Laserfiche WebLink
1. REINFORCING STEEL SHALL BE PLACED IN ACCORDANCE TO AMERICAN CONCRETE INSTITUTE ACI 301 <br />“SPECIFICATIONS FOR STRUCTURAL CONCRETE” AND CONCRETE REINFORCING STEEL INSTITUTE (CRSI) <br />“MANUAL OF STANDARD PRACTICE.” <br />2. REINFORCING STEEL FOR FOUNDATIONS, SLABS ON GRADE, AND ELEVATED SLABS SHALL CONFORM TO <br />ASTM A615/A615M, GRADE 60, UNLESS NOTED OTHERWISE. BARS TO BE WELDED SHALL CONFORM TO <br />LOW ALLOY ASTM A706/A706M, GRADE 60. <br />3. WELDED WIRE REINFORCEMENT (WWR) SHALL CONFORM TO ASTM A1064/A1064M. SPLICE LENGTH <br />FOR WELDED WIRE REINFORCEMENT SHALL BE AT LEAST 8 INCHES, MEASURED BETWEEN OUTERMOST <br />CROSS WIRE OF EACH REINFORCEMENT SHEET. <br />4. ALL REINFORCING STEEL SHALL BE SPLICED AS SPECIFIED ON THESE DRAWINGS. IF NO LOCATION IS <br />SPECIFIED, LOCATE SPLICES IN AREAS OF MINIMUM STRESS. SPLICE LENGTHS SHALL NOT BE LESS THAN <br />THE LENGTHS INDICATED ON THESE DRAWINGS. <br />5. MINIMUM CONCRETE COVER AND CLEARANCES BETWEEN REINFORCING STEEL BARS SHALL BE <br />SATISFIED AT ALL LOCATIONS INCLUDING SPLICES. THE CLEARANCE BETWEEN THE REINFORCING STEEL <br />BARS SHALL NOT BE LESS THAT THE GREATER VALUE OF ONE BAR DIAMETER, ONE INCH, AND 4/3 TIMES <br />THE MAXIMUM SIZE OF THE AGGREGATE. AT COLUMNS AND BEAM, PROVIDE 1 1/2 INCHES OR 1.5 TIMES <br />THE LARGEST LONGITUDINAL BAR DIAMETER, WHICHEVER IS GREATER. FOR CONSIDERING THE COVER <br />AND CLEAR DISTANCE IN BUNDLED BARS, TOTAL AREA OF BUNDLE SHALL BE CONSIDERED FOR <br />CALCULATING EQUIVALENT BAR DIAMETER. <br />6. CONCRETE COVERAGE FOR REINFORCING STEEL PLACED IN CAST-IN-PLACE CONCRETE SHALL BE AS <br />TABLE CONCOV-1. <br />7. IF SPACERS AND CHAIRS ARE RESTING ON EXPOSED CONCRETE SURFACES, THEY SHALL BE PASTIC <br />COATED OR USE PLASTIC. <br />8. ELECTRODES UTILIZED IN WELDING OF REINFORCING STEEL, SHALL BE LOW HYDROGEN ELECTRODE <br />AS SPECIFIED IN AMERICAN WELD SOCIETY AWS D1.4 “STRUCTURAL WELDING CODE - REINFORCING <br />STEEL.” <br />9. ALL REINFORCING STEEL SHALL BE BENT COLD AND PRIOR TO PLACING THE BARS. RE-BENDING OF <br />PREVIOUSLY BENT REINFORCING STEEL IS NOT PERMITTED. BENDING OF REINFORCEMENT IN <br />PREVIOUSLY CAST CONCRETE IS NOT PERMITTED. OFFSET BARS SHALL BE BENT PRIOR TO PLACEMENT IN <br />THE FORMS. HOOKING AND WALKING-IN ARE NOT PERMITTED. <br />10. FIRMLY SECURE ALL REINFORCING STEEL BARS AND WELDED WIRE REINFORCING WHILE PLACING <br />CONCRETE. WHERE REQUIRED, ADDITIONAL CHAIRS, CONCRETE BLOCKS, STEEL BARS, BOLSTERS, OR <br />OTHER APPROVED MEANS AND METHODS SHALL BE PROVIDED BY THE CONTRACTOR TO FURNISH ALL <br />REQUIRED SUPPORTS FOR ALL REINFORCING. <br />11. PRIOR TO FINAL INSPECTION, CLEARLY MARK ALL REINFORCING STEEL SO THEIR IDENTIFICATION CAN <br />BE PROPERLY MADE AT THE TIME OF INSPECTION. <br />REINFORCING STEEL <br />1. ALL WOOD OR WOOD BASED MATERIALS SHALL CONFORM TO THE FOLLOWING STANDARDS: <br />1.1. ALL STRUCTURAL WOOD LUMBERS AND TIMBERS SHALL BE DOUGLAS FIR-LARCH CONFORMING TO <br /> THE REQUIREMENTS OF WWPA OR WCLIB UNLESSE NOTE OTHERWISE ON THESE DRAWINGS. <br />1.2. STRUCTURAL ALL STRUCTURAL PLYWOOD SHALL BE DOUGLAS FIR LARCH AND SHALL CONFORM TO <br /> THE REQUIREMENTS OF USDOC PS 1—09 OR MORE RECENT EDITION. <br />1.3. ALL STRUCTURAL PANELS SHALL CONFORM TO THE REQUIREMENTS OF USDOC PS 2—10 OR MORE <br /> RECENT EDITION. <br />1.4. ALL STRUCTURAL SAWN LUMBER INCLUDING END-JOINTED OR EDGE-GLUED LUMBER, MACHINE <br />STRESS-RATED OR MACHINE-EVALUATED LUMBER, SHALL BE IDENTIFIED BY THE GRADE MARK OF A <br />LUMBER GRADING OR INSPECTION AGENCY THAT HAS BEEN APPROVED BY AN ACCREDITATION ODY <br /> BODY THAT COMPLIES WITH DOC PS 20-05 OR MORE RECENT EDITION. <br />1.5. ENGINEERED WOOD RIM BOARDS SHALL CONFORM TO ANSI/APA PRR 410-2021 OR MORE RECENT <br /> EDITION. <br />2. UNLESS NOTED OTHERWISE, ALL STRUCTURAL LUMBER SHALL BE DOUGLAS FIR-LARCH CONFORMING <br />TO THE LATEST EDITION OF NDS FOR THE TABLE FL-1. <br />3. MEMBER SIZES SHOWN ARE NOMINAL UNLESS NOTED OTHERWISE. <br />4. ALL CONNECTORS AND FASTENERS SHALL COMPLY WITH THE APPLICABLE PROVISIONS AND TABLES OF <br />SECTIONS 2304.10.1 THROUGH 2304.10.7 OF CBC 2022. <br />5. ALL WOOD AND WOOD BASED MATERIALS SHALL CONFORM TO THE REQUIREMENTS OF AMERICAN <br />WOOD PROTECTION ASSOCIATION (AWPA) U1 FOR THE USE CATEGORY OF THE COMPONENT. <br />6. ANY PRESERVATIVE-TREATED WOOD MEMBERS THAT ARE ALTERED, CUT, DRILLED OR NOTCHED ON <br />THE FIELD, SHALL BE RETREADED AS SPECIFIED BY MANUFACTURER AND APPROVED BY LOCAL <br />AUTHORITIES. IF NO WRITTEN RECOMMENDATIONS ARE PROVIDED, ALL DRILLED HOLES AND CUT ENDS <br />NEED TO BE TREATED WITH A PRESERVATIVE, TO CONFORM AMERICAN WOOD PROTECTION ASSOCIATION <br />(AWPA) STANDARD M4. <br />7. FASTENERS SHALL CONFORM TO THE REQUIREMENTS SPECIFIED ON THESE DRAWINGS. FASTENERS <br />SHALL NOT BE PLACED CLOSER THAN THE SPECIFIED EDGE AND END DISTANCES. SPACING OF THE <br />FASTENERS SHALL BE AS SPECIFIED. <br />8. FASTENERS HEAD SHALL BE DRIVEN FLUSH WITH THE SURFACES AND SHALL NOT FRACTURE OR <br />DAMAGE THE LUMBER OR SHEATHING SURFACES. <br />9. PROVIDE LEAD HOLE 40%-70% OF THREADED SHANK DIA. AND FULL DIA. FOR SMOOTH SHANK <br />PORTION OF LAG BOLTS. THREADED CONNECTORS SUCH AS LAG SCREWS AND WOOD SCREWS SHALL BE <br />INSTALLED BY TURNING WIDTH A WRENCH. HAMMER DRIVEN SCREWS SHALL NOT BE PERMITTED. <br />10. ALL BOLT HOLES, OTHER THAN LAG BOLT HOLES, SHALL BE DRILLED A MINIMUM OF 1/32" TO A <br />MAXIMUM OF 1/16" LARGER THAN BOLT DIAMETER. HOLES SHALL BE ACCURATELY ALIGNED IN THE MAIN <br />MEMBERS AND SIDE PLATES. BOLTS SHALL NOT BE FORCIBLY DRIVEN. INSPECTOR SHALL VERIFY ALL <br />HOLES AT JOB SITE <br />11. PROVIDE LATERAL SUPPORT FOR THE TOP OF INTERIOR NON-BEARING WALLS WHEN MANUFACTURED <br />TRUSSES ARE USED. <br />12. ALL ROOF/FLOOR AND SHEAR WALL NAILING SHALL UTILIZE COMMON NAILS OR GALVANIZED BOX. <br />GALVANIZED NAILS SHALL BE HOT-DIPPED OR TUMBLED. NAIL GUNS USING "CLIPPED HEAD" OR SINKER <br />NAILS ARE NOT ACCEPTABLE. <br />13. ROOF/FLOOR NAILING TO BE INSPECTED BEFORE COVERING. FACE GRAIN OF PLYWOOD SHALL BE <br />PERPENDICULAR TO SUPPORTS. FLOOR SHALL HAVE TONGUE AND GROOVE OR BLOCKED PANEL EDGES. <br />14. STUCCO SHEAR WALLS SHALL UTILIZE FURRING, GALVANIZED NAILS (HAVING A MINIMUM 11 GA., <br />1-1/2" LONG, 7/16" DIAMETER HEAD, AND FURRED OUT A MIN OF 1/4") TO ATTACH THE LATH TO THE <br />STUDS. (TABLE 2306.3(3)). <br />15. SHOP WELDS SHALL BE PERFORMED WITH LICENSED FABRICATORS. <br />16. STRUCTURAL WOOD SHEAR WALLS SHALL BE COVERED WITH MINIMUM TWO LAYERS GRADE D FELT <br />UNDERLAY PRIOR TO PLACING FINISH MATERIAL. <br />17. HOLD-DOWN CONNECTOR BOLTS INTO WOOD FRAMING REQUIRE APPROVED PLATE WASHERS. <br />HOLD-DOWNS SHALL BE FINGER TIGHT AND 1/2 WRENCH TURN JUST PRIOR TO COVERING THE WALL <br />FRAMING. CONNECTOR BOLTS INTO WOOD FRAMING REQUIRE STEEL PLATE WASHERS ON THE POST ON <br />THE OPPOSITE SIDE OF THE ANCHORAGE DEVICE. PLATE SIZE SHALL BE A MINIMUM OF 0.25 IN. BY 3 IN. <br />BY 3 IN. <br />18. MAXIMUM MOISTURE CONTENT FOR FRAMING LUMBER INCLUDING PRESERVATIVE-TREATED WOOD <br />SHALL NOT EXCEED 19% AT THE TIME OF PLYWOOD OR GYPBOARD COVERAGE INSTALLATION. <br />19. UNLESS NOTED OTHERWISE, FRAMING LUMBER USED FOR COMPLETELY NEW CONSTRUCTIONS SHELL <br />BE STAMPED AS KILN-DRIED (KD), HEAT TREATED (KD-HT), SURFACE-DRY (S-DRY) LUMBER OR MC-15 <br />LUMBER. (S-DRY) LUMBER SHALL NOT BE PERMITTED TO BE USED IN EXISTING CONSTRUCTION OR FOR <br />THE NEW CONSTRUCTIONS THAT ARE ATTACHED TO EXISTING CONSTRUCTION. <br />20. TOP AND BOTTOM PLATES OF WALLS SHALL BE KLIN DRIED FOR BUILDINGS MORE THAN TWO <br />STORIES. <br />21.PROVIDE DOUBLE JOISTS OR 4x BEAM GIRDERS UNDER PARALLEL PARTITIONS. STITCH NAIL THE <br />DOUBLE SWAN JOISTS WITH 16D NAILS SPACED NOT MORE THAN THE LESSER OF JOISTS DEPTH AND 12 <br />IN. NAILS SHALL BE STAGGERED AT THE TOP AND BOTTOM. <br />22.PROVIDE DOUBLE 2X OR 4X BLOCKING UNDER WALLS OR PARTITIONS PERPENDICULAR TO THE JOISTS. <br />23.UNO, ALL DISCONTINUOUS WALLS SHALL BE SUPPORTED ON BEAMS, DOUBLE JOISTS OR SOLID <br />BLOCKING WITH THE WIDTH NOT LESS THAN THE WIDTH OF THE SUPPORTED WALL. <br />24. ALL WOOD BOLTS AND LAG SCREWS SHALL CONFORM TO REQUIREMENTS OF ANSI/ASME B18.2.1, <br />WOOD SCREWS SHALL CONFORM TO THE REQUIREMENTS OF ANSI/ASME B18.6.1, AND NAILS SHALL <br />CONFORM TO THE REQUIREMENTS OF ASTM F1667. <br />25. ALL NAILS SHALL CONFORM TO THE REQUIREMENTS OF ASTM F1667. UNLESS OTHERWISE NOTED ON <br />THESE DRAWINGS, ALL NAILS SHALL BE COMMON WIRE NAILS, AND NUMBER OF CONNECTING NAILS AT <br />EACH LOCATION SHALL NOT BE LESS THAN THE SPECIFIED NUMBERS ON THESE DRAWINGS. ALL NAILS <br />THAT ARE EXPOSED TO WEATHER OR MOISTURE SHALL BE HOT-DIPPED GALVANIZED COMMON NAILS <br />THAT CONFORMS TO ASTM A153 CLASS D. NAILS SHALL CONFORM TO THE REQUIREMENTS SPECIFIED IN <br />TABLE FL-2. NAILS. <br />26. ALL HORIZONTAL JOINTS OCCURRING IN BRACED / SHEAR WALL PANELS SHALL OCCUR OVER <br />BLOCKING EQUAL IN SIZE TO THE STUDDING. <br />27. ALL STEEL BOLT AND RODS SHALL CONFORM TO ASTM A307 OR ASTM F1554 GR. 36. ALL BOLT HOLES <br />SIZES SHALL INSPECTED AND VERIFIED AT JOB SITE. <br />28. ALL BOLTS, NUTS, AND LAG SCREWS THAT BEAR ON WOOD MATERIALS SHALL HAVE STANDARD CUT <br />WASHERS UNDER THE BOLT HEAD AND NUTS. NOT MORE THAN 24 HRS PRIOR TO COVERING THE BOLTS, <br />ALL BOLTS SHALL BE RETIGHTENED. <br />29. PROVIDE FULL HEIGHT SOLID BLOCKING AT THE ENDS OF THE SWAN LUMBERS JOISTS, BEAMS AND <br />RAFTERS ABOVE AND BELOW WALLS. INTERMEDIATE FULL BLOCKING OF THE SWAN LUMBERS SHALL NOT <br />BE SPACED MORE THAN 8 FT O.C. <br />30. PROVIDE ONE INTERMEDIATE AND END FULL HEIGHT SOLID BLOCKING ALONG THE JOISTS WITH <br />SPANS GREATER THAN 8 FT BUT LESS THAN 16 FT. THE INTERMEDIATE BLOCKING SHALL BE SPACED <br />MID-SPAN OF THE JOIST. <br />31. PROVIDE TWO INTERMEDIATE AND END FULL HEIGHT SOLID BLOCKING ALONG THE JOISTS WITH <br />SPANS GREATER THAN 16 FT BUT LESS THAN 24 FT. THE INTERMEDIATE BLOCKING SHALL BE SPACED 1/3 <br />OF THE SPAN FROM EACH END. <br />32. PROVIDE THREE INTERMEDIATE AND END FULL HEIGHT SOLID BLOCKING ALONG THE JOISTS WITH <br />SPANS GREATER THAN 24 FT. THE INTERMEDIATE BLOCKING SHALL BE SPACED NOT MORE THAN 8 FT <br />ALONG THE SPAN FROM EACH OTHER. <br />33. APPROVED METAL BRIDGING THAT HAVE CURRENT ICC ES EVALUATION MAY BE USED INSTEAD OF <br />SOLID BLOCKING FOR FULL HEIGHT INTERMEDIATE SUPPORTS. <br />34. DO NOT SUSPEND CEILINGS, SOFFITS, SPRINKLERS, PIPING, MECHANICAL DUCTS, NOR ANY OTHER <br />ELEMENT FROM 2X4 ROOF FRAMING UNLESS SPECIFICALLY DETAILED. <br />35. CUTTING, NOTCHING, AND BORING OF WOOD FRAMING MEMBERS SHALL BE IN ACCORDANCE WITH <br />CBC SECTION 2308.5.9. AND AS SHOWN ON THESE DRAWINGS. <br />36. FIRE-RETARDANT-TREATED WOOD IS ANY WOOD PRODUCT THAT, WHEN IMPREGNATED WITH <br />CHEMICALS BY A PRESSURE PROCESS OR OTHER MEANS DURING MANUFACTURE, SHALL HAVE, WHEN <br />TESTED IN ACCORDANCE WITH ASTM E84 OR UL 723, A LISTED FLAME SPREAD INDEX OF 25 OR LESS AND <br />SHOW NO EVIDENCE OF SIGNIFICANT PROGRESSIVE COMBUSTION WHEN THE TEST IS CONTINUED FOR <br />AN ADDITIONAL 20-MINUTE PERIOD. ADDITIONALLY, THE FLAME FRONT SHALL NOT PROGRESS MORE <br />THAN 10-1/2 FEET BEYOND THE CENTERLINE OF THE BURNERS AT ANY TIME DURING THE TEST. <br />37. SQUASH BLOCKS WITH THE SAME WIDTH SHALL BE PROVIDED UNDER ALL BEARING POINT LOADS <br />FROM ABOVE TO THE TOP OF THE TOP PLATES BELOW AT FLOOR LEVELS. <br />38. LATERAL BRACING OF WEB MEMBERS IN TRUSSES SHALL BE END ON AN EXTERIOR SHEAR/BRACING <br />WALL. <br />39. BLOCKING REQUIRED FOR LIGHT FEATURES, CABINETS, HANDRAILS, GUARDRAILS TOWEL BARS OR <br />OTHER LIGHT ATTACHMENTS ARE NOT SHOWN ON THESE DRAWINGS AND SHALL BE PROVIDED BY GC AS <br />REQUIRED BASED ON ARCHITECTURAL, AND MEP DRAWINGS. <br />40. FIREBLOCKS NOT SMALLER THAN 2 IN. NOMINAL SHALL BE PROVIDED TO CUT OFF ALL HORIZONTAL <br />AND VERTICAL DRAFTS BETWEEN TWO STORIES AND ROOF ATTIC SPACES. FIREBLOCKS SHALL BE <br />PROVIDED AT STUD WALLS AT FURRED SOFFITS, CEILING AND FLOOR LEVELS, . BETWEEN STAIR <br />STRINGERS AT TOP AND BOTTOM OF RUN AND BETWEEN STUDS IN A WALL PARALLEL AND ADJOINING <br />RUN OF STAIRS, AROUND TOP, BOTTOM, SIDES AND ENDS OF SLIDING POCKET DOOR. <br />41. FURRING SHALL BE PROVIDED TO ALIGN SHEAR WALLS WITH ALL OTHER WALLS. <br />42. BEARING WALLS SHALL BE SHEATHED ON NOT LESS THAN ONE SIDE OR BRIDGING SHALL BE <br />INSTALLED NOT GREATER THAN 4 FEET APART MEASURED VERTICALLY FROM EITHER END OF THE STUD. <br />2x BLK'G SHALL BE PROVIDED AT PLYWD JOINTS FOR ALL WALLS. <br />43. ALL STEEL CONNECTORS INCLUDING BOLTS, SCREWS AND NAILS USED IN EXTERIOR STRUCTURE OR <br />EXPOSED TO WEATHER SHALL BE STAINLESS STEEL OR HOT-DIP GALVANIZED. FASTENERS IN <br />PRESERVATIVE TREATED WOOD OR FIRE RETARDANT TREATED WOOD SHALL BE OF HOT DIPPED ZINC <br />COATED GALVANIZED STEEL OR STAINLESS STEEL. <br />ENGINEERED WOOD PRODUCTS <br />1. ALL STRUCTURAL GLUED-LAMINATED TIMBERS AND STRUCTURAL COMPOSITE LUMBERS AND ORIENTED <br />STRAND BOARDS SHALL HAVE A CURRENT ICC ES EVALUATION REPORT AND AS A MINIMUM SHALL <br />CONFORM TO REQUIREMENTS SPECIFIED IN TABLE FL-3 : <br />2. GLUED-LAMINATED TIMBERS SHALL BE MANUFACTURED AND IDENTIFIED AS REQUIRED IN AMERICAN <br />INSTITUTE OF TIMBER CONSTRUCTION, ANSI/AITC A 190.1 AND AMERICAN SOCIETY FOR TESTING AND <br />MATERIALS ASTM D3737. <br />3. STRUCTURAL GLUED LAMINATED TIMBER SHALL BE MADE OF 1-1/2 IN. DOUGLAS FIR LAMINATION <br />WITH 24-F COMBINATION AS SPECIFIED IN AMERICAN INSTITUTE OF TIMBER CONSTRUCTION (AITC). <br />4. UNLESS NOTED OTHERWISE, ALL GLUED LAMINATED TIMBERS SHALL BE GRADE INDUSTRIAL <br />BAR SIZE <br />NO. <br />YIELD STRENGTH OF STEEL <br />60,000 PSI (420 MPA) <br />SPLICE LENGTH OR <br />TENSION DEVELOPMENT <br />LENGTH (IN.) <br />LAP SPLICE LENGTH-TENSION <br />4 30 <br />5 38 <br />6 45 <br />TENSION DEVELOPMENT LENGTH FOR STRAIGHT BAR <br />4 23 <br />5 28 <br />6 34 <br />TENSION DEVELOPMENT LENGTH FOR: <br />A. 90° AND 180° STANDARD HOOKS WITH NOT LESS THAN 2 <br />1/2" OF SIDE COVER PERPENDICULAR TO PLANE OF HOOK. <br />B. 90° STANDARD HOOKS WITH NOT LESS THAN 2" OF <br />COVER ON THE BAR EXTENSION BEYOND THE HOOK. <br />4 9 <br />5 11 <br />6 13 <br />TENSION DEVELOPMENT LENGTH FOR BAR WITH 90° OR <br />180° STANDARD HOOK HAVING LESS COVER THAN <br />REQUIRED IN ITEMS A AND B. <br />4 12 <br />5 15 <br />6 18 <br />TABLE CAST-1. CONCRETE MINIMUM MECHANICAL PROPERTIES <br />LOCATION COMPRESSIVE <br />STRENGTH (PSI)TYPE <br />FOOTING 4,500 NORMAL WEIGHT (145 PCF) <br />SLAB-ON-GROUND 4,500 NORMAL WEIGHT (145 PCF) <br />ALL OTHER STRUCTURAL ELEMENTS 4,500 NORMAL WEIGHT (145 PCF) <br />TABLE FUND-1. SOIL PROPERTIES <br />PARAMETER VALUE UNIT <br />ALLOWABLE BEARING CAPACITY (D+L)1,500 PSF <br />FRICTION COEFFICIENT N/A <br />PASSIVE SOIL RESISTANCE N/A PCF <br />AT REST SOIL PRESSURE N/A PCF <br />ACTIVE SOIL PRESSURE N/A PCF <br />INCREMENTAL SEISMIC PRESSURE N/A PCF <br />1. ALL CONCRETE WORK SHALL CONFORM TO THE STANDARDS OF THE AMERICAN CONCRETE INSTITUTE, <br />ACI 301 “SPECIFICATION FOR STRUCTURAL CONCRETE” AND ALL APPLICABLE MODIFICATIONS AS NOTED <br />IN THE CONTRACT DOCUMENTS OR BY LOCAL AUTHORITIES. <br />2. CONCRETE SHALL ATTAIN THE FOLLOWING MINIMUM MECHANICAL PROPERTIES AT 28-DAY, UNLESS <br />NOTED OTHERWISE IN TABLE CAST-1. <br />3. UNLESS NOTED OTHERWISE IN GEOTECHNICAL REPORT OR CONTRACT DOCUMENTS, CONCRETE MIX <br />SHALL CONFORM TO THE REQUIREMENTS FOR CONCRETE ASSIGNED TO EXPOSURE CLASSES F1, S2, W0, <br />AND C1, AS DEFINED IN TABLE 19.3.1.1 OF ACI 318. <br />4. UNLESS NOTED OTHERWISE IN GEOTECHNICAL REPORT OR CONTRACT DOCUMENTS, PORTLAND <br />CEMENT FOR CONCRETE SHALL CONFORM TO ASTM C150 TYPE V. <br />5. UNLESS NOTED OTHERWISE IN CONTRACT DOCUMENTS, WATER CEMENT RATIO (W/cm) SHALL BE <br />BASED ON THE REQUIREMENTS FOR SPECIFIED EXPOSURES, AND IT SHALL NOT EXCEED 0.45. <br />6. DETERIORATED OR CONTAMINATED MATERIALS SHALL NOT BE USED IN CONCRETE PRODUCTION. <br />CONCRETE PRODUCTION INCLUDING EQUIPMENT USED TO MIX; BATCH AND DELIVERY SHALL CONFORM <br />TO ASTM C94 OR ASTM C685. <br />7. CONCRETE SHALL BE MOIST CURED FOR AT LEAST 7 DAYS OF PLACEMENT EXCEPT IF APPROVED <br />ACCELERATED CURING COMPOUND OR HIGH-SOLIDS CURING COMPOUND IS USED. <br />8. THE CONCRETE MAINTAINED AT A TEMPERATURE OF AT LEAST 50°F DURING THE CURING TIME BUT <br />NOT LESS THAN 7 DAYS. <br />9. UNLESS APPROVED BY ARCHITECT, NO CURING COMPOUNDS, SEALERS, HARDENERS, ETC., SHALL BE <br />ADDED TO OR APPLIED ON CONCRETE RECEIVING FINISHES. <br />10. AGGREGATE SHALL CONFORM TO ASTM C33 FOR NORMALWEIGHT CONCRETE. NORMALWEIGHT <br />CONCRETE SHALL HAVE A MINIMUM DRY UNIT WEIGHT OF 145 PCF. <br />11. MAXIMUM AGGREGATE SIZE FOR FOUNDATION CONCRETE SHALL BE 1-1/2 IN. MAXIMUM AGGREGATE <br />SIZE FOR OTHER MEMBERS SHALL BE 1 IN. BUT NOT LARGER THAN THE LEAST OF, ¾ THE MINIMUM <br />CLEAR SPACING BETWEEN REINFORCING STEEL BARS INCLUDING SPLICES AND 1/5 THE NARROWEST <br />DIMENSIONS BETWEEN SIDE OF THE FORMS. <br />12. FRESH CONCRETE SLUMP IN FLATWORK SHALL NOT BE MORE THAN 4 INCHES. <br />13. CONCRETE MIX SHALL BE BASED ON THE REQUIREMENTS STATED IN SECTION 4.2.3 OF ACI 301 FOR <br />TRIAL MIXTURE OR/AND FIELD EXPERIENCES. <br />14. UNLESS NOTED OTHERWISE, ALL PREVIOUSLY HARDENED CONCRETE AT CONSTRUCTION JOINT SHALL <br />BE CLEAN, FREE OF LAITANCE, AND INTENTIONALLY ROUGHENED TO FULL AMPLITUDE OF ¼ IN. PRIOR TO <br />FRESH CONCRETE PLACEMENT. <br />15. UNLESS APPROVED BY THE STRUCTURAL ENGINEER, CENTER TO CENTER SPACING OF THE PIPES AND <br />CONDUITS SHALL NOT BE LESS THAN 3 TIMES THE LARGEST DIAMETER OF PIPES OR CONDUITS, AND <br />CLEAR SPACING BETWEEN THE EMBEDMENTS SHALL NOT BE LESS THAN 4 IN. <br />16. EMBEDMENTS PARALLEL TO THE CONSTRUCTION JOINTS SHALL NOT BE PLACED CLOSER THAN <br />DEVELOPMENT LENGTH OF THE LARGER BAR CROSSING THE CONSTRUCTION JOINT. CROSSING OF THE <br />CONDUITS SHALL NOT BE PERMITTED. <br />17. PIPES AND CONDUITS SHALL BE PLACED IN THE MIDDLE THIRD OF THE SLAB, FOUNDATION, AND WALL <br />THICKNESS OR BEAM AND GIRDER SIDE DIMENSION. <br />18. SLEEVES SHALL BE PROVIDED FOR PLUMBING AND ELECTRICAL PENETRATIONS AND OPENINGS. <br />ALUMINUM EMBEDMENTS SHALL BE COATED OR COVERED. NO CONTACT BETWEEN ALUMINUM AND <br />CONCRETE OR ELECTROLYTIC ACTION BETWEEN ALUMINUM AND STEEL IS PERMITTED. <br />19. DO NOT DAMAGE REINFORCING STEEL. WHERE CONFLICT OCCURS BETWEEN REINFORCING STEEL AND <br />EMBEDMENTS OR SLEEVES LAYOUT, REPOSITION THE SLEEVES OR REINFORCING STEEL. UNLESS <br />APPROVED BY STRUCTURAL ENGINEER, CORING IS NOT PERMITTED. <br />20.CONCRETE SHALL BE PLACED IN ACCORDANCE WITH ACI 304. PROPERLY SECURE ALL REINFORCING <br />STEEL, EMBEDMENT PARTS, PIPES, CONDUITS, ANCHORS, AND OTHER CONCRETE EMBEDMENTS IN <br />POSITION, PRIOR TO PLACING CONCRETE. REMOVE DEBRIS AND CLEAN REINFORCING STEELS AND FORM <br />PRIOR TO PLACING CONCRETE. <br />21.KEYED CONSTRUCTION JOIST SHALL BE PROVIDED AS SHOWN ON THESE DRAWINGS. <br />22.FORMWORK DESIGN, CONSTRUCTION, AND REMOVAL SHALL BE IN ACCORDANCE WITH ACI 347 AND <br />ACI 347.2R. CONSTRUCTION LOADS MAY BE GREATER THAN THE SPECIFIED STRUCTURAL LIVE LOADS. <br />23.GROUT SHALL BE NON-METALLIC, NON-SHRINK AND SHALL ATTAIN A 28-DAY COMPRESSIVE STRENGTH <br />OF AT LEAST TWICE THE STRENGTH OF THE CONCRETE BEARING ON, BUT NOT LESS THAN 7,000 PSI. <br />GROUT SHALL NOT CONTAIN CHLORIDES. UNLESS APPROVED BY STRUCTURAL ENGINEER, GROUT <br />THICKNESS SHALL NOT BE LESS THAN 1 IN. INFORM STRUCTURAL ENGINEER FOR WRITTEN APPROVAL <br />WHERE GROUT WITH MORE THAN 1 1/2 IN. THICKNESS IS REQUIRED. <br />24. WHERE LEAN CONCRETE IS SPECIFIED ON THE DRAWINGS, LEAN CONCRETE SHALL CONTAIN A <br />MINIMUM OF 2 SACKS OF CEMENT PER CUBIC YARD ON CONCRETE. <br />25. ALUMINUM OR ALUMINUM ALLOY PIPES SHALL NOT BE USED FOR PUMPING AND DELIVERING FRESH <br />CONCRETE. <br />26.UNLESS NOTED OTHERWISE BY STRUCTURAL ENGINEER OR CONTRACT DOCUMENTS, AT LEAST TWO <br />6X12 IN. OR THREE 4X8 IN. CONCRETE SAMPLES SHALL BE MOLDED, FIELD-CURED, AND TESTED IN <br />ACCORDANCE WITH ASTM C31 AND ASTM C39. <br />27.CONCRETING IN HOT WEATHER AND COLD WEATHER SHALL BE IN ACCORDANCE WITH ACI 305.1 AND <br />ACI 306.1 AND ACI 301. ACI 301 SHALL BE CONSIDERED AS GOVERNING DOCUMENT UNLESS NOTE <br />OTHERWISE ON THE CONTRACT SPECIFICATIONS OR DOCUMENTS. <br />28.IF ANCHOR BOLTS ARE PLACED IN THE TOP OF A COLUMNS PILE OR PEDESTAL, THE BOLTS SHALL BE <br />ENCLOSED BY TRANSVERSE REINFORCEMENT THAT ALSO SURROUNDS AT LEAST FOUR LONGITUDINAL <br />BARS WITHIN THE PILE OR PEDESTAL. THE TRANSVERSE REINFORCEMENT SHALL BE DISTRIBUTED <br />WITHIN THE TOP 5 IN. OF THE COLUMN OR PEDESTAL AND SHALL CONSIST OF AT LEAST TWO NO. 4 OR <br />THREE NO. 3 BARS. <br />29. THE TESTING AGENCY PERFORMING ACCEPTANCE TESTING SHALL COMPLY WITH ASTM C1077. <br />CAST IN PLACE CONCRETE <br />FOUNDATIONS <br />1. NO GEOTECHNICAL REPORT WAS PROVIDED. THE DESIGN OF FOUNDATION IS BASED ON THE DEFAULT <br />VALUE PROVIDED IN FOUNDATION REQUIREMENTS FOR RESIDENTIAL PROJECTS AND ACCESSORY <br />STRUCTURES DATED 06/22/2020 BY THE COUNTY OF ORANGE DEPARTMENT OF PUBLIC WORKS. THE <br />DESIGN OF FOUNDATION IS ALSO BASED ON THE DEFAULT VALUES PROVIDED IN TABLE 1806.2 OF CBC <br />2022 FOR SOIL CLASS 5 (CL, ML, MH AND CH). SEE TABLE FUND-1 FOR THE DESIGN PARAMETERS <br />RECOMMENDED BY THE ABOVE REFERENCED DOCUMENT AND WERE CONSIDERED FOR THE FOUNDATION <br />DESIGN OF THIS PROJECT. A 33% INCREASE FOR BEARING CAPACITY WAS CONSIDERED FOR LOAD <br />COMBINATIONS INCLUDING WIND OR SEISMIC LOADS. <br />2. EXTERIOR & INTERIOR FOUNDATIONS SHALL BE CARRIED AT LEAST 24 IN. & 18 IN. INTO FIRM <br />UNDISTURBED NATURAL OR COMPACTED SOIL UNO ON THE PLANS OR DETAILS. <br />3. IF A GEOTECHNICAL ENGINEER IS HIRED BY THE OWNER, FOUNDATION, EARTHWORK, AND <br />EXCAVATION DRAWINGS SHALL BE SUBMITTED TO THE GEOTECHNICAL ENGINEER TO REVIEW AND <br />APPROVE FOR COMPLIANCE WITH THE GEOTECHNICAL ENGINEER'S RECOMMENDATIONS, PRIOR TO <br />SUBMITTING THE DRAWINGS TO THE CITY FOR PERMIT APPLICATION. <br />4. EXCAVATION AND STABILITY OF SLOPES ARE NOT PART OF THE DESIGN SCOPE, AND CONTRACTOR <br />SHALL REMAIN SOLELY RESPONSIBLE FOR ALL EXCAVATION PROCEDURES INCLUDING BUT NOT LIMITED <br />TO LAGGING, SHORING, RESHORING UNDERPINNING AND PROTECTION OF EXISTING CONSTRUCTION. <br />5. NO CONSTRUCTION, EXPANSION OR COLD JOINTS ARE PERMITTED IN THE FOUNDATIONS AND GRADE <br />BEAMS, UNLESS SPECIFICALLY SHOWN ON THESE DRAWINGS. <br />6. STANDING WATER SHALL BE REMOVED FROM THE FOUNDATION EXCAVATIONS PRIOR TO THE <br />CONCRETE PLACING. <br />7. NOTIFY THE OWNER'S REPRESENTATIVE, IF ANY BURIED CONSTRUCTIONS THAT ARE NOT INDICATED <br />ON THESE DRAWINGS ARE FOUND ON THE CONSTRUCTION SITE. UNLESS SPECIFICALLY SHOWN ON THESE <br />DRAWINGS, DO NOT DAMAGE ANY EXISTING BURIED STRUCTURES SUCH AS CESSPOOLS, CISTERNS, <br />FOUNDATIONS, ETC. <br />8. LOCATE ALL UTILITIES PRIOR TO COMMENCING THE WORK. EXISTING EMBEDDED OR SURFACE <br />UTILITIES SHALL BE PROTECTED TO REMAIN UNDAMAGED DURING AND AFTER CONSTRUCTION WORK. <br />9. UNLESS NOTED OTHERWISE, OR REQUIRED BY THE LOCAL AUTHORITIES, REMOVE ABANDONED <br />FOUNDATIONS, UTILITIES, PIPES, ETC. WHEREVER INTERFERE WITH THE NEW CONSTRUCTION OR <br />IMPOSE DANGERS. <br />10. UNLESS NOTED OTHERWISE ON CONTRACTUAL DOCUMENTS, OR REQUIRED BY THE LOCAL <br />AUTHORITIES, EXCAVATIONS FOR FOUNDATIONS MUST BE ACCEPTED BY THE APPROVED REPRESENTATIVE <br />OF GEOTECHNICAL ENGINEER OR INSPECTORS PRIOR TO PLACING REINFORCING AND CONCRETE. NOTIFY <br />THE GEOTECHNICAL ENGINEER WHEN EXCAVATIONS ARE READY FOR INSPECTION. <br />11. WHERE EXCAVATION IS CAPABLE OF MAINTAINING A VERTICAL CUT WITHOUT SLOUGHING, <br />FOUNDATIONS MAY BE CAST DIRECTLY AGAINST EXCAVATIONS PROVIDED. WHERE FOUNDATIONS ARE <br />CAST AGAINST EARTH, DIMENSIONS OF THE FOUNDATIONS SHALL BE ENLARGED BY AN ADDITIONAL ONE <br />INCH IN THE DIRECTION OF THE SIDE CAST AGAINST EARTH. <br />12. CONCRETE SHALL NOT BE PLACED ON FROZEN GRADE. FOUNDATIONS THAT MAY SUBJECT TO <br />FREEZING TEMPERATURES AFTER FOUNDATION CONSTRUCTION SHALL BE ADEQUATELY PROTECTED FROM <br />FREEZING. <br />13. ALL EARTHWORK INCLUDING BUT NOT LIMITED TO EXCAVATION, BACKFILL, AND COMPACTION SHALL <br />BE DONE IN STRICT ACCORDANCE WITH THE RECOMMENDATIONS STATED IN GEOTECHNICAL <br />INVESTIGATION REPORT OR THE REQUIREMENTS OF THE CITY OF THE PROJECT. <br />14. FOUNDATION EXCAVATION, BACKFILLING, AND COMPACTION SHALL BE OBSERVED AND APPROVED BY <br />THE GEOTECHNICAL ENGINEER OF RECORD, IF APPLICABLE, AND THE GOVERNING AGENCY PRIOR TO <br />PLACING REINFORCING STEEL AND CONCRETE. GEOTECHNICAL ENGINEER SHALL PROVIDE A LETTER OF <br />COMPLIANCE TO THE OWNER. <br />15. FOR SLOT-CUTTING METHOD OF EXCAVATION, PROVIDE SUPPORTING COMPUTATIONS BY A <br />REGISTERED GEOTECHNICAL ENGINEER AND A DRAWING SHOWING THE LOCATION OF SLOTS, THEIR <br />WIDTH AND SEQUENCE OF SLOT CUTS. SLOT CUT TO BE AT LEAST 36" AWAY FROM ANY PROPERTY LINES <br />AND NOT EXCEED 5 FEET IN DEPTH. <br />16. TEMPORARY CUT SLOPES SHALL NOT EXCEED RECOMMENDED DEPTH IN THE GEOTECHNICAL <br />INVESTIGATION REPORT. DO NOT PERMIT ANY PERSON TO DESCEND INTO TRENCHES OR EXCAVATIONS <br />GREATER THAN FIVE FEET IN DEPTH UNLESS NECESSARY PERMIT FROM STATE OF CALIFORNIA DIVISION <br />OF INDUSTRIAL SAFETY IS OBTAINED PRIOR TO ISSUANCE OF BUILDING OR GRADING PERMIT. <br />CONTRACTOR SHALL PROVIDE FOR DESIGN, PERMIT, AND INSTALLATION OF ALL SHORING AND <br />SHEATHING NECESSARY TO SAFELY RETAIN EARTH BANKS. <br />17. CONTRACTOR SHALL PROVIDE FOR DEWATERING OF EXCAVATIONS FROM SURFACE WATER, <br />GROUNDWATER OR SEEPAGE. DEWATERING SHALL EFFECTIVELY ELIMINATE ANY HYDROSTATIC PRESSURE <br />ON SHORING. ENSURE THAT CONTAMINATED WATER IS NOT DISPOSED OF IN PUBLIC SEWER OR STORM <br />DRAIN SYSTEM AND ENSURE THAT DIRTY WATER IS NOT DISPOSED OF INTO PUBLIC RIGHT-OF-WAY. <br />18. SIDEWALKS OR PAVING IMMEDIATELY ADJACENT TO BUILDING PERIMETER SHALL BE SLOPED TO <br />PROVIDE POSITIVE DRAINAGE AWAY FROM BUILDING. LANDSCAPE IRRIGATION IS NOT PERMITTED <br />WITHIN FIVE FEET OF BUILDING PERIMETER FOOTINGS EXCEPT WHEN ENCLOSED IN PROTECTED <br />PLANTERS THAT DIRECT DRAINAGE AWAY FROM STRUCTURE AND FOUNDATIONS. DISCHARGE FROM <br />DOWNSPOUTS, ROOF DRAINS, AND SCUPPERS IS NOT PERMITTED ONTO UNPROTECTED SOILS WITHIN <br />FIVE FEET OF BUILDING PERIMETER. <br />19. UNLESS ADEQUATELY BRACED AND SHORED, RETAINING WALLS SHALL NOT BE BACKFILLED UNTIL <br />WALLS HAVE ATTAINED FULL DESIGN STRENGTH. FOR PIT WALLS AND BUILDING WALLS BELOW GRADE, <br />BRACING AND SHORING SHALL REMAIN IN PLACE UNTIL ATTACHED FLOORS ARE PLACED, CURED FOR AT <br />LEAST 7 DAYS, AND HAVE ATTAINED 70% DESIGN STRENGTH. BACKFILL PLACED IMMEDIATELY BEHIND <br />RETAINING WALLS SHALL BE COMPACTED WITH HAND OPERATED EQUIPMENT. <br />20. WHERE THE STEEL COLUMNS ARE EXPOSED TO WEATHER, BASE PLATES AND COLUMNS UP TO 12" <br />ABOVE THE CONCRETE SLAB SHALL BE COATED WITH MIN. 2 COATS OF MACROPOXY 646. <br />23. ALL PERMANENT STEELS IN CONTACT WITH WEATHER SHALL BE PROTECTED FOR CORROSION. <br />TABLE WIND-1. WIND DESIGN DATA <br />CASE VALUE <br />BASIC WIND SPEED 95 MPH <br />IMPORTANCE FACTOR, Iw 1.0 <br />EXPOSURE CATEGORY B <br />ENCLOSURE CLASSIFICATION ENCLOSED BUILDING <br />INTERNAL PRESSURE COEFFICIENT, GCpi ±0.18 <br />WIND BASE SHEAR IN EAST- WEST DIRECTION 4 KIPS <br />WIND BASE SHEAR IN NORTH- SOUTH DIRECTION 3.4 KIPS <br />TABLE EQ-1. EARTHQUAKE DESIGN DATA <br />PARAMETER VALUE <br />SITE CLASS D-DEFAULT <br />IMPORTANCE FACTOR, IE 1.0 <br />MAPPED SPECTRAL RESPONSE ACCELERATION, SS 1.295 G <br />MAPPED SPECTRAL RESPONSE ACCELERATION, S1 0.462 G <br />SITE COEFFICIENT, FA 1.2 <br />SITE COEFFICIENT, FV 1.838 <br />DESIGN SPECTRAL RESPONSE COEFFICIENT, SDS 1.036 G <br />DESIGN SPECTRAL RESPONSE COEFFICIENT, SD1 0.566 G <br />SEISMIC DESIGN CATEGORY D <br />RESPONSE MODIFICATION COEFFICIENT (S) OF LIGHT- <br />FRAME (WOOD), R 6.5 <br />OVERSTRENGTH FACTOR (WOOD), Ω0 3 <br />DEFLECTION AMPLIFICATION FACTOR (WOOD), CD 4 <br />SEISMIC RESPONSE COEFFICIENT, CS 0.159 (LRFD) <br />SEISMIC BASE SHEAR OF LIGHT- FRAME (WOOD)2.97 KIPS <br />ANALYSIS PROCDURE ELF PROC. <br />RESPONSE MODIFICATION COEFFICIENT (S) OF OMF <br />(STEEL), R <br />N/A <br />OVERSTRENGTH FACTOR (STEEL), Ω0 N/A <br />DEFLECTION AMPLIFICATION FACTOR (STEEL), CD N/A <br />SEISMIC RESPONSE COEFFICIENT, CS N/A <br />SEISMIC BASE SHEAR OF OMF (STEEL) N/A <br />ANALYSIS PROCDURE N/A <br />TABLE LL-1. MINIMUM LIVE LOAD <br />RESIDENTIAL AREAS VALUE <br />PRIVATE ROOMS AND CORRIDORS SERVING THEM 40 PSF <br />PUBLIC ROOMS 100 PSF <br />CORRIDORS SERVING PUBLIC ROOMS 100 PSF <br />UNINHABITABLE ATTICS WITHOUT STORAGE 10 PSF <br />UNINHABITABLE ATTICS WITH STORAGE 20 PSF <br />HABITABLE ATTICS AND SLEEPING AREAS 30 PSF <br />ALL OTHER AREAS 40 PSF <br />BALCONIES AND DECKS <br />1.5 TIMES THE LIVE LOAD FOR THE AREA <br />SERVED. NOT REQUIRED TO EXCEED 100 <br />PSF <br />ROOFS <br />ORDINARY FLAT, PITCHED, AND CURVED ROOFS 20 PSF <br />ROOF AREAS USED FOR OCCUPANTS SAME AS OCCUPANCY SERVED <br />ROOF AREAS USED FOR ASSEMBLY PURPOSES 100 PSF <br />1. SAZAN'S SCOPE OF WORK IS LIMITED TO PROVIDING STRUCTURAL DRAWINGS FOR THE DEMOLISHING <br />AND REBUILDING THE EXISTING GARAGE LIKE FOR LIKE, LOCATED AT 1011 W 2ND ST, SANTA ANA, CA <br />92703. <br />2. THE SCOPE OF WORK DOES NOT INCLUDE THE ANALYSIS OR EVALUATIONS OF EXISTING STRUCTURE <br />AS A WHOLE OR THE PORTIONS OF IT THAT IS NOT INCLUDED IN THIS SCOPE OF WORK FOR LATERAL <br />AND GRAVITY LOADS. NO WARRANTY EXPRESSED OR IMPLIED TO THE ADEQUACY, CODE COMPLIANCE, OR <br />CONFORMANCE OF THE EXISTING STRUCTURE IS MADE BY VIRTUE OF THIS DESIGN. THIS SCOPE OF <br />WORK DOES NOT INCLUDE ANY VERIFICATION FOR THE CONFORMANCE OF THE EXISTING STRUCTURE TO <br />THE PROVIDED DOCUMENTS OR CODE COMPLIANCE. <br />3. SAZAN PERFORMED THE DESIGN CONSIDERING THE AVAILABLE INFORMATION FOR THE STRUCTURE. <br />SHOULD ADDITIONAL INFORMATION BECOME AVAILABLE THAT SAZAN WAS NOT AWARE OF, OR WHICH <br />WAS UNKNOWN AT THE TIME OF ANALYSIS OR DESIGN, SAZAN RESERVES THE RIGHT TO REVISE THE <br />DESIGN AS NEEDED AND ADDITIONAL COSTS MAY BE REQUIRED. <br />4. SAZAN PERFORMED THE STRUCTURAL DESIGN IN A MANNER CONSISTENT WITH THE LEVEL OF SKILL <br />AND CARE ORDINARILY EXERCISED BY PROFESSIONAL ENGINEERS AND CONSULTANTS PRACTICING UNDER <br />SIMILAR CONDITIONS. NO OTHER REPRESENTATION, WARRANTY, OR GUARANTEE IS GIVEN. PROVIDED <br />OPINIONS ARE BASED ON OUR ENGINEERING JUDGMENT. SAZAN WILL NOT BE RESPONSIBLE FOR LATENT <br />DEFECTS THAT MAY APPEAR IN THE FUTURE OR FOR DIFFERENT OPINIONS OF OTHERS THAT MAY ARISE. <br />5. THE CLIENT IS SOLELY RESPONSIBLE FOR THE ACCURACY OF THE PROVIDED INFORMATION, AND <br />STRUCTURAL ENGINEER DISCLAIMS ANY LIABILITIES FOR DISCREPANCIES BETWEEN THE DOCUMENTS <br />THEMSELVES OR PROVIDED INFORMATION AND FIELD CONDITIONS. <br />6. STRUCTURAL OBSERVATION AND SPECIAL INSPECTIONS ARE NOT INCLUDED IN THIS SCOPE OF WORK. <br />7. ALL WORK SHALL BE INACCORDANCE WITH THE 2022 EDITION OF CALIFORNIA BUILDING CODE (CBC), <br />CALIFORNIA RESIDENTIAL CODE (CRC), AND ALL AMENDMENTS OF THE CITY OF THE PROJECT LOCATION <br />AND LOCAL AUTHORITIES INCLUDING LOCAL ORDINANCE. <br />8. ALL WORK SHALL BE PERFORMED IN ACCORDANCE WITH THE STANDARDS FOR THE OCCUPATIONAL <br />SAFETY AND HEALTH ADMINISTRATION (OSHA) OF PROJECT STATE AND ALL APPLICABLE LOCAL CODES <br />AND ORDINANCES. CONTRACTOR REMAINS SOLELY RESPONSIBLE FOR THE SAFTEY OF PERSONEL AND <br />JOBSITE OF THIS CONTRACT DURING THE CONSTRUCTION. ENGINEER AND THE OWNER SHALL REMAIN <br />HARMLESS FROM ANY AND ALL LIABILITIES OF THE CONSTRUCTION WORK. <br />9. THE JURISDICTION PERMIT SET SHALL NOT BE USED FOR ANY CONSTRUCTION OR COMMENCING THE <br />WORK PRIOR TO ACQUIRING THE JURISDICTION’S PERMIT. SAZAN SHALL HAVE NO LIABILITY OR <br />RESPONSIBILITY FOR THE SAFETY, AND/OR COSTS OF ANY CONSTRUCTION THAT IS PERFORMED PRIOR <br />TO ACQUIRING THE JURISDICTION’S PERMIT. FAILURE TO OBTAIN A BUILDING PERMIT IS A VIOLATION OF <br />CONTRACTORS LICENSE LAW. CONSTRUCTION PERFORMED WITHOUT A PERMIT CAN EXPOSE A <br />HOMEOWNER TO ADDITIONAL LIABILITY AND COSTS. <br />10. CONSTRUCTION DOCUMENTS IDENTIFIED AS BID SET OR ISSUED FOR PERMIT ON ANY OR ALL SHEETS <br />ARE SUBJECTED TO REVIEW AND APPROVAL BY BUILDING OFFICIALS. THIS REVIEW MAY RESULT CHANGES <br />TO THE DOCUMENTS. DRAWING SETS/SHEETS THAT ARE NOT APPROVED BY BUILDING OFFICIALS SHALL <br />NOT BE USED FOR ANY CONSTRUCTION OR COMMENCING ANY PREPARATION WORK. THESE DOCUMENTS <br />ARE NOT CONSTRUED AS BEING THE COMPLETED OR FINAL CONSTRUCTION DOCUMENTS AND THEY <br />SHALL NOT IN ANY WAY BE USED AS SUCH. <br />11. DESIGN OF HANDRAILS AND GUARDRAILS ARE NOT INCLUDED WITH THIS SCOPE OF WORK. <br />12. ALL GUARDRAILS AND HANDRAILS SHALL BE DESIGNED TO WITHSTAND A LATERAL POINT LOAD OF 200 <br />POUNDS APPLIED HORIZONTALLY AT RIGHT ANGLES, AT ANY POINT TO TOP RAIL. A 50 PLF LOAD IS <br />REQUIRED AT 3-STORY AND MULTI-FAMILY. <br />13. THESE DRAWINGS ARE PROVIDED SPECIFICALLY FOR THE PROJECT LISTED ON THE TITLE BLOCK AND <br />ANY REUSE OR REPRODUCE OF THE DRAWINGS AND DETAILS AS A WHOLE, OR A PART ARE STRICTLY <br />PROHIBITED UNLESS A WRITTEN APPROVAL FROM THE ENGINEER IS ISSUED. <br />14. CONTRACTOR SHALL COORDINATE FOR ALL INSPECTIONS AND SPECIAL INSPECTIONS THAT ARE <br />REQUIRED BY LOCAL AUTHORITIES FOR THE WORK. ALL REPORTS SHALL BE SUBMITTED TO THE OWNER <br />AND ENGINEERS PRIOR TO THE CONCLUDING OF THE WORK. ALL REPORTED DEFICIENCIES IDENTIFIED BY <br />THE STRUCTURAL OBSERVER SHALL BE REPAIRED AT NO COSTS TO THE OWNER OR ENGINEERS PRIOR TO <br />CONCLUSION OF WORK. <br />15. ALL DIMENSIONS SHALL BE VERIFIED IN FIELD PRIOR TO COMMENCEMENT OF WORK. ANY <br />DISCREPANCIES BETWEEN THE DIMENSION SHOWN ON THESE DRAWINGS AND CIVIL DRAWINGS, <br />ARCHITECTURAL DRAWINGS OR FIELD CONDITIONS SHALL BE REPORTED TO THE ENGINEER. ALL <br />OPENINGS' LAYOUT, EMBEDMENTS, SLEEVES, AND PENETRATIONS FOR ARCHITECTURAL, MECHANICAL, <br />AND ELECTRICAL ATTACHMENTS SHALL BE VERIFIED PRIOR TO PERFORMING THE WORK. NO WORK SHALL <br />BE PERFORMED UNTIL THE DISCREPANCIES ARE RESOLVED. <br />16. REVIEW ALL CONTRACT DOCUMENTS FOR THE SCOPE OF WORK AND CONTRACTOR MINIMUM <br />RESPONSIBILITIES. PROJECT DOCUMENTS INCLUDE INFORMATION REQUIRED TO CONVEY THE DESIGN <br />INTENT. NOTIFY THE ENGINEER PRIOR TO COMMENCING OF THE WORK, IF ANY CLARIFICATIONS OF THE <br />DESIGN ARE NEEDED. <br />17. THE DRAWINGS SHALL NOT BE SCALED. SPECIFIC DIMENSIONS SHOWN ON THE DRAWINGS, TAKE <br />PRECEDENCE OVER THE SCALED DRAWINGS. <br />18. CONTRACTOR SHALL SCHEDULING SEQUENCE OF ALL WORK AND SUBCONTRACTORS' PLANS AND <br />COORDINATE ALL WORK AND MAINTAIN CLEAN PATHS FOR ALL CODE REQUIRED EXITS AT ALL THE <br />PHASES OF CONSTRUCTION. THE SCHEDULE SHALL BE APPROVED BY THE OWNER AND <br />ARCHITECT-ENGINEER OF THE RECORD PRIOR TO COMMENCING THE WORK. <br />19. APPROVAL BY THE INSPECTOR DOES NOT MEAN APPROVAL OR ALLOWABLE FAILURE TO COMPLY WITH <br />THE PLANS AND SPECIFICATIONS. ANY DESIGN WHICH FAILS TO BE CLEAR OR IS AMBIGUOUS MUST BE <br />REFERRED TO THE DESIGNER OR ENGINEER FOR INTERPRETATION OR CLARIFICATION. <br />20. VIBRATION EFFECTS OF MECHANICAL EQUIPMENT HAVE NOT BEEN CONSIDERED BY SEOR. <br />21.DRAWINGS INDICATE GENERAL AND TYPICAL DETAILS OF CONSTRUCTION. WHERE INSTRUCTIONS OR <br />REQUIREMENTS OF REGULATORY AGENCIES IS TO THE LATEST PRINTED EDITION OF EACH IN EFFECT AT <br />THE DATE OF SUBMISSION OF BID UNLESS THE DOCUMENT DATE IS SHOWN. DETAILS ON SHEETS TITLED <br />“TYPICAL DETAILS” APPLY TO SITUATIONS OCCURRING ON THE PROJECT THAT ARE THE SAME OR SIMILAR <br />TO THOSE SPECIFICALLY REFERENCED. SUCH DETAILS ARE NOT NOTED AT EACH LOCATION THAT THEY <br />OCCUR. <br />22. TYPICAL AND SIMILAR DETAILS SHALL BE CONSIDERED WHERE THE CONDITIONS ARE NOT <br />SPECIFICALLY DETAILED. RESPONSIBILITIES OF THE CONTRACTOR INCLUDE UNDERSTANDING THE <br />EXTENT OF THE TYPICAL DETAILS AND THEIR APPLICATION PRIOR TO PERFORMING WORK. <br />23.SPECIFIC NOTES AND DETAILS ON DRAWINGS TAKE PRECEDENCE OVER GENERAL NOTES AND TYPICAL <br />DETAILS. IF CONFLICT OCCURS BETWEEN THE CONTRACT DRAWINGS AND THE PROJECT MANUAL, <br />IMMEDIATELY NOTIFY ARCHITECT AND STRUCTURAL ENGINEER FOR RESOLUTION. NO WORK SHALL BE <br />PERFORMED IN THE AREA OF QUESTION TILL THE CONFLICT IS RESOLVED. <br />24. THE STABILITY, AND INTEGRITY OF THE STRUCTURE ARE VERIFIED AS A WHOLE. PROJECT <br />DOCUMENTS DO NOT INDICATE MEANS AND METHODS OF THE CONSTRUCTION. CONTRACTOR SHALL <br />TAKE REQUIRED MEASURES TO ENSURE THE STABILITY AND INTEGRITY OF THE STRUCTURE <br />CONSIDERING ALL FIELD CONDITIONS. NEW COMPONENTS THAT ARE ADDED FOR STABILITY AND ARE <br />NOT PART OF THE FINAL CONSTRUCTION SHALL BE REMOVED PRIOR TO CONCLUDING THE WORK. <br />25.DURIG THE CONSTRUCTION, ALL TEMPORARY BRACING ELEMENTS REQUIRED TO RESIST WIND, <br />SEISMIC, SOIL PRESSURE OR OTHER LATERAL LOADS, SHALL BE MAINTAINED UNTIL THE MAIN LATERAL <br />FORCE RESISTING SYSTEMS OF THE BUILDING AND THEIR CONNECTIONS ARE COMPLETED. PROJECT <br />OBSERVATION PROGRAMS AND VISITS PERFORMED BY ENGINEERS AND INSPECTORS SHALL NOT BE <br />CONSIDERED AS APPROVAL OF CONSTRUCTION MEANS AND METHODS. STRUCTURAL OBSERVATIONS DO <br />NOT CONSTITUTE QUALITY CONTROL, DO NOT GUARANTEE CONTRACTOR'S PERFORMANCE, AND SHALL <br />NOT BE CONSIDERED AS SUPERVISION OF CONSTRUCTION. <br />26.CONTRACTOR IS SOLELY RESPONSIBLE FOR PROTECTION OF ALL STRUCTURAL, NONSTRUCTURAL, <br />ARCHITECTURAL, FINISHING, ELECTRICAL AND MECHANICAL COMPONENTS WHICH ARE NOT DESIGNATED <br />FOR DEMOLITION OR NEW CONSTRUCTION. ANY DAMAGES CAUSED BY THE CONTRACTOR OR <br />SUBCONTRACTORS SHALL BE REPAIRED BY THE CONTRACTOR AT NO COSTS TO THE OWNER. <br />27. ALL MODIFICATIONS AND SUBSTITUTIONS SHALL BE SUBMITTED FOR APPROVAL. <br />28. THE CONTRACTOR SHALL VERIFY EXISTING CONCEALED AND VISIBLE CONDITIONS AND SHALL MAKE <br />NECESSARY ADJUSTMENTS TO THE SYSTEMS AND COSTS DUE TO ACTUAL FIELD CONDITIONS. UNLESS <br />SPECIFICALLY APPROVED BY THE OWNER, ARCHITECT AND STRUCTURAL ENGINEER OF THE RECORD, <br />AFTER AWARDING THE PROJECT, NO ADDITIONAL COSTS TO THE OWNER OR ENGINEER ARE ACCEPTED <br />DUE TO FIELD CONDITIONS. <br />29.STRUCTURAL DESIGN CAPACITIES PROVIDED ON THESE DRAWINGS ARE APPLICABLE AFTER THE ALL <br />ELEMENTS AND THEIR CONNECTIONS ARE CONSTRUCTED AND FULLY CURED. WHERE CONSTRUCTION <br />MATERIALS ARE PLACED ON CONSTRUCTED FLOORS AND ROOFS, MATERIALS SHALL BE DISTRIBUTED <br />SUCH THAT THE DESIGN LIVE LOAD PER SQUARE FOOT IS NOT EXCEEDED AT ANY LOCATIONS. <br />30.EQUIPMENT ANCHORAGE TO THE STRUCTURE SHALL BE PROVIDED BY MANUFACTURER IN <br />ACCORDANCE WITH STATE AND CITY CODES. <br />31.BRACING SYSTEMS USED FOR ATTACHMENTS SHALL HAVE CURRENT APPROVAL DOCUMENTS AND <br />EVALUATION REPORT, WHICH CONFORM TO THE GOVERNING CODE, AND AUTHORITY REQUIREMENTS. <br />32.SUSPENDED EQUIPMENT SHALL BE SECURED WITH APPROVED LATERAL BRACING SYSTEM HAVING <br />CURRENT APPROVAL DOCUMENTS AND EVALUATION REPORT. <br />33.UNLESS NOTES OTHERWISE, LOADS FROM ELECTRICAL, MECHANICAL, AND PLUMBING ATTACHMENTS <br />SHALL BE SUPPORTED BY STRUCTURAL BEAMS. <br />34.INSTALL ALL MATERIALS AND PRODUCTS SPECIFIED OR SHOWN IN THESE DRAWINGS IN STRICT <br />CONFORMANCE WITH THE MANUFACTURER'S WRITTEN RECOMMENDATIONS. <br />35.REFER TO ARCHITECTURAL DRAWINGS FOR DIMENSIONS NOT SHOWN ON STRUCTURAL DRAWINGS <br />LAYOUT OF DOOR AND WINDOW OPENINGS IN STRUCTURAL WALLS, LOCATION AND EXTENT OF <br />EXTERIOR WALL SYSTEM, LOCATION AND EXTENT OF NON-BEARING CMU WALLS AND LAYOUT OF <br />OPENINGS THEREIN, LAYOUT OF SLOPES, CONCRETE CURBS, DEPRESSIONS, CHANGES IN LEVEL, <br />CHAMFERS AND REVEALS, INSERTS FOR FINISH SYSTEMS, LAYOUT OF OPENINGS IN FLOORS AND ROOF <br />AND SLAB EDGES,FRAMING, LAYOUT AND DETAILS STAIR SIZE AND LOCATION. <br />36.REFER TO ELECTRICAL, MECHANICAL, PLUMBING DRAWINGS FOR LOCATION AND SIZE OF PIPE <br />SLEEVES, TRENCHES, AND OPENINGS THROUGH WALLS AND SLABS FOR DUCTWORK, LAYOUT, LOCATIONS <br />AND EXTENT OF ANCHORAGE OF PIPING, ELECTRICAL CONDUITS AND DUCTWORK, TO STRUCTURE, <br />LAYOUT, LOCATIONS, AND EXTENT OF EQUIPMENT ANCHORAGE TO STRUCTURE, EQUIPMENT PADS, AND <br />REQUIREMENT WEIGHTS, LAYOUT, LOCATIONS, AND EXTENT OF ELECTRICAL CONDUITS, OUTLETS, AND <br />BOXES IN CONCRETE SLABS AND WALLS. <br />37.UNLESS APPROVED BY THE ENGINEER, NO OPENING, HOLES, CUTS OR DISCONTINUITIES NOT SHOWN <br />ON THE STRUCTURAL DRAWINGS AND EXTENDING INTO OR THROUGH STRUCTURAL ELEMENTS SHALL BE <br />PERMITTED. ADDITIONAL DETAILING MAY BE REQUIRED AT THESE LOCATIONS. <br />38. ANY MODIFICATION TO THESE DRAWINGS OR DETAILS WITHOUT A WRITTEN APPROVAL FROM THE <br />ENGINEER SHALL VOID THE ENGINEER’S RESPONSIBILITY FOR THE WHOLE STRUCTURE. IF ANY <br />MODIFICATIONS ARE REQUIRED, IT SHALL BE REPORTED TO THE ENGINEER AND SHALL BE APPROVED <br />PRIOR TO PERFORMING THE WORK. <br />39.DESIGN DATA <br />DESIGN OF THE STRUCTURE IS IN ACCORDANCE WITH THE CALIFORNIA BUILDING CODE, 2022. <br />UNLESS NOTED OTHERWISE ON THE DRAWINGS, THE DESIGN LOADS ARE AS TABLE LL-1. <br />RESIDENTIAL AREAS <br />RISK CATEGORY = II <br />CODE LEVEL WIND DESIGN DATA ARE AS TABLE WIND-1. <br />CODE LEVEL EARTHQUAKE DESIGN DATA ARE AS TABLE EQ-1. <br />GENERAL NOTES <br />1 1/2" <br />LAP SPLICE LENGTH <br />db <br />GA <br />P <br /> <br />S <br />H <br />A <br />L <br />L <br /> <br />N <br />O <br />T <br /> <br />E <br />X <br />C <br />E <br />E <br />D <br />TH <br />E <br /> <br />S <br />M <br />A <br />L <br />L <br />E <br />R <br /> <br />O <br />F <br /> <br />1 <br />/ <br />2 <br />LA <br />P <br /> <br />L <br />E <br />N <br />G <br />T <br />H <br /> <br />A <br />N <br />D <br /> <br />6 <br />" <br />REINFORCEMENT AS REQD.CONCRETE <br />NOTE: <br />BARS ARE REPMITTED TO BE IN CONTACT WITH EACH OTHER <br />DE <br />V <br />E <br />L <br />O <br />P <br />M <br />E <br />N <br />T <br /> <br />L <br />E <br />N <br />G <br />T <br />H <br />PE <br />R <br /> <br />T <br />A <br />B <br />L <br />E <br />SURFACE OF CONCRETE OR <br />SECTION FROM WHICH <br />DEVELOPMENT LENGTH IS <br />MEASURED <br />CO <br />V <br />E <br />R <br /> <br />O <br />N <br /> <br />B <br />A <br />R <br /> <br />E <br />X <br />T <br />E <br />N <br />T <br />I <br />O <br />N <br />FO <br />R <br /> <br />9 <br />0 <br />° <br /> <br />H <br />O <br />O <br />K <br />A <br />SECTION A <br />SIDE COVER <br />FOR 90° AND <br />180° HOOK <br />DEVELOPMENT LENGTH AND COVER FOR HOOKS AND BAR EXTENSION <br />90° HOOK <br />db <br />12 <br /> <br />d <br />b <br />EX <br />T <br />E <br />N <br />S <br />I <br />O <br />N <br />6d <br />b B <br />E <br />N <br />D <br />DI <br />A <br />. <br />180° HOOK <br />db <br />6d <br />b B <br />E <br />N <br />D <br />DI <br />A <br />. <br />2 1/2", BUT NOT <br />LESS THAN 4db EXTENSION <br />HOOKS FOR REINFORCEMENT <br />IN WALLS AND FOUNDATIONS <br />90° HOOK <br />db <br />12 <br /> <br />d <br />b <br />EX <br />T <br />E <br />N <br />S <br />I <br />O <br />N <br />4d <br />b B <br />E <br />N <br />D <br />DI <br />A <br />. <br />135° HOOK <br />db <br />4d <br />b B <br />E <br />N <br />D <br />DI <br />A <br />. <br />6db <br />EXTEN <br />S <br />I <br />O <br />N <br />HOOKS FOR STIRRUPS IN <br />LINTELS <br />FIGURE STANDARD HOOKS <br />FRAMING LUMBER AND ENGINEERED WOOD PRODUCT <br />TABLE CONCOV-1. CONCRETE COVERAGE <br />LOCATION VALUE <br />CONCRETE CAST AGAINST AND PERMANENTLY EXPOSED TO <br />EARTH <br />3" <br />CONCRETE EXPOSED TO EARTH OR WEATHER: <br />NO. 6 THROUGH NO. 18 BARS <br />NO. 5 BARS, W31 OR D31 WIRE, AND SMALLER <br />2" <br />1 1/2" <br />CONCRETE NOT EXPOSED WEATHER OR IN CONTACT WITH <br />GROUND: <br /> SLAB, WALL, JOIST: <br /> NO. 14 AND NO. 18 BARS <br /> NO. 11 BARS AND SMALLER (*) <br /> BEAMS AND COLUMNS: <br /> PRIMARY REINFORCEMENT, TIES, STIRRUPS, SPIRALS <br /> SLAB-ON-GRADE <br />1 1/2" <br />1" <br />1 1/2" <br />AT ONE-THIRD OF THE SLAB THICKNESS <br />FROM THE TOP SIDE <br />(*) CONCRETE COVER FOR THESE MEMBERS MAY NOT BE ADEQUATE FOR 2 HOURS OF FIRE RATING <br />PROJECT <br />CLIENT <br />0' 2' 4' 8' 16' <br />SHEET TITLE <br />1011 W 2ND ST, SANTA ANA, <br />CA 92703 <br />JUAN GARSIA <br />SAZAN INC. <br />2610 Vista Del Oro, Newport Beach, CA 92660 <br />S0.01 <br />CONSTRUCTION NOTES <br />DATE. 12/21/2023 <br />EXP. 06-30-2024 <br />   <br /> <br />  <br /><br />  <br />1011 W Second St <br />5/1/2025