My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3000 S Sycamore St Unit# A - Plan
PBA
>
Building
>
ProjectDox
>
S
>
Sycamore St
>
3000 S Sycamore St Unit# A
>
3000 S Sycamore St Unit# A - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/5/2025 7:37:07 AM
Creation date
6/5/2025 7:36:43 AM
Metadata
Fields
Template:
Plan
Permit Number
20182272
101118488
Full Address
3000 S Sycamore St Unit# A
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
© 2020 IRONRIDGE, INC. VERSION 3.2 FLUSH MOUNT INSTALLATION MANUAL - 17 <br />CONDUIT MOUNT <br />Remove the tile that the mount will be installed on, and the <br />tiles in the course above it. Lift the bottom of the tile and <br />slide the bottom clamp over the bottom edge of the tile. <br />Insert the 4" tap bolt through the slot into the threaded hole <br />and use a 7/16" socket to thread the screw. Tighten until <br />the top clamp hook end unbends and forms a 90 degree <br />angle with the tile. Use the Cap Screw (included) to attach <br />your pipe clamp (not included) to bottom clamp. Insert <br />conduit and tighten with 7/16" socket. <br /> ➢The clamp is reversible, use the wider hook end on tile greater <br />than 1" thick and the thinner hook end on tiles less than 1" thick. <br /> ➢The installation process is the same on curved tile, make sure <br />that the Conduit Mount is installed on the crown(high point) of the <br />tile. <br /> ➢Install mounts as required to support conduit across the roof. <br /> ➢For additional details refer to the full QMPV Installation Manual. <br />QMPV CONDUIT MOUNT - TIL e <br />Place conduit mounts along path of conduit. Lift shingle <br />above mount location and insert flashing into position. <br />Mark center for drilling, remove flashing and drill pilot <br />hole with 1/8" bit. Clean area, fill hole with roofing <br />manufacturer's approved sealant. Lift shingle and slide <br />Conduit Mount into place. Prepare the lag bolt with sealing <br />washer and pipe clamp (not included). Insert lag through <br />hole in block and drill with 7/16" socket until block is tight. <br /> ➢Install mounts as required to support conduit across the roof. <br /> ➢For additional details refer to the full QMPV Installation Manual. <br />QMPV CONDUIT MOUNT - COMPOSITION SHINGL e <br />3000 S Sycamore St Unit# <br />A- 201822724/29/2024
The URL can be used to link to this page
Your browser does not support the video tag.