Laserfiche WebLink
APPLICABLE CODES <br />2022 CALIFORNIA BUILDING CODE <br />2022 CALIFORNIA ELECTRICAL CODE <br />2022 CALIFORNIA PLUMBING CODE <br />2022 CALIFORNIA MECHANICAL CODE <br />2022 CALIFORNIA FIRE CODE <br />CITY OF SANTA ANA MUNICIPAL CODE <br />PROJECT DESCRIPTION <br />1. <br />SCOPE OF WORK: <br />NEW MECHANICAL ROOF SCREEN AT ONE STORY ROOF FOR <br />REPLACEMENT HVAC UNITS <br />*ALL NEW CONSTRUCTION TO REMAIN THE EXISTING TYPE. <br />EXISTING BUILDING INFORMATION: <br />GROSS AREA: 9,178 SQ. FT. (NO CHANGE) <br /># OF LEVELS: PARTIAL ONE & TWO STORY <br />OCCUPANCY: M <br />BUILDING TYPE: V-B <br />SPRINKLERED: NO <br />DEFERRED SUBMITTALS <br />NONE <br />CLIENT: <br />ASSISTANCE LEAGUE OF SANTA ANA <br />1031 W FIRST ST <br />SANTA ANA, CA 92703 <br />949-2411-7580 <br />CONTACT: JUDI FINE JUDIFINE@IME.COM <br />ARCHITECT: <br />ITZEN ARCHITECTS INC. <br />1800 N. BRISTOL ST. #C418 <br />SANTA ANA, CA 92706 <br />714-716-5042 <br />CONTACT: JANA ITZEN JANA@ITZEN.COM <br />STRUCTURAL ENGINEER: <br />CROSS ENGINEERS <br />3196-G AIRPORT LOOP DR <br />COSTA MESA, CA 92626 <br />714-566-5475 <br />CONTACT: KIRK D. CROSS KCROSS@CROSSENG.COM <br />PROJECT DIRECTORY <br />KEYNOTE <br />WALL TYPE <br />DATUM POINT <br />ROOM NAME <br />MATCH LINE <br />REVISION <br />BUILDING SECTION <br />INTERIOR ELEVATIONS <br />DETAIL <br />COLUMN LINE <br />WALL SECTION <br />NORTH ARROWS <br />WINDOW TYPE <br />SURFACE DRAINAGE <br />LEVEL LINE, CONTROL POINT <br />BREAKS OF BUILDING COMPONENTS <br />STAIR DIRECTION SYMBOL <br />CENTER LINES, FLOOR LINES AND LEVEL LINES <br />24 <br />3 <br />1 <br />2 <br />DOOR DESIGNATION <br />ROOM NUMBER <br />SHADED PORTION IS THE SIDE CONSIDERED <br />CLOUD AROUND REVISED AREA OPTIONAL <br />SHEET WHERE ELEVATION IS DRAWN <br />ELEVATION IDENTIFICATION <br />DETAIL IDENTIFICATION <br />SHEET WHERE DETAIL IS DRAWN <br />SHEET WHERE SECTION IS DRAWN <br />SECTION IDENTIFICATION <br />SHEET WHERE SECTION IS DRAWN <br />SECTION IDENTIFICATION <br />ARROW INDICATES DIRECTION OF FLOW <br />EL: 23'-6" = ELEVATION/SECTION <br />DN. <br />0 <br />0 <br />1 <br />A101 <br />TYP <br />1 <br />A101 <br />TYP <br />A101 <br />1 <br />SIM <br />A101 <br />1 <br />SIM <br />A101 <br />1 <br />SIM <br />A101 <br />1 <br />SIM <br />101 <br />Room <br />name <br />101 <br />? <br />1t <br />Name <br />Elevation <br />SYMBOLS LIST <br />VICINITY REFERENCE MAP <br />PROJECT SITE <br />1037 WEST FIRST STREET <br />& <br />@ <br />∅ <br /># <br />(E) <br />ACOUS. <br />A.C. <br />ADJ. <br />AFF. <br />AGGR. <br />ALUM. <br />APPROX. <br />ARCH. <br />ASPH. <br />BD. <br />BLDG. <br />BLK'G. <br />B.O.C. <br />BOT. <br />B.O.W. <br />B.S. <br />CAB. <br />C.B. <br />C.I.P. <br />C.J. <br />CLG. <br />CLR. <br />COL. <br />CONC. <br />CONT. <br />CORR. <br />CTR. <br />DBL. <br />DEPT. <br />DESC. <br />D.F. <br />DIA. <br />DIM. <br />DN. <br />D.O. <br />DWG. <br />EA. <br />E.J. <br />EL. <br />ELEC. <br />ELEV. <br />EMER. <br />E.P. <br />EQ. <br />EQUIP. <br />EXP. <br />EXT. <br />F.A. <br />F.B. <br />F.D. <br />FDN. <br />F.E. <br />F.E.C. <br />F.H.C. <br />FIN. <br />FLR. <br />F.O.C. <br />F.O.F. <br />F.O.M. <br />F.O.S. <br />F.O.W. <br />F.S. <br />FT. <br />FTG. <br />GA. <br />GALV. <br />GC <br />GL. <br />GND. <br />GR. <br />GYP. <br />H.B. <br />H.C. <br />HDW. <br />H.M. <br />HORIZ. <br />HGT./HT. <br />AND <br />ANGLE <br />AT <br />CENTERLINE <br />DIAMETER OR ROUND <br />POUND OR NUMBER <br />EXISTING <br />ACOUSTICAL <br />ASPHALTIC CONCRETE <br />ADJUSTABLE <br />ABOVE FINISH FLOOR <br />AGGREGATE <br />ALUMINUM <br />APPROXIMATE <br />ARCHITECTURAL <br />ASPHALT <br />BOARD <br />BUILDING <br />BLOCKING <br />BACK OF CURB <br />BOTTOM <br />BOTTOM OF WALL <br />BOTTOM OF SLOPE <br />CABINET <br />CATCH BASIN <br />CAST IN PLACE <br />CONTROL JOINT <br />CEILING <br />CLEAR <br />COLUMN <br />CONCRETE <br />CONTINUOUS <br />CORRIDOR <br />CENTER <br />DOUBLE <br />DEPARTMENT <br />DESCRIPTION <br />DRINKING FOUNTAIN <br />DIAMETER <br />DIMENSION <br />DOWN <br />DOOR OPENING <br />DRAWING <br />EACH <br />EXPANSION JOINT <br />ELEVATION <br />ELECTRICAL <br />ELEVATOR <br />EMERGENCY <br />ELECTRICAL PANELBOARD <br />EQUAL <br />EQUIPMENT <br />EXPANSION <br />EXTERIOR <br />FIRE ALARM <br />FLAT BAR <br />FLOOR DRAIN <br />FOUNDATION <br />FIRE EXTINGUISHER <br />FIRE EXTINGUISHER CABINET <br />FIRE HOSE CABINET <br />FINISH <br />FLOOR <br />FACE OF CONCRETE <br />FACE OF FINISH <br />FACE OF MASONRY <br />FACE OF STUD <br />FACE OF WALL <br />FINISH SURFACE <br />FOOT OR FEET <br />FOOTING <br />GAUGE <br />GALVANIZED <br />GENERAL CONTRACTOR <br />GLASS <br />GROUND <br />GRADE <br />GYPSUM <br />HOSE BIB <br />HOLLOW CORE <br />HARDWARE <br />HOLLOW METAL <br />HORIZONTAL <br />HEIGHT <br />JT. <br />LAB. <br />LAM. <br />LAV. <br />MAX. <br />MECH. <br />MET. <br />MFR. <br />MH. <br />MIN. <br />MISC. <br />M.O. <br />N.I.C. <br />NO./# <br />NOM. <br />N.T.S. <br />OA. <br />O.C. <br />O.D. <br />OPP. <br />PA <br />P.H. <br />PL. <br />P. LAM. <br />P.O.T. <br />PT. <br />RAD. <br />R.D. <br />REF. <br />REFR. <br />RGTR. <br />REQD. <br />RM. <br />R.O. <br />R.O.W. <br />S.C. <br />SECT. <br />S.F. <br />SHR. <br />SHT. <br />SIM. <br />SPEC. <br />SQ. <br />S.S. <br />STD. <br />STL. <br />STOR. <br />SYM. <br />T.C. <br />TEL. <br />T.&G. <br />T.O.B. <br />T.O.C. <br />T.O.W. <br />T.O.P. <br />T.S. <br />T.V. <br />TYP. <br />U.N.O. <br />UR. <br />V.C.T. <br />VERT. <br />VEST. <br />W/ <br />W.C. <br />WD. <br />W/O <br />WP. <br />W.R. <br />WT. <br />W.W.F. <br />JOINT <br />LABORATORY <br />LAMINATE <br />LAVATORY <br />MAXIMUM <br />MECHANICAL <br />METAL <br />MANUFACTURER <br />MANHOLE <br />MINIMUM <br />MISCELLANEOUS <br />MASONRY OPENING <br />NOT IN CONTRACT <br />NUMBER <br />NOMINAL <br />NOT TO SCALE <br />OVERALL <br />ON CENTER <br />OUTSIDE DIAMETER <br />OPPOSITE <br />PLANTING AREA <br />PANIC HARDWARE <br />PLATE <br />PLASTIC LAMINATE <br />PATH OF TRAVEL <br />PAINT <br />RADIUS <br />ROOF DRAIN <br />REFERENCE <br />REFRIGERATOR <br />REGISTER <br />REQUIRED <br />ROOM <br />ROUGH OPENING <br />RIGHT OF WAY <br />SOLID CORE <br />SECTION <br />SQUARE FEET <br />SHOWER <br />SHEET <br />SIMILAR <br />SPECIFICATION(S) <br />SQUARE <br />STAINLESS STEEL <br />STANDARD <br />STEEL <br />STORAGE <br />SYMMETRICAL <br />TOP OF CURB <br />TELEPHONE <br />TONGUE & GROOVE <br />TOP OF BEAM <br />TOP OF CONCRETE <br />TOP OF WALL <br />TOP OF PARAPET <br />TOP OF SLOPE <br />TELEVISION <br />TYPICAL <br />UNLESS NOTED OTHERWISE <br />URINAL <br />VINYL COMPOSITION TILE <br />VERTICAL <br />VESTIBULE <br />WITH <br />WATER CLOSET <br />WOOD <br />WITHOUT <br />WATERPROOF <br />WATER RESISTANT <br />WEIGHT <br />WELDED WIRE FABRIC <br />F.G. FINISH GRADE <br />OUTSIDE AIRO.A. <br />MATL. MATERIAL <br />F.L. FLOW LINE <br />INTERIOR <br />INSIDE DIAMETER <br />INT. <br />I.D. <br />ACC. ACCESSIBLE <br />F.H FIRE HYDRANT <br />OSA OUTSIDE AIR <br />ABBREVIATION LIST <br />∠1. <br />2. <br />3. <br />4. <br />5. <br />6. <br />7. <br />8. <br />9. <br />10. <br />11. <br />12. <br />13. <br />14. <br />15. <br />PRIOR TO BEGINNING ANY WORK, THE GENERAL CONTRACTOR SHALL <br />FURNISH A CONSTRUCTION SCHEDULE SHOWING THE CHRONOLOGICAL <br />PHASES OF HIS WORK AND ALL RELATED WORK FOR THE PROJECT. THIS <br />SCHEDULE SHALL INDICATE ALL ORDERING LEAD TIMES, LENGTH OF TIME <br />FOR EACH PHASE (AS APPLICABLE), START AND COMPLETION, WITH A <br />PROJECTED COMPLETION DATE. <br />ALL WORK PERFORMED BY THE CONTRACTOR/SUBCONTRACTORS SHALL <br />CONFORM TO THE REQUIREMENTS OF MUNICIPAL, LOCAL, FEDERAL, AND <br />STATE LAWS, AS WELL AS OTHER GOVERNING REQUIREMENTS, WHETHER <br />OR NOT SPECIFIED ON THE DRAWINGS. <br />WHERE THE CONTRACT NOTES, OR DRAWINGS CALL FOR ANY WORK OF A <br />MORE STRINGENT NATURE THAN THAT REQUIRED BY THE BUILDING CODE OR <br />ANY OTHER DEPARTMENT HAVING JURISDICTION OVER THE WORK, THE <br />WORK OF THE MORE STRINGENT NATURE CALLED FOR BY THE CONTRACT, <br />CONSTRUCTION NOTES OR DRAWINGS SHALL BE FURNISHED IN ALL CASES. <br />THE CONTRACTOR SHALL BE FULLY AND SOLELY RESPONSIBLE FOR THE <br />REMOVAL, REPLACEMENT AND RECTIFICATION OF ALL DAMAGED AND <br />DEFECTIVE MATERIAL AND WORKMANSHIP IN CONNECTION WITH THE <br />CONTRACT WORK. HE SHALL REPLACE OR REPAIR AS DIRECTED ALL SUCH <br />DAMAGED OR DEFECTIVE MATERIALS WITHIN A PERIOD OF FIVE (5) BUSINESS <br />DAYS FROM THE DATE OF SUBSTANTIALCOMPLETION, UNLESS OTHERWISE <br />AGREED UPON IN WRITING BY THE OWNER. <br />THE CONTRACTOR/SUBCONTRACTORS SHALL OBTAIN AND PAY FOR ALL <br />LEGALLY REQUIRED APPROVALS AND PERMITS NECESSARY FOR THE <br />EXECUTION AND COMPLETION OF HIS WORK. <br />ALL DRAWINGS AND ALL CONSTRUCTION NOTES ARE COMPLIMENTARY, AND <br />WHAT IS CALLED FOR BY EITHER WILL BE BINDING AS IF CALLED FOR BY ALL. <br />ANY WORK SHOWN OR REFERRED TO ON ANY ONE SET OF DRAWINGS SHALL <br />BE PROVIDED AS THOUGH SHOWN ON ALL RELATED DRAWINGS. <br />THE GENERAL CONTRACTOR IS WHOLLY RESPONSIBLE FOR THE <br />COORDINATION AND SCHEDULING OF THE WORK EFFORT FOR ALL <br />SUBCONTRACTORS, CRAFTSMEN AND TRADESMEN REQUIRED TO COMPLETE <br />THE JOB. <br />THE GENERAL CONTRACTOR SHALL NOTIFY ARCHITECT IMMEDIATELY IF HE <br />CANNOT COMPLY WITH ALL WORK CALLED FOR ON THESE DRAWINGS. <br />THE GENERAL CONTRACTOR SHALL NOTIFY ARCHITECT IMMEDIATELY OF <br />DISCREPANCIES OR OMISSIONS BETWEEN THE DRAWINGS, THESE NOTES <br />AND/OR FIELD CONDITIONS BEFORE COMMENCING ANY WORK SUBMIT A <br />REQUEST FOR CLARIFICATION. <br />BEFORE SUBMITTING FINAL PRICING, ALL CONTRACTORS SHALL VISIT THE <br />PREMISES, FAMILIARIZE THEMSELVES WITH EXISTING CONDITIONS AND <br />SATISFY THEMSELVES AS TO THE NATURE AND SCOPE OF THE WORK AND <br />THE DIFFICULTIES THAT ATTEND EXECUTION. THE SUBMISSION OF A <br />PROPOSAL SHALL BE CONSTRUED AS EVIDENCE THAT SUCH AN <br />EXAMINATION HAS BEEN MADE. LATER CLAIMS FOR LABOR, EQUIPMENT, OR <br />MATERIAL REQUIRED FOR DIFFICULTIES ENCOUNTERED, WHICH COULD HAVE <br />BEEN FORESEEN HAD SUCH AN EXAMINATION BEEN MADE, WILL NOT BE <br />RECOGNIZED. <br />EACH CONTRACTOR AND SUBCONTRACTOR SHALL CHECK AND VERIFY ALL <br />DIMENSIONS AND CONDITIONS AT JOB SITE AS IS RELATED TO THEIR WORK <br />AND NOTIFY THE ARCHITECT/OWNER IF THERE ARE OBSTRUCTIONS AND <br />CANNOT BE ACCOMPLISHED AS REFLECTED IN THE CONTRACT DOCUMENTS. <br />THE GENERAL CONTRACTOR AND THE SUBCONTRACTORS INVOLVED IN THIS <br />PROJECT SHALL TAKE NOTE THAT ANY COST CAUSED BY DEFECTIVE OR ILL- <br />TIMED WORK AS A RESULT OF, BUT NOT LIMITED TO INFERIOR <br />WORKMANSHIP OR MATERIALS, IMPROPER SCHEDULING OR DELINQUENT <br />ORDERING SHALL BE BORNE BY THE PARTY RESPONSIBLE. <br />WITH SUBMISSION OF FINAL PRICING , THE GENERAL CONTRACTOR SHALL <br />ALSO SUBMIT A LIST OF LONG LEAD TIME ITEMS THAT PREVENT COMPLETION <br />OF THE PROJECT BY PROJECTED MOVE-IN DATE. WHERE SPECIAL ITEMS <br />REQUIRE EXTENDED LEAD TIME PREVENTING INSTALLATION BY PROJECTED <br />MOVE-IN DATE, CONTRACTOR IS TO PROPOSE AN AVAILABLE ALTERNATE <br />FOR APPROVAL BY OWNER AND TENANT, AS WELL AS TO PREPARE PRICING <br />FOR POSSIBLE TEMPORARY ASSEMBLIES. <br />THE USE OF THE WORDS ‘PROVIDE’ OR ‘PROVIDED’ IN CONNECTION WITH <br />ANY ITEM SPECIFIED IS INTENDED TO MEAN, UNLESS OTHERWISE NOTED, <br />THAT WHICH SHALL BE FURNISHED AND INSTALLED AND CONNECTED WHERE <br />SO REQUIRED. <br />WHERE THE TERMS ‘APPROVED EQUAL’, ‘EQUAL TO’, ‘ACCEPTABLE’ OR THE <br />OTHER GENERAL QUALIFYING TERMS ARE USED IN THESE NOTES, IT SHALL <br />BE UNDERSTOOD THAT REFERENCE IS MADE TO THE RULING AND <br />JUDGEMENT OF THE ARCHITECT. <br />1 GENERAL CONDITIONS <br />16. <br />17. <br />18. <br />19. <br />20. <br />21. <br />22. <br />23. <br />24. <br />25. <br />26. <br />27. <br />28. <br />29. <br />30. <br />31. <br />THE GENERAL CONTRACTOR SHALL HAVE FIVE (5) WORKING DAYS FROM <br />AWARD OF THE CONTRACT TO SUBMIT ANY ‘OR EQUAL’ SUBSTITUTIONS FOR <br />SPECIFIED PRODUCTS OR WORK FOR REVIEW BY ARCHITECT. HE SHALL <br />INCLUDE CUT SHEETS WITH SPECIFICATIONS AND REASONS FOR <br />SUBSTITUTIONS. ARCHITECT SHALL RESPOND IN FIVE (5) WORKING DAYS TO <br />SUBMITTAL. NO SUBSTITUTIONS SHALL BE ACCEPTED AFTER THE INITIAL TEN <br />(10) DAY TIME LIMIT HAS PASSED. <br />ALL WOODWORK, BLOCKING, ETC., TO BE FIRE RETARDANT TREATED AS <br />REQUIRED BY CODE. <br />THE GENERAL CONTRACTOR SHALL EXERCISE STRICT DUST CONTAINMENT <br />CONTROL OVER JOB TO PREVENT DIRT OR DUST FROM LEAVING THE JOB <br />SITE. <br />THE CONSTRUCTION NOTES AND/OR DRAWINGS ARE SUPPLIED TO <br />ILLUSTRATE THE DESIGN INTENT AND THE GENERAL TYPE OF CONSTRUCTION <br />DESIRED, AND ARE INTENDED TO APPLY TO THE FINEST QUALITY OF <br />CONSTRUCTION, MATERIAL AND WORKMANSHIP THROUGHOUT. <br />THE GENERAL CONTRACTOR SHALL MAINTAIN A COMPLETE AND CURRENT <br />SET OF CONSTRUCTION DRAWINGS ON SITE DURING ALL PHASES OF <br />CONSTRUCTION FOR USE OF ALL TRADES. <br />THE GENERAL CONTRACTOR UPON AWARD OF THE CONTRACT FOR <br />CONSTRUCTION, ASSUMED FULL RESPONSIBILITY FOR THE CONSTRUCTION, <br />MATERIALS, AND WORKMANSHIP OF THE WORK DESCRIBED IN THESE NOTES <br />AND DRAWINGS. <br />ALL REQUIRED EXITS, WAYS OF APPROACH THERETO, AND WAYS OF TRAVEL <br />FROM THE EXIT INTO THE STREET SHALL CONTINUOUSLY BE MAINTAINED <br />FREE FROM ALL OBSTRUCTIONS AND IMPEDIMENTS FROM UNOBSTRUCTED <br />EGRESS IN THE CASE OF FIRE OR OTHER EMERGENCY. <br />DURING THE ENTIRE PERIOD OF DEMOLITION AND CONSTRUCTION, ALL <br />EXISTING EXITS, EXIT LIGHTING, FIRE PROTECTIVE DEVICES AND ALARMS <br />SHALL BE CONTINUOUSLY MAINTAINED. <br />THE GENERAL CONTRACTOR SHALL PROVIDE AND INSTALL FIRE <br />EXTINGUISHERS AS REQUIRED BY FEDERAL OCCUPATIONAL SAFETY AND <br />HEALTH ACT (OSHA) AND THE FIRE AUTHORITY REGULATIONS. <br />THE GENERAL CONTRACTOR SHALL REPLACE ANY BROKEN OR CRACKED <br />WINDOW GLAZING. <br />THE GENERAL CONTRACTOR SHALL VERIFY SIZE, ELECTRICAL <br />REQUIREMENTS, LOCATIONS AND CHARACTERISTICS OF ALL WORK AND/OR <br />EQUIPMENT SUPPLIED BY THE OWNER OR TENANT, WITH THE <br />MANUFACTURER OR SUPPLIER PRIOR TO THE START OF RELATED WORK. <br />CONTRACTOR SHALL PROTECT AREA AND NEW OR EXISTING MATERIALS AND <br />FINISHES FROM DAMAGE WHICH MAY OCCUR FROM CONSTRUCTION, <br />DEMOLITION, DUST, WATER, ETC., AND SHALL PROVIDE AND MAINTAIN <br />TEMPORARY BARRICADES, CLOSURE WALLS, ETC. AS REQUIRED TO PROTECT <br />THE PUBLIC DURING THE PERIOD OF CONSTRUCTION. DAMAGE TO NEW AND <br />EXISTING MATERIALS, FINISHES, STRUCTURES AND EQUIPMENT SHALL BE <br />REPAIRED OR REPLACED AT THE EXPENSE OF THE GENERAL CONTRACTOR. <br />ALL DIMENSIONS SHALL BE VERIFIED IN THE FIELD AND DISCREPANCIES <br />REPORTED TO THE ARCHITECT PRIOR TO CONSTRUCTION. <br />DIMENSIONS AND ELEVATIONS ARE TO TOP OF CONCRETE OR PLYWOOD <br />FLOORING, NOT TOP OF FLOOR COVERING. <br />DO NOT SCALE DRAWINGS. IF NEEDED, THE ARCHITECT SHALL BE <br />CONTACTED FOR VERIFICATION OR CLARIFICATION. <br />THE GENERAL CONTRACTOR SHALL SUBMIT ALL APPLICATIONS FOR PAYMENT <br />TO THE OWNER FOR REVIEW AND APPROVAL. <br />THE GENERAL CONTRACTOR SHALL SEE THAT ALL SUBCONTRACTORS <br />RECEIVE COMPLETE SETS OF WORKING DRAWINGS AND ASSUME FULL <br />RESPONSIBILITY FOR COORDINATION OF WORK. <br />CONTRACT CLOSE-OUT SHALL OCCUR ONLY AFTER THE ARCHITECT HAS <br />ISSUED THE PUNCH-LIST AND PUNCH-LIST ITEMS HAVE BEEN CORRECTED BY <br />THE CONTRACTOR. <br />No. C31793W <br />REN. 02-28-25 <br />L <br />AINROFILACFOETATS <br />IC ENSED ARCHITECT <br />N <br />I <br />LL <br />M I TZE <br />I A <br />Job. No. <br />Date <br />Drawn/Checked by <br />Scale <br />FOR PLAN <br />REVIEW ONLY <br />This and all other project documents and all ideas, aesthetics and <br />designs incorporated therein are instruments of service. <br />All project documents are the registered property of ITZEN. (ITZEN) <br />and cannot be lawfully used in whole or in part for any project or <br />purpose except as described in the contractual agreement between <br />ITZEN and Client. ITZEN hereby gives formal notice that any such <br />project document use, reproduction or modification (misuse) is not only <br />unlawful but automatically binds all parties involved with misuse to fully <br />indemnify and defend ITZEN and ITZEN's Consultants to the maximum <br />legal extent against all losses, demands, claims or liabilities arising <br />directly or indirectly from project document misuse. <br />Project documents describe design intent of work and are not a <br />representation of as-built or existing conditions. ITZEN and ITZEN's <br />Consultants make no representations concerning the accuracy of <br />documents and are not responsible for any discrepancies between <br />project documents and the existing conditions. <br />Copyright 2021C <br />mailing: <br />1800 N. Bristol Street #C-418 <br />Santa Ana CA 92706 <br />714-716-5042 <br />sayhello@ITZEN.com <br />www.ITZEN.com <br /> 12" = 1'-0" <br />23014 <br />04-08-2024 <br />WBI/AT <br />AS <br />S <br />I <br />S <br />T <br />A <br />N <br />C <br />E <br /> <br />L <br />E <br />A <br />G <br />U <br />E <br /> <br />O <br />F <br /> <br />S <br />A <br />N <br />T <br />A <br /> <br />A <br />N <br />A <br />10 <br />3 <br />1 <br /> <br />W <br /> <br />F <br />I <br />R <br />S <br />T <br /> <br />S <br />T <br />SA <br />N <br />T <br />A <br /> <br />A <br />N <br />A <br />, <br /> <br />C <br />A <br /> <br />9 <br />2 <br />7 <br />0 <br />3 <br />ME <br />C <br />H <br />A <br />N <br />I <br />C <br />A <br />L <br /> <br />E <br />Q <br />U <br />I <br />P <br />M <br />E <br />N <br />T <br /> <br />S <br />C <br />R <br />E <br />E <br />N <br />COVER <br />G0.0 <br />MECHANICAL EQUIPMENT SCREEN <br />ASSISTANCE LEAGUE OF SANTA ANA <br />1031 W FIRST ST <br />SANTA ANA, CA 92703 <br />AGENCY SUBMITTAL <br />04-08-2024 <br />SHEET INDEX <br />#SHEET NAME <br />GENERAL <br />G0.0 COVER <br />TITLE 24 <br />T-1 PP 1-8 <br />T-2 PP 9-16 <br />T-3 MANDATORY MEASURES <br />ARCHITECTURE <br />A0.1 SHEET SPECIFICATIONS <br />A1.1 SITE PLAN <br />A2.1 ROOF PLANS <br />A3.1 ELEVATIONS <br />A8.1 EXTERIOR DETAILS <br />STRUCTURAL <br />S0.1 STRUCTURAL GENERAL NOTES <br />S1.1 TYPICAL STRUCTURAL DETAILS <br />S2.2 ROOF FRAMING PLAN <br />S3.1 STRUCTURAL DETAILS <br />MECHANICAL <br />M-0 ROOF PLAN <br />Grand total: 14 <br />REV DESCRIPTION DATE <br />Bldg# 101119950 <br />Mech# 40139270 <br /> <br />APPROVALS: <br />PLNG - PRaj <br />BLDG - CSG Consultants <br />MECH - TLuka <br />1031 W 1st St - <br />101119950 & 4013927010/18/2024