Laserfiche WebLink
GENERAL REQUIREMENTS <br />1. IT IS THE CONTRACTOR'S RESPONSIBILITY TO VERIFY ALL DIMENSIONS, PROJECT BOUNDARIES AND EXISTING <br />CONDITIONS AT THE SITE PRIOR TO COMMENCEMENT OF WORK. THE CONTRACTOR SHALL CROSS-CHECK DETAILS AND <br />DIMENSIONS SHOWN ON THE STRUCTURAL DRAWINGS WITH RELATED REQUIREMENTS ON OTHER CONSTRUCTION <br />DOCUMENTS. <br /> <br />2. THE CONTRACTOR SHALL IMMEDIATELY NOTIFY THE STRUCTURAL ENGINEER OF RECORD (SEOR) OF ANY CONFLICTS <br />BETWEEN THE STRUCTURAL DRAWINGS AND OTHER CONSTRUCTION DOCUMENTS OR EXISTING CONDITIONS. THE <br />CONTRACTOR SHALL NOT ORDER MATERIAL, FABRICATE ELEMENTS, OR CONSTRUCT ANY PORTION OF STRUCTURE <br />THAT IS IN CONFLICT UNTIL RESOLUTION IS MADE. <br />3. WHEN DIMENSIONS ARE UNCLEAR, REQUEST CLARIFICATION FROM THE SEOR AND ARCHITECT. DO NOT SCALE <br />DRAWINGS. UNLESS NOTED OTHERWISE, PLAN DIMENSIONS INDICATE CENTERLINE OF BEAMS AND COLUMNS, LIGHT- <br />FRAMED WALLS ARE DIMENSIONED TO FACE OF STUDS, AND FOOTINGS ARE CENTERED UNDER THE ELEMENTS THEY <br />SUPPORT. <br />4. WHERE INFORMATION IS CONFLICTING WITHIN THE STRUCTURAL DOCUMENTS, SPECIFIC DETAILS SHALL GOVERN OVER <br />TYPICAL DETAILS, WHICH HAVE PRECEDENCE OVER THESE NOTES, WHICH IN TURN OVERRULE PROJECT <br />SPECIFICATIONS. <br />5. DETAILS NOTED AS TYPICAL ON STRUCTURAL SHEETS SHALL APPLY IN ALL CASES UNLESS SPECIFICALLY SHOWN OR <br />NOTED OTHERWISE. WHERE NO DETAIL IS INDICATED, CONSTRUCTION SHALL BE OF THE SAME NATURE AS FOR SIMILAR <br />CASES OF CONSTRUCTION ON THIS PROJECT. <br /> <br />6. THE ARCHITECT AND SEOR SHALL INTERPRET THE CONSTRUCTION DOCUMENTS IN CASE OF POSSIBLE CONFLICT OR <br />DISCREPANCY BETWEEN STRUCTURAL AND OTHER DISCIPLINES. <br />7. THE CONTRACTOR SHALL PROVIDE ALL NEW (N) MATERIALS TO PERFORM THE WORK INDICATED ON STRUCTURAL <br />DOCUMENTS UNLESS NOTED AS EXISTING (E) OR SUPPLIED BY OTHERS. WRITTEN APPROVAL FROM THE SEOR SHALL <br />BE OBTAINED PRIOR TO THE SUBSTITUTION OF ANY MATERIAL OR PRODUCT SPECIFIED ON THE STRUCTURAL <br />DOCUMENTS. <br />8. STRUCTURAL CONSTRUCTION DOCUMENTS REPRESENT THE FINISHED STRUCTURE, UNLESS OTHERWISE SHOWN THEY <br />DO NOT INDICATE THE METHOD OF CONSTRUCTION OR NECESSARY COMPONENTS FOR CONSTRUCTION SAFETY. THE <br />CONTRACTOR IS SOLELY RESPONSIBLE FOR THE DESIGN OF TEMPORARY ERECTION AIDS, FORMWORK, SCAFFOLDING, <br />SAFETY MEASURES, SHORING OF ANY PORTION OF WORK, AND PROTECTION OF ADJACENT PROPERTIES. THE <br />CONTRACTOR SHALL SUPERVISE AND DIRECT THE WORK AND SHALL BE RESPONSIBLE FOR ALL CONSTRUCTION MEANS, <br />METHODS, TECHNIQUES, SEQUENCES AND PROCEDURES. VISITS TO THE SITE BY THE SEOR SHALL NOT INCLUDE <br />OBSERVATION OR INSPECTION OF THE ABOVE ITEMS AND DO NOT IN ANY WAY RELIEVE THE CONTRACTOR OF HIS <br />RESPONSIBILITIES FOR THE ABOVE. <br /> <br />9. IT IS THE CONTRACTOR'S RESPONSIBILITY TO COMPLY WITH THE PERTINENT SECTIONS OF THE "CONSTRUCTION <br />SAFETY ORDERS" ISSUED BY THE STATE OF CALIFORNIA, LATEST EDITION, AND ALL OSHA REQUIREMENTS AS THEY <br />APPLY TO THIS PROJECT. THE SEOR AND THE OWNER DO NOT ACCEPT ANY RESPONSIBILITY FOR THE CONTRACTOR'S <br />FAILURE TO COMPLY WITH THESE. <br />10. ALL STRUCTURAL FRAMING SHALL BE ERECTED PLUMB AND TRUE TO LINE. TEMPORARY BRACING SHALL BE INSTALLED <br />AND LEFT IN PLACE UNTIL ADEQUATE STRUCTURE IS CONSTRUCTED FOR STABILITY. <br />11. CONSTRUCTION MATERIALS AND ERECTION LOADS SHALL BE DISTRIBUTED WHEN PLACED ON THE STRUCTURE SUCH <br />THAT THEY DO NOT EXCEED DESIGN LIVE LOADS OR RESULT IN AN UNBALANCED CONDITION. MAXIMUM PERMANENT <br />EQUIPMENT WEIGHTS, POSTED LOAD LIMITS OR OTHER RESTRICTIONS NOTED ON THE STRUCTURAL DRAWINGS SHALL <br />NOT BE EXCEEDED WITHOUT PRIOR WRITTEN APPROVAL BY THE SEOR. UNLESS SPECIFICALLY STATED, THE <br />STRUCTURE IS NOT DESIGNED TO SUPPORT TRAFFIC FROM CRANES OR OTHER HEAVY CONSTRUCTION VEHICLES. <br />12. FLOOR, ROOF AND WALL OPENINGS, SLEEVES, INSERTS, EMBEDS, CONDUITS AND OTHER DISCIPLINE REQUIREMENTS <br />MUST BE COORDINATED BEFORE THE CONTRACTOR PROCEEDS WITH CONSTRUCTION. THE EXACT DEPTH, EXTENT, <br />AND LOCATION OF ALL FLOOR OR ROOF DEPRESSIONS, SLOPES, CURBS, PADS, TRENCHES, DRAINS AND OTHER <br />FEATURES SHALL BE COORDINATED WITH THE CONSTRUCTION DOCUMENTS. THE STRUCTURAL DRAWINGS DO NOT <br />NECESSARILY INDICATE ALL OF THESE ITEMS. <br />13. CORE DRILLING OF CONCRETE OR MASONRY IS NOT PERMITTED WITHOUT PRIOR APPROVAL BY THE SEOR. CORES, <br />WHERE APPROVED SHALL NOT CUT REINFORCEMENT. THE CONTRACTOR SHALL PRESENT ALL CORES TO THE <br />INSPECTOR OF RECORD (IOR) FOR VERIFICATION. <br />14. STRUCTURAL DRAWINGS INDICATE THE APPROXIMATE LOCATION OF EQUIPMENT AND THEIR SECONDARY FRAMING <br />SUPPORTS. THE CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING WORK BETWEEN SUBCONTRACTORS AND <br />CRAFTS IN ORDER TO PROVIDE NECESSARY DIMENSIONS IN A TIMELY MANNER TO ALL PARTIES AND DETAILERS <br />INVOLVED. <br /> <br />15. PROVIDE A SHIM SPACE AT HEADERS AND JAMBS TO ALLOW FOR SETTLEMENT AND MOVEMENT OF FRAMING. INSTALL <br />WINDOWS, DOORS AND OTHER INSET ITEMS IN WALLS AFTER BUILDING LOADS ARE FULLY APPLIED. <br />16. EXPANSION AND SEPARATION JOINT DIMENSIONS SHOWN INDICATE THE CLEAR DISTANCE REQUIRED. COMPONENTS <br />COVERING OR CROSSING SUCH JOINTS MUST ACCOMMODATE THE JOINT FULLY CLOSING OR OPENING TO TWICE THE <br />DIMENSION SHOWN, AS WELL AS RELATIVE LATERAL MOVEMENT ALONG THE JOINT. ALL PIPES, DUCTS, CONDUIT, ETC., <br />CROSSING SUCH JOINTS SHALL HAVE FLEXIBLE LINES WITH ADEQUATE RANGE OF MOTION. <br />STRUCTURAL DESIGN CRITERIA__________________________________________________________ <br />CODES:DESIGN IS BASED ON THE 2022 CALIFORNIA BUILDING CODE <br />LIVE LOADS (REDUCIBLE, UNO): <br />ROOF, UNIFORM..................................................................................................................20 PSF <br />TYPICAL OFFICE, UNIFORM + PARTITION ALLOWANCE................50 PSF + 15 PSF = 65 PSF <br />WIND LOADS: <br />RISK CATEGORY...........................................................................................................................II <br />EXPOSURE....................................................................................................................................B <br />ULTIMATE DESIGN WIDE SPEED, Vult............................................................................95 MPH <br />INTERNAL PRESSURE COEFFICIENT, G Cpi.......................................................................± 0.18 <br />EARTHQUAKE LOADS: <br />RISK CATEGORY..........................................................................................................................II <br />SEISMIC IMPORTANCE FACTOR, Ie.........................................................................................1.0 <br />SITE CLASSIFICATION................................................................................................D-DEFAULT <br />SPECTRAL ACCEL PARAMETERS (USGS ‘08)........................................SS = 1.265, S1 = 0.454 <br />DESIGN SPECTRAL ACCEL PARAMETERS.........................................SDS = 1.012, SD1 = 0.562 <br />SEISMIC DESIGN CATEGORY.....................................................................................................D <br />SEISMIC FORCE RESISTING SYSTEM(S): <br />NON STRUCTURAL COMPONENTS <br />STRUCTURAL SUBMITTALS <br />1. REVIEW OF SHOP DRAWINGS AND SUBMITTALS BY THE SEOR IS FOR GENERAL CONFORMANCE WITH THE <br />INFORMATION GIVEN IN THE CONTRACT DOCUMENTS. SEE THE STRUCTURAL SUBMITTAL SCHEDULE AND PROJECT <br />SPECIFICATIONS FOR REQUIREMENTS. <br />2. SHOP DRAWINGS FOR ITEMS SPECIFIED ON THE STRUCTURAL DOCUMENTS SHALL BE SUBMITTED TO THE SEOR FOR <br />REVIEW PRIOR TO FABRICATION. THE CONTRACTOR IS RESPONSIBLE FOR CHECKING DIMENSIONS, AND ALL ERRORS <br />OF DETAILING, FABRICATION, AND FIT UP OF STRUCTURAL MEMBERS INCLUDING COORDINATION WITH OTHER <br />TRADES. <br />3. SHOP DRAWINGS SUBMITTED TO THE SEOR SHALL CONSIST OF ELECTRONIC FILES AND/OR TWO HARDCOPY SETS. <br />ALLOW 10 BUSINESS DAYS FOR REVIEW BY THE SEOR UPON RECEIPT UNLESS ADVANCE NOTICE IS PROVIDED AND A <br />REDUCED TIMEFRAME AGREED UPON. THE SEOR WILL RETURN ONE SET OF REVIEWED ELECTRONIC FILES OR <br />HARDCOPY. SCHEDULE ALLOWANCE FOR REVIEWS AND PROCESSING TIME BY THE ARCHITECT, OWNER OR OTHER <br />DISCIPLINES MAY BE REQUIRED. <br />4. SHOP DRAWINGS AND SUBMITTALS DO NOT CONSTITUTE CHANGE ORDERS. ANY PROPOSED DEVIATION FROM THE <br />STRUCTURAL DOCUMENTS MUST BE SUBMITTED IN WRITING AS A REQUEST FOR SUBSTITUTION FOR APPROVAL BY <br />THE SEOR. <br />5. SUBSTITUTION REQUESTS FOR MATERIALS SPECIFIED ON THE STRUCTURAL DOCUMENTS MAY BE CONSIDERED WITH <br />MATERIALS HAVING EQUIVALENT OR GREATER CAPACITY AND PERFORMANCE. CURRENT EVALUATION REPORTS <br />AND PRODUCT INFORMATION SHALL BE PROVIDED TO THE SEOR DEMONSTRATING EQUIVALENT QUALITIES OF THE <br />MATERIAL TO BE SUBSTITUTED. <br />6. EACH CONTRACTOR RESPONSIBLE FOR THE CONSTRUCTION OF A MAIN WIND- OR SEISMIC- LATERAL FORCE <br />RESISTING SYSTEM (LFRS), DESIGNATED SEISMIC SYSTEM, OR A WIND- OR SEISMIC-RESISTING COMPONENT LISTED <br />IN THE STATEMENT OF SPECIAL INSPECTIONS SHALL SUBMIT A WRITTEN STATEMENT OF RESPONSIBILITY TO THE <br />BUILDING OFFICIAL AND THE OWNER PRIOR TO THE COMMENCEMENT OF WORK ON THE SYSTEM OR COMPONENT. <br />THE CONTRACTOR’S STATEMENT OF RESPONSIBILITY SHALL CONTAIN ACKNOWLEDGEMENT OF AWARENESS OF THE <br />SPECIAL REQUIREMENTS CONTAINED IN THE STATEMENT OF SPECIAL INSPECTION. <br />THE STRUCTURAL SUBMITTAL SCHEDULE BELOW IS A SUMMARY LIST AND MAY NOT BE ALL INCLUSIVE OF <br />SUBMITTALS REQUIRED FOR THIS PROJECT. PROVIDE ALL SUBMITTALS NOTED ON THE CONTRACT DOCUMENTS <br />AND AS REQUIRED BY THE ARCHITECT, BUILDING OFFICIAL AND OWNER’S REPRESENTATIVE. <br />STRUCTURAL SUBMITTAL SCHEDULE <br />GENERAL <br />REQ’D: QUALIFICATION DATA FOR APPROVED INSTALLERS AND FABRICATORS <br />REQ’D: CERTIFICATES OF CONFORMANCE FOR PREFABRICATED MEMBERS <br />REQ’D: STATEMENT OF RESPONSIBILITY FOR LFRS CONSTRUCTION <br />CONCRETE FORMWORK <br />NOT REQ’D: MANUFACTURER’S PRODUCT DATA AND INSTALLATION INSTRUCTIONS FOR PROPRIETARY <br />MATERIALS INCLUDING FORM COATINGS, MANUFACTURED FORM SYSTEMS, TIES AND <br />ACCESSORIES <br />NOT REQ’D: SHOP DRAWINGS FOR FABRICATION AND ERECTION OF FORMWORK AND SHORING <br />CONCRETE REINFORCEMENT <br />REQ’D: MANUFACTURER’S PRODUCT DATA, SPECIFICATIONS AND INSTALLATION PROCEDURES FOR <br />PROPRIETARY MATERIALS AND REINFORCEMENT <br />REQ’D: STEEL PRODUCER’S CERTIFICATES OF MILL ANALYSIS, TENSILE AND BEND TESTS <br />REQ’D: SHOP DRAWINGS FOR FABRICATION, BENDING AND PLACEMENT <br />CAST-IN-PLACE CONCRETE <br />REQ’D: DESIGN MIX FOR EACH CONCRETE MIXTURE, INDICATING LOCATION OF USE <br />REQ’D: MATERIAL CERTIFICATES FOR CEMENT, AGGREGATES AND ADMIXTURES <br />REQ’D: TEST CERTIFICATES FOR NON-POTABLE MIX WATER <br />REQ’D: SHOP DRAWINGS FOR PROPOSED LOCATIONS OF CONSTRUCTION AND CONTROL JOINTS <br />REQ’D: MINUTES FROM PREINSTALLATION CONFERENCE <br />NOT REQ’D: MANUFACTURER’S PRODUCT DATA FOR WATERSTOPS, BONDING AGENTS, VAPOR RETARDERS, <br />JOINT FILLER, CURING MATERIALS AND FLOOR TREATMENTS <br />REQ’D: CERTIFICATION OF INSTALLERS FOR OVERHEAD ADHESIVE ANCHORS <br />REQ’D: SHOP DRAWINGS FOR SHOTCRETE TEST PANELS AND MOCKUPS <br />REQ’D: SHOTCRETE CONTRACTOR AND NOZZLEMENT QUALIFICATIONS <br />MASONRY <br />NOT REQ’D: DESIGN MIX FOR GROUT <br />NOT REQ’D: MATERIAL TEST REPORTS <br />STRUCTURAL STEEL <br />REQ’D: MANUFACTURER’S MILL CERTIFICATES <br />REQ’D: MILL TEST REPORTS <br />REQ’D: SHOP DRAWINGS FOR FABRICATION AND ASSEMBLY OF MEMBERS <br />REQ’D: ERECTION PLAN SEQUENCE AND PROCEDURES <br />REQ’D: TEST REPORTS FOR SHOP AND FIELD WELDED AND BOLTED CONNECTIONS <br />STEEL JOISTS <br />REQ’D: SHOP DRAWINGS INDICATING LAYOUT AND DETAILS <br />NOT REQ’D: MANUFACTURER’S MILL CERTIFICATES <br />NOT REQ’D: ENGINEERING CALCULATIONS <br />STEEL DECK <br />REQ’D: SHOP DRAWINGS INDICATING TYPE, LAYOUT, DETAILS AND OPENINGS LARGER THAN 1 FOOT <br />COLD-FORMED METAL FRAMING <br />NOT REQ’D: SHOP DRAWINGS INDICATING LAYOUT AND DETAILS <br />NOT REQ’D: ENGINEERING CALCULATIONS <br />WELDING <br />REQ’D: WELDING PROCEDURE SPECIFICATIONS (WPS) <br />REQ’D: CERTIFICATES FOR ALL WELDERS VERIFYING CURRENT AWS QUALIFICATIONS <br />ROUGH CARPENTRY <br />NOT REQ’D: PRODUCT DATA FOR TREATMENTS AND PRESERVATIVES <br />NOT REQ’D: MATERIAL CERTIFICATES FOR DIMENSION LUMBER <br />PREFABRICATED WOOD PRODUCTS <br />NOT REQ’D: SHOP DRAWINGS INDICATING LAYOUT AND DETAILS <br />NOT REQ’D: ENGINEERING CALCULATIONS <br />GLUE-LAMINATED BEAMS <br />NOT REQ’D: SHOP DRAWINGS INDICATING LAYOUT <br />NOT REQ’D: CERTIFICATE OF CONFORMANCE <br />M/E/P COORDINATION <br />REQ’D: SHOP DRAWINGS OF PROPOSED LAYOUT OF PIPES, DUCTS AND CONDUIT INDICATING DETAILS OF <br />PENETRATIONS THROUGH STRUCTURE; GRAVITY AND SEISMIC FORCES OF SUPPORTS AND <br />BRACING ON STRUCTURE <br />DEFERRED APPROVALS <br />REQ’D: DRAWINGS, AND AS APPLICABLE, STRUCTURAL DESIGN CALCULATIONS <br />FOUNDATIONS <br />REQ’D: INSTALLATION PLAN FOR PILES / MICROPILES <br />REQ’D: AS BUILT RECORD SURVEY FOR PILES / MICROPILES <br />SPECIAL INSPECTIONS SCHEDULE <br />SOILS SUPPORTING FOUNDATIONS <br />PERIODIC: VERIFY EXCAVATIONS ARE EXTENDED TO PROPER DEPTH AND HAVE REACHED PROPER MATERIAL <br />PERIODIC: VERIFY MATERIALS BELOW FOOTING ARE ADEQUATE TO ACHIEVE THE DESIGN BEARING CAPACITY. <br />PERIODIC: PRIOR TO PLACEMENT OF CONTROLLED FILL, INSPECT SUBGRADE AND VERIFY THAT SITE HAS BEEN <br />PREPARED PROPERLY <br />CONTINUOUS: VERIFY USE OF PROPER MATERIALS, DENSITIES AND LIFT THICKNESSES DURING PLACEMENT AND <br />COMPACTION OF CONTROLLED FILLS <br />PERIODIC: PERFORM CLASSIFICATION AND TESTING OF CONTROLLED FILL MATERIALS <br />STRUCTURAL CONCRETE AND REINFORCEMENT <br />PERIODIC: INSPECTIONS OF REINFORCING STEEL AND PLACEMENT <br />PERIODIC: INSPECT BOLTS TO BE INSTALLED IN CONCRETE PRIOR TO AND DURING PLACEMENT OF CONCRETE <br />PERIODIC: INSPECT FORMWORK FOR SHAPE, LOCATION AND DIMENSIONS OF THE CONCRETE MEMBER BEING <br />FORMED <br />PERIODIC: VERIFY USE OF REQUIRED DESIGN MIX <br />PERIODIC: VERIFY COMPLIANCE OF NON-POTABLE MIX WATER <br />CONTINUOUS: INSPECTION OF CONCRETE AND SHOTCRETE PLACEMENT FOR PROPER APPLICATION TECHNIQUES <br />CONTINUOUS: SAMPLING FRESH CONCRETE AND PERFORMING SLUMP AND AIR CONTENT TESTS & DETERMINING THE <br />TEMPERATURE OF FRESH CONCRETE AT THE TIME OF MAKING SPECIMENS FOR STRENGTH TESTS <br />PERIODIC: INSPECTION FOR MAINTENANCE OF SPECIFIED CURING TEMPERATURE AND TECHNIQUE <br />PERIODIC: VERIFICATION OF IN-SITU CONCRETE STRENGTH, PRIOR TO REMOVAL OF SHORES AND FORMS FROM <br />BEAMS AND STRUCTURAL SLABS <br />PERIODIC: ERECTION OF PRECAST CONCRETE MEMBERS <br />PERIODIC: POST-INSTALLED AND ADHESIVE ANCHORS <br />PERIODIC: VERIFY INSTALLER CERTIFICATIONS FOR OVERHEAD ADHESIVE ANCHORS <br />CONTINUOUS: REBAR COUPLERS AND TERMINATORS, SELECT SPLICE SPECIMENS FOR TESTING <br />CONTINUOUS: [DSA/OSHPD] POST-INSTALLED AND ADHESIVE ANCHORS <br />STRUCTURAL STEEL <br />PERIODIC: STRUCTURAL STEEL IDENTIFICATION MARKINGS TO CONFORM TO ASTM STANDARDS SPECIFIED IN THE <br />APPROVED CONSTRUCTION DOCUMENTS <br />PERIODIC: STRUCTURAL STEEL MANUFACTURER’S CERTIFIED MILL TEST REPORTS REQUIRED <br />PERIODIC: INSPECTION OF STEEL FRAME BRACING & STIFFENER DETAILS FOR COMPLIANCE WITH APPROVED <br />CONSTRUCTION DOCUMENTS <br />PERIODIC: STEEL FRAME MEMBER LOCATIONS <br />PERIODIC: APPLICATION OF JOINT DETAILS AT EACH CONNECTION <br />PERIODIC: HIGH-STRENGTH BOLTS, NUTS, AND WASHERS IDENTIFICATION MARKINGS TO CONFORM TO ASTM <br />STANDARDS SPECIFIED IN THE APPROVED CONSTRUCTION DOCUMENTS, MANUFACTURER'S <br />CERTIFICATE OF COMPLIANCE REQUIRED <br />PERIODIC: INSPECTION OF HIGH-STRENGTH BOLTING BEARING-TYPE CONNECTIONS <br />PERIODIC: INSPECTION OF SLIP-CRITICAL CONNECTIONS USING TURN-OF-NUT METHOD WITH MATCHMARKING, <br />DIRECT TENSION INDICATOR METHOD, OR TWIST OFF BOLTS <br />CONTINUOUS: INSPECTION OF SLIP-CRITICAL CONNECTIONS USING CALIBRATED WRENCH METHOD OR TURN-OF-NUT <br />WITHOUT MATCHMARKING <br />WELDING <br />CONTINUOUS: COMPLETE AND PARTIAL PENETRATION GROOVE WELDS <br />CONTINUOUS: FILLET WELDS > 5/16" AND MULTIPASS FILLET WELDS <br />PERIODIC: FILLET WELDS ≤ 5/16" <br />PERIODIC: METAL DECK WELDS <br />PERIODIC: LIGHT GAUGE METAL WELDS <br />PERIODIC: WELD FILLER MATERIAL IDENTIFICATION MARKINGS TO CONFORM TO AWS STANDARDS SPECIFIED IN <br />THE APPROVED CONSTRUCTION DOCUMENTS, MANUFACTURE’S CERTIFICATION OF COMPLIANCE <br />REQUIRED <br />CONTINUOUS: WELDING OF REINFORCEMENT STEEL RESISTING SEISMIC FORCES, INDICATED ON PLANS AND DETAILS <br />AS LFRS ELEMENT OR CONNECTIONS <br />PERIODIC: VERIFICATION OF WELDABILITY OF REINFORCING STEEL OTHER THAN ASTM A706 <br />CONTINUOUS: WELDING OF STIRRUPS, HOOPS OR TIES <br />CONTINUOUS: REINFORCING WELDS IN CMU <br />PERIODIC: ALL OTHER REINFORCEMENT WELDS, UNO <br />ROUGH CARPENTRY / WOOD <br />PERIODIC: FRAMING NAILS SIZE, TYPE AND FINISH <br />PERIODIC: NAILING OF ROOF, WALL, & FLOOR SHEATHING <br />PERIODIC: NAILING/BOLTING OF STRAPS, HOLDOWNS, BRACES AND DRAG STRUTS <br />PERIODIC: MANUFACTURE OF STRUCTURAL GLUED-LAMINATED TIMBERS LARGER THAN 5-1/8" WIDE, 18" DEEP, OR <br />CLEAR SPAN 32 FEET OR MORE <br />PERIODIC: MANUFACTURE OF OPEN WEB TRUSSES <br />PERIODIC: INSTALLATION OF TIMBER CONNECTORS <br />PERIODIC: HIGH LOAD WOOD DIAPHRAGMS, VERIFY PANEL GRADE. THICKNESS, NOMINAL FRAMING SIZES AND <br />FASTENERS PER APPROVED PLANS <br />CONCRETE MASONRY <br />PERIODIC: PROPORTIONS OF SITE- PREPARED MORTAR AND GROUT <br />CONTINUOUS: PREPARATION OF GROUT & MORTAR SPECIMENS AND/OR PRISMS <br />PERIODIC: VERIFICATION OF SIZE & LOCATION OF MASONRY UNITS <br />PERIODIC: VERIFICATION OF SIZE, GRADE, TYPE AND PLACEMENT OF REINFORCING STEEL <br />PERIODIC: VERIFICATION OF SIZE AND LOCATION OF ANCHORS OR EMBEDDED STRUCTURAL ELEMENTS <br />INCLUDING OTHER DETAILS OF ANCHORAGE OF MASONRY TO STRUCTURAL MEMBERS, FRAMES OR <br />OTHER CONSTRUCTION <br />PERIODIC: CONSTRUCTION OF MORTAR JOINTS <br />PERIODIC: GROUT SPACE CLEAN PRIOR TO GROUTING <br />CONTINUOUS: GROUT PLACEMENT PER CONSTRUCTION DOCUMENTS & CODE COMPLIANCE <br />PERIODIC: COMPLIANCE WITH REQUIRED INSPECTION PROVISIONS OF CONSTRUCTION DOCUMENTS & APPROVED <br />SUBMITTALS SHALL BE VERIFIED <br />PERIODIC: PROTECTION OF MASONRY DURING COLD WEATHER BELOW 40˚F OR HOT WEATHER ABOVE 90˚F <br />PERIODIC: POST-INSTALLED ANCHORS AND REINFORCEMENT <br />CONTINUOUS: [DSA / OSHPD] POST-INSTALLED ANCHORS AND REINFORCEMENT <br />COLD-FORMED STEEL FRAMING <br />PERIODIC: SCREW ATTACHMENT, BOLTING, AND ANCHORING OF STRAPS, HOLDOWNS, BRACES, DRAG STRUTS, <br />AND ROOF, WALLS AND FLOORS. <br />PERIODIC: INSTALLATION OF STEEL DECKING PER SDI QA/QC STANDARDS <br />STATEMENT OF SPECIAL INSPECTIONS <br />1. THE OWNER SHALL EMPLOY ONE OR MORE SPECIAL INSPECTORS TO PROVIDE INSPECTIONS DURING CONSTRUCTION. <br />THE SPECIAL INSPECTOR SHALL BE A QUALIFIED PERSON WHO DEMONSTRATES COMPETENCE TO THE SATISFACTION OF <br />THE BUILDING OFFICIAL FOR INSPECTION OF THE PARTICULAR TYPE OF CONSTRUCTION OR OPERATION REQUIRING <br />SPECIAL INSPECTION. <br />2. SEE THE SPECIAL INSPECTIONS SCHEDULE AND PROJECT SPECIFICATIONS FOR REQUIREMENTS. IT IS SOLELY THE <br />CONTRACTOR’S RESPONSIBILITY TO SEE THAT THESE INSPECTIONS ARE PERFORMED. <br />3. SPECIAL INSPECTIONS ARE NOT REQUIRED WHERE THE WORK IS DONE ON THE PREMISES OF A FABRICATOR <br />REGISTERED AND APPROVED TO PERFORM SUCH WORK WITHOUT SPECIAL INSPECTION. APPROVED FABRICATORS MUST <br />SUBMIT A CERTIFICATE OF COMPLIANCE FOR OFFSITE FABRICATIONS SUCH AS STRUCTURAL STEEL, PRECAST <br />CONCRETE, GLUED LAMINATED TIMBER, ETC. <br />4. ALL INSPECTIONS SHALL BE PERFORMED BY INDEPENDENT SPECIAL INSPECTORS. JOB SITE VISITS BY THE STRUCTURAL <br />ENGINEER OR BUILDING OFFICIAL DO NOT CONSTITUTE AND ARE NOT A SUBSTITUTE FOR INSPECTIONS BY A SPECIAL <br />INSPECTOR. <br />5. ALL INSPECTION REPORTS SHALL BE SUBMITTED TO THE BUILDING OFFICIAL AND SEOR. THE FINAL REPORTS BY THE <br />SPECIAL INSPECTOR(S) MUST CERTIFY THAT THE ENTIRE STRUCTURAL SYSTEM COMPLIES WITH THE APPROVED PLANS <br />AND SPECIFICATIONS. <br />6. WORK REQUIRING SPECIAL INSPECTION SHALL BE INSPECTED BY THE SPECIAL INSPECTOR WHO IS PRESENT IN THE <br />AREA WHERE THE WORK IS PERFORMED AND AT THE COMPLETION OF WORK. CONTINUOUS INSPECTION CONSISTS OF <br />FULL-TIME INSPECTION; PERIODIC INSPECTION CONSISTS OF PART-TIME OR INTERMITTENT INSPECTION. <br />7. THE SPECIAL INSPECTIONS SCHEDULE BELOW IS A SUMMARY LIST AND MAY NOT BE ALL INCLUSIVE OF INSPECTIONS <br />REQUIRED FOR THIS PROJECT. THE CONTRACTOR SHALL CALL FOR ALL INSPECTIONS NOTED ON THE CONTRACT <br />DOCUMENTS AND AS REQUIRED BY THE ARCHITECT, BUILDING OFFICIAL AND OWNER’S REPRESENTATIVE. <br />No. 6250 <br />FFOHSIB <br />RYAN W. <br />REGISTEREDPROFESSIONALENGINEER <br />STRUCTURALSTATEOFCALIFORNIA <br />DATE: <br />FOR BRANDOW & JOHNSTON <br />STRUCTURAL+CIVIL ENGINEERS (B&J HBK, INC.) <br />3300 IRVINE AVE. SUITE 245 <br />NEWPORT BEACH, CALIFORNIA 92660 <br />T:(949)862-8500 WWW.BJSCE.COM <br />JOB#: <br />1 <br />7 <br /> <br />8 <br /> <br />8 <br /> <br />0 <br /> <br /> <br />S <br /> <br />k <br /> <br />y <br /> <br /> <br />P <br /> <br />a <br /> <br />r <br /> <br />k <br /> <br /> <br />C <br /> <br />i <br /> <br />r <br /> <br />c <br /> <br />l <br /> <br />e <br /> <br />, <br /> <br /> <br />S <br /> <br />u <br /> <br />i <br /> <br />t <br /> <br />e <br /> <br />2 <br /> <br />3 <br /> <br />0 <br /> <br /> <br />- <br />I <br />r <br /> <br />v <br /> <br />i <br /> <br />n <br /> <br />e <br /> <br />, <br /> <br /> <br />C <br /> <br />A <br /> <br /> <br />9 <br /> <br />2 <br /> <br />6 <br /> <br />1 <br /> <br />4 <br />t <br /> <br />e <br /> <br /> <br />l <br /> <br /> <br /> <br />9 <br /> <br /> <br />4 <br /> <br /> <br />9 <br /> <br /> <br /> <br />. <br /> <br /> <br /> <br />5 <br /> <br /> <br />5 <br /> <br /> <br />3 <br /> <br /> <br /> <br />. <br /> <br /> <br /> <br />8 <br /> <br /> <br />9 <br /> <br /> <br />0 <br /> <br /> <br />0 <br />a <br />r <br /> <br />c <br /> <br />h <br /> <br />i <br /> <br />t <br /> <br />e <br /> <br />c <br /> <br />t <br /> <br />u <br /> <br />r <br /> <br />e <br />i <br />n <br /> <br />t <br /> <br />e <br /> <br />r <br /> <br />i <br /> <br />o <br /> <br />r <br /> <br /> <br />d <br /> <br />e <br /> <br />s <br /> <br />i <br /> <br />g <br /> <br />n <br />p <br />l <br /> <br />a <br /> <br />n <br /> <br />n <br /> <br />i <br /> <br />n <br /> <br />g <br />DA <br />I <br />M <br />L <br />E <br />R <br /> <br />A <br />C <br />P <br />L <br />30 <br />0 <br />9 <br /> <br />D <br />A <br />I <br />M <br />L <br />E <br />R <br /> <br />S <br />T <br />SA <br />N <br />T <br />A <br /> <br />A <br />N <br />A <br />, <br /> <br />C <br />A <br /> <br /> <br />9 <br />2 <br />7 <br />9 <br />5 <br />S0.1 <br />GENERAL NOTES <br />07/23/24 <br />NO. REMARKS DATE <br />60% COMPLETE SET 05/28/24 <br />90% COMPLETE SET 07/12/24 <br />ISSUE FOR BID 07/16/24 <br />CITY SUBMITTAL 07/23/24 <br />NON-STRUCTURAL COMPONENTS <br />PERIODIC: ERECTION AND FASTENING OF EXTERIOR CLADDING, INTERIOR AND EXTERIOR NONBEARING WALLS, <br />AND INTERIOR AND EXTERIOR VENEER GREATER 30' HEIGHTS, EXTERIOR WALLS GREATER THAN 5 <br />PSF, AND INTERIOR WALLS MORE THAN 15 PSF <br />PERIODIC: ANCHORAGE OF ELECTRICAL EQUIPMENT <br />PERIODIC: ANCHORAGE OF SUSPENDED CEILING SYSTEMS <br />PERIODIC: ANCHORAGE OF HVAC DUCTWORK THAT WILL CONTAIN HAZARDOUS MATERIALS <br />PERIODIC: ANCHORAGE OF PIPING SYSTEMS AND MECHANICAL UNITS CONTAINING FLAMMABLE, COMBUSTIBLE <br />OR HIGHLY TOXIC MATERIALS <br />PERIODIC: ANCHORAGE OF ACCESS FLOORS AND ANCHORAGE OF STORAGE RACKS 8 FEET OR GREATER IN <br />HEIGHT <br />PERIODIC: FLEXIBLE CONNECTIONS OF UTILITIES CROSSING EXPANSION OR SEISMIC JOINTS <br />PRESTRESSED CONCRETE <br />PERIODIC: INSPECTION OF PRESTRESSNG TENDON PLACEMENT AND SIZES <br />PERIODIC: VERIFICATION OF IN-SITU CONCRETE STRENGTH PRIOR TO STRESSING OF TENDONS IN <br />POST-TENSIONED CONCRETE <br />CONTINUOUS: APPLICATION OF PRESTRESSING LOADS <br />CONTINUOUS: GROUTING OF BONDED PRESTRESSING TENDONS IN THE LFRS <br />PIER FOUNDATIONS <br />CONTINUOUS: OBSERVE DRILLING OPERATIONS AND MAINTAIN COMPLETE AND ACCURATE RECORDS FOR EACH PIER <br />CONTINUOUS: VERIFY PLACEMENTS, LOCATIONS AND PLUMBNESS, CONFIRM PIER DIAMETERS, BELL DIAMETERS, <br />LENGTHS, EMBEDMENT INTO BEDROCK (IF APPLICABLE) AND ADEQUATE END BEARING STRATA <br />CAPACITY <br />PILE FOUNDATIONS <br />CONTINUOUS: VERIFY PILE MATERIALS, SIZES AND LENGTHS COMPLY WITH THE APPROVED CONSTRUCTION <br />DOCUMENTS <br />CONTINUOUS: DETERMINE CAPACITIES OF TEST PILES AND CONDUCT ADDITIONAL LOAD TESTS AS REQUIRED <br />CONTINUOUS: OBSERVE DRIVING OPERATIONS AND MAINTAIN COMPLETE AND ACCURATE RECORDS FOR EACH PILE <br />CONTINUOUS: VERIFY PLACEMENT, LOCATIONS AND PLUMBNESS, CONFIRM TYPE AND SIZE HAMMER, RECORD <br />NUMBER OF BLOWS PER FOOT OF PENETRATION, DETERMINE REQUIRED PENETRATIONS TO ACHIEVE <br />DESIGN CAPACITY, RECORD TIP AND BUTT ELEVATIONS AND DOCUMENT ANY PILE DAMAGE <br />LE <br />A <br />V <br />E <br /> <br />B <br />L <br />A <br />N <br />K <br /> <br />F <br />O <br />R <br /> <br />C <br />I <br />T <br />Y <br /> <br />S <br />T <br />A <br />M <br />P <br />3009 S Daimler St <br />11/18/2024