <br />ALL DEBRIS WHETHER CREATED BY THE CONTRACTOR'S WORK OR THE FAILURE OF THE <br />CONTRACTOR'S SUB-CONTRACTORS TO CLEAN UP AFTER THEIR WORK. <br />8. ALL ABANDONED PLUMBING LINES, ELECTRICAL CONDUIT OR BOXES, A/C DUCTS OR <br />DIFFUSERS AND TELEPHONE CABLES WILL BE REMOVED BACK TO CLOSEST FEEDER POINT. <br />9. DO NOT CUT, DRILL, NOTCH, CORE, ALTER, OR DAMAGE STRUCTURAL ELEMENTS OR FRAMING <br />UNLESS SPECIFICALLY DETAILED ON APPROVED PLANS OR ACCEPTED BY THE SEOR/AOR. <br />FIRE AND LIFE SAFETY MEASURES <br />1. REQUIRED MEANS OF EGRESS SHALL BE MAINTAINED DURING CONSTRUCTION AND DEMOLITION AT <br />ALL TIMES. <br />2. TEMPORARY EXITING SHALL BE APPROVED BY THE LOCAL FIRE AUTHORITY. (CFC - 2019, SECTION <br />3311.2) <br />3. PROVIDE FIRE EXTINGUISHERS AS REQUIRED BY THE LOCAL FIRE AUTHORITY. <br />4. CONTRACTOR SHALL PROVIDE PROPER FIRE STOPPING AT EXISTING OR NEW FLOOR AND WALL <br />PENETRATIONS FOR MECHANICAL, PLUMBING, ELECTRICAL AND FIRE SPRINKLER LINES AS <br />REQUIRED PER THE APPROPRIATE UL DESIGN LISTING NUMBER. <br />5. FIRE PROTECTION SYSTEM SHALL BE MAINTAINED OPERATIONAL AT ALL TIMES DURING <br />ALTERATION. <br />6. SMOKE DETECTORS SHALL BE COVERED OR REMOVE DURING ALTERATION WHEN REQUIRED BY <br />THE LOCAL FIRE AUTHORITY, COVERINGS PLACED ON OR OVER FIRE PROTECTION DEVICES TO <br />PROTECT THEM FROM DAMAGE DURING CONSTRUCTION PROCESSES SHALL BE IMMEDIATELY <br />REMOVED UPON THE COMPLETION OF THE CONSTRUCTION PROCESSES IN THE ROOM OR AREA IN <br />WHICH THE DEVICES ARE INSTALLED. (CFC -2019, SECTION 3308.7) <br />7. FIRE RESISTIVE RATED CONSTRUCTION SHALL BE MAINTAINED AT ALL TIMES DURING <br />CONSTRUCTION. (CFC - 2019, SECTION 703.1) <br />8. CUTTING AND WELDING OPERATION SHALL BE IN ACCORDANCE WITH CHAPTER 35 OF THE FIRE <br />CODE. (CFC - 2019, SECTION 3304.6) <br />NONCONFORMING CONDITIONS <br />IN THE EVENT THAT AN EXISTING NONCONFORMING CONDITION IS DISCOVERED DURING THE COURSE OF <br />CONSTRUCTION, THE CONTRACTOR SHALL IMMEDIATELY NOTIFY THE OWNER AND ARCHITECT. <br />TEMPORARY CONSTRUCTION <br />1. CONTRACTOR SHALL ARRANGE FOR, IN ADVANCE WITH THE OWNER, CONSTRUCTION <br />STORAGE AND STAGING AREAS NECESSARY TO COMPLETE THE WORK. ALL STORAGE AND <br />STAGING AREAS SHALL BE RETURNED TO THE OWNER IN LIKE ORIGINAL CONDITION. <br />2. THE CONTRACTOR SHALL PROVIDE ADEQUATE MEANS TO PROTECT FINISHED PARTS OF <br />THE MATERIALS AND EQUIPMENT AGAINST DAMAGE FROM ANY CAUSE DURING THE <br />PROGRESS OF THE WORK AND UNTIL ACCEPTANCE BY THE OWNER. <br />3. CONTRACTOR SHALL MAKE EVERY EFFORT TO MAINTAIN A CLEAN WORK PLACE. DUST <br />PALLIATION AND PREVENTION OF DUST CONTAMINATION OF NON-WORK SPACES WILL BE <br />THE RESPONSIBILITY OF THE CONTRACTOR ON AN ON GOING, DAILY BASIS. THE <br />CONTRACTOR SHALL DEVELOP A SCHEDULE OF CONSTRUCTION WHICH INCLUDES THE <br />NECESSARY ACTIONS TO MAINTAIN THE OPERATION OF THE TENANTS DURING THE <br />CONSTRUCTION PROCESS. <br />4. CONTRACTOR SHALL MAKE NECESSARY CONNECTIONS TO EXISTING UTILITIES FOR <br />TEMPORARY POWER AND WATER SUPPLIES, AND SHALL COORDINATE SUCH USE WITH THE <br />OWNER PRIOR TO CONNECTION. <br />15 <br />" <br /> <br />M <br />I <br />N <br />. <br />15 <br />" <br /> <br />M <br />I <br />N <br />. <br /> <br />8" <br />ALIGN <br />ALIGN <br />COVER PLATE <br />FLOOR DATUM <br />ALIGN <br />ALIGN <br />FLOOR DATUM <br />COVER PLATE <br />ALIGN <br />FACILITY NAME:SANTA ANA MEDICAL OFFICES <br />FACILITY ADDRESS:1900 E. 4TH STREET <br />SANTA ANA, CA 90025 <br />PROJECT NAME:RAD SAN 1ST FLOOR GEN RAD REPLACEMENT <br />CONSTRUCTION INFORMATION <br />CONSTRUCTION TYPE:TYPE III-B <br />MAIN OCCUPANCY:B, OFFICES <br />YEAR OF CONSTRUCTION: 1991 <br />FIRE EXTINGUISING SYSTEM: AUTOMATIC SPRINKLERS (NFPA 13), THROUGHOUT <br />NUMBER OF STORIES: 3 <br />AREA LIMITATIONS: 57,000 <br />REMODEL INFORMATION <br />REMODEL FLOOR: 1ST FLR <br />REMODEL USE/OCCUPANCY: B (OFFICES) <br />TOTAL REMODEL AREA: 1045 SF <br />PROJECT SCOPE: <br />THIS PROJECT INVOLVES THE RELOCATION OF AN EXISTING IMAGING RADIOLOGY ROOM INTO AN <br />EXISTING CONTROL ROOM. THE EXISTING DRESSING ROOMS WILL BE DEMOLISHED AND REBUILT <br />TO ACCOMODATE THE NEW LOCATION OF THE IMAGING RADIOLOGY ROOM. THE EXISTING <br />LOCATION OF THE IMAGING RADIOLOGY ROOM WILL BE CONVERTED INTO A SHELL SPACE. <br />THIS FACILITY IS NOT A CLINIC OR OUTPATIENT FACILITY LICENSED PERSUANT TO HEALTH AND <br />SAFETY CODE SECTION 1200 OR 1250 AND DOES NOT REQUIRE TO BE OSHPD 3 COMPLIANT. <br />INFECTION CONTROL RISK ASSESSMENT (ICRA) <br />THE INFECTION CONTROL RISK ASSESSMENT IS A MULTIDISCIPLINARY, DOCUMENTED <br />ASSESSMENT PROCESS INTENDED TO PROACTIVELY IDENTIFY AND MITIGATE RISKS FROM <br />INFECTION THAT COULD OCCUR DURING CONSTRUCTION ACTIVITIES. THIS PROCESS IDENTIFIES <br />AND TAKES INTO ACCOUNT THE PATIENT POPULATION AT RISK, THE NATURE AND SCOPE OF THE <br />PROJECT, AND THE FUNCTIONAL PROGRAM OF THE HEALTH CARE FACILITY. THE ICRA <br />DETERMINES THE POTENTIAL RISK OF TRANSMISSION OF VARIOUS AIR- AND WATERBORNE <br />BIOLOGICAL CONTAMINANTS IN THE FACILITY. <br />ICRA TIMING <br />AN ICRA SHALL BE CONDUCTED BEFORE CONSTRUCTION BEGINS, AND CONTINUE THROUGH <br />PROJECT CONSTRUCTION AND COMMISSIONING. <br />ICRA TEAM <br />AT MINIMUM, AN ICRA SHALL BE CONDUCTED BY A TEAM WITH EXPERTISE IN INFECTION <br />PREVENTION AND CONTROL, DIRECT PATIENT CARE (CLINICAL USE OF RELEVANT AREAS), FACIL- <br />ITY DESIGN, CONSTRUCTION, AND HVAC AND PLUMBING SYSTEMS WHEN THESE SYSTEMS ARE <br />INVOLVED. THE SCOPE AND NATURE OF THE PROJECT SHALL DICTATE OTHERS TO BE INVOLVED. <br />ICRA CONSIDERATIONS <br />THE ICRA SHALL ADDRESS, BUT NOT BE LIMITED TO COVERING, THE FOLLOWING: <br />• NUMBER, LOCATION, AND TYPE OF AIRBORNE INFECTION ISOLATION AND PROTECTIVE <br />ENVIRONMENT ROOMS. <br />• NUMBER, LOCATION, AND TYPE OF PLUMBED HAND-WASHING STATIONS, HAND <br />SANITATION DISPENSERS, AND EMERGENCY FIRST-AID EQUIPMENT (EYEWASH STATIONS <br />AND DELUGE SHOWERS). <br />(1) THE NUMBER AND LOCATION OF HAND-WASHING STATIONS AND HAND SANITATION <br />DISPENSERS SHALL BE DETERMINED BY THE FUNCTIONAL PROGRAM AND THE ICRA. <br />(2) HAND-WASHING STATIONS SHALL BE CONVENIENT AND ACCESSIBLE FOR HEALTH <br />CARE PERSONNEL AND OTHER USERS. <br />• SPECIAL HVAC NEEDS TO MEET THE FUNCTIONAL PROGRAM AND ACCOMMODATE THE <br />SERVICES (E.G., SURGICAL SERVICES, AIRBORNE INFECTION ISOLATION AND PRO- <br />TECTIVE ENVIRONMENT ROOMS, LABORATORIES, PHARMACIES, LOCAL EXHAUST <br />SYSTEMS FOR HAZARDOUS AGENTS, AND OTHER SPECIAL AREAS) INCLUDED IN OR <br />AFFECTED BY THE PROJECT <br />• WATER SYSTEMS TO LIMIT LEGIONELLA SP. AND WATERBORNE OPPORTUNISTIC <br />PATHOGENS <br />WHEN CONDUCTING THE ICRA AND DEVELOPING THE INFECTION CONTROL RISK MITIGATION <br />REQUIREMENTS FOR BUILDING AND SITE AREAS ANTICIPATED TO BE AFFECTED BY CONSTRUC- <br />TION, THE FOLLOWING SHALL BE ADDRESSED: <br />• THE IMPACT OF DISRUPTING ESSENTIAL SERVICES TO PATIENTS AND EMPLOYEES <br />• DETERMINATION OF THE SPECIFIC HAZARDS AND PROTECTION LEVELS FOR EACH <br />DESIGNATED AREA <br />• LOCATION OF PATIENTS ACCORDING TO THEIR SUSCEPTIBILITY TO INFECTION AND THE <br />DEFINITION OF RISKS TO EACH <br />• IMPACT OF MOVEMENT OF DEBRIS, TRAFFIC FLOW, SPILL CLEANUP, AND TESTING AND <br />CERTIFICATION OF INSTALLED SYSTEMS <br />• ASSESSMENT OF EXTERNAL AS WELL AS INTERNAL CONSTRUCTION ACTIVITIES <br />• LOCATION OF KNOWN HAZARDS <br />ICRA DOCUMENTATION <br />THIS WRITTEN RECORD SHALL REMAIN AN ACTIVE PART OF THE PROJECT DOCUMENTS FOR THE <br />DURATION OF THE CONSTRUCTION PROJECT AND THROUGH COMMISSIONING. <br />• THESE WRITTEN PLANS SHALL DESCRIBE THE SPECIFIC METHODS BY WHICH <br />TRANSMISSION OF AIR- AND WATERBORNE BIOLOGICAL CONTAMINANTS WILL BE <br />AVOIDED DURING CONSTRUCTION AS WELL AS DURING COMMISSIONING, WHEN HVAC <br />AND PLUMBING SYSTEMS AND EQUIPMENT (E.G., ICE MACHINES, STEAM STERILIZATION <br />SYSTEMS) ARE STARTED/RESTARTED. <br />INFECTION CONTROL RISK MITIGATION RECOMMENDATIONS <br />INFECTION CONTROL RISK MITIGATION RECOMMENDATIONS (ICRMRS) SHALL BE PREPARED BY <br />THE ICRA TEAM AND SHALL, AT MINIMUM, ADDRESS THE FOLLOWING: <br />1. PATIENT PLACEMENT AND RELOCATION <br />• STANDARDS FOR BARRIERS AND OTHER PROTECTIVE MEASURES REQUIRED TO <br />PROTECT ADJACENT AREAS AND SUSCEPTIBLE PATIENTS FROM AIRBORNE <br />CONTAMINANTS <br />• TEMPORARY PROVISIONS OR PHASING FOR CONSTRUCTION OR MODIFICATION OF HVAC <br />AND WATER SUPPLY SYSTEMS <br />• PROTECTION FROM DEMOLITION <br />• MEASURES TO BE TAKEN TO TRAIN HOSPITAL STAFF, VISITORS, AND CONSTRUCTION <br />PERSONNEL <br />• THE IMPACT OF POTENTIAL UTILITY OUTAGES OR EMERGENCIES, INCLUDING <br />PROTECTION OF PATIENTS DURING PLANNED AND UNPLANNED UTILITY OUTAGES. <br />SPECIFIC HAZARDS THAT ARE LIKELY IN THE EVENT OF DIFFERENT TYPES OF ESSENTIAL <br />SERVICE DISRUPTIONS SHOULD BE PROACTIVELY DETERMINED. A PLAN SHOULD BE <br />DEVELOPED TO ENSURE CONTINUED PROVISION OF SERVICE IN THE EVENT OF PLANNED <br />AND UNPLANNED DISRUPTIONS. <br />• THE IMPACT OF MOVEMENT OF DEBRIS, TRAFFIC FLOW, CLEANUP, ELEVATOR USE FOR <br />CONSTRUCTION MATERIALS AND CONSTRUCTION WORKERS, AND CONSTRUCTION <br />WORKER ROUTES <br />2. VENTILATION OF THE CONSTRUCTION ZONE <br />• AIRFLOW INTO THE CONSTRUCTION ZONE FROM OCCUPIED SPACES SHOULD BE <br />MAINTAINED BY MEANS OF A DEDICATED VENTILATION/EXHAUST SYSTEM FOR THE <br />CONSTRUCTION AREA. ENSURE PROPER OPERATION OF THE AIR-HANDLING SYSTEM IN <br />THE AFFECTED AREA AFTER ERECTION OF BARRIERS AND BEFORE THE ROOM OR AREA <br />IS SET TO NEGATIVE PRESSURE <br />• LOCATIONS OF EXHAUST DISCHARGE RELATIVE TO EXISTING FRESH AIR INTAKES AND <br />FILTERS, AS WELL AS THE DISCONNECTION AND SEALING OF EXISTING AIR DUCTS, <br />SHOULD BE REVIEWED AS REQUIRED BY THE ICRA. <br />• IF THE EXISTING BUILDING SYSTEM OR A PORTION THEREOF IS USED TO ACHIEVE THIS <br />REQUIREMENT, THE SYSTEM SHOULD BE THOROUGHLY CLEANED PRIOR TO OCCUPANCY <br />OF THE CONSTRUCTION AREA. <br />• HOSPITAL CONSTRUCTION BARRIERS FOR PROJECTS IN HIGH-RISK AREAS SHOULD BE <br />MAINTAINED AT A PRESSURE DIFFERENTIAL OF AT LEAST 0.03 INCH WATER GAUGE (7.0 <br />PASCALS), WITH AIRFLOW FROM HOSPITAL CLEAN AREAS TO CONSTRUCTION DIRTY <br />AREAS. CONSTRUCTION BARRIERS IN HIGH-RISK AREAS SHOULD HAVE VISUAL DISPLAY <br />OF AIRFLOW DIRECTION. (HIGH-RISK AREAS INCLUDE CRITICAL CARE UNITS, EMERGENCY <br />ROOMS, LABOR AND DELIVERY FACILITIES, NEWBORN NURSERIES, OUTPATIENT <br />SURGERY FACILITIES, AREAS SERVING PEDIATRIC PATIENTS, PHARMACIES, SURGICAL <br />UNITS, POST-ANESTHETIC CARE UNITS, AREAS SERVING IMMUNOCOMPROMISED <br />PATIENTS, BURN UNITS, CARDIAC CATHETERIZATION LABS, CENTRAL STERILE SUPPLY, <br />AIRBORNE INFECTION ISOLATION ROOMS, PROTECTIVE ENVIRONMENT ROOMS, <br />ONCOLOGY UNITS, OPERATING ROOMS, AND CESAREAN DELIVERY ROOMS.) MONITOR <br />BARRIERS AND ENSURE INTEGRITY OF THE CONSTRUCTION BARRIERS; REPAIR GAPS OR <br />BREAKS IN BARRIER JOINTS <br />3. DISASTER PLANS FOR WATER SUPPLY AND VENTILATION EMERGENCIES <br />• THE OWNER SHOULD PROVIDE A WRITTEN PLAN FOR WHAT WILL HAPPEN IN THE EVENT <br />OF A WATER OUTAGE. THIS SHOULD INCLUDE WHERE SUPPLIES ARE, WHO IS <br />RESPONSIBLE FOR WHAT, AND WHO IS TO BE NOTIFIED. <br />• THE OWNER SHOULD PROVIDE A WRITTEN PLAN FOR WHAT WILL HAPPEN IN THE EVENT <br />OF AN AIR SHUTDOWN. THIS SHOULD INCLUDE WHO IS RESPONSIBLE FOR WHAT AND <br />WHO IS TO BE NOTIFIED. <br />• THE OWNER SHOULD PROVIDE A WRITTEN PLAN FOR WHAT WILL HAPPEN IN THE EVENT <br />OF A WATER LEAK. THIS SHOULD INCLUDE WHO IS TO BE NOTIFIED. <br />4. CONSTRUCTION WORK ZONE PROTECTION <br />• CONSTRUCTION MATERIALS SHOULD BE KEPT CLEAN AND DRY, AS APPROPRIATE. <br />• DUCTWORK SHOULD BE KEPT CAPPED/CLEAN DURING DEMOLITION AND DUST- <br />GENERATING CONSTRUCTION. <br />• DRYWALL INSTALLATION SHOULD NOT PROCEED UNTIL EXTERIOR PROTECTION AGAINST <br />RAIN DAMAGE HAS BEEN INSTALLED. <br />• CONSTRUCT BARRIERS TO PREVENT DUST FROM CONSTRUCTION AREAS FROM <br />ENTERING PATIENT-CARE AREAS; ENSURE THAT BARRIERS ARE IMPERMEABLE TO <br />FUNGAL SPORES AND IN COMPLIANCE WITH LOCAL FIRE CODES <br />• SEAL OFF AND BLOCK RETURN AIR VENTS IF RIGID BARRIERS ARE USED FOR <br />CONTAINMENT <br />• IMPLEMENT DUST-CONTROL MEASURES ON SURFACES AND DIVERT PEDESTRIAN <br />TRAFFIC AWAY FROM WORK ZONES. <br />• CLEAN WORK ZONES AND THEIR ENTRANCES DAILY BY : <br />1) WET-WIPING TOOLS AND TOOL CARTS BEFORE THEIR REMOVAL FROM THE WORK <br />ZONE <br />2) PLACING MATS WITH TACKY SURFACES INSIDE THE ENTRANCE <br />3) COVERING DEBRIS AND SECURING THIS COVERING BEFORE REMOVING DEBRIS FROM <br />THE WORK ZONE <br />• IN PATIENT-CARE AREAS, FOR MAJOR REPAIRS THAT INCLUDE REMOVAL OF CEILING <br />TILES AND DISRUPTION OF THE SPACE ABOVE THE FALSE CEILING, USE PLASTIC SHEETS <br />OR PREFABRICATED PLASTIC UNITS TO CONTAIN DUST; USE A NEGATIVE PRESSURE <br />SYSTEM WITHIN THIS ENCLOSURE TO REMOVE DUST; AND EITHER PASS AIR THROUGH <br />AN INDUSTRIAL-GRADE, PORTABLE HEPA FILTER CAPABLE OF FILTRATION RATES OF <br />300 - 800 FT3/MIN., OR EXHAUST AIR DIRECTLY TO THE OUTSIDE <br />• UPON COMPLETION OF THE PROJECT, CLEAN THE WORK ZONE ACCORDING TO FACILITY <br />PROCEDURES, AND INSTALL BARRIER CURTAINS TO CONTAIN DUST AND DEBRIS BEFORE <br />REMOVING RIGID BARRIERS. FLUSH THE WATER SYSTEM TO CLEAR SEDIMENT FROM <br />PIPES TO MINIMIZE WATERBORNE MICROORGANISM PROLIFERATION. RESTORE <br />APPROPRIATE ACH, HUMIDITY, AND PRESSURE DIFFERENTIAL; CLEAN OR REPLACE AIR <br />FILTERS; DISPOSE OF SPENT FILTERS <br />5. PROVIDE CONSTRUCTION CREWS WITH <br />• DESIGNATED ENTRANCES, CORRIDORS, AND ELEVATORS WHEREVER PRACTICAL <br />• ESSENTIAL SERVICES (E.G., TOILET FACILITIES) AND CONVENIENCE SERVICES (E.G., <br />VENDING MACHINES) <br />• PROTECTIVE CLOTHING (E.G., COVERALLS, FOOTGEAR, AND HEADGEAR) FOR TRAVEL TO <br />PATIENT-CARE AREAS <br />• A SPACE OR ANTEROOM FOR CHANGING CLOTHING AND STORING EQUIPMENT <br />MONITORING PLAN AND PROCEDURES <br />(1) THE OWNER SHALL PROVIDE MONITORING PLANS FOR EFFECTIVE APPLICATION OF ICRMRS <br />DURING THE COURSE OF THE PROJECT. <br />(2) PROVISIONS FOR MONITORING SHALL INCLUDE WRITTEN PROCEDURES FOR EMERGENCY <br />SUSPENSION OF WORK AND PROTECTIVE MEASURES INDICATING THE RESPONSIBILITIES AND <br />LIMITATIONS OF EACH PARTY (OWNER, DESIGNER, CONTRACTOR, AND MONITOR). <br />• RESPONSIBILITIES OF PERSONS AND GROUPS FOR PROCEDURES AND ACTIVITIES TO BE <br />PERFORMED TO MITIGATE RISK SHOULD BE INCLUDED IN INFECTION CONTROL RISK <br />MITIGATION PLANS TO ENSURE THE PROPER ACTIONS ARE TAKEN AT THE PROPER TIME. <br />• MONITORING EFFORTS WILL BE DETERMINED BY THE OWNER AND MAY BE CONDUCTED <br />BY THE OWNER’S INFECTION PREVENTIONIST(S), EPIDEMIOLOGIST, CONSTRUCTION <br />COORDINATORS, AND/OR SAFETY STAFF OR BY INDEPENDENT OUTSIDE CONSULTANTS. <br />COMMUNICATION <br />(1) UPDATES ON ICRA COMPLIANCE SHALL BE PROVIDED BY THE ICRA TEAM. <br />(2) CHANGES TO THE ORIGINAL DESIGN PLANS SHALL BE DOCUMENTED, UPDATED, AND <br />CONTINUOUSLY SHARED BETWEEN THE ICRA TEAM AND THE DESIGNERS/ <br />ARCHITECTS/PLANNERS, OWNER, AND CONTRACTOR. <br />THE CONTRACTOR SHALL PREPARE SUBMITTAL DOCUMENTS FOR DEFERRED SUBMITTAL ITEMS <br />AND SUBMIT TO THE ARCHITECT OR ENGINEER OF RECORD FOR REVIEW PRIOR TO SUBMITTAL <br />TO THE AGENCY HAVING JURISDICTION (AHJ) FOR APPROVAL. <br />INSTALLATION OF DEFERRED APPROVAL SHALL NOT BE STARTED UNTIL DOCUMENTS HAVE <br />BEEN REVIEWED BY THE ARCHITECT OR ENGINEER AND APPROVED BY THE AHJ. <br />DEFERRED ITEMS ARE TO BE COMPLETELY INSTALLED PRIOR TO OCCUPANCY OF BUILDING(S) <br />AND/ OR AREAS AFFECTED BY THE DEFERRED WORK. <br />DEFERRED APPROVALS: <br />1. FIRE ALARM DESIGN - REWORK EXISTING SYSTEM TO CONFORM TO NEW SPACE <br />CONFIGURATION. ADD DEVICES AS NECESSARY FOR NEW ROOMS. MATCH DEVICES TO <br />MANUFACTURER OF CURRENT SYSTEM. <br />2. FIRE SPRINKLER DESIGN - REWORK EXISTING SYSTEM TO CONFORM TO NEW SPACE <br />CONFIGURATION. RELOCATE HEADS TO COVER THE AREAS AS NEEDED. BRANCH <br />MODIFICATIONS ONLY, ALL MAIN LINES ARE EXISTING TO REMAIN. MATCH TYPE, <br />STYLE, AND FINISH OF EXISTING SPRINKLER HEADS. <br />INT <br />ER <br />S <br />TA <br />TE 5 <br />FOURTH STREET <br />FIRST STREET <br />GO <br />L <br />D <br />E <br />N <br /> <br />C <br />I <br />R <br />C <br />L <br />E <br /> <br />D <br />R <br />. <br />CA <br />B <br />R <br />I <br />L <br />L <br />O <br /> <br />P <br />A <br />R <br />K <br /> <br />D <br />R <br />. <br />SITE LOCATION <br />N <br />R <br />No. <br />F <br />LICENSE <br />STATE <br />D <br />O <br />A RCHITECT <br />C AL IFORNIA <br />STEPHE WHI TE <br />RENEWAL <br />DATE <br />C-34829 <br />N <br />08/31/25 <br />SHEET TITLE <br />PROJECT <br />FACILITY <br />FAC NO: BLDG NO: FLOOR LEV: SECTION: <br />KP PROJ. NO. <br />MATTERPORT LINK: https://my.matterport.com/show/?m=FW21iEbmuii <br />555 W. Fifth Street Suite 2950 | Los Angeles, CA 90013 USA <br />ARCHITECT <br />CONSULTANT <br />ARCHITECT SEAL CONSULTANT SEAL <br />KAISER FOUNDATION HOSPITALS <br />NATIONAL FACILITIES SERVICES <br />1800 HARRISON STREET OAKLAND, <br />CALIFORNIA 94612 <br />NO. ISSUED DATE <br />0 <br />5' <br /> <br />50 <br />' <br /> <br />GR <br />A <br />P <br />H <br />I <br />C <br /> <br />S <br />C <br />A <br />L <br />E <br />S <br />: <br /> <br />1/ <br />1 <br />6 <br />" <br /> <br />= <br /> <br />1 <br />' <br />- <br />0 <br />" <br /> <br />0 <br />25 <br />' <br /> <br />1/ <br />8 <br />" <br /> <br />= <br /> <br />1 <br />' <br />- <br />0 <br />" <br /> <br />5' <br /> <br />0 <br />12 <br />' <br /> <br />1/ <br />4 <br />" <br /> <br />= <br /> <br />1 <br />' <br />- <br />0 <br />" <br /> <br />1' <br /> <br />0 <br />6' <br /> <br />1/ <br />2 <br />" <br /> <br />= <br /> <br />1 <br />' <br />- <br />0 <br />" <br /> <br />1' <br /> <br />0 <br />2' <br /> <br />1- <br />1 <br />/ <br />2 <br />" <br /> <br />= <br /> <br />1 <br />' <br />- <br />0 <br />" <br /> <br />0 <br />1' <br /> <br />3" <br /> <br />= <br /> <br />1 <br />' <br />- <br />0 <br />" <br />IF <br /> <br />T <br />H <br />I <br />S <br /> <br />S <br />H <br />E <br />E <br />T <br /> <br />I <br />S <br /> <br />N <br />O <br />T <br />30 <br />" <br />x <br />4 <br />2 <br />" <br />, <br /> <br />I <br />T <br /> <br />I <br />S <br /> <br />A <br /> <br />R <br />E <br />D <br />U <br />C <br />E <br />D <br />PR <br />I <br />N <br />T <br /> <br />- <br /> <br />S <br />C <br />A <br />L <br />E <br />AC <br />C <br />O <br />R <br />D <br />I <br />N <br />G <br />L <br />Y <br />AGENCY APPLICATION NUMBER <br />AGENCY APPROVAL STAMP <br />THIS DOCUMENT IS THE PROPERTY OF THE OWNER AND IS <br />NOT TO BE USED WITHOUT OWNER'S WRITTEN PERMISSION. <br />HZ PROJ. NO. <br />HISTORY LOG <br />Phone 310.820.4600 | Fax 310.207.4215 <br />www.huitt-zollars.com <br />C: <br />\ <br />U <br />s <br />e <br />r <br />s <br />\ <br />jp <br />a <br />r <br />k <br />\ <br />D <br />o <br />c <br />u <br />m <br />e <br />n <br />t <br />s <br />\ <br />R <br />3 <br />14 <br />4 <br />1 <br />2 <br />. <br />4 <br />4 <br /> <br />- <br /> <br />K <br />P <br /> <br />S <br />A <br />N <br /> <br />1s <br />t <br /> <br />F <br />l <br />r <br /> <br />G <br />e <br />n <br /> <br />R <br />a <br />d <br />_ <br />A <br />2 <br />2_ <br />C <br />e <br />n <br />t <br />r <br />a <br />l <br />_ <br />j <br />h <br />a <br />L <br />W <br />M <br />Q <br />W. <br />r <br />v <br />t <br />7/ <br />3 <br />/ <br />2 <br />0 <br />2 <br />4 <br /> <br />8 <br />:0 <br />9 <br />: <br />0 <br />3 <br /> <br />A <br />M <br /> <br />SOCC 2023 R RAD SAN 1ST FLOOR <br />GEN RAD REPLACEMENT (5284) <br />G0-01 <br />TITLE SHEET <br />CA361 1 1 - <br />CAP028060R314412.44 <br />SANTA ANA MEDICAL OFFICES <br />1900 E. 4TH ST. <br />SANTA ANA, CA 92701 <br />1900 E. 4TH ST. <br />SANTA ANA, CA 92701 <br />KP NO.CAP028060 <br />SOCC 2023 R RAD SAN 1ST <br />FLOOR GEN RAD <br />REPLACEMENT (5284) <br />N/A SYMBOLS LEGEND 11 N/A DRAWING SET ORGANIZATION 21 N/A PROJECT TEAM 01 <br />02N/A SHEET INDEX <br />N/A GENERAL NOTES 22 <br />N/A PROJECT SUMMARY 09 <br />N/A INFECTION CONTROL NOTES 16 <br />GENERAL <br />G0-01 TITLE SHEET <br />G0-02 SPECIFICATIONS <br />G0-03 SPECIFICATIONS <br />G0-04 SPECIFICATIONS <br />G0-05 SPECIFICATIONS <br />G1-00 PLAN - SITE ACCESSIBLITY <br />G1-11 PLAN - CODE ANALYSIS 1ST FLR <br />STRUCTURAL <br />S0-01 GENERAL NOTES <br />S1-13 PLAN - REMODEL 1ST FLR <br />S5-01 DETAILS <br />S5-02 DETAILS <br />ARCHITECTURAL <br />A0-11 PLAN - DEMO OVERALL 1ST FLR <br />A0-12 PLAN - DEMO OVERALL RCP 1ST FLR <br />A0-13 PLAN - DEMO 1ST FLR <br />A0-14 PLAN - DEMO CONCRETE 1ST FLR <br />A1-11 PLAN - REMODEL OVERALL 1ST FLR <br />A1-12 PLAN - REMODEL OVERALL RCP 1ST FLR <br />A1-13 PLAN - REMODEL 1ST FLR <br />A1-14 PLAN - REMODEL ENLARGED - DIMENSION & PARTITION TYPE <br />A2-01 ELEVATIONS - INTERIOR <br />A2-02 ELEVATIONS - INTERIOR <br />A2-03 ELEVATIONS - INTERIOR <br />A5-01 DETAILS - PARTITION TYPES <br />A5-02 DETAILS - TYPICAL FRAMING <br />A5-03 DETAILS - MISC. <br />A5-04 DETAILS - TYPICAL CEILING <br />A6-01 SCHEDULE - DOOR <br />INTERIORS <br />I1-11 PLAN - FINISH 1ST FLR <br />EQUIPMENT AND FURNITURE <br />Q1-11 PLAN - EQUIPMENT & FURNITURE <br />Q7-01 IMAGING EQUIPMENT VENDOR DRAWINGS RM 1507 (FOR REFERENCE ONLY) <br />Q7-02 IMAGING EQUIPMENT VENDOR DRAWINGS RM 1507 (FOR REFERENCE ONLY) <br />Q7-03 IMAGING EQUIPMENT VENDOR DRAWINGS RM 1507 (FOR REFERENCE ONLY) <br />Q7-04 IMAGING EQUIPMENT VENDOR DRAWINGS RM 1507 (FOR REFERENCE ONLY) <br />Q7-05 IMAGING EQUIPMENT VENDOR DRAWINGS RM 1507 (FOR REFERENCE ONLY) <br />Q8-11 PLAN - SHIELDING RM 1507 <br />PLUMBING <br />P0-01 GENERAL NOTES, LEGEND & SYMBOLS <br />P0-02 SPECIFICATIONS - PLUMBING <br />P0-11 PLAN - DEMO OVERALL 1ST FLR <br />P0-12 PLAN - DEMO 1ST FLR <br />P1-11 PLAN - REMODEL OVERALL 1ST FLR <br />P1-12 PLAN - REMODEL 1ST FLR <br />P6-01 DETAILS & SCHEDULES - PLUMBING <br />MECHANICAL <br />M0-01 GENERAL NOTES, LEGEND & SYMBOLS <br />M0-02 SPECIFICATIONS - MECHANICAL <br />M0-11 PLAN - DEMO OVERALL 1ST FLR <br />M0-12 PLAN - DEMO 1ST FLR <br />M1-11 PLAN - REMODEL OVERALL 1ST FLR <br />M1-12 PLAN - REMODEL 1ST FLR <br />M5-01 DETAILS - MECHANICAL <br />ELECTRICAL <br />E0-01 GENERAL NOTES, ABBREVIATIONS AND SYMBOLS LIST <br />E0-02 SPECIFICATIONS <br />E1-11 PLAN - OVERALL 1ST FLR <br />E1-12 PLAN - ENLARGED - DEMO - 1ST FLOOR <br />E1-13 PLAN - ENLARGED - REMODEL - 1ST FLOOR <br />E5-00 VENDOR DRAWINGS <br />E5-01 DETAILS - ELECTRICAL <br />E6-01 PARTIAL SINGLE LINE DIAGRAMS, PANEL SCHEULDE, & LIGHT FIXTURE SCHEDULE <br />E6-02 SINGLE LINE DIAGRAM <br />E7-01 TITLE 24 <br />SECURITY <br />T1-11 PLAN - REMODEL 1ST FLR - SECURITY <br />T1-21 PLAN - 2ND FLR - SECURITY <br />T5-01 DETAILS - SECURITY <br />SIGNAGE <br />SG1-11 SIGNAGE - PLAN <br />SG5-01 DETAILS - SIGNAGE <br />GRAND TOTAL: 64 <br />N/A DEFERRED APPROVALS 06 <br />NTS VICINITY MAP 13 <br />GENERAL PROVISIONS <br />1. ALL WORK SHALL CONFORM TO THE CURRENT EDITIONS OF NATIONAL, STATE AND LOCAL CODES, <br />AND OTHER REGULATORY AGENCIES WHICH HAVE AUTHORITY OVER ANY PORTION OF THE WORK. ALL <br />CONTRACTORS AND SUBCONTRACTORS PERFORMING GENERAL CONSTRUCTION, MECHANICAL, <br />ELECTRICAL, PLUMBING, OR RELATED WORK SHALL COMPLY WITH APPLICABLE SECTIONS OF THE <br />CODES THAT HAVE JURISDICTION, INCLUDING BUT NOT LIMITED TO: <br />2022 CALIFORNIA BUILDING STANDARDS ADMINISTRATIVE CODE (CAC) <br />CALIFORNIA CODE OF REGULATIONS (CCR) TITLE 24, PART 1 <br />2022 CALIFORNIA BUILDING CODE (CBC) <br />CALIFORNIA CODE OF REGULATIONS (CCR) TITLE 24, PART 2 <br />(2021 INTERNATIONAL BUILDING CODE WITH CALIFORNIA AMENDMENTS) <br />2022 CALIFORNIA ELECTRICAL CODE (CEC) <br />CALIFORNIA CODE OF REGULATIONS (CCR) TITLE 24, PART 3 <br />(2020 NATIONAL ELECTRICAL CODE WITH CALIFORNIA AMENDMENTS) <br />2022 CALIFORNIA MECHANICAL CODE (CMC) <br />CALIFORNIA CODE OF REGULATIONS (CCR) TITLE 24, PART 4 <br />(2021 UNIFORM MECHANICAL CODE WITH CALIFORNIA AMENDMENTS) <br />2022 CALIFORNIA PLUMBING CODE (CPC) <br />CALIFORNIA CODE OF REGULATIONS (CCR) TITLE 24, PART 5 <br />(2021 UNIFORM PLUMBING CODE WITH CALIFORNIA AMENDMENTS) <br />2022 CALIFORNIA ENERGY CODE <br />CALIFORNIA CODE OF REGULATIONS (CCR) TITLE 24, PART 6 <br />2022 CALIFORNIA FIRE CODE (CFC) <br />CALIFORNIA CODE OF REGULATIONS (CCR) TITLE 24, PART 9 <br />(2021 INTERNATIONAL FIRE CODE WITH CALIFORNIA AMENDMENTS) <br />2022 CALIFORNIA GREEN BUILDING STANDARDS CODE (CALGREEN CODE) <br />CALIFORNIA CODE OF REGULATIONS (CCR) TITLE 24, PART 11 <br />TITLE 19, CALIFORNIA CODE OF REGULATIONS (CCR) <br />DIVISION 1, STATE FIRE MARSHAL REGULATIONS <br />2022 CALIFORNIA BUILDING CODE CHAPTER 35 REFERENCE STANDARDS <br />NFPA 13-22: STANDARD FOR THE INSTALLATION OF SPRINKLER SYSTEMS <br />NFPA 72-22: NATIONAL FIRE ALARM AND SIGNAL CODE WITH CALIFORNIA AMENDMENTS <br />2. ALL WORK AND MATERIALS SHALL BE IN FULL ACCORDANCE WITH THE REQUIREMENTS OF THESE <br />CODES AND ALL APPLICABLE LOCAL ORDINANCES. WHERE CONTRACT DOCUMENTS EXCEED SUCH <br />REQUIREMENTS, WITHOUT VIOLATING SUCH CODES, REGULATIONS AND ORDINANCES, CONTRACT <br />DOCUMENTS TAKE PRECEDENCE. WHERE CODES CONFLICT, THE MORE STRINGENT SHALL APPLY. <br />07 N/A APPLICABLE CODES <br />CITY SUBMITTAL 04/19/2024 <br />BID SET 05/20/2024 <br />PLAN CHECK CORRECTIONS 07/02/2024 <br />Bldg# 101119067 <br /> <br />APPROVALS: <br />PLNG - JHeidi <br />BLDG - CSG Consultants <br />1900 E 4th St - <br />1011190678/9/2024