My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD ZONE - 718 S Flintridge Dr Unit# 2 - Plan
PBA
>
Building
>
ProjectDox
>
F
>
Flintridge Dr
>
718 S Flintridge Dr Unit# 2
>
FLOOD ZONE - 718 S Flintridge Dr Unit# 2 - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/6/2025 7:18:28 AM
Creation date
6/6/2025 7:18:19 AM
Metadata
Fields
Template:
Plan
Permit Number
101119235
Full Address
718 S Flintridge Dr Unit# 2
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
115
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
TMC ENGINEERS INC. <br />Geotechnical, Structural and Civil Engineering <br />Add: 9542 Pacific Ave, Anaheim, CA92804. Phone: 714-829-5053; Email: Tienchu.pe@gmail.com <br /> <br />Page 14 <br /> <br /> <br />9.0 INSPECTION <br />As a necessary requisite to the use of this report, the following inspection is recommended: <br />Temporary excavations. <br />Removal of surficial soils. <br />Backfill placement and compaction. <br />• Foundation excavations. The geotechnical engineer should be notified at least 1 day in <br />advance of the start of construction. A joint meeting between the client, the contractor, and <br />the geotechnical engineer is recommended prior to the start of construction to discuss <br />specific procedures and scheduling. <br /> <br />10.0 INVESTIGATION LIMITATIONS <br />+ The materials encountered on the subject site and utilized in our laboratory testing program <br />are believed to be representative of the area. However, soil may vary in characters between <br />the exploratory borings. Since our investigation is based on the site materials observed, <br />selected laboratory testing, and engineering analyses, the conclusions and <br />recommendations are professional opinion. These opinions have been derived in accordance <br />with current standard of practice. <br />+ Based on our site investigation and recommendation, we believed that the proposed <br />improvements will not adversely impact adjoining site. <br /> <br />FLOOD ZONE - 718 S <br />Flintridge Dr Unit# 23/26/2025
The URL can be used to link to this page
Your browser does not support the video tag.