My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2210 3%4 N Grand Ave Unit# WCC01 - REV 1 - Plan
PBA
>
Building
>
ProjectDox
>
G
>
Grand Ave
>
2210 3/4 N Grand Ave Unit# WCC01
>
2210 3%4 N Grand Ave Unit# WCC01 - REV 1 - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/13/2025 3:47:25 AM
Creation date
6/6/2025 1:22:17 PM
Metadata
Fields
Template:
Plan
Permit Number
101118404
101122299
Full Address
2210 3/4 N Grand Ave Unit# WCC01
Street Number
2210
Partial
3/4
Street Direction
N
Street Name
Grand
Street Suffix
Ave
Unit Number
WCC01
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
167
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Geotechnical Report of Subsurface Investigation <br />LA3642 SCE LAVETA SUB CS (LA23642A) <br />Job Number: 24125796 <br /> <br /> <br />April 29, 2024│5 <br />Excavations <br />Groundwater was not encountered at the time of drilling. Although not expected, if encountered <br />in deep trench excavations during construction, groundwater or perched groundwater will require <br />dewatering until backfilling operations are complete. <br />All excavations that may be required should, at a minimum, comply with applicable local, state <br />and federal safety regulations, including the current OSHA Excavation and Trench Safety <br />Standards to provide stability and safe working conditions. <br />Slopes <br />For permanent slopes in unreinforced compacted fill areas, we recommended maximum <br />configurations of 3:1 (Horizontal: Vertical) for the cohesive soils (clay) found at the site. <br />If steeper slopes are required for site development, stability analyses should be completed to design <br />the grading plan. The face of all slopes should be compacted to the minimum specification for fill <br />embankments. Fill slopes should be overbuilt and trimmed to compacted material. <br />Earthwork Construction Considerations <br />The near-surface, on-site soils will lose strength when exposed to moisture. To the extent practical, <br />earthwork should be performed during drier periods of weather. Increased remedial measures due to <br />wet and soft or otherwise unsuitable conditions should be expected if earthwork is performed during <br />colder and wetter periods of weather. <br />A qualified geotechnical engineer should be retained during the earthwork phase of the project to <br />observe earthwork and to perform necessary tests and observations during subgrade preparation; <br />to monitor proof-rolling, placement and compaction of controlled compacted fills, and backfilling <br />of excavations to the completed subgrade. <br /> <br />2210 3%4 N Grand Ave Unit# <br />WCC01 - 1011184045/30/2024
The URL can be used to link to this page
Your browser does not support the video tag.