Laserfiche WebLink
(E)4"S <br />(E)4"S <br />(E)4"S <br />SL <br />O <br />P <br />E <br /> <br />@ <br /> <br />2 <br />% <br />SL <br />O <br />P <br />E <br /> <br />@ <br /> <br />2 <br />% <br />TP-1 <br />FS-1 <br />FS-1 <br />2"S <br />SLOPE @ 2% <br />(E)FCO <br />1 <br />1 <br />1 <br />SLOPE @ 2% <br />SLOPE @ 2% <br />2"S <br />2"S <br />2"V, B/G <br />2"V, UP <br />2"VTR <br />2"V, B/G <br />2"VTR <br />2"V, B/G <br />2"VTR(E)2"DCW(E)2"DCW <br />2 SOV <br />3 <br />3/4"DCW <br />TP-1 <br />TP-1 <br />3/4"DCW <br />3/4"DCW <br />4 <br />4 <br />4 <br />FS-1 <br />SL <br />O <br />P <br />E <br /> <br />@ <br /> <br />2 <br />% <br />SLOPE @ 2% <br />SL <br />O <br />P <br />E <br /> <br />@ <br /> <br />2 <br />% <br />3/4"DCW, DN <br />2"V, UP 5 <br />5 <br />5 <br />3/4"DCW, DN <br />3/4"DCW, UP <br />SOV SOV <br />1 <br />WF6 <br />3/4"DCW <br />3/4"DCW <br />3/4"DCW, UP <br />SOV <br />2"S <br />FCO <br />FCO <br />FCO <br />7 <br />3/4"DCW <br />1"CD, UP <br />SL <br />O <br />P <br />E <br /> <br />@ <br /> <br />1 <br />% <br />1"CD, DN <br />(E)FLOOR SINK 8 <br />C D E <br />1 <br />2 <br />3 <br />4 <br />PLUMBING FIRST FLOOR PLAN01SCALE: 1/4" = 1'-0"NORTH <br />POC 2" SANITARY SEWER TO EXISTING PIPE. <br />POC 3/4" COLD WATER TO EXISTING PIPE. <br />3/4" COLD WATER TO EQUIPMENT #94 WITH SHUT OFF VALVE. <br />TRAP PRIMER BEHIND ACCESS PANEL, SEE DETAIL 5/P2.1. <br />FLOOR SINK, REFER TO DETAIL 5/P2.1. <br />WATER FILTER TO BE MOUNTED ON WALL AT 4 FEET AFF. <br />PROVIDE SHUT OFF VALVE IN WALL AT 5 FEET AFF WITH WALL <br />ACCESS PANEL AND PAINT TO MATCH ARCHITECTURE FINISH. <br />ACCESS PANEL TO FACE THE CORRIDOR. <br />1" CONDENSATE DRAIN DISCHARGE AT EXISTING FLOOR SINK. <br />SEE DETAIL 8/P2.1. <br />1 <br />KEY NOTES: <br />1.CONTRACTOR TO FIELD VERIFY SIZE AND LOCATION OF ALL <br />PLUMBING FIXTURES, PIPING, HANGERS, SUPPORTS AND <br />ACCESSORIES PRIOR TO COMMENCEMENT OF WORK. <br />2.CONTRACTOR SHALL FIELD VERIFY EXISTING PIPE SIZES <br />AND ELEVATIONS AT ALL POINTS OF CONNECTION PRIOR <br />TO PROCUREMENT OF MATERIAL AND INSTALLATION. <br />3.FOR PIPE TRAPEZE AND HANGER PIPE DETAILS, 3&4/P2.1. <br />GENERAL NOTES: <br />2 <br />3 <br />4 <br />REMARKSNO.DATE <br />ar <br />c <br />h <br />i <br />t <br />e <br />c <br />t <br />u <br />r <br />e <br />in <br />t <br />e <br />r <br />i <br />o <br />r <br /> <br />d <br />e <br />s <br />i <br />g <br />n <br />pl <br />a <br />n <br />n <br />i <br />n <br />g <br />17 <br />8 <br />8 <br />0 <br /> <br />S <br />k <br />y <br /> <br />P <br />a <br />r <br />k <br /> <br />C <br />i <br />r <br />c <br />l <br />e <br />, <br /> <br />S <br />u <br />i <br />t <br />e <br /> <br />2 <br />3 <br />0 <br /> <br />- <br /> <br />I <br />r <br />v <br />i <br />n <br />e <br />, <br /> <br />C <br />A <br /> <br />9 <br />2 <br />6 <br />1 <br />4 <br />t <br />e <br />l <br /> <br />9 <br />4 <br />9 <br />. <br />5 <br />5 <br />3 <br />. <br />8 <br />9 <br />0 <br />0 <br />Ed <br />w <br />a <br />r <br />d <br />s <br />DA <br />I <br />M <br />L <br />E <br />R <br /> <br />A <br />C <br />P <br />L <br />30 <br />0 <br />9 <br /> <br />D <br />A <br />I <br />M <br />L <br />E <br />R <br /> <br />S <br />T <br />R <br />E <br />E <br />T <br />. <br />SA <br />N <br />T <br />A <br /> <br />A <br />N <br />A <br />, <br /> <br />C <br />A <br /> <br />9 <br />2 <br />7 <br />0 <br />5 <br />P1.1 <br />PLUMBING 1ST FLOOR <br />PLAN <br />5 <br />6 <br />7 <br />8 <br />3009 S Daimler St <br />11/18/2024