Laserfiche WebLink
APPEARANCE GRADE WITH MOISTURE CONTENT BETWEEN 7-14 PERCENT. <br />5. ALL FABRICATIONS SHALL BE IN ACCORDANCE WITH AITC A190 AND PERFORMED WITH A CERTIFIED <br />FABRICATOR AS PER AITC. <br />6. GLUED-LAMINATED TIMBERS SHALL HAVE INSPECTION CERTIFICATE AT NO COST TO THE OWNER, OR <br />ENGINEER. A COPY OF THE INSPECTION CERTIFICATE SHALL BE SUBMITTED TO THE BUILDING OFFICIALS, <br />AEOR AND SEOR. <br />7. UNLESS NOTED OTHERWISE, GLUE LAMINATED TIMERS SHALL NOT HAVE ANY CAMBERS. <br />8. ENGINEERED STRUCTURAL MEMBERS SHALL NOT BE NOTCHED, DRILLED, OR ALTERED EXCEPT AS <br />PERMITTED BY THE MANUFACTURER'S WRITTEN RECOMMENDATIONS AND AS SPECIFICALLY SHOWN ON <br />THESE DRAWINGS, WHICHEVER IS MORE STRICTER. <br />TABLE FL-2. NAIL PROPERTIES SCHEDULE <br />DESIGNATION LENGTH (IN.) WIRE DIAMETER (IN.) HEAD DIAMETER (IN.) <br />6d 2 0.113 0.266 <br />8d 2-1/2 0.131 0.281 <br />10d 3 0.148 0.312 <br />12d 3-1/4 0.148 0.312 <br />16d 3-1/2 0.162 0.344 <br />20d 4 0.192 0.406 <br />30d 4-1/2 0.207 0.438 <br />40d 5 0.225 0.469 <br />50d 5-1/2 0.244 0.5 <br />60d 6 0.263 0.531 <br />TABLE FL-3. STRUCTURAL GLUED-LAMINATED TIMBERS AND STRUCTURAL COMPOSITE LUMBER <br />MEMBER Fb (PSI)Fv (PSI)E (x106 PSI) <br />PSL (2.2E)PARALLAM 2900 290 2.2 <br />LVL (2.0E)MICROLLAM LVL 2900 285 2.0 <br />GLB 24F-V4 DF/DF GLB 2400 265 1.8 <br />LSL TIMBERSTRAND 2325 310 1.55 <br />TABLE FL-1. REQUIRED GRADE FOR STRUCTURAL WOOD MEMBERS: ALL STRUCTURAL WOOD <br />MEMBERS SHALL BE DOUGLAS FIR-LARCH CONFORMING TO THE REQUIREMENTS OF WWPA OR <br />WCLIB UNLESSE NOTE OTHERWISE ON THESE DRAWINGS <br />JOIST <br />2x8 & LARGER NO.2 OR BETTER <br />3x NO.1 <br />STUD <br />2x4 NO.2 OR BETTER <br />2x6 NO.2 OR BETTER <br />PLATE <br />2x OR 3X NO.2 OR BETTER <br />POST <br />4x10 & SMALLER NO.2 <br />4x12 & LARGER NO.1 <br />6x & 8x NO.1 <br />BEAM & STRINGERS & HDR <br />4x10 & SMALLER NO.2 <br />4x12 & LARGER NO.1 <br />6x & 8x NO.1 <br />1. STRUCTURAL OBSERVATION IS REQUIRED FOR THIS PROJECT IN ACCORDANCE WITH SECTION 1704.6 <br />OF THE CBC 2022. STRUCTURAL OBSERVATION IS THE VISUAL OBSERVATION OF THE STRUCTURAL <br />SYSTEM BY A LICENSED DESIGN PROFESSIONAL FOR GENERAL CONFORMANCE TO THE APPROVED <br />CONSTRUCTION DOCUMENTS. <br />2. STRUCTURAL OBSERVATIONS DO NOT CONSTITUTE QUALITY CONTROL, DO NOT GUARANTEE <br />CONTRACTOR'S PERFORMANCE, AND SHALL NOT BE CONSIDERED AS SUPERVISION OF <br />CONSTRUCTION. <br />3. THE OWNER OR QWNER'S REPRESENTATIVE SHALL COORDINATE AND CALL FOR A MEETING BETWEEN <br />THE ENGINEER OR ARCHITECT RESPONSIBLE FOR THE STRUCTURAL DESIGN, STRUCTURAL <br />OBSERVER, CONTRACTOR, AFFECTED SUBCONTRACTORS AND DEPUTY INSPECTORS. THE PURPOSE OF <br />THE MEETING SHALL BE TO IDENTIFY THE MAJOR STRUCTURAL ELEMENTS AND CONNECTIONS THAT <br />AFFECT THE VERTICAL AND LATERAL LOAD SYSTEMS OF THE STRUCTURE AND TO REVIEW <br />SCHEDULING OF THE REQUIRED OBSERVATIONS. <br />4. STRUCTURAL OBSERVATION DOES NOT WAIVE THE RESPONSIBILITY FOR THE REQUIRED <br />INSPECTIONS BY THE CITY OF LEMON GROVE. <br />5. THE OWNER SHALL EMPLOY A LICENSED DESIGN PROFESSIONAL TO PERFORM STRUCTURAL <br />OBSERVATION SITE VISITS, AND TO ISSUE ALL STRUCTURAL OBSERVATION REPORTS. <br />6. THE STRUCTURAL OBSERVER SHALL PREPARE A STRUCTURAL OBSERVATION REPORT FOR EACH <br />STAGE OF CONSTRUCTION OBSERVED. THE CITY OF LEMON GROVE STRUCTURAL OBSERVATION <br />REPORT” FORM, OR A SIMILARLY FORMATTED REPORT, SHALL BE USED FOR ALL STRUCTURAL <br />OBSERVATION REPORT. <br />7. IF THE CITY’S FORM IS NOT USED, REPORTS SHALL BE ON STRUCTURAL OBSERVER’S LETTERHEAD, <br />STATE SITE ADDRESS, PLAN CHECK & PERMIT NUMBERS, STAGES & ELEMENTS OBSERVED, DATE <br />OBSERVED, & COMPLETE CONTACT INFORMATION FOR STRUCTURAL OBSERVER. <br />8. ALL STRUCTURAL OBSERVATION REPORTS, REGARDLESS OF FORM USED, SHALL INCLUDE THE <br />LICENSE STAMP & SIGNATURE OF THE STRUCTURAL OBSERVER RESPONSIBLE FOR THE PROJECT. <br />9. EACH STRUCTURAL OBSERVATION REPORT SHALL BE GIVEN TO THE OWNER OR OWNER’S <br />REPRESENTATIVE, PROJECT CONTRACTOR, AND THE BUILDING INSPECTOR. <br />10. THE CONTRACTOR SHALL RESOLVE ALL DEFICIENCIES & THE FINAL STRUCTURAL OBSERVATION <br />REPORT ISSUED PRIOR TO FINAL INSPECTION OR ACCEPTANCE OF STRUCTURAL WORK BY THE <br />BUILDING INSPECTOR. <br />11. THE FINAL STRUCTURAL OBSERVATION REPORT SHALL STATE THAT THE STRUCTURAL SYSTEM <br />CONFORMS TO THE APPROVED CONSTRUCTION DOCUMENTS & THAT ALL PREVIOUSLY OBSERVED <br />DEFICIENCIES HAVE BEEN CORRECTED. <br />12. FINAL INSPECTION OR OTHER ACCEPTANCE OF THE STRUCTURAL SYSTEM BY THE CHIEF BUILDING <br />OFFICIAL, OR DESIGNEE, WILL NOT OCCUR UNTIL THE FINAL STRUCTURAL OBSERVATION REPORT IS <br />RECEIVED. <br />13. THE LICENSED DESIGN PROFESSIONAL IN RESPONSIBLE CHARGE SHALL PREPARE ALL CONSTRUCTION <br />DOCUMENT CHANGES RELATING TO THE STRUCTURAL SYSTEMS. REVIEW & APPROVAL OF SUCH <br />CHANGES BY THE CHIEF BUILDING OFFICIAL, OR DESIGNEE, SHALL BE OBTAIN BY THE DESIGN <br />PROFESSIONAL AND/OR CONTRACTOR PRIOR TO INSTALLATION AND/OR CONSTRUCTION OF SAID <br />CHANGES. <br />1. AN APPROVED AGENCY, RETAINED BY OWNER AND SATISFACTORY TO STRUCTURAL ENGINEER AND <br />GOVERNING CODE AUTHORITIES, SHALL PERFORM SPECIAL INSPECTIONS AND TESTS REQUIRED BY <br />THE CONTRACT AND APPLICABLE CODE. THESE SPECIAL INSPECTIONS AND TESTS ARE IN ADDITION <br />TO THE INSPECTIONS REQUIRED BY CBC SECTION 110 “INSPECTIONS”. <br />2. APPROVED AGENCY SHALL KEEP RECORDS OF ALL SPECIAL INSPECTIONS AND TESTS AND SHALL <br />FURNISH REPORTS OF SPECIAL INSPECTIONS AND TESTS TO THE GOVERNING CODE AUTHORITY AND <br />THE STRUCTURAL ENGINEER. REPORTS SHALL INDICATE WHETHER THE WORK INSPECTED OR TESTED <br />WAS OR WAS NOT COMPLETED IN CONFORMANCE TO APPROVED CONSTRUCTION DOCUMENTS. <br />DISCREPANCIES SHALL BE BROUGHT TO THE IMMEDIATE ATTENTION OF THE CONTRACTOR FOR <br />CORRECTION. IF NOT CORRECTED, THE DISCREPANCIES SHALL BE BROUGHT TO THE ATTENTION OF <br />THE GOVERNING CODE AUTHORITY AND THE STRUCTURAL ENGINEER PRIOR TO THE COMPLETION OF <br />THAT PHASE OF WORK. A FINAL REPORT DOCUMENTING REQUIRED SPECIAL INSPECTIONS AND TESTS, <br />AND CORRECTION OF DISCREPANCIES, SHALL BE SUBMITTED UPON COMPLETION OF THAT PHASE OF <br />WORK. <br />3. WHERE FABRICATION OF STRUCTURAL, LOAD-BEARING OR LATERAL LOAD-RESISTING MEMBERS OR <br />ASSEMBLIES IS BEING CONDUCTED ON THE PREMISES OF A FABRICATOR’S SHOP, SPECIAL INSPECTION <br />OF THE FABRICATED ITEMS SHALL BE PERFORMED DURING FABRICATION. SPECIAL INSPECTIONS <br />DURING FABRICATION ARE NOT REQUIRED WHERE WORK IS DONE ON THE PREMISES OF A <br />FABRICATOR REGISTERED AND APPROVED BY THE GOVERNING CODE AUTHORITY TO PERFORM SUCH <br />WORK WITHOUT SPECIAL INSPECTION. FABRICATOR APPROVAL SHALL BE IN ACCORDANCE TO CBC <br />SECTION 1704.2.5.1. ACCORDING TO 1704A.2.5.1 FABRICATOR APPROVAL IS NOT PERMITTED BY <br />DSA-SS, DSA-SS/CC, OR OSHPD. <br />4. EACH CONTRACTOR RESPONSIBLE FOR THE CONSTRUCTION OF A MAIN WIND OR SEISMIC FORCE <br />RESISTING SYSTEM, DESIGNATED SEISMIC SYSTEM, OR A WIND OR SEISMIC FORCE-RESISTING <br />COMPONENT LISTED IN THE STATEMENT OF SPECIAL INSPECTION SHALL SUBMIT A WRITTEN <br />STATEMENT OF RESPONSIBILITY TO THE GOVERNING CODE AUTHORITY AND THE OWNER PRIOR TO <br />THE COMMENCEMENT OF WORK ON THE SYSTEM OR COMPONENT. THE CONTRACTOR’S STATEMENT OF <br />RESPONSIBILITY SHALL CONTAIN ACKNOWLEDGEMENT OF AWARENESS OF THE SPECIAL <br />REQUIREMENTS OF INSPECTION. <br />5. CONTRACTOR SHALL SUBMIT MATERIAL CERTIFICATION OR LABORATORY TEST REPORTS CERTIFYING <br />MATERIALS ARE OF IDENTIFIABLE TESTED STOCK, COMPLYING WITH PROJECT SPECIFICATIONS, TO <br />OWNER, APPROVED AGENCY, STRUCTURAL ENGINEER AND, UPON REQUEST, TO GOVERNING CODE <br />AUTHORITY. IF LABORATORY TEST REPORTS CANNOT BE MADE AVAILABLE, APPROVED AGENCY WILL <br />PERFORM TESTS AS DIRECTED BY STRUCTURAL ENGINEER. CONTRACTOR SHALL PAY FOR COSTS <br />RELATED TO TESTS AND INSPECTIONS OF UNIDENTIFIABLE MATERIALS, MATERIALS FURNISHED <br />WITHOUT LABORATORY TEST REPORTS, MATERIALS FOUND DEFICIENT AFTER INITIAL TESTS AND <br />INSPECTIONS, AND/OR MATERIALS REPLACING DEFICIENT MATERIALS. <br />6. APPROVED AGENCY SHALL SUBMIT MATERIAL TEST REPORTS INDICATING WHETHER TESTED <br />MATERIALS ARE IN COMPLIANCE OR NONCOMPLIANCE WITH CONTRACT DOCUMENTS TO OWNER, <br />CONTRACTOR, STRUCTURAL ENGINEER AND, UPON REQUEST, TO GOVERNING CODE AUTHORITY. <br />7. APPROVED AGENCY SHALL PERFORM SPECIAL INSPECTIONS IN ACCORDANCE WITH CBC SECTION 1705, <br />SECTION 1705A “REQUIRED SPECIAL INSPECTIONS AND TESTS”AND WITH THESE DRAWINGS FOR THE <br />FOLLOWING WORK. SEE PROJECT SPECIFICATIONS FOR ADDITIONAL TEST AND INSPECTION <br />REQUIREMENTS. <br />7.1. SOILS: SPECIAL INSPECTIONS AND TESTS OF EXISTING SITE SOIL CONDITIONS, FILL <br />PLACEMENT AND LOAD-BEARING REQUIREMENTS SHALL BE PERFORMED IN ACCORDANCE WITH <br />TABLE 1. THE APPROVED GEOTECHNICAL REPORT AND THE CONSTRUCTION DOCUMENTS <br />SHALL BE USED TO DETERMINE COMPLIANCE. <br />7.1.1. DURING FILL PLACEMENT THE APPROVED AGENCY SHALL VERIFY THAT PROPER MATERIALS <br />AND PROCEDURES ARE USED IN ACCORDANCE WITH THE PROVISIONS OF THE APPROVED <br />GEOTECHNICAL REPORT. <br />8. APPROVED AGENCY SHALL PERFORM SPECIAL INSPECTIONS FOR SEISMIC RESISTANCE IN ACCORDANCE <br />WITH CBC SECTION 1705.12 FOR THE FOLLOWING WORK. <br />8.1. STRUCTURAL WOOD: CONTINUOUS SPECIAL INSPECTION IS REQUIRED DURING FIELD GLUING <br />OPERATIONS OF ELEMENTS OF THE SFRS. <br />8.1.1. PERIODIC INSPECTION IS REQUIRED FOR NAILING, BOLTING, ANCHORING AND OTHER <br />FASTENING OF ELEMENTS OF THE SFRS, INCLUDING WOOD SHEAR WALLS, WOOD <br />DIAPHRAGMS, DRAG-STRUTS, BRACES, SHEAR PANELS AND HOLD-DOWNS. <br />8.1.2. SPECIAL INSPECTION IS REQUIRED FOR WOOD SHEAR WALLS, SHEAR PANELS AND <br />DIAPHRAGMS, INCLUDING NAILING, BOLTING, ANCHORING AND OTHER FASTENING TO <br />OTHER COMPONENTS OF THE SFRS, WHERE FASTENER SPACING IS OF THE SHEATHING AT <br />EDGES OR BOUNDARIES IS 4 IN. OR LESS. <br />8.2. SPECIAL INSPECTIONS ARE NOT REQUIRED FOR COLD-FORMED STEEL LIGHT-FRAME SHEAR <br />WALLS AND DIAPHRAGMS, INCLUDING SCREW INSTALLATION, BOLTING, ANCHORING AND <br />OTHER FASTENING TO COMPONENTS OF THE SEISMIC FORCE-RESISTING SYSTEM, WHERE <br />EITHER OF THE FOLLOWING APPLIES: <br />8.2.1. THE SHEATHING IS GYPSUM BOARD OR FIBERBOARD. <br />8.2.2. THE SHEATHING IS WOOD STRUCTURAL PANEL OR STEEL SHEETS ON ONLY ONE SIDE OF <br />THE SHEAR WALL, SHEAR PANEL OR DIAPHRAGM ASSEMBLY AND THE FASTENER SPACINGS <br />AT THE EDGES ARE 4 IN. OR LESS. <br />8.3. ARCHITECTURAL COMPONENTS: PERIODIC SPECIAL INSPECTION IS REQUIRED FOR THE <br />ERECTION AND FASTENING OF EXTERIOR CLADDING, INTERIOR AND EXTERIOR NONBEARING <br />WALLS AND INTERIOR AND EXTERIOR VENEER. <br />8.3.1. PERIODIC SPECIAL INSPECTION IS NOT REQUIRED FOR THE FOLLOWING: <br />8.3.2. EXTERIOR CLADDING, INTERIOR AND EXTERIOR NONBEARING WALLS AND INTERIOR AND <br />EXTERIOR VENEER 30 FEET OR LESS IN HEIGHT ABOVE GRADE OR WALKING SURFACE. <br />8.3.3. EXTERIOR CLADDING AND INTERIOR AND EXTERIOR VENEER WEIGHING 5 PSF OR LESS. <br />8.3.4. INTERIOR NONBEARING WALLS WEIGHING 15 PSF OR LESS. <br />9. CONTINUOUS SPECIAL INSPECTION BY A REGISTERED DEPUTY INSPECTOR IS REQUIRED FOR FIELD <br />WELDING, POST-INSTALLED ADHESIVE ANCHORS INSTALLED HORIZONTALLY OR UPWARDLY INCLINED <br />TO RESIST SUSTAINED TENSION LOADS, SHOTCRETE PLACEMENT, CONCRETE STRENGTH f'c > 2500psi, <br />SPRAYED-ON FIREPROOFING, ENGINEERED MASONRY, HIGH-LIFT GROUTING, HIGH LOAD DIAPHRAGMS, <br />SPECIAL MOMENT-RESISTING CONCRETE FRAMES, AND HELICAL PILE FOUNDATION. <br />10. SPECIAL INSPECTORS OR INSPECTION AGENCIES SHALL SUBMIT A SIGNED FINAL REPORT TO THE <br />BUILDING DIVISION STATING THAT ALL ITEMS REQUIRING SPECIAL INSPECTION AND TESTING WERE <br />FULFILLED AND REPORTED AND, TO THE BEST OF THEIR KNOWLEDGE, IN CONFORMANCE WITH THE <br />APPROVED DESIGN DRAWINGS, SPECIFICATIONS, APPROVED CHANGE ORDERS AND THE APPLICABLE <br />PROVISIONS OF THE CBC ITEMS NOT IN CONFORMANCE, UNRESOLVED ITEMS OR ANY DISCREPANCIES <br />IN INSPECTION COVERAGE (I.E. MISSED INSPECTIONS, PERIODIC INSPECTIONS WHEN CONTINUOUS <br />WAS REQUIRED, ETC.) SHOULD BE SPECIFICALLY ITEMIZED IN THIS REPORT. ALTERNATE FORMS MAY <br />BE APPROVED BY THE BUILDING OFFICIALS. THE FINAL REPORT SHALL BE SUBMITTED AT THE SITE <br />WITHIN SEVEN (7) DAYS OF COMPLETION OF THE JOB. <br />11. EMPLOYMENT OF SPECIAL INSPECTION IS THE DIRECT RESPONSIBILITY OF THE OWNER, OR THE <br />ENGINEER/ARCHITECT OF RECORD ACTING AS THE OWNER'S REPRESENTATIVE. SPECIAL INSPECTOR <br />SHALL BE ONE OF THOSE AS PRESCRIBED IN SEC. 1704. <br />STRUCTURAL OBSERVATION <br />SPECIAL INSPECTIONWALL <br />STUD TO STUD (NOT AT BRACED WALL PANELS)16d COMMON 24” O.C. FACE NAIL <br />STUD TO STUD AND ABUTTING STUDS AT INTERSECTING <br />WALL CORNERS (AT BRACED WALL PANELS)16d COMMON 16” O.C. FACE NAIL <br />BUILT-UP HEADER 16d COMMON 16” O.C. EACH EDGE, FACE NAIL <br />CONTINUOUS HEADER TO STUD 4-8d COMMON TOENAIL <br />TOP PLATE TO TOP PLATE 16d COMMON 16” O.C. FACE NAIL <br />TOP PLATE TO TOP PLATE, AT END JOINTS 8-16d COMMON <br />EACH SIDE OF END JOINT, FACE <br />NAIL (MIN 24” LAP SPLICE <br />LENGTH EACH SIDE OF END JOINT) <br />BOTTOM PLATE TO JOIST, RIM JOIST, BAND JOIST OR <br />BLOCKING (NOT AT BRACED WALL PANELS)16d COMMON 16” O.C. FACE NAIL <br />BOTTOM PLATE TO JOIST, RIM JOIST, BAND JOIST OR <br />BLOCKING AT BRACED WALL PANELS 2-16d COMMON 16” O.C. FACE NAIL <br />STUD TO TOP OR BOTTOM PLATE 4-8d COMMON TOENAIL <br />TOP OR BOTTOM PLATE TO STUD 2-16d COMMON END NAIL <br />TOP PLATES, LAPS AT CORNERS AND INTERSECTIONS 2-16d COMMON FACE NAIL <br />1” BRACE TO EACH STUD AND PLATE 2-8d COMMON FACE NAIL <br />1”X6” SHEATHING TO EACH BEARING 2-8d COMMON FACE NAIL <br />1”8” AND WIDER SHEATHING TO EACH BEARING 3-8d COMMON FACE NAIL <br />FLOOR <br />JOIST TO SILL, TOP PLATE, OR GIRDER 3-8d COMMON TOENAIL <br />RIM JOIST, BAND JOIST, OR BLOCKING TO TOP PLATE, <br />SILL OR OTHER FRAMING BELOW 8d COMMON 6” O.C., TOENAIL <br />1”X6” SUBFLOOR OR LESS TO EACH JOIST 2-8d COMMON FACE NAIL <br />2” SUBFLOOR TO JOIST OR GIRDER 2-16d COMMON FACE NAIL <br />2” PLANK 2-16d COMMON EACH BEARING, FACE NAIL <br />BUILT UP GIRDERS AND BEAMS, <br />2” LUMBER LAYERS <br />20d COMMON <br />32” O.C. FACE NAIL AT TOP AND <br />BOTTOM STAGGERED ON <br />OPPOSITE SIDES <br />2-20d COMMON ENDS AND AT EACH SPLICE, FACE <br />NAIL <br />LEDGER STRIP SUPPORTING JOISTS OR RAFTERS 3-16d COMMON EACH JOIST OR RAFTER, FACE NAIL <br />JOIST TO BAND JOIST OR RIM JOIST 3-16d COMMON END NAIL <br />BRIDGING OR BLOCKING TO JOIST, RAFTER OR TRUSS 2-8d COMMON EACH END, TOENAIL <br />2022 CBC TABLE 2304.10.2 - FASTENING SCHEDULE <br />DESCRIPTION OF BUILDING ELEMENTS NUMBER AND TYPE <br />OF FASTENER <br />SPACING AND <br /> LOCATION <br />ROOF <br />BLOCKING BETWEEN CEILING JOISTS, RAFTERS OR <br />TRUSSES TO TOP PLATE OR OTHER FRAMING BELOW 3 - 8d COMMON TOENAIL EACH END <br />BLOCKING BETWEEN RAFTERS OR TRUSS NOT AT THE <br />WALL TOP PLATE, TO RAFTER OR TRUSS <br />2 - 8d COMMON TOENAIL EACH END <br />2-16d COMMON END NAIL <br />FLAT BLOCKING TO TRUSS AND WEB FILLER 16d COMMON <br />@6"O.C.FACE NAIL <br />CEILING JOISTS TO TOP PLATE 3-8d COMMON TOENAIL EACH JOIST <br />CEILING JOIST NOT ATTACHED TO PARALLEL RAFTER, <br />LAPS OVER PARTITIONS (NO THRUST) (TABLE AND <br />SECTION2308.7.3.1) <br />3-16d COMMON FACE NAIL <br />CEILING JOISTS ATTACHED TO PARALLEL RAFTER (HEEL <br />JOINT) (TABLE AND SECTION2308.7.3.1)7-16d COMMON FACE NAIL <br />COLLAR TIE TO RAFTER 3-10d COMMON FACE NAIL <br />RAFTER OR ROOF TRUSS TO TOP PLATE <br />(TABLE AND SECTION 2308.7.5)3-10d COMMON TOENAIL (C) <br />ROOF RAFTERS TO RIDGE VALLEY OR HIP RAFTERS; OR <br />ROOF RAFTER TO 2” RIDGE BEAM <br />2-16d COMMON END NAIL <br />3-10d COMMON TOENAIL <br />Structural Observation Program <br />Designation of Structural Observation <br />PROJECT ADDRESS: _________________________________________ PERMIT APPL. NO.__________ <br />Description of Work: ____________________________________________________________________ <br />Owner: _______________________ Architect: ________________________ Engineer: _______________ <br />STRUCTURAL OBSERVATION (Only checked items are required) <br />Firm or individual to be responsible for the Structural Observation: <br />Name: Phone: ( <br />FOUNDATION <br />Footing, Stem Walls, Piers <br />Mat Foundation <br />Caisson, Piles, Grade Beams <br />Stepp’g/Retaining Foundation, <br />Hillside Special Anchors <br />WALL <br />Concrete <br />Masonry <br />Wood <br />Others: <br />The structure is classified as Occupancy Category III or IV. <br />The Height of the structure is greater then 75 feet (22,860 mm) above the base. The structure is assigned to Seismic <br />Design Category E, is classified as Occupancy Category I or II. <br />DECLARATION BY OWNER I, the Owner of the project, declare that the above listed firm or individual <br />is hired by me to be the Structural Observer. <br />) Calif. Registration: <br />FRAME <br />Steel Moment Frame <br />Steel Braced Frame <br />DIAPHRAGM <br />Concrete <br />Steel Deck <br />Concrete Moment Frame <br />Masonry Wall Frame Others: <br />Signature ______________________________Date _________________ <br />Declaration by Engineer or Architect of Record (required if different from the listed Structural Observer) I, the <br />Engineer or Architect of record for the project, declare that the above listed firm or individual is designated by me <br />to be responsible for the Structural Observation. <br />Signature ______________________________ <br />300 N. Flower Street, Santa Ana, CA 92703 <br />P.O. Box 4048, Santa Ana, CA 92702-4048 <br />Revised 02/2017 <br />Date __________________ <br />www.ocpublicworks.com <br />P: 714.667.8888 I F: 714.667.7575 <br />ocpCustomerCare@ocpw.ocgov.com <br /> Wood <br />1011 W 2ND ST, SANTA ANA, CA 92703 <br />DEMOLISHING AND REBUILDING THE EXISTING GARAGE LIKE FOR LIKE <br />Special Inspection Program and Designation of <br />Special Inspectors <br />601 N. Ross Street, Santa Ana, CA 92701 <br />P.O. Box 4048, Santa Ana, CA 92702-4048 <br />www.ocpublicworks.com <br />714.667.8888 | myOCeServices.ocgov.com <br />□ Concrete (Design Mix, Form Work, Placement, etc., per <br />□ Erection of Pre-Cast Concrete Members <br />□ Bolts Installed in Concrete <br />□ Reinforcing Steel and Pre-Stressing Steel Tendons <br />□ StructuralWelding/Rebar Welding <br />□ High-Strength Bolting/Material Verification <br />□ Steel Frame Joint Details <br />□ All Masonry Construction <br />□ Sprayed Fire-Resistive Materials <br />□ Shotcrete (Curing Temperature, Design Mix, <br /> Placement, Strength etc. per table 1705.3) <br />□ Soils (Excavation, Fill, etc. per table 1705.6) <br />□ Smoke-Control System <br />□ Driven Piles per Table 1705.7 <br />□ Cast in Place Piers per Table 1705.8 <br />□ Mastic and Intumescent Fire-Resistant Coatings <br />□ Exterior Insulation and Finish Systems (EIFS) <br />□Wood for High-Load Diaphragms <br />□ Others <br />□ Others <br />□ Others <br />□ Others <br /> SPECIAL INSPECTIONS <br />(Only checked items are required) <br />INSPECTION ITEMS SPECIAL INSPECTORS(S) <br />NAME,PHONE NUMBER,REGISTRATION# <br />DECLARATION BY OWNER OR ARCHITECT/ENGINEER OF RECORD: <br />I, the □ Owner □ Engineer or □ Architect of record,declare that the above listed Special Inspector(s) is/are hired by me. <br />Print Name Signature Date <br />1. EXPANDED METAL OR WOVEN WIRE LATH AND PORTLAND CEMENT PLASTER SHALL CONFORM TO THE <br />FOLLOWIG: <br />1.1. EXPANDED METAL OR WOVEN WIRE LATH AND PORTLAND CEMENT SHALL CONFORM TO ASTM <br />C847,ASTM C1032, AND ASTM C150 AND SHALL BE INSTALLED IN ACCORDANCE WITH ASTM C926 <br />AND ASTM C1063.METAL LATH AND LATH ATTACHMENTS SHALL BE OF CORROSION - RESISTANT <br />MATERIAL.. <br />1.2. FASTENER TO STUDS,TOP AND BOTTOM PLATES, AND BLOCKING SHALL BE 0.120" NAIL X 1-½” <br />LONG, 7/16" HEAD OR NO. 16 GAGE GALV. STAPLE, 7/8" LEGS. STAPLES SHALL HAVE A MINIMUM <br />CROWN WIDTH OF 7/16", MEASURED OUTSIDE THE LEGS, AND SHALL BE INSTALLED WITH THEIR <br />CROWNS PARALLEL TO THE LONG DIMENSION OF THE FRAMING MEMBERS.STAPLES FOR THE <br />ATTACHMENT OF GYPSUM LATH AND WOVEN-WIRE LATH SHALL HAVE A MINIMUM CROWN WIDTH <br />OF 3/4", MEASURED OUTSIDE THE LEGS. <br />2. ALL WALLS,FLOOR,CIELING AND ROOF GYPSUM BOARD SHALL BE AT LEAST 5/8" THICK (UNO ON ARCH. <br />DWG.) AND CONFORM TO THE FOLLOWING REQUIREMENTS: <br />2.1. GYPSUM WALLBOARD SHALL CONFORM TO ASTM C 1396 AND SHALL BE INSTALLED IN <br />ACCORDANCE WITH ASTM C 840. GYPSUM BASE FOR VENEER PLASTER SHALL CONFORM TO ASTM C <br />1396 AND SHALL BE INSTALLED IN ACCORDANCE WITH ASTM C844 BUT NOT LESS THAN THE <br />FOLLOWING REQUIREMENTS. WATER-RESISTANT GYPSUM BACKING BOARD SHALL CONFORM TO <br />ASTM C 1396 AND SHALL BE INSTALLED IN ACCORDANCE WITH ASTM C 840. <br />2.2. GYPSUM BOARD OR GYPSUM PANEL PRODUCTS SHALL BE INSTALLED PERPENDICULAR TO FRAMING <br />MEMBERS.END JOINTS OF ADJACENT COURSES OF GYPSUM BOARD SHALL NOT OCCUR ON THE <br />SAME JOIST. <br />2.3. BOARDS SHALL BE CONNECTED TO THE SUPPORTING ELEMENTS (STUDS, JOISTS,RAFTERS, TOP <br />AND BOTTOM PLATES, AND BLOCKING) WITH 6D COOLER (0.092" X 1-7/8" LONG, 1/4" HEAD) OR <br />WALLBOARD NAIL (0.0915" X 1-7/8" LONG, 19/64" HEAD) OR 0.120" NAIL X 1-3/4" LONG, MIN 3/8" <br />HEAD. <br />2.4. ALTERNATIVELY BOARDS INSTALLED ON THE WALLS MAY BE CONNECTED TO THE SUPPORTING <br />MEMBERS WITH NO.16 GAGE GALV. STAPLE, 1-1/2" LEGS, 1-5/8" LONG. STAPLES SHALL HAVE A <br />MINIMUM CROWN WIDTH OF 7/16", MEASURED OUTSIDE THE LEGS, AND SHALL BE INSTALLED <br />WITH THEIR CROWNS PARALLEL TO THE LONG DIMENSION OF THE FRAMING MEMBERS.STAPLES <br />FOR THE ATTACHMENT OF GYPSUM LATH AND WOVEN-WIRE LATH SHALL HAVE A MINIMUM CROWN <br />WIDTH OF 3/4", MEASURED OUTSIDE THE LEGS. <br />2.5. TYPE S OR W DRYWALL SCREWS SHALL CONFORM TO REQUIREMENTS OF ASTM C 1002. <br />2.6. FASTENERS SHALL BE SPACED NOT MORE THAN 7 INCHES ON CENTER AT ALL SUPPORTS, <br />INCLUDING PERIMETER BLOCKING, AND NOT MORE THAN 3/4" FROM THE EDGES AND ENDS OF THE <br />GYPSUM BOARD OR GYPSUM PANEL PRODUCT. <br />2.7. PERIMETER EDGES OF ALL GYPSUM BOARDS SHALL BE BLOCKED USING A WOOD MEMBER NOT LESS <br />THAN 2"X6" NOMINAL DIMENSION. BLOCKING MATERIAL SHALL BE INSTALLED FLAT OVER THE TOP <br />PLATE OF THE WALL TO PROVIDE A NAILING SURFACE NOT LESS THAN 2" IN WIDTH FOR THE <br />ATTACHMENT OF THE GYPSUM BOARD OR GYPSUM PANEL PRODUCT. <br />1. EXTERIOR AND INTERIOR CEMENT PLASTER AND LATHING SHALL BE DONE WITH THE APPROPRIATE <br />MATERIALS LISTED IN TABLE BELOW. <br />2. EXPANDED METAL OR WOVEN WIRE LATH AND PORTLAND CEMENT PLASTER SHALL CONFORM TO THE <br />FOLLOWING: <br /> 2.1 EXPANDED METAL OR WOVEN WIRE LATH AND PORTLAND CEMENT SHALL CONFORM TO ASTM C847, <br />ASTM C1032, AND ASTM C150 AND SHALL BE INSTALLED IN ACCORDANCE WITH ASTM C926 AND ASTM <br />C1063. METAL LATH AND LATH ATTACHMENTS SHALL BE OF CORROSION-RESISTANT MATERIAL. <br />2.2 FASTENER TO STUDS, TOP AND BOTTOM PLATES, AND BLOCKING SHALL BE 0.120" NAIL X 1-1/2" <br />LONG, 7/16" HEAD OR NO.16 GAGE GALV. STAPLE, 7/8" LEGS. STAPLES SHALL HAVE A MINIMUM CROWN <br />WIDTH OF 7/16", MEASURED OUTSIDE THE LEGS, AND SHALL BE INSTALLED WITH THEIR CROWNS <br />PARALLEL TO THE LONG DIMENSION OF THE FRAMING MEMBERS. STAPLES FOR THE ATTACHMENT OF <br />GYPSUM LATH AND WOVEN-WIRE LATH SHALL HAVE A MINIMUM CROWN WIDTH OF 3/4", MEASURED <br />OUTSIDE THE LEGS. <br />3. MATERIALS SHALL BE STORED IN SUCH A MANNER AS TO PROTECT THEM FROM THE WEATHER. <br />4. INSTALLATION OF THESE MATERIALS SHALL BE IN COMPLIANCE WITH ASTM C926 AND ASTM C1063. <br />5. METAL LATH AND LATH ATTACHMENTS SHALL BE OF CORROSION-RESISTANT MATERIAL. <br />6. BACKING OR A LATH SHALL PROVIDE SUFFICIENT RIGIDITY TO PERMIT PLASTER APPLICATIONS. <br />6.1 WHERE LATH ON VERTICAL SURFACES EXTENDS BETWEEN RAFTERS OR OTHER SIMILAR PROJECTING <br />MEMBERS, SOLID BACKING SHALL BE INSTALLED TO PROVIDE SUPPORT FOR LATH AND ATTACHMENTS. <br />6.2 GYPSUM LATH OR GYPSUM WALLBOARD SHALL NOT BE USED AS BACKING FOR CEMENT PLASTER <br />UNO. <br />7. APPROVED WATER-RESISTIVE BARRIERS SHALL BE INSTALLED AND, WHERE APPLIED OVER <br />WOOD-BASED SHEATHING, SHALL INCLUDE A WATER-RESISTIVE VAPOR-PERMEABLE BARRIER WITH A <br />PERFORMANCE AT LEAST. EQUIVALENT TO TWO LAYERS OF WATER-RESISTIVE BARRIER COMPLYING WITH <br />ASTM E2556, TYPE I. THE INDIVIDUAL LAYERS SHALL BE INSTALLED INDEPENDENTLY SUCH THAT EACH <br />LAYER PROVIDES A SEPARATE CONTINUOUS PLANE AND ANY FLASHING (SEE ARCH DWG. AND INSTALLED <br />IN ACCORDANCE WITH SECTION 1404.4 OF CBC) INTENDED TO DRAIN TO THE WATER-RESISTIVE BARRIER <br />IS DIRECTED BETWEEN THE LAYERS. <br />7.1 EXCEPTION 1: WHERE THE WATER-RESISTIVE BARRIER THAT IS APPLIED OVER WOOD-BASED <br />SHEATHING HAS A WATER RESISTANCE EQUAL TO OR GREATER THAN THAT OF A WATER-RESISTIVE <br />BARRIER COMPLYING WITH ASTM E2556, TYPE II AND IS SEPARATED FROM THE STUCCO BY AN <br />INTERVENING, SUBSTANTIALLY NONWATERY-ABSORBING LAYER OR DRAINAGE SPACE. <br /> 7.2 EXCEPTION 2: WHERE THE WATER-RESISTIVE BARRIER IS APPLIED OVER WOOD-BASE SHEATHING IN <br />CLIMATE ZONE 1A, 2A OR 3A, A VENTILATED AIR SPACE SHALL BE PROVIDE BETWEEN THE STUCCO AND <br />WATER-RESISTIVE BARRIER. <br />8. MASONRY AND CONCRETE SURFACES SHALL BE CLEAN, FREE FROM EFFLORESCENCE, SUFFICIENTLY <br />DAMP AND ROUGH FOR PROPER BOND. IF THE SURFACE IS INSUFFICIENTLY ROUGH, APPROVED BONDING <br />AGENTS OR A PORTLAND CEMENT DASH BOND COAT MIXED IN PROPORTIONS OF NOT MORE THAN TWO <br />PARTS VOLUME OF SAND TO ONE PART VOLUME OF PORTLAND CEMENT OR PLASTIC CEMENT SHALL BE <br />APPLIED. THE DASH BOND COAT SHALL BE LEFT UNDISTURBED AND SHALL BE MOIST CURED NOT LESS <br />THAN 24 HOURS. <br />TABLE 2507 - LATH, PLASTERING MATERIALS AND ACCESSORIES <br />MATERIAL STANDARD <br />ACCESSORIES FOR GYPSUM VENEER BASE ASTM C1047 <br />BLENDED CEMENT ASTM C595 <br />COLD-FORMED STEEL STUDS AND TRACK, STRUCTURAL AISI S240 <br />COLD-FORMED STEEL STUDS AND TRACK, NONSTRUCTURAL AISI S220 <br />EXTERIOR PLASTER BONDING COMPOUNDS ASTM C932 <br />HYDRAULIC CEMENT ASTM C1157; C1600 <br />GYPSUM CASTING AND MOLDING PLASTER ASTM C59 <br />GYPSUM KEENE'S CEMENT ASTM C61 <br /> GYPSUM PLASTER ASTM C28 <br />GYPSUM VENEER PLASTER ASTM C587 <br />INTERIOR BONDING COMPOUNDS, GYPSUM ASTM C631 <br />LIME PLASTERS ASTM C5;C206 <br />MASONRY CEMENT ASTM C91 <br />METAL LATH ASTM C847 <br />PLASTER AGGREGATES <br /> SAND <br />PERLITE <br /> VERMICULITE <br />ASTM C35; C897 <br />ASTM C35 <br />ASTM C35 <br />PLASTIC CEMENT ASTM C1328 <br /> PORTLAND CEMENT ASTM C150 <br />STEEL SCREWS ASTM C1002; C954 <br />WELDED WIRE LATH ASTM C933 <br />WOVEN WIRE PLASTER BASE ASTM C103 <br />1. PLASTERING WITH CEMENT PLASTER SHALL BE NOT LESS THAN THREE COATS WHERE APPLIED OVER <br />METAL LATH OR WIRE FABRIC LATH OR GYPSUM BOARD BACKING AS SPECIFIED IN NOTE 5 AND SHALL BE <br />NOT LESS THAN TWO COATS WHERE APPLIED OVER MASONRY OR CONCRETE. IF THE PLASTER SURFACE IS <br />TO BE COMPLETELY COVERED BY VENEER OR OTHER FACING MATERIAL, OR IS COMPLETELY CONCEALED <br />BY ANOTHER WALL, PLASTER APPLICATION NEED ONLY BE TWO COATS, PROVIDED THAT THE TOTAL <br />THICKNESS IS AS SET FORTH IN ASTM C926. <br />2. ON WOOD FRAME OR STEEL STUD CONSTRUCTION WITH AN ON-GRADE CONCRETE FLOOR SLAB <br />SYSTEM, EXTERIOR PLASTER SHALL BE APPLIED IN SUCH A MANNER AS TO COVER, BUT NOT TO EXTEND <br />BELOW, THE LATH AND PAPER. THE APPLICATION OF LATH, PAPER AND FLASHING OR DRIP SCREEDS <br />SHALL COMPLY WITH ASTM C1063. <br />3. A MINIMUM 0.019-INCH (NO. 26 GALVANIZED SHEET GAGE), CORROSION-RESISTANT WEEP SCREED <br />WITH A MINIMUM VERTICAL ATTACHMENT FLANGE OF 3.5 IN. SHALL BE PROVIDED AT OR BELOW THE <br />FOUNDATION PLATE LINE ON EXTERIOR STUD WALLS IN ACCORDANCE WITH ASTM C926. THE WEEP <br />SCREED SHALL BE PLACED NOT LESS THAN 4 IN. ABOVE THE EARTH OR 2 IN. ABOVE PAVED AREAS AND BE <br />OF A TYPE THAT WILL ALLOW TRAPPED WATER TO DRAIN TO THE EXTERIOR OF THE BUILDING. THE <br />WATER-RESISTIVE BARRIER SHALL LAP THE ATTACHMENT FLANGE. THE EXTERIOR LATH SHALL COVER <br />AND TERMINATE ON THE ATTACHMENT FLANGE OF THE WEEP SCREED. <br />4. ONLY APPROVED PLASTICITY AGENTS AND APPROVED AMOUNTS THEREOF SHALL BE ADDED TO <br />PORTLAND CEMENT OR BLENDED CEMENTS. WHERE PLASTIC CEMENT OR MASONRY CEMENT IS USED, <br />ADDITIONAL LIME OR PLASTICIZERS SHALL NOT BE ADDED. HYDRATED LIME OR THE EQUIVALENT <br />AMOUNT OF LIME PUTTY USED AS A PLASTICIZER IS PERMITTED TO BE ADDED TO CEMENT PLASTER OR <br />CEMENT AND LIME PLASTER IN AN AMOUNT NOT TO EXCEED THAT SET FORTH IN ASTM C926. <br />5. GYPSUM PLASTER SHALL NOT BE USED ON EXTERIOR SURFACES. <br />6. CEMENT PLASTER COATS SHALL BE PROTECTED FROM FREEZING FOR A PERIOD OF NOT LESS THAN 24 <br />HOURS AFTER SET HAS OCCURRED. PLASTER SHALL BE APPLIED WHEN THE AMBIENT TEMPERATURE IS <br />HIGHER THAN 40°F, UNLESS PROVISIONS ARE MADE TO KEEP CEMENT PLASTER WORK ABOVE 40°F <br />DURING APPLICATION AND 48 HOURS THEREAFTER. <br />7. THE SECOND COAT SHALL BE BROUGHT OUT TO PROPER THICKNESS, RODDED AND FLOATED <br />SUFFICIENTLY ROUGH TO PROVIDE ADEQUATE BOND FOR THE FINISH COAT. THE SECOND COAT SHALL <br />NOT HAVE VARIATIONS GREATER THAN 1/4 IN. IN ANY DIRECTION UNDER A 5-FOOT STRAIGHT EDGE. <br />8. FIRST AND SECOND COATS OF CEMENT PLASTER SHALL BE APPLIED AND MOIST CURED AS SET FORTH <br />IN ASTM C926 AND TABLE BELOW. <br />a. THE FIRST TWO COATS SHALL BE AS REQUIRED FOR THE FIRST COATS OF EXTERIOR PLASTER, <br />EXCEPT THAT THE MOIST-CURING TIME PERIOD BETWEEN THE FIRST AND SECOND COATS SHALL <br />BE NOT LESS THAN 24 HOURS. MOIST CURING SHALL NOT BE REQUIRED WHERE JOB AND WEATHER <br />CONDITIONS ARE FAVORABLE TO THE RETENTION OF MOISTURE IN THE CEMENT PLASTER FOR THE <br />REQUIRED TIME PERIOD. <br />b. TWENTY-FOUR-HOUR MINIMUM INTERVAL BETWEEN COATS O INTERIOR CEMENT PLASTER. OTHER <br />METHODS SHALL BE SUBMITTED FOR REVIEW AND APPROVAL. <br />c. FINISH COAT PLASTER IS PERMITTED TO BE APPLIED TO INTERIOR CEMENT PLASTER BASE COATS <br />AFTER A 48-HOURS PERIOD. <br />9.WHERE APPLIED DIRECTLY TO UNIT MASONRY SURFACES, THE SECOND COAT IS PERMITTED TO BE <br />APPLIED AS SOON AS THE FIRST COAT HAS ATTAINED SUFFICIENT HARDNESS. <br />10. THE SECOND COAT IS PERMITTED TO BE APPLIED AS SOON AS THE FIRST COAT HAS ATTAINED <br />SUFFICIENT RIGIDITY TO RECEIVE THE SECOND COAT. <br />10.1 WHERE USING THIS METHOD OF APPLICATION, CALCIUM ALUMINATE CEMENT UP TO 15 PERCENT <br />OF THE WEIGHT OF THE PORTLAND CEMENT IS PERMITTED TO BE ADDED TO THE MIX. <br />10.2 CURING OF THE FIRST COAT IS PERMITTED TO BE OMITTED AND THE SECOND COAT SHALL BE <br />CURED AS SET FORTH IN ASTM C926 AND TABLE 2512.6. <br />11. CEMENT PLASTER FINISH COATS SHALL BE APPLIED OVER BASE COATS THAT HAVE BEEN IN PLACE <br />FOR THE TIME PERIODS SET FORTH IN ASTM C926. THE THIRD OR FINISH COAT SHALL BE APPLIED WITH <br />SUFFICIENT MATERIAL AND PRESSURE TO BOND AND TO COVER THE BROWN COAT AND SHALL BE OF <br />SUFFICIENT THICKNESS TO CONCEAL THE BROWN COAT. <br />TABLE 2512.6 CEMENT PLASTERS <br />COAT MINIMUM PERIOD MOIST CURING MINIMUM INTERVAL BETWEEN COTTS <br />FIRST 48 HOURS 48 HOURS <br />SECOND 48 HOURS 7 DAYS <br />FINISH - NOTE C <br />1. ALL WALLS,FLOOR,CIELING AND ROOF GYPSUM BOARD SHALL BE AT LEAST 5/8" THICK (UNO ON ARCH. <br />DWG.) AND CONFORM TO THE FOLLOWING REQUIREMENTS: <br />1.1 GYPSUM WALLBOARD SHALL CONFORM TO ASTM C 1396 AND SHALL BE INSTALLED IN ACCORDANCE <br />WITH ASTM C 840. GYPSUM BASE FOR VENEER PLASTER SHALL CONFORM TO ASTM C 1396 AND SHALL BE <br />INSTALLED IN ACCORDANCE WITH ASTM C844 BUT NOT LESS THAN THE FOLLOWING REQUIREMENTS. <br />WATER-RESISTANT GYPSUM BACKING BOARD SHALL CONFORM TO ASTM C 1396 AND SHALL BE INSTALLED <br />IN ACCORDANCE WITH ASTM C 840. <br />1.2 GYPSUM BOARD OR GYPSUM PANEL PRODUCTS SHALL BE INSTALLED PERPENDICULAR TO FRAMING <br />MEMBERS. END JOINTS OF ADJACENT COURSES OF GYPSUM BOARD SHALL NOT OCCUR ON THE SAME <br />JOIST. <br />1.3 BOARDS SHALL BE CONNECTED TO THE SUPPORTING ELEMENTS (STUDS, JOISTS,RAFTERS, TOP AND <br />BOTTOM PLATES, AND BLOCKING) WITH 6D COOLER (0.092" X 1-7/8" LONG, 1/4" HEAD) OR WALLBOARD <br />NAIL (0.0915" X 1-7/8" LONG, 19/64" HEAD) OR 0.120" NAIL X 1-3/4" LONG, MIN 3/8" HEAD. <br />1.4 ALTERNATIVELY BOARDS INSTALLED ON THE WALLS MAY BE CONNECTED TO THE SUPPORTING <br />MEMBERS WITH NO.16 GAGE GALV. STAPLE, 1-1/2" LEGS, 1-5/8" LONG. STAPLES SHALL HAVE A MINIMUM <br />CROWN WIDTH OF 7/16", MEASURED OUTSIDE THE LEGS, AND SHALL BE INSTALLED WITH THEIR CROWNS <br />PARALLEL TO THE LONG DIMENSION OF THE FRAMING MEMBERS. STAPLES FOR THE ATTACHMENT OF <br />GYPSUM LATH AND WOVEN-WIRE LATH SHALL HAVE A MINIMUM CROWN WIDTH OF 3/4", MEASURED <br />OUTSIDE THE LEGS. <br />1.5 TYPE S OR W DRYWALL SCREWS SHALL CONFORM TO REQUIREMENTS OF ASTM C 1002. <br />1.6 FASTENERS SHALL BE SPACED NOT MORE THAN 7 INCHES ON CENTER AT ALL SUPPORTS, INCLUDING <br />PERIMETER BLOCKING, AND NOT MORE THAN 3/4" FROM THE EDGES AND ENDS OF THE GYPSUM BOARD <br />OR GYPSUM PANEL PRODUCT. <br />1.7 PERIMETER EDGES OF ALL GYPSUM BOARDS SHLL BE BLOCKED USING A WOOD MEMBER NOT LESS <br />THAN 2"X6" NOMINAL DIMENSION. BLOCKING MATERIAL SHALL BE INSTALLED FLAT OVER THE TOP PLATE <br />OF THE WALL TO PROVIDE A NAILING SURFACE NOT LESS THAN 2" IN WIDTH FOR THE ATTACHMENT OF <br />THE GYPSUM BOARD OR GYPSUM PANEL PRODUCT. <br />GYPSUM BOARD AND EXPANDED METAL OR WOVEN WIRE <br />LATH AND PORTLAND CEMENT PLASTER (STUCCO) NOTES <br />LATHING AND FURRING FOR CEMENT PLASTER <br />EXTERIOR PLASTER <br />GYPSUM BOARD <br />PROJECT <br />CLIENT <br />0' 2' 4' 8' 16' <br />SHEET TITLE <br />1011 W 2ND ST, SANTA ANA, <br />CA 92703 <br />JUAN GARSIA <br />SAZAN INC. <br />2610 Vista Del Oro, Newport Beach, CA 92660 <br />S0.02 <br />CONSTRUCTION NOTES <br />DATE. 12/21/2023 <br />EXP. 06-30-2024 <br />   <br /> <br />  <br /><br />  <br />1011 W Second St <br />5/1/2025