My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3000 S Sycamore St Unit# A - Plan
PBA
>
Building
>
ProjectDox
>
S
>
Sycamore St
>
3000 S Sycamore St Unit# A
>
3000 S Sycamore St Unit# A - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/5/2025 7:37:07 AM
Creation date
6/5/2025 7:36:43 AM
Metadata
Fields
Template:
Plan
Permit Number
20182272
101118488
Full Address
3000 S Sycamore St Unit# A
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
© 2020 IRONRIDGE, INC. VERSION 3.2 FLUSH MOUNT INSTALLATION MANUAL - 14 <br />TIL e <br />Remove tile and mark rafter. Measure up 6 5/8" from <br />bottom of tiles and mark horizontally. Align QBase over <br />rafter center and drill two 7/32" pilot holes, back fill with <br />roofing manufacturers' approved sealant. Place grade-8 <br />Cap Screw under QBase, lag QBase into rafter location. <br />Install Sub-flashing, waterproof at underlayment level <br />according to roofing manufacturers' instructions and the <br />Tile Roofing Industry Alliance guidelines. Cut tile with <br />diamond blade to allow post to pass through. Place tile <br />in position and then install Post. Install 18"x18" flashing, <br />pre-bent to follow the contour of the tile as required. Apply <br />sealant where Post and Flashing meet and install EPDM <br />counter flashing. Attach L-Foot on Standoff with hardware. <br />Torque to 174 in-lbs (14.5 ft-lbs). Attach rails to L-Foot <br />using Bonding Hardware and torque to 250 in-lbs (21-ft- <br />lbs). <br /> ➢For additional details refer to the full QMPV Installation Manual. <br />ADDITIONAL ROOF TYP e S <br />QMPV QBASe M e TAL, SHAK e AND SLAT e <br />The QMPV QBase can be used to install on multiple <br />roofing types with different installation methods. <br /> <br /> ➢For instructions on installing the QBase on Slate refer to the full <br />Quick Mount PV Installation Manual. <br /> ➢For instructions on installing the QBase on Shake refer to the full <br />Quick Mount PV Installation Manual. <br /> ➢For instructions on installing the QBase on Metal Shingle refer to <br />the full QMPV Installation Manual. <br />QMPV QBAS e UNIVeRSAL TIL e MOUNT <br />Locate roof rafters and mark locations on roof, remove <br />shakes directly above mount if needed to expose felt <br />paper. Level out installation area and location installation <br />point, mark. Drill 7/32" pilot hole, back fill with roofing <br />manufacturers' approved sealant. Prepare Hanger Bolt <br />with Hex Nut and Sealing washer, insert into QBlock hole <br />and drive into rafter until fully seated and the QBlock no <br />longer swivels easily. Insert EPDM washer over hanger <br />bolt and then install L-Foot in desired orientation and <br />torque hardware to 132 in-lbs (11 ft-lbs). Attach rail to <br />L-Foot with Bonding Hardware and torque to 250 in-lbs <br />(21 ft-lbs). <br /> ➢For additional details refer to the full QMPV Installation Manual. <br />QMPV CLASSIC SHAKe MOUNT <br />Torque to <br />174 in-lbs <br />3000 S Sycamore St Unit# <br />A- 201822724/29/2024
The URL can be used to link to this page
Your browser does not support the video tag.