My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2515 & 2517 N Cotter St - Plan
PBA
>
Building
>
ProjectDox
>
C
>
Cotter St
>
2517 N Cotter St
>
2515 & 2517 N Cotter St - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/6/2025 1:19:14 PM
Creation date
6/6/2025 1:18:27 PM
Metadata
Fields
Template:
Plan
Permit Number
101120876
101120877
101120878
Full Address
2517 N Cotter St
2515 N Cotter St
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
81
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Page 6 <br /> <br /> <br />The fill/backfill materials, if any, should be free of organic matter and oversized <br />materials, 4 inches or greater in diameter, placed in near-horizontal loose lifts not to <br />exceed eight inches in thickness, and moisture conditioned to slightly over optimum <br />moisture content prior to compaction. <br /> <br />Imported soils, if any, should have a very low expansion potential and should be <br />geotechnically observed/tested and accepted by the geotechnical consultant prior to using <br />at the site. <br /> <br />In general, grading at the site, if any, should be performed in accordance with the <br />requirements of the City and under the geotechnical observation and testing of the project <br />geotechnical consultant. The compaction criterion for fill and backfill materials is a <br />minimum of 90% of the maximum density determined in accordance with ASTM Test <br />Method D1557. <br /> <br />Temporary Excavations <br /> <br />In general, temporary excavations should be performed in accordance with OSHA <br />requirements. In general, care should be taken during excavation near an existing <br />structural object, if any to ensure no damage is done to the existing object. <br /> <br />For this project, all new (detached) buildings will be located far away from the existing <br />building. Therefore, impact of the proposed temporary excavation to the existing building <br />is not anticipated. <br /> <br />BUILDING FOUNDATION DESIGN GUIDELINES <br /> <br />Geotechnical Parameters For Structural Design <br /> <br />For conservative purposes, the following “lowest” code values should be used for <br />structural design, as needed. <br /> <br />a. Allowable vertical bearing earth pressure: 1,500 psf. <br /> <br />An increase of one-third is permitted when using the alternative load <br />combinations that include wind or earthquake loads. <br /> <br />b. Lateral bearing passive earth pressure: 100 psf. per foot into competent materials <br />below the finished ground surface. <br /> <br />An increase of one third is permitted when using the alternative load <br />combinations that include wind or earthquake loads. <br /> <br />c. Lateral Sliding Resistance: cohesion = 130 psf. <br /> <br />2515 & 2517 N <br />Cotter St5/1/2025
The URL can be used to link to this page
Your browser does not support the video tag.