My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD ZONE - 718 S Flintridge Dr Unit# 2 - Plan
PBA
>
Building
>
ProjectDox
>
F
>
Flintridge Dr
>
718 S Flintridge Dr Unit# 2
>
FLOOD ZONE - 718 S Flintridge Dr Unit# 2 - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/6/2025 7:18:28 AM
Creation date
6/6/2025 7:18:19 AM
Metadata
Fields
Template:
Plan
Permit Number
101119235
Full Address
718 S Flintridge Dr Unit# 2
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
115
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
TMC ENGINEERS INC. <br />Geotechnical, Structural and Civil Engineering <br />Add: 9542 Pacific Ave, Anaheim, CA92804. Phone: 714-829-5053; Email: Tienchu.pe@gmail.com <br /> <br />Page 9 <br /> <br /> <br />7.0 RECOMMENDATIONS <br /> <br />The following recommendations should be incorporated into the design or construction <br />phases. <br /> <br />7.1 Grading <br />7.1.1 Site Preparation <br />Prior to initiating grading operations, any existing vegetation, trash, debris, over-sized <br />materials (greater than 12 inches), and other deleterious materials within fill areas should be <br />removed from the site. <br /> <br />7.1.2 Surficial Soil Removals <br />For the proposed new house, after removal of existing concrete slabs where occur and/or <br />vegetation including roots. It is recommended that the top 2 feet thick near surface earth <br />materials should be over-excavated and re-compacted. Removal should be extended at least <br />2 feet beyond building lines. <br />No deeper removal is anticipated, however, if deeper loose soils are encountered, deeper <br />removal and re-compaction will be required. This will be determined at the field by the project <br />geotechnical/civil engineer, based on the actual conditions exposed at the time of site grading. <br />The removed clean on-site earth materials without any debris, vegetation and roots can be re- <br />used as fill or back fill material. <br />Fill, back fill material or additional imported soils should be free of organic matter and oversize <br />material, 6 inches or greater in diameter, placed in near-horizontal loose lift not to exceed 4 <br />inches in thickness and moisture conditioned to slightly over optimum moisture content prior <br />to compaction. <br />Imported soil, if any, should have a very low expansion potential and should be geotechnical <br />observed/tested and accepted by the geotechnical/civil engineer prior to using at the site. <br />In general, grading at the site should be performed in accordance with the requirements of the <br />city and under the geotechnical observation and testing of the project geotechnical / civil <br />engineer. The compaction criteria for fill and backfill material is a minimum of 90% of the <br />maximum density determined in accordance with ASTM Test Method D1557. <br />FLOOD ZONE - 718 S <br />Flintridge Dr Unit# 23/26/2025
The URL can be used to link to this page
Your browser does not support the video tag.