My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1330 E Seventeenth St - Plan
PBA
>
Building
>
ProjectDox
>
S
>
Seventeenth St
>
1330 E Seventeenth St
>
1330 E Seventeenth St - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/6/2025 1:19:14 PM
Creation date
6/6/2025 1:18:39 PM
Metadata
Fields
Template:
Plan
Permit Number
20183938
101120775
Full Address
1330 E Seventeenth St
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
141
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Existing Building Code Allowance <br />Target T0286 - Santa Ana - Final Report PPE-05184.03 <br />Checked by AY <br />• Pursuant to CA Existing Building Code section 502.4, any existing gravity load-carrying structural element for <br />which additions and/or alterations cause an increase in design gravity load of no more than 5 percent, shall be <br />permitted to remain unaltered, thus considered to be code-compliant and adequate. Any existing gravity load- <br />carrying structural element for which additions and/or alterations cause an increase in design gravity loads <br />exceeding 5 percent is checked against the applicable Code criteria for new structures. <br />• Pursuant to CA Existing Building Code Sections 502.5, any existing lateral load-carrying structural element <br />whose demand-capacity ratio with the addition and/or alteration considered is no more than 10 percent greater <br />than its demand-capacity ratio with the addition and/or alteration ignored shall be permitted to remain <br />unaltered, thus considered to be Code-compliant and adequate. If the demand- capacity ratio increase is more <br />than 10 percent, the subject structural element is checked against the applicable Code criteria for new <br />structures. <br />• Pursuant International Building Code section 1607A.13.5.1, where PV panels are installed on building roof, it is <br />not necessary to include roof live load in the area(s) covered by the panels when these area(s) are inaccessible, <br />or signs are posted prohibiting storage under the panels. Therefore, Pure Power has applied the roof live/snow <br />load in all areas that are still accessible and subject to foot traffic, maintenance workers, storage, etc., but not <br />directly under the modules. <br />Sheet 3.2 <br />7/19/2024 <br />Prepared by PB <br />1330 E Seventeenth <br />St4/10/2025
The URL can be used to link to this page
Your browser does not support the video tag.