Laserfiche WebLink
GE <br />N <br />E <br />R <br />A <br />L <br /> <br />N <br />O <br />T <br />E <br />S <br />G.2 <br />mh <br />1.THIS PROJECT AND ALL WORK ASSOCIATED WITH PROJECT SHALL CONFORM TO STATE <br />AND LOCAL CODES AND ORDINANCES HAVING JURISDICTION OVER THIS PROJECT. <br />2.THE TERM "ARCHITECT" OR "DESIGNER" AS USED IN THESE DOCUMENTS REFERS TO <br />SH-PARTNERS. <br />3.THE ARCHITECT SHALL NOT HAVE CONTROL OR CHARGE OF AND SHALL NOT BE <br />RESPONSIBLE FOR CONSTRUCTION MEANS, METHODS, TECHNIQUES, SEQUENCE OF <br />PROCEDURE, OR FOR SAFETY PRECAUTIONS AND PROGRAMS IN CONNECTION WITH THE <br />WORK, ALL OF WHICH SHALL BE THE SOLE RESPONSIBILITY OF THE CONTRACTOR. <br />4.THE DESIGN ADEQUACY, AND SAFETY OF ERECTION BRACING, SHORING, TEMPORARY <br />SUPPORTS, ETC. DURING DEMOLITION AND/OR CONSTRUCTION IS THE SOLE <br />RESPONSIBILITY OF THE CONTRACTOR, AND HAS NOT BEEN CONSIDERED BY THE <br />STRUCTURAL ENGINEER OR ARCHITECT. <br />5.THE ARCHITECT ASSUMES NO RESPONSIBILITY FOR THE COMPLETENESS OF PLANS FOR <br />BID PURPOSES PRIOR TO THE ISSUANCE OF THE BUILDING PERMIT. <br />6.ALL WORK NOTED "N.I.C." OR "NOT IN CONTRACT" IS TO BE ACCOMPLISHED BY A <br />CONTRACTOR OTHER THAN THE GENERAL CONTRACTOR AND IS NOT TO BE PART OF <br />THE CONSTRUCTION AGREEMENT. THE GENERAL CONTRACTOR SHALL COORDINATE <br />WITH "OTHER" CONTRACTORS PER REQUIREMENTS ESTABLISHED BY OWNER AND <br />TENANT. <br />7.THE GENERAL CONTRACTOR AND ALL SUBCONTRACTORS ARE RESPONSIBLE FOR <br />EXAMINING CONTRACT DOCUMENTS, FIELD CONDITIONS, AND CONFIRMING THAT WORK <br />IS BUILDABLE AS SHOWN BEFORE PROCEEDING WITH CONSTRUCTION. IF THERE ARE <br />ANY QUESTIONS REGARDING THESE OR OTHER COORDINATION ITEMS, THE <br />CONTRACTOR IS RESPONSIBLE FOR OBTAINING CLARIFICATION FROM THE ARCHITECT <br />BEFORE PROCEEDING WITH WORK IN QUESTION OR RELATED WORK. <br />8.CONTRACTOR SHALL MAINTAIN RECORD DOCUMENTS OF CONSTRUCTION CHANGES <br />("AS-BUILT DRAWINGS") AND SHALL PROVIDE SAID DOCUMENTATION TO THE ARCHITECT <br />UPON COMPLETION OF CONSTRUCTION - NO EXCEPTION ALLOWED. <br />9.THE GENERAL CONTRACTOR IS SOLELY RESPONSIBLE TO COORDINATE WITH ALL <br />SUBCONTRACTORS PER REQUIREMENTS ESTABLISHED BY OWNER, TENANT, OR BOTH, <br />WHICH ARE UNDER SEPARATE CONTRACT WITH THE OWNER, OR TENANT, OR BOTH. <br />10.THE STRUCTURAL, MECHANICAL, ELECTRICAL, PLUMBING, OTHER DRAWINGS, AND JOB <br />SPECIFICATIONS ARE SUPPLEMENTARY TO ARCHITECTURAL CONSTRUCTION DRAWINGS. <br />ANY DISCREPANCY BETWEEN THESE DOCUMENTS SHALL BE IMMEDIATELY BROUGHT TO <br />THE ATTENTION OF THE ARCHITECT FOR CLARIFICATION. <br />11.THE INTENT OF DRAWINGS AND SPECIFICATIONS IS TO INCLUDE ALL LABOR, <br />MATERIALS AND SERVICES NECESSARY FOR THE COMPLETION OF ALL WORK SHOWN, <br />DESCRIBED, OR REASONABLY IMPLIED, BUT NOT LIMITED TO THAT EXPLICITLY <br />INDICATED IN THE CONTRACT DOCUMENTS. <br />12.INSTALL ALL MANUFACTURED ITEMS, MATERIALS, AND EQUIPMENT IN STRICT <br />ACCORDANCE WITH THE MANUFACTURER'S SPECIFICATIONS, U.O.N. <br />13.ANY WORK INSTALLED IN CONFLICT WITH THE CONSTRUCTION DRAWINGS, WITHOUT <br />THE PRIOR APPROVAL OF THE OWNER AND THE ARCHITECT SHALL BE CORRECTED AT <br />THE CONTRACTOR'S EXPENSE. <br />14.THE GENERAL CONTRACTOR SHALL NOTIFY THE ARCHITECT IMMEDIATELY OF ANY <br />SPECIFIED MATERIALS OR EQUIPMENT WHICH ARE EITHER UNAVAILABLE OR THAT WILL <br />CAUSE A DELAY IN THE CONSTRUCTION COMPLETION SCHEDULE. THE CONTRACTOR <br />SHALL SUBMIT CONFIRMATIONS OF DELIVERY DATES FOR ORDERS OF MATERIALS AND <br />EQUIPMENT HAVING LONG LEAD TIMES. <br />15.ALL REQUESTS FOR SUBSTITUTIONS OF ITEMS SPECIFIED SHALL BE SUBMITTED IN <br />WRITING AND WILL BE CONSIDERED ONLY IF BETTER SERVICE FACILITIES, A MORE <br />ADVANTAGEOUS DELIVERY DATE, OR A LOWER PRICE WITH CREDIT TO THE OWNER / <br />TENANT WILL BE PROVIDED WITHOUT SACRIFICING QUALITY, APPEARANCE, AND <br />FUNCTION. UNDER NO CIRCUMSTANCES WILL THE ARCHITECT BE REQUIRED TO PROVE <br />THAT A PRODUCT PROPOSED FOR SUBSTITUTION IS OR IS NOT OF EQUAL QUALITY TO <br />THE PRODUCT SPECIFIED. <br />16.PROJECT SPECIFICATIONS ARE AN INTEGRAL PART OF THESE PLANS - SUBSTITUTIONS <br />FOR SPECIFIED MATERIALS REQUIRE THE WRITTEN APPROVAL FROM THE ARCHITECT. <br />17.UNLESS OTHERWISE NOTED IN THE CONTRACT DOCUMENTS, THE CONTRACTOR SHALL <br />SUBMIT ONE (1) SET OF SHOP DRAWINGS. SHOP DRAWINGS SHOULD INCLUDE DETAILED, <br />FABRICATION AND ERECTION DRAWINGS, SETTING DRAWINGS, DIAGRAMMATIC <br />DRAWINGS, AND MATERIAL SCHEDULES. LOCATION AND ORIENTATION OF ALL ITEMS <br />SHOULD BE CLEARLY INDICATED. BEGIN FABRICATION OF SHOP ITEMS AFTER <br />RECEIVING ARCHITECT'S OR DESIGNER'S APPROVAL OF SHOP DRAWINGS. <br />18.THE ARCHITECT'S REVIEW OF SHOP DRAWINGS SHALL NOT RELIEVE THE GENERAL <br />CONTRACTOR OR SUBCONTRACTOR FROM RESPONSIBILITY FOR DEVIATIONS FROM THE <br />DRAWINGS OR SPECIFICATIONS UNLESS HE HAS, IN WRITING, AND BROUGHT TO THE <br />ATTENTION OF THE ARCHITECT SUCH DEVIATIONS AT THE TIME OF THE SUBMISSION, <br />NOR SHALL IT RELIEVE HIM (GENERAL CONTRACTOR) FROM RESPONSIBILITY FOR <br />ERRORS OF ANY SORT IN THE SHOP DRAWINGS. <br />19.THE GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING ALL REQUIRED <br />BUILDING PERMITS PRIOR TO STARTING CONSTRUCTION. <br />20.PRIOR TO THE ISSUANCE OF A BUILDING PERMIT, THE APPLICANT SHALL HAVE <br />EVIDENCE OF CURRENT WORKMAN'S COMPENSATION INSURANCE COVERAGE ON <br />FILE WITH THE STATE LABOR DEPARTMENT IN COMPLIANCE WITH CURRENT LABOR <br />CODES. <br />21.PROVIDE CONTINUOUS INSPECTIONS AS SET FORTH IN STATE AND LOCAL CODES AND <br />PER CONTRACT DOCUMENTS AS NEEDED. <br />22.PRIOR TO THE ISSUANCE OF FINAL CERTIFICATE OF OCCUPANCY FOR THIS PROJECT, <br />THE GENERAL CONTRACTOR SHALL SUBMIT A SIGNED CERTIFICATE TO THE <br />DEPARTMENT OF BUILDING AND SAFETY STATING THAT ALL WORK HAS BEEN <br />PERFORMED AND MATERIALS INSTALLED ACCORDING TO THE PLANS AND <br />SPECIFICATIONS AFFECTING NON-RESIDENTIAL ENERGY. <br />23.CONTRACTOR SHALL VERIFY ALL BUILDING STANDARDS WITH BUILDING LANDLORD <br />PRIOR TO BEGINNING ANY WORK. HOWEVER, THERE SHALL BE NO DEVIATIONS <br />WHATSOEVER FROM THE CONTRACTOR DOCUMENTS WITHOUT THE ARCHITECT'S <br />WRITTEN APPROVAL THEREOF. THE CONTRACTOR AGREES TO DEFEND, INDEMNIFY AND <br />HOLD THE ARCHITECT HARMLESS FROM ANY CLAIMS ARISING AS A RESULT OF <br />UNAPPROVED CHANGES. <br />24.UPON COMPLETION OF CONSTRUCTION, CONTRACTOR IS RESPONSIBLE FOR EMERGENCY <br />RESPONDER RADIO COVERAGE TESTING AND COMPLIANCE. <br />25.UNLESS OTHERWISE NOTED OR INDICATED, ALL DIMENSIONS ON THESE DOCUMENTS <br />SHALL BE TO FACE OF CURB, FACE OF CONCRETE OR MASONRY, FACE OF FINISH OR <br />CENTERLINE OF GRIDS. <br />26.ALL VERTICAL DIMENSIONS SHOWN ARE FROM FLOOR SLAB, U.O.N. <br />27.DIMENSIONS SHOWN IN FIGURES TAKE PRECEDENCE OVER DIMENSIONS SCALED FROM <br />DRAWINGS. LARGE SCALE DRAWINGS AND DETAILS TAKE PRECEDENCE OVER SMALLER <br />SCALE DRAWINGS. <br />28.THE TERM "ALIGN", AS USED IN THESE DOCUMENTS, SHALL MEAN TO ACCURATELY <br />LOCATE FINISHES IN THE SAME PLANE. <br />29."TYPICAL" AS USED IN THESE DOCUMENTS SHALL MEAN THAT THE CONDITION IS THE <br />SAME OR REPRESENTATIVE FOR ALL SIMILAR CONDITIONS THROUGHOUT, U.O.N. <br />30.DETAILS ARE USUALLY KEYED AND NOTED "TYPICAL" ONLY ONCE, WHEN THEY FIRST <br />OCCUR AND ARE REPRESENTATIVE OF ALL SIMILAR CONDITIONS THROUGHOUT, U.O.N. <br />31.COLUMN CENTERLINES (GRID LINES) ARE SHOWN FOR DIMENSIONING PURPOSES. <br />32.WHERE CONSTRUCTION DETAILS ARE NOT SHOWN OR NOTED FOR ANY PART OF THE <br />WORK, THE DETAILS SHALL BE THE SAME AS FOR OTHER SIMILAR WORK IN THE SAME <br />BUILDING. <br />1.WHERE EXISTING TENANTS/BUSINESSES ARE ADJACENT TO THE JOB SITE/TENANT, <br />THE CONTRACTOR SHALL MINIMIZE CONSTRUCTION NOISE - EXTREME NOISE <br />CONSTRUCTION SHALL OCCUR AT NON-TYPICAL BUSINESS HOURS. CONTRACTOR <br />SHOULD NOTIFY BUILDING REPRESENTATIVE OF SPECIAL CIRCUMSTANCES IN <br />ADVANCE PRIOR TO WORK. <br />2.THE CONTRACTOR AT HIS OWN EXPENSE, SHALL KEEP THE PROJECT AND <br />SURROUNDING AREA FREE FROM DUST AND DEBRIS. THE WORK SHALL BE IN <br />CONFORMANCE WITH THE AIR AND WATER POLLUTION CONTROL STANDARDS AND <br />REGULATIONS OF THE STATE DEPARTMENT OF HEALTH. <br />3.CONSTRUCTION DEBRIS AND WASTES SHALL BE DEPOSITED AT AN APPROPRIATE <br />SITE. THE CONTRACTOR SHALL INFORM THE BUILDING REPRESENTATIVE OF THE <br />LOCATION OF DISPOSAL SITES. <br />4.CONTRACTOR SHALL BE RESPONSIBLE FOR THE GENERAL CLEANING OF THE JOB <br />AFTER ITS COMPLETION. WHERE APPLICABLE, CLEANING SHALL INCLUDE, BUT NOT <br />BE LIMITED TO, THE EXTERIOR AND THE INTERIOR OF THE BUILDING, THE PATH OF <br />TRAVEL TO THE JOB SITE, PARKING LOTS, ELEVATORS, LOBBIES, AND CORRIDOR <br />CARPETS. <br />5.THE CONTRACTOR SHALL PROVIDE PEDESTRIAN PROTECTION, WHERE REQUIRED PER <br />STATE AND LOCAL CODES. <br />6.IF TRENCHES OR EXCAVATIONS 5'-0" OR MORE IN DEPTH ARE REQUIRED, OBTAIN <br />ISSUANCE OF A BUILDING OR GRADING PERMIT. <br />7.NO HAZARDOUS MATERIALS SHALL BE USED OR STORED WITHIN THE BUILDING <br />WHICH DOES NOT COMPLY WITH THE LOCAL FIRE AUTHORITY AND STATE & COUNTY <br />REQUIREMENTS. <br />8.CONTRACTOR SHALL BE RESPONSIBLE FOR BLOCKING OFF SUPPLY AND RETURN AIR <br />GRILLES, DIFFUSERS & DUCTS TO KEEP DUST FROM ENTERING INTO BUILDING AIR <br />DISTRIBUTION SYSTEMS. <br />9.BUILDINGS UNDERGOING CONSTRUCTION, ALTERATION OR DEMOLITION SHALL BE <br />DONE SO IN ACCORDANCE WITH STATE & LOCAL CODES. <br />10.THE CONTRACTOR SHALL TAKE ALL NECESSARY PRECAUTIONS TO ENSURE THE <br />SAFETY OF THE OCCUPANTS AND WORKERS AT ALL TIMES. <br />11.THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE COMPLETE SECURITY OF THE <br />BUILDING AND SITE WHILE JOB IS IN PROGRESS AND UNTIL THE JOB IS COMPLETED. <br />12.WHERE ELECTRICAL, MECHANICAL AND/OR PLUMBING ITEMS, SUCH AS LIGHTS, <br />DUCTS, PIPING, DOWNSPOUTS, ETC. ARE TO PENETRATE ANY BUILDING FOOTINGS, <br />SLABS, FLOORS, STRUCTURAL FRAMING, WALL PARTITIONS, CEILINGS, ETC., IT IS <br />REQUIRED THAT AN APPROPRIATELY SIZED OPENING OR CLEARANCE BE FURNISHED. <br />CONTRACTOR SHALL COORDINATE THE INSTALLATION OF ALL ITEMS WITH THE <br />CONSTRUCTION DOCUMENTS PRIOR TO THE INSTALLATION OF STRUCTURAL, <br />MECHANICAL, PLUMBING AND ELECTRICAL WORK. ANY CONFLICT OR DISCREPANCY <br />WITHIN CONSTRUCTION DOCUMENTS SHALL BE BROUGHT TO THE ARCHITECT'S <br />ATTENTION FOR CLARIFICATION. <br />13.CONTRACTOR, ALONG WITH MECHANICAL CONTRACTOR, SHALL PROVIDE AND <br />LOCATE ACCESS DOORS/PANELS IN WALL & CEILING CONSTRUCTION AS REQUIRED <br />TO PROVIDE ACCESS TO MECHANICAL, FIRE SPRINKLER, PLUMBING & ELECTRICAL <br />WORK. CONTRACTOR SHALL SUBMIT A PLAN OF ALL PROPOSED ACCESS PANEL <br />LOCATIONS TO ARCHITECT FOR APPROVAL PRIOR TO INSTALLATION. <br />14.ALL PENETRATIONS AT RATED CONSTRUCTION SHALL BE PROTECTED TO MAINTAIN <br />RATING. <br />15.WHERE OCCURS, CONTRACTOR SHALL PATCH ANY EXISTING WALLS AND/OR <br />CEILINGS AS NEEDED TO REFURBISH THE LEASE SPACE AND REPAIR ALL DAMAGES <br />CAUSED BY CONTRACTOR. <br />16.INTERIOR WALLS AND CEILINGS SHALL BE INSTALLED IN ACCORDANCE TO STATE & <br />LOCAL CODES, INCLUDING REQUIREMENTS FOR FLAME SPREAD AND SMOKE DENSITY <br />RATINGS FOR FINISH MATERIALS. <br />17.WHEN USED, ALL NOISE BARRIER BATTS (SOUND INSULATION) AND INSULATION <br />BATTS SHALL BE NON-COMBUSTIBLE AND SHALL NOT CONTAIN OR UTILIZE OZONE <br />DEPLETING COMPOUNDS. <br />18.ALL NEW CONSTRUCTION MATERIALS SHALL BE 100% ASBESTOS-FREE. <br />19.OUR FIELD VERIFICATION IS BASED ON THOSE BUILDING ELEMENTS WHICH ARE <br />IMMEDIATELY AND READILY VISIBLE WITHOUT THE USE OF DEMOLITION OR REMOVAL <br />OF ANY PERMANENT ELEMENTS. <br />GENERAL NOTES:job site notes: <br />SHEET <br />PA / PM: <br />JOB NO.: <br />DRAWN BY: <br />CAUTION: 24"x36" <br />RE <br />M <br />A <br />R <br />K <br />S <br />DA <br />T <br />E <br />de <br />b <br />s <br />@ <br />s <br />h <br />p <br />a <br />r <br />t <br />n <br />e <br />r <br />s <br />. <br />n <br />e <br />t <br />ma <br />r <br />c <br />o <br />h <br />@ <br />s <br />h <br />p <br />a <br />r <br />t <br />n <br />e <br />r <br />s <br />. <br />n <br />e <br />t <br />(7 <br />1 <br />4 <br />) <br />3 <br />9 <br />0 <br />. <br />8 <br />6 <br />0 <br />0 <br />ar <br />c <br />h <br />i <br />t <br />e <br />c <br />t <br />u <br />r <br />e <br /> <br />a <br />n <br />d <br /> <br />p <br />l <br />a <br />n <br />n <br />i <br />n <br />g <br />PA <br />R <br />T <br />N <br />E <br />R <br />S <br />ww <br />w <br />. <br />s <br />h <br />p <br />a <br />r <br />t <br />n <br />e <br />r <br />s <br />. <br />n <br />e <br />t <br />07 <br />- <br />0 <br />3 <br />- <br />2 <br />0 <br />2 <br />4 <br />PL <br />A <br />N <br /> <br />C <br />H <br />E <br />C <br />K <br /> <br />S <br />U <br />B <br />M <br />I <br />T <br />T <br />A <br />L <br />UN <br />I <br />T <br />E <br />D <br /> <br />M <br />E <br />D <br />I <br />C <br />A <br />L <br /> <br />I <br />M <br />A <br />G <br />I <br />N <br />G <br /> <br />H <br />E <br />A <br />L <br />T <br />H <br />C <br />A <br />R <br />E <br />80 <br />0 <br /> <br />N <br />. <br /> <br />T <br />U <br />S <br />T <br />I <br />N <br /> <br />A <br />V <br />E <br />N <br />U <br />E <br />, <br />SA <br />N <br />T <br />A <br /> <br />A <br />N <br />A <br />, <br /> <br />C <br />A <br /> <br />9 <br />2 <br />7 <br />0 <br />5 <br />TE <br />N <br />A <br />N <br />T <br /> <br />I <br />M <br />P <br />R <br />O <br />V <br />E <br />M <br />E <br />N <br />T <br /> <br />F <br />O <br />R <br />Un <br />i <br />t <br />e <br />d <br /> <br />M <br />e <br />d <br />i <br />c <br />a <br />l <br /> <br />I <br />m <br />a <br />g <br />i <br />n <br />g <br /> <br />H <br />e <br />a <br />l <br />t <br />h <br />c <br />a <br />r <br />e <br />SU <br />I <br />T <br />E <br /> <br />- <br /> <br />H <br />DS/MH <br />23-16 <br />N/A <br />N/A <br />N/A <br />N/A <br />N/A <br />N/A <br />N/A <br />N/A <br />N/A <br />N/A <br />N/A <br />N/A <br />N/A <br />N/A <br />N/A <br />N/A <br />N/A <br />N/A <br />N/A <br />N/A <br />N/A <br />N/A <br />N/A <br />N/A <br />4/G.4 <br />N/A <br />N/A <br />800 N. TUSTIN AVE., SANTA ANA, CA <br />TENANT IMPROVEMENT <br />A6.4 <br />800 N Tustin Ave Unit <br />#H1/23/2025