My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3000 S Sycamore St Unit# A - Plan
PBA
>
Building
>
ProjectDox
>
S
>
Sycamore St
>
3000 S Sycamore St Unit# A
>
3000 S Sycamore St Unit# A - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/5/2025 7:37:07 AM
Creation date
6/5/2025 7:36:43 AM
Metadata
Fields
Template:
Plan
Permit Number
20182272
101118488
Full Address
3000 S Sycamore St Unit# A
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
© 2020 IRONRIDGE, INC. VERSION 3.2 FLUSH MOUNT INSTALLATION MANUAL - 13 <br />TIL e <br />Remove tile and mark rafter. Position base over rafter, <br />adjust arm if necessary and torque hardware to 132 in-lbs <br />(11 ft-lbs). Use base as guide to drill 1/4" pilot holes, back <br />fill with roofing manufacturer’s approved sealant, then <br />insert lag bolts and tighten until fully seated. Replace tiles <br />and notch as necessary to ensure proper fit. Attach rails to <br />either side of slot using Bonding Hardware and torque to <br />250 in-lbs (21-ft-lbs). <br /> ➢Position arm near the center of valley for curved tiles. <br /> ➢Position arm away from seam of joining flat tiles. <br /> ➢Ensure top of hook does not extend above rail. <br /> ➢Standalone All Tile Hook manual available on website. <br />Rafter <br />Torque to <br />132 in-lbs <br />Torque to <br />250 in-lbs <br />Tighten Until <br /> Fully Seated <br />Remove tile and mark rafter, use Base Plate to mark two <br />holes on rafter. Drill two 7/32" pilot holes and back fill <br />with roofing manufacturers' approved sealant. Use 1/2" <br />socket to drive lag into place. Slide hook into place and <br />adjust to desired position. Drive self-tapping screw using <br />a #3 Phillips bit to lock hook in place. Clean underlayment <br />and apply a bead of sealant compatible with roofing <br />manufacturer, install flashing over mount. Fasten sub- <br />flashing to deck with one roofing nail in each corner. <br />Waterproof at underlayment level according to roofing <br />manufacturers' instructions and the Tile Roofing Industry <br />Alliance guidelines. Cut clearance notch in the weather <br />guard of tile as needed or utilize QMPV Tile Replacement <br />Flashings. Attach rails to either side of slot using Bonding <br />Hardware and torque to 250 in-lbs (21-ft-lbs). <br /> ➢Position arm near the center of valley for curved tiles. <br /> ➢Position arm away from seam of joining flat tiles. <br /> ➢Ensure top of hook does not extend above rail. <br /> ➢For additional details refer to the full QMPV Installation Manual. <br />QMPV QUICK HOOK <br />ALL TIL e HOOK <br />3000 S Sycamore St Unit# <br />A- 201822724/29/2024
The URL can be used to link to this page
Your browser does not support the video tag.