Laserfiche WebLink
LE <br />A <br />V <br />E <br /> <br />B <br />L <br />A <br />N <br />K <br /> <br />F <br />O <br />R <br /> <br />C <br />I <br />T <br />Y <br /> <br />S <br />T <br />A <br />M <br />P <br />SYMBOL ABBREVIATION DESCRIPTION <br />PLUMBING LEGEND <br />POC <br />S <br />S <br />CD <br />V <br />DCW <br />TP <br />CA <br />RPBP <br />SOV <br />CV <br />COG <br />FCO <br />WCO <br />CL <br /># % <br />DN <br />UP <br />WHB <br />HB <br />U <br />WHA <br />TP <br />FS <br />FD <br />PLUMBING GENERAL NOTES <br />NOTE:GENERAL NOTES ARE LISTED FOR GENERAL USE; NOT ALL LISTED ARE NECESSARILY USED ON <br />DRAWINGS. <br />GENERAL: <br />1.CONTRACTOR SHALL CAREFULLY REVIEW THESE PLANS AND SPECIFICATIONS PRIOR TO BID. <br />CONTRACTOR SHALL ALSO REVIEW PLANS AND SPECIFICATIONS OF OTHER RELATED TRADES (INCLUDING <br />ARCHITECTURAL, MECHANICAL, STRUCTURAL, CIVIL AND ELECTRICAL) PRIOR TO BID TO INSURE AN <br />ACCURATE UNDERSTANDING OF EXACT SCOPE OF WORK. <br />2.EQUIPMENT INDICATED ON THESE DRAWINGS IS SHOWN IN APPROXIMATE LOCATIONS. THE CONTRACTOR <br />SHALL FIELD VERIFY ALL EXISTING CONDITIONS INCLUDING EQUIPMENT LOCATIONS, STRUCTURAL <br />MEMBERS, POC'S, INVERT ELEVATIONS AND AVAILABILITY OF ALL EXISTING UTILITIES PRIOR TO <br />INSTALLATION. NOTIFY THE CONSTRUCTION COORDINATOR OF ANY DISCREPANCIES OR CONFLICTS <br />PRIOR TO COMMENCING ANY WORK. DO NOT PROCEED WITHOUT CONSTRUCTION COORDINATOR <br />APPROVAL FOR ANY CHANGES IF REQUIRED. <br />3.PLUMBING EQUIPMENT, MATERIAL AND CONNECTIONS SHALL BE INSTALLED COMPLETE PER <br />MANUFACTURER'S INSTRUCTIONS TO PROVIDE A COMPLETE AND FULLY OPERATIONAL SYSTEM. <br />4.WORK SHALL CONFORM TO CODE. IN CASE OF CONFLICTS WITH CODE, DRAWINGS, OR SPECIFICATIONS, <br />THE MORE STRINGENT SHALL PREVAIL. <br />5.PLUMBING SHALL BE INSTALLED TO AVOID INTERFERENCE WITH ELECTRICAL AND MECHANICAL <br />EQUIPMENT AND STRUCTURAL FRAMING. COORDINATE WITH ALL OTHER TRADES, STRUCTURAL <br />CONDITIONS AND BUILDING CONSTRUCTION, PRIOR TO START OF INSTALLATION. <br />6.PLUMBING WORK SHALL BE CONCEALED WITHIN THE BUILDING STRUCTURE TO AS GREAT EXTENT AS <br />POSSIBLE. <br />7.PIPING SYSTEMS SHALL BE SEISMICALLY BRACED PER CALIFORNIA BUILDING CODE. <br />8.VALVES SHALL BE READILY ACCESSIBLE. WHERE VALVES ARE INSTALLED WITHIN OR BEHIND WALLS, AN <br />ACCESS PANEL SHALL BE INSTALLED. <br />9.OUTLETS FOR FUTURE CONNECTIONS SHALL BE INSTALLED TO PERMIT EASY CONNECTION. COORDINATE <br />WITH DUCTWORK, STRUCTURAL CONDITIONS AND ARCHITECTURAL LAYOUT. <br />10.INSULATING MATERIALS INSTALLED SHALL BE CERTIFIED BY CALIFORNIA ENERGY COMMISSION TO MEET <br />C.E.C. ENERGY EFFICIENCY STANDARDS (E.E.S) SECTION 110.3. <br />11.PLUMBING EQUIPMENT SHALL BE CERTIFIED BY AND COMPLY WITH THE STATE OF CALIFORNIA ENERGY <br />CONSERVATION STANDARDS (E.E.S.) SECTION 110.3. COMPLIANCE CERTIFICATES SHALL BE PROVIDED <br />WITH EQUIPMENT SUBMITTALS. <br />12.DO NOT ROUTE PIPING OVER ELECTRICAL ROOMS, MDF ROOMS, IDF ROOMS, COMPUTER ROOMS, <br />ELEVATOR EQUIPMENT ROOMS, OR STAIRWELLS. EXCEPTION: PIPES REQUIRED TO SERVE THE ROOM. <br />13.ALL PIPE, PIPE FITTINGS, TRAPS, FIXTURES, MATERIAL, AND DEVICES USED IN THE PLUMBING SYSTEM <br />SHALL BE LISTED OR THIRD-PARTY CERTIFIED BY AN APPROVED LISTING AGENCY AND SHALL CONFORM <br />TO APPLICABLE RECOGNIZED STANDARDS REFERENCED IN THE 2022 CALIFORNIA PLUMBING CODE. <br />14.THE LEAD CONTENT OF PIPES, PIPE OR PLUMBING FITTINGS, AND FIXTURES INTENDED TO CONVEY OR <br />DISPENSE WATER FOR HUMAN CONSUMPTION SHALL BE IN ACCORDANCE WITH SECTION 116875 OF THE <br />HEALTH AND SAFETY CODE. <br />DRAINAGE: <br />1.COORDINATE LOCATION OF CONDENSATE DRAIN AND WATER CONNECTIONS TO MECHANICAL EQUIPMENT <br />WITH MECHANICAL CONTRACTOR PRIOR TO INSTALLATION. <br />2.ALL INTERIOR CONDENSATE DRAIN PIPING SHALL BE INSULATED AND SLOPED AT 1/8" PER FOOT MINIMUM. <br />3.CONDENSATE FROM ALL MECHANICAL COOLING COILS SHALL BE ROUTED AND DISCHARGED TO AN <br />APPROVED RECEPTOR PER THE CALIFORNIA PLUMBING CODE. <br />4.BUILDING DRAIN AND VENT PIPING MATERIALS SHALL COMPLY WITH SECTIONS 701.0 AND 903.0 OF THE <br />CALIFORNIA PLUMBING CODE. <br />5.ALL SANITARY SYSTEM MATERIALS SHALL BE LISTED BY AN APPROVED LISTING AGENCY. <br />6.CLEANOUTS ARE REQUIRED AT THE UPPER MOST TERMINALS OF ALL HORIZONAL WASTE LINES. PLEASE <br />PROVIDE ADDITIONAL CLEANOUTS WITHIN THE FLOOR PLAN. CPC 707.4. <br />7.EACH VENT SHALL RISE VERTICALLY TO A POINT NOT LESS THAN SIX (6) INCHES ABOVE THE FLOOD-LEVEL <br />RIM OF THE FIXTURE SERVED BEFORE OFFSETTING HORIZONTALLY OR BEFORE BEING CONNECTED TO <br />ANY OTHER VENT. <br />8.EACH ROOF VENT SHALL TERMINATE AT LEAST 10 FT FROM EVERY BUILDING OUTSIDE AIR INTAKE. <br />9.SOIL, SEWER AND WASTE PIPING SHALL SLOPE AT 1/4" PER FOOT MINIMUM UNLESS INDICATED <br />OTHERWISE. <br />10.A SLOPE OF NOT LESS THAN 1/8 INCH PER FOOT OR 1 PERCENT IS PROVIDED FOR DRAINAGE PIPING 4 <br />INCHES OR LARGER ONLY WHERE IT IS IMPRACTICAL DUE TO THE DEPTH OF THE STREET SEWER, TO THE <br />STRUCTURAL FEATURES, OR TO THE ARRANGEMENT OF A BUILDING OR STRUCTURE TO OBTAIN A SLOPE <br />OF 1/4 INCH PER FOOT OR 2 PERCENT AND THAT IS SUBJECT TO THE AUTHORITY HAVING JURISDICTION <br />PLUMBING FIELD INSPECTOR'S APPROVAL. <br />PLUMBING FIXTURES: <br />1.EXACT LOCATION AND MOUNTING HEIGHTS OF PLUMBING FIXTURES SHALL BE OBTAINED FROM THE <br />ARCHITECTURAL DRAWINGS. <br />2.FLOOR DRAINS OR SIMILAR TRAPS DIRECTLY CONNECTED TO THE DRAINAGE SYSTEM AND SUBJECT TO <br />INFREQUENT USE SHALL BE PROVIDED WITH AN APPROVED AUTOMATIC MEANS OF MAINTAINING THEIR <br />WATER SEALS. <br />3.FLOOR AND TRENCH DRAINS SHALL BE IN ACCORDANCE WITH ASME A112.6.3. <br />4.FLOOR SINKS SHALL BE IN ACCORDANCE WITH ASME A112.6.7. <br />5.TRAP SEAL PRIMERS FOR POTABLE WATER SUPPLY SHALL BE IN ACCORDANCE WITH ASSE 1018. <br />DRAINAGE AND ELECTRONIC DESIGN TYPE TRAP SEAL PRIMER DEVICES SHALL COMPLY WITH ASSE 1044. <br />TRAP PRIMERS SHALL BE INSTALLED IN AN ACCESSIBLE LOCATION FOR MAINTENANCE. <br />6.ROOF RECEPTORS ARE PLUMBING FIXTURES THAT ARE LISTED BY IAPMO AS INDIRECT WASTE <br />RECEPTORS. <br />CROSS CONNECTION CONTROL: <br />1.CROSS CONNECTION PROTECTION SHALL BE PROVIDED AT ALL POTABLE WATER SUPPLIED APPLIANCES <br />AND EQUIPMENT. <br />ABOVE CEILING <br />AMERICANS WITH DISABILITIES ACT <br />ABOVE FINISHED FLOOR <br />BELOW GRADE <br />BELOW FLOOR <br />BELOW FINISHED FLOOR <br />BUILDING <br />BRITISH THERMAL UNITS PER HOUR <br />CALIFORNIA BUILDING CODE <br />CUBIC FEET PER HOUR <br />CUBIC FEET PER MINUTE <br />CLEANOUT <br />CALIFORNIA PLUMBING CODE <br />DRAINAGE FIXTURE UNITS <br />DRAWINGS <br />EXISTING <br />ENERGY EFFICIENCY STANDARDS <br />FLOOR CLEANOUT <br />FEET <br />FEET/SECOND <br />FIXTURE UNIT <br />GAUGE <br />GALLONS PER CYCLE <br />GALLONS PER DAY <br />GALLONS PER FLUSH <br />GALLONS PER HOUR <br />GALLONS PER MINUTE <br />HORSE POWER <br />HEATING, VENTILATING, & AIR CONDITIONING <br />INVERT ELEVATION <br />INCH/INCHES <br />POUNDS <br />MAXIMUM <br />MECHANICAL <br />MANUFACTURER'S <br />MINIMUM <br />NORMALLY CLOSED <br />NORMALLY OPEN <br />OWNER FURNISHED CONTRACTOR INSTALLED <br />OWNER FURNISHED OWNER INSTALLED <br />QUICK CONNECT <br />PRESSURIZED DISCHARGE (PUMPED) <br />PLUMBING <br />QUANTITY <br />SQUARE FEET <br />STATIC PRESSURE <br />TONNAGE OF AIR CONDITIONING <br />TOTAL DRAINAGE FIXTURE UNITS <br />TOTAL DEVELOPED LENGTH <br />TOTAL FIXTURE UNITS <br />TYPICAL <br />VARIABLE FREQUENCY DRIVE <br />VERIFY IN FIELD <br />VENT THRU ROOF <br />VOLTS/PHASE/HERTZ <br />WALL CLEAN-OUT <br />UNDERWRITERS LABORATORY <br />WATER SUPPLY FIXTURE UNITS <br />A/C <br />ADA <br />AFF <br />B/G <br />B/F <br />BFF <br />BLDG <br />BTUH <br />CBC <br />CFH <br />CFM <br />CO <br />CPC <br />DFU <br />DWGS <br />(E) <br />E.E.S. <br />FCO <br />FT <br />FPS <br />FU <br />GA <br />GPC <br />GPD <br />GPF <br />GPH <br />GPM <br />HP <br />HVAC <br />IE <br />IN <br />LBS <br />MAX <br />MECH <br />MFR'S <br />MIN <br />N.C. <br />N.O. <br />OFCI <br />OFOI <br />QC <br />PD <br />PLBG <br />QTY <br />SF <br />SP <br />T <br />TDFU <br />TDL <br />TFU <br />TYP <br />VFD <br />VIF <br />VTR <br />V/PH/HZ <br />WCO <br />UL <br />WSFU <br />POINT OF CONNECTION <br />SEWER PIPING UNDERGROUND / BELOW FLOOR <br />SEWER PIPING ABOVE GROUND <br />CONDENSATE DRAIN PIPING <br />SANITARY VENT PIPING <br />DOMESTIC COLD WATER PIPING <br />TRAP PRIMER PIPING <br />COMPRESSED AIR PIPING <br />BACKFLOW PREVENTER <br />SHUT OFF VALVE (BALL VALVE) <br />CHECK VALVE <br />CLEAN-OUT TO GRADE <br />PRESSURE REGULATOR VALVE <br />FLOOR CLEAN-OUT <br />WALL CLEAN-OUT <br />CAPPED LINE <br />PERCENTAGE SLOPE OF PIPE WITH DIRECTIONAL ARROW <br />DOWN OR DROP <br />RISE OR RISER <br />WALL HOSE BIBB <br />HOSE BIBB <br />UNION (DIELECTRIC) <br />WATER HAMMER ARRESTOR (P.D.I. SIZE) <br />TRAP PRIMER <br />FLOOR SINK <br />FLOOR DRAIN <br />KEYED NOTE <br />TYPE/MARK <br />EQUIPMENT NUMBER <br />EQUIPMENT TAG <br />NOTE: LEGEND AND ABBREVIATIONS LISTED ARE FOR <br />GENERAL USE; NOT ALL LISTED ARE NECESSARILY <br />USED ON DRAWINGS.PIPE MATERIAL SCHEDULE <br />SEWER WASTE & VENT PIPING BELOW GRADE: <br />CHARLOTTE CHEMDRAIN SCHEDULE 40 CPVC WITH SOLVENT WELDED SOCKET FITTINGS. <br />SEWER WASTE & VENT PIPING ABOVE GRADE: <br />CHARLOTTE CHEMDRAIN SCHEDULE 40 CPVC WITH SOLVENT WELDED SOCKET FITTINGS. <br />WATER PIPING ABOVE GRADE: <br />COPPER TYPE "L", HARD DRAWN, WITH LEAD-FREE SOLDER. <br />WATER PIPING BELOW GRADE: <br />COPPER TYPE "K", HARD DRAWN, WITH LEAD-FREE SOLDER. <br />CONDENSATE DRAIN ABOVE GRADE: <br />COPPER TYPE "M", WITH LEAD - FREE SOLDER. INSULATED. <br />COMPRESSED AIR ABOVE GRADE: <br />316 STANLESS STEEL, CLEANED, PURGED AND SEALED FOR OXYGEN SERVICE. WITH SWAGELOK <br />FITTINGS. <br />ALL PIPING TO BE LABELED PER ANSI/ASME A13.1 STANDARD COLOR AND LETTER REQUIREMENTS. <br />ALL PIPING SHALL HAVE HANGERS AND SUPPORTS SPACED IN ACCORDANCE WITH CPC TABLE 313.3 AND <br />HANGER RODS IN ACCORDANCE WITH CPC 313.6. <br />FITTINGS FOR CHANGES IN DIRECTION <br />WYE <br />WYE WITH <br />1/8 BEND COMB. 1/8 <br />BEND <br />SANIT. <br />TEE <br />SANIT. <br />TAPPED <br />TEE <br />LONG <br />SWEEP <br />SHORT <br />SWEEP <br />1/8 BEND 1/6 BEND <br />TYPE OF FITTING <br />CHANGES IN <br />DIRECTION OF <br />FLOW <br />HORIZONTAL <br />TO VERTICAL <br />VERTICAL TO <br />HORIZONTAL <br />HORIZONTAL <br />TO HORIZONTAL <br />*BASED ON 2018 UNIFORM PLUMBING CODE ILLUSTRATED TRAINING MANUAL, FIGURE 706.1 <br />ENERGY CONSERVATION NOTES <br />1.EQUIPMENT SHALL MEET THE APPLICABLE REQUIREMENTS OF THE APPLIANCE EFFICIENCY <br />REGULATIONS PER SECTION 110.1. <br />2.ALL PIPE INSULATION MATERIAL SHALL MEET THE REQUIREMENTS PER SECTION 120.3 E.E.S. <br />SYMBOL DESCRIPTION <br />PIPE SIZES (INCHES) <br />CW <br />REMARKS <br />FIXTURE CONNECTION SCHEDULE <br />MANUFACTURER AND MODEL NUMBER <br />--------1/2 PPP #PR-500TP-1 TRAP PRIMER PRESSURE ACTIVATED. PROVIDE WITH DISTRIBUTION UNIT AND ACCESS PANEL. <br />FLOOR SINKFS-1 1/2 --2 2 --ZURN #Z1750-2 STAINLESS STEEL FLOOR SINK. PROVIDE W/ TRAP PRIMER CONNECTION. <br />HW W V CA <br />ELECTRICAL <br />(V/PH/HZ) <br />-- <br />-- <br />2% <br />1% <br />TP <br />CD <br />CA <br /># <br />PRV <br />PIPE, PIPE FITTINGS, VALVES AND FIXTURES INTENDED TO CONVEY OR DISPENSE WATER FOR HUMAN <br />CONSUMPTION THROUGH DRINKING OR COOKING, SHALL BE CERTIFIED TO BE "LEAD FREE" AS DEFINED BY <br />STATUTE AB 1953. NOTHING CONTAINED IN THESE DRAWINGS OR SPECIFICATIONS IS INTENDED TO VIOLATE <br />THIS STATUTE. <br />AB 1953 COMPLIANCE <br />PLUMBING EXISTING AND DEMOLITION <br />NOTES TO CONTRACTOR <br />1.CONTRACTOR SHALL NOT CUT, DRILL, OR ALTER ANY STRUCTURAL SUPPORT MEMBER WITHOUT <br />WRITTEN APPROVAL BY THE STRUCTURAL ENGINEER. <br />2.CONTRACTOR SHALL FIELD VERIFY EXISTING PIPE SIZES AND ELEVATIONS AT ALL POINTS OF <br />CONNECTION PRIOR TO PROCUREMENT OF MATERIALS AND INSTALLATIONS. <br />3.CONTRACTOR SHALL PERFORM CAMERA INSPECTION OF PIPING AND HYDRO-JET ALL ABOVE AND BELOW <br />GRADE SEWER, WASTE & VENT PIPING TO ENSURE INTEGRITY OF INTERIOR OF PIPING SYSTEM AND <br />SLOPE . REPAIR ALL DAMAGED PORTION OF PIPING SYSTEM TO REMOVE ALL OBSTRUCTIONS. <br />4.CONTRACTOR SHALL X-RAY SLAB TO IDENTIFY STRUCTURAL COMPONENTS PRIOR TO CORE DRILLING <br />AND / OR SAW-CUTTING SLAB. <br />5.ALL EXISTING PLUMBING COMPONENTS THAT ARE INTENDED TO REMAIN FOR REUSE SHALL BE <br />PROTECTED DURING CONSTRUCTION. <br />6.ALL EXISTING PLUMBING FIXTURES COSMETIC APPEARANCE AND FUNCTIONAL CONDITIONS SHALL BE <br />VERIFIED TO ENSURE COMPLIANCE WITH CURRENT FLOW AND CLEARANCE REQUIREMENTS. <br />7.CONTRACTOR SHALL SAW-CUT AND DEMOLISH EXISTING SLAB, EXCAVATION AS REQUIRED TO INSTALL <br />NEW UNDERGROUND PIPING. PROVIDE BACKFILL, COMPACTION AND CONCRETE POURING / FINISHING AS <br />REQUIRED IN COORDINATION WITH GENERAL CONTRACTOR. <br />1/2--------AMFLO #C-30 <br /> #C-31LAO-1 LAB AIR OUTLET <br />(QUICK CONNECT)INSTALL PER MANUFACTURER'S INSTRUCTIONS.-- <br />-- <br />2 <br />TRAP <br />-- <br />REMARKSNO.DATE <br />ar <br />c <br />h <br />i <br />t <br />e <br />c <br />t <br />u <br />r <br />e <br />in <br />t <br />e <br />r <br />i <br />o <br />r <br /> <br />d <br />e <br />s <br />i <br />g <br />n <br />pl <br />a <br />n <br />n <br />i <br />n <br />g <br />17 <br />8 <br />8 <br />0 <br /> <br />S <br />k <br />y <br /> <br />P <br />a <br />r <br />k <br /> <br />C <br />i <br />r <br />c <br />l <br />e <br />, <br /> <br />S <br />u <br />i <br />t <br />e <br /> <br />2 <br />3 <br />0 <br /> <br />- <br /> <br />I <br />r <br />v <br />i <br />n <br />e <br />, <br /> <br />C <br />A <br /> <br />9 <br />2 <br />6 <br />1 <br />4 <br />t <br />e <br />l <br /> <br />9 <br />4 <br />9 <br />. <br />5 <br />5 <br />3 <br />. <br />8 <br />9 <br />0 <br />0 <br />Ed <br />w <br />a <br />r <br />d <br />s <br />DA <br />I <br />M <br />L <br />E <br />R <br /> <br />A <br />C <br />P <br />L <br />30 <br />0 <br />9 <br /> <br />D <br />A <br />I <br />M <br />L <br />E <br />R <br /> <br />S <br />T <br />R <br />E <br />E <br />T <br />. <br />SA <br />N <br />T <br />A <br /> <br />A <br />N <br />A <br />, <br /> <br />C <br />A <br /> <br />9 <br />2 <br />7 <br />0 <br />5 <br />P0.1 <br />PLUMBING GENERAL <br />NOTES, LEGENDS & <br />SCHEDULES <br />MARK GALLON <br />CAPACITY <br />ELECTRICAL DATA <br />VOLT HP <br />REMARKS <br />WF <br />1 -------- <br />EQUIPMENT SCHEDULE <br />---- <br />PH.CYCLE WATTS AMPS <br />MANUFACTURER MODEL NO. <br />CULLIGAN #MS040954 <br />#MS004499 -INSTALL PER MANUFACTURER'S INSTRUCTIONS. <br />DESCRIPTION <br />WATER FILTER <br />--------3/4 ACORN #8126-LFHB-1 HOSE BIBB PROVIDE WITH VACUUM BREAKER.---- <br />1--------SMC #AR50-N10E-Z-DCA-PRV-1 <br />LAB AIR PRESSURE <br />REGULATOR WITH <br />GAUGE <br />PRESSURE REGULATOR WITH PRESSURE GAUGE. INSTALL PER MANUFACTURER'S INSTRUCTIONS.---- <br />3009 S Daimler St <br />11/18/2024