Page 8 <br /> <br /> <br />New Exterior Slabs-on-Grade <br /> <br />To reduce the potential for excessive cracking, new exterior concrete slabs-on-grade, if <br />any, should be minimum 4 inches thick, provided with construction or weakened plane <br />joints at frequent intervals (e. g., every 6 feet or less). Provision of a 2-inch thick layer of <br />crushed rock, gravel, or clean sand to be placed beneath the slabs and/or reinforcement, <br />such as #3 re-bars at 24 inches on-centers, or equivalent, placed at the mid-height of the <br />slab should be considered. The subgrade soils for the exterior slabs should be properly re- <br />compacted. <br /> <br />Slab Subgrade Pre-Saturation <br /> <br />The conventional pre-saturation of subgrade soils to minimum 140% of the optimum <br />moisture content to minimum 24 inches deep is not considered necessary for this project. <br />However, spraying with water should be performed prior to concrete pour. <br /> <br />Other Recommendations for Reducing Slab Cracking <br /> <br />While not a geotechnical issue, the potential for slab cracking may also be reduced by <br />careful control of water/cement ratio and slump of concrete. The contractor should take <br />appropriate curing precautions during the pouring of concrete in hot weather to reduce <br />cracking of slabs. <br /> <br />A slip sheet (or equivalent) can be utilized if grouted tile, marble tile, or other crack- <br />sensitive floor covering is planned directly on concrete slabs. <br /> <br />New Driveway <br /> <br />The minimum section required by the City can be used for a new driveway, if any. If <br />there is no minimum requirements by the City, a 5-inch thick concrete slab (PCC), <br />reinforced with #4 rebar (placed at mid-height of slabs) at 18 inches on-centers both <br />ways, or 5-in. thick asphalt concrete (AC), or equivalent, over a 6-inch thick layer of <br />aggregate base (AB) can be used. The aggregate base and subgrade should be properly <br />compacted to a minimum of 95% and 90%, respectively, of the maximum density <br />determined in accordance with ASTM D1557 prior to placement of the concrete slab. <br />Spraying the compacted subgrade soils with water should be performed prior to concrete <br />pour. <br /> <br />If pavers are to be used, they must be properly designed by the civil engineer of record <br />for this project and approved by the city prior to construction. Additional geotechnical <br />data can be provided for design, if requested. <br /> <br />Site Drainage <br /> <br />2515 & 2517 N <br />Cotter St5/1/2025