Laserfiche WebLink
By: J.R. <br />Date: 12/5/23 <br />Gravity Loads: <br />DEMAND DECREASED BY 4.58% = OK! <br />Lateral Loads: <br />DEMAND INCREASED BY 2.08% < 10% = OK! <br />Anchorage: <br />DEMAND OF 509.2LB. < CAPACITY OF 1702.4LB. = OK! <br />USE (2) 5/16IN. DIA. LAG SCREW(S) AT 4FT. MAX. O.C. W/ 2.5IN. MIN. PENETRATION <br />Summary: <br />STRUCTURE IS ADEQUATE FOR THE PROPOSED PV ARRA <br />ANCHORS ON EAVES/OVERHANGS ARE OK! <br />Summary <br />12/5/2023  9:03 AM <br />7 of 7 <br />©McPherson Engineering <br />2044 S Orange Ave - <br />101117921 & 201818526/13/2024