Laserfiche WebLink
Page 5 <br /> <br /> <br />Slope Stability <br /> <br />The site is a flat area; therefore, slope instability is not a concern for the proposed <br />development. <br /> <br />CONCLUSIONS AND RECOMMENDATIONS <br /> <br />General Conclusions <br /> <br />Construction of the proposed structure at the subject site is considered geotechnically <br />feasible, provided the recommendations outlined in this report are implemented. <br /> <br />Note: The conclusions and recommendations of this report are based on information as <br />interpreted from our limited subsurface investigation. It is not anticipated but they should <br />be revised accordingly if geotechnical conditions to be exposed during site preparation/ <br />grading and construction significantly differ from our findings and interpretations. <br /> <br />In general, a conventional shallow foundation can be used for support of the proposed <br />structure. <br /> <br />The following recommendations are considered minimum and may be superseded by <br />more restrictive requirements of the architect, civil/structural engineer, building codes, or <br />governing agencies. <br /> <br />Geotechnical Impact on Neighboring Properties <br /> <br />Adverse geotechnical impact of the proposed development on the neighboring properties <br />is not anticipated, provided the recommendations outlined in this report are properly <br />implemented. <br /> <br />Site Preparation/Grading <br /> <br />To create a relatively uniform new engineered compacted fill layer for a proposed new <br />structural slab-on-grade area, over-excavation and recompaction of about 3 ft. deep <br />(measured from the existing ground surface) of the existing on-site soils should be <br />performed. The lateral limits of the over-excavation should be minimum equal to depth of <br />removal (3 ft. in this case) beyond the outside perimeter of the proposed new structure. <br /> <br />For the proposed new exterior concrete slabs including new driveway, if any, the <br />overexcavation and recompaction should be minimum 1 ft deep and 1 ft. outside of the <br />new slab areas. <br /> <br />Deeper remedial removal is not anticipated; however, this will be determined in the field <br />by the project geotechnical engineer, based on the actual conditions to be exposed at the <br />time of the site grading/preparation. <br />2515 & 2517 N <br />Cotter St5/1/2025