Laserfiche WebLink
TMC ENGINEERS INC. <br />Geotechnical, Structural and Civil Engineering <br />Add: 9542 Pacific Ave, Anaheim, CA92804. Phone: 714-829-5053; Email: Tienchu.pe@gmail.com <br /> <br />Page 10 <br /> <br /> <br /> <br />7.1.3 Structural Backfill <br />The onsite soils may be used as compacted fill provided they are free of organic materials <br />and debris. Fills should be placed in relatively thin lifts; brought to near optimum moisture <br />content, then compacted to obtain at least 90 percent relative compaction based on <br />laboratory standard ASTM D-1557-07. <br />7.1.4 Site Drainage <br />Foundation and slab performance depend greatly on how well runoff waters drain from the <br />site. This is true both during construction and over the entire life of the structure. The ground <br />surface around structures should be graded so that water flows rapidly away from structure. <br />Roof gutters and downspouts should be properly provided and maintained. <br />In the future, sources of uncontrolled water, such as leaky sewer, water (domestic, irrigation) <br />or drain pipes should be repaired if identified. <br />The requirements of the governmental agency and the current CBC should be followed, as <br />needed. <br />FLOOD ZONE - 718 S <br />Flintridge Dr Unit# 23/26/2025