Laserfiche WebLink
UP <br />OTIS <br />GEN2 <br />3500 LB / 200 FPM <br />5'-0" PIT <br />14'-8" OVERRUN <br />9'-9" TALL CAB HEIGHT <br />100' MAX. TRAVEL <br />RETAIL RETAIL RETAIL RETAIL <br />AD <br />AD <br />5' DIA. <br />ED <br />AD <br />STEP <br />UP <br />ED <br />2 2 <br />1 <br />1 <br />1 <br />AD <br />AD <br />AD <br />ADUP <br />UP <br />DN <br />% <br />M <br />A <br />X <br />. <br />5. <br />2 <br />3 <br />% <br /> <br />M <br />A <br />X <br />. <br />SL <br />O <br />P <br />E <br /> <br />D <br />O <br />W <br />N <br />CHARGIE <br />ELECTRIC VEHICLE <br />CHARGE STATION <br />HIGH POWER <br />POWER <br />CHARGING <br />POWER FAULT <br />CHARGING FAULT <br />CHARGIE <br />ELECTRIC VEHICLE <br />CHARGE STATION <br />HIGH POWER <br />POWER <br />CHARGING <br />POWER FAULT <br />CHARGING FAULT <br />7 SINGLE PORT WALL MOUNTED EV STATION <br />0 DUAL PORT PEDESTAL MOUNTED EV STATION <br />0 SINGLE PORT PEDESTAL MOUNTED EV STATION <br />ACCESSIBLE EV STATION <br />GARAGE FIRST TIER <br />7 TOTAL EV STATIONS ON FIRST TIER & LOWER TIER <br />10'-7" <br />18'-11" <br />9' <br />4' <br />25'-10" <br />28'-10" <br />12' <br />21' <br />NEW <br />ACCESS <br />PATH <br />5' <br />9' <br />NEW <br />ACCESS <br />AISLE <br />IDENTIFICATION SIGN <br />IDENTIFICATION SIGN <br />CONTRACTOR <br />SHEET DESCRIPTION: <br />ENLARGED PLAN I <br />DRAWN DATE 27.06.2024 <br />DRAWN BY EMMANUEL <br />REVIEWED BY ---- <br />REVISIONS <br />REV DESCRIPTION DATE <br />SHEET INDEX <br />UTILITY : SCE <br />PROJECT INFORMATION <br />AHJ : SANTA ANA <br />ADDRESS : 2010 E WARNER AVE, <br />SANTA ANA, CA <br />NAME : WARNER REDHILL <br />APN : 430-222-07/430-222-16 <br />SYSTEM INFORMATION: <br />(58)LITEON <br />CHARGING STATIONS <br />PROJECT INFORMATION: <br />CHARGIE TO DESIGN AND <br />INSTALL THE CHARGING <br />SYSTEM. <br />N <br />S <br />EW <br />SITE PLAN: <br />NOTE: THE HIGH FORWARD REACH SHALL <br />BE 48 INCHES (1219.2 MM) MAXIMUM AND <br />THE LOW FORWARD REACH SHALL BE 15 <br />INCHES (381 MM) MINIMUM ABOVE THE <br />FINISH FLOOR OR GROUND. THE <br />CONTRACTOR NEED TO PROVIDE DURING <br />THE INSTALLATION <br />REACH RANGES: <br />ELECTRIC <br />VEHICLE <br />CHARGING <br />STATION <br />PARKING ONLY <br />WHILE CHARGING <br />EV PANEL <br />SAFETY BOLLARD <br />SAFETY BOLLARD: <br />PARKING SIGN <br />EV-03 <br />SCALE: 1"=15.8' <br />PROJECT INFORMATION: <br />CHARGIE WILL DESIGN AND INSTALL THE ENTIRE EV CHARGING SYSTEM. <br />LEGEND: <br />MSP - EV <br />PULL <br />PNL - EV <br />N <br />G <br />(N) TRANSFORMER <br />(N)TRANSFORMER <br />G <br />M <br />CHARGIE <br />ELECTRIC VEHICLE <br />CHARGE STATION <br />HIGH POWER <br />POWER <br />CHARGING <br />POWER FAULT <br />CHARGING FAULT <br />CHARGIE <br />ELECTRIC VEHICLE <br />CHARGE STATION <br />HIGH POWER <br />POWER <br />CHARGING <br />POWER FAULT <br />CHARGING FAULT <br />- SAFETY BOLLARD <br />- CONDUIT <br />- PARKING SIGN <br />- MAIN SERVICE PANEL (EV) <br />- PULL SECTION <br />- EV PANEL <br />- EV TRANSFORMER <br />- DISCONNECT <br />- METER <br />- GAS METER <br />- EV CHARGING STALL <br />- EV SINGLE PORT <br /> WALL MOUNTED <br />- EV SINGLE PORT <br /> PEDESTAL MOUNTED <br />- 2 EV SINGLE PORT <br /> PEDESTAL MOUNTED <br />- RETAIL PARKING <br />- GUEST PARKING <br />- RESIDENT PARKING <br />RETAIL <br /> GUEST <br />### <br />NO <br /> <br />P <br />A <br />R <br />K <br />I <br />N <br />G <br />- ACCESSIBLE STALL <br />- NEW ACCESS AISLE MARKINGS <br />- NEW EVCS ACCESSIBLE ONLY SIGNAGE <br />2010 E Warner Ave, Bldg P <br />- 101119118 & 20182681 <br />7/8/2024