Laserfiche WebLink
CALIFORNIA LICENSE NO. C83664 <br />VANDERVOORT, DAVID <br />2307 NORTH TOWNER STREET <br />SANTA ANA, CA 92706 <br /> PN/PARCEL NO: 00121406 <br />EXO ENERGY <br />1358 LA MIRADA DRIVE <br />SAN MARCOS, CA 92071 <br />(208) 351-4153 <br />MICHAEL ESPINOZA <br />CSLB: 1063308 <br />ENGINEERED PLANS COMPLETED BY ENGINEERS IN THE USA PV-1 <br />AERIAL MAP VICINITY MAP <br />SCOPE OF WORK <br />CONTRACTOR <br />DATE: <br />DRAWN BY: <br />REVIEWED BY: <br />CODE REFERENCE <br />DESIGN CRITERIA <br />2307 NORTH TOWNER STREET, <br />SANTA ANA, CALIFORNIA 92706 <br />(33.767339,-117.879137) <br />18 MODULES - 7.200 KW DC 6.984 KW AC SYSTEM SIZE <br />DAVID VANDERVOORT RESIDENCE - 2307 NORTH TOWNER STREET, SANTA ANA, CALIFORNIA 92706 <br />NEW PV ROOFTOP AND BATTERY SYSTEM DESIGN <br />ABD <br />1. CONTRACTOR SHALL FIELD VERIFY ALL DIMENSIONS AND REVIEW ALL MANUFACTURER INSTALLATION DOCUMENTS PRIOR TO INITIATING CONSTRUCTION. <br />2. ALL COMPONENTS SHALL BE NEW AND LISTED BY A RECOGNIZED ELECTRICAL TESTING LABORATORY AND LISTED FOR THEIR SPECIFIC APPLICATION. <br />3. OUTDOOR EQUIPMENT SHALL BE NEMA 3R RATED OR BETTER. <br />4. ACCESS TO ELECTRICAL COMPONENTS OVER 150 VOLTS TO GROUND SHALL BE RESTRICTED TO QUALIFIED PERSONNEL. <br />5. CONTRACTOR SHALL OBTAIN ELECTRICAL PERMITS PRIOR TO INSTALLATION AND SHALL COORDINATE ALL INSPECTIONS, TESTING COMMISSIONING, AND ACCEPTANCE WITH <br />THE CLIENT, UTILITY CO. AND CITY INSPECTORS AS NEEDED. <br />6. EACH MODULE TO BE GROUNDED USING THE SUPPLIED CONNECTION POINT PER THE MANUFACTURER'S REQUIREMENTS. ALL PV MODULES, EQUIPMENT, AND METALLIC <br />COMPONENTS ARE TO BE BONDED. IF THE EXISTING GROUNDING ELECTRODE SYSTEM CANNOT BE VERIFIED OR IS ONLY METALLIC WATER PIPING, IT IS THE CONTRACTOR'S <br />RESPONSIBILITY TO INSTALL A SUPPLEMENTAL GROUNDING ELECTRODE. <br />7. DC CONDUCTORS SHALL BE RUN IN EMT AND/OR MC (METAL CLAD CABLE) AND SHALL BE LABELED. ALL DC CONDUCTORS RUN INSIDE OF THE STRUCTURE SHALL BE INSTALLED <br />A MINIMUM OF 18" BELOW THE ROOF DECK. <br />8. EXPOSED NON-CURRENT CARRYING METAL PARTS OF ELECTRICAL EQUIPMENT SHALL BE GROUNDED IN ACCORDANCE WITH APPLICABLE NEC. <br />9. CONFIRM LINE SIDE VOLTAGE AT THE ELECTRIC UTILITY SERVICE PRIOR TO CONNECTING INVERTER. VERIFY SERVICE VOLTAGE IS WITHIN INVERTER VOLTAGE OPERATIONAL <br />RANGE. <br />10. ELECTRICAL CONTRACTOR TO PROVIDE CONDUIT EXPANSION JOINTS AND ANCHOR CONDUIT RUNS AS REQUIRED PER CODE. <br />11. ALL WIRING MUST BE PROPERLY SUPPORTED BY DEVICES OR MECHANICAL MEANS DESIGNED AND LISTED FOR SUCH USE, AND FOR ROOF-MOUNTED SYSTEMS, WIRING MUST BE <br />PERMANENTLY AND COMPLETELY HELD OFF OF THE ROOF SURFACE. <br />12. ALL ROOF PENETRATIONS MUST BE SEALED OR FLASHED. <br />13. EQUIPMENT MAY BE SUBSTITUTED FOR SIMILAR EQUIPMENT BASED ON AVAILABILITY. SUBSTITUTED EQUIPMENT SHALL COMPLY WITH DESIGN CRITERIA. <br />14. REMOVAL OF AN INTERACTIVE INVERTER OR OTHER EQUIPMENT SHALL NOT DISCONNECT THE BONDING CONNECTION BETWEEN THE GROUNDING ELECTRODE CONDUCTOR AND <br />THE PHOTOVOLTAIC SOURCE AND/OR OUTPUT CIRCUIT GROUNDED CONDUCTORS. <br />15. WHENEVER A DISCREPANCY IN THE QUALITY OF EQUIPMENT ARISES ON THE DRAWING OR SPECIFICATIONS, THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING AND <br />INSTALLING ALL MATERIAL AND SERVICES REQUIRED BY THE STRICTEST CONDITIONS NOTED ON THE DRAWINGS OR IN THE SPECIFICATIONS TO ENSURE COMPLETE <br />COMPLIANCE AND LONGEVITY OF THE OPERABLE SYSTEM REQUIRED BY THE ENGINEERS. <br />GENERAL NOTES <br />ATF <br />SCOTT E. WYSSLING, P.E. <br />INSTALL 7.200 KW DC ROOF MOUNTED <br />PV SYSTEM UTILIZING <br />(18) HANWHA Q.CELL BLK ML-G10+ 400 <br />(18) ENPHASE IQ8PLUS-72-2-US <br />(1) ENPHASE - X-IQ-AM1-240-4C <br />(1) 30A PV AC DISCONNECT <br />(1) 30A ESS AC DISCONNECT <br />(1) 125 GENERATION PANEL <br />(1) TESLA BACKUP GATEWAY 2 <br />(1) TESLA POWERWALL AC II BATTERY <br />ECOFASTEN CLICKFIT RAIL RACKING WITH <br />(51) ECOFASTEN TILE HOOK FLASHING MOUNTS <br />NEW 225 A BUSBAR WITH 175 A MAIN BREAKER <br />INTERCONNECTION METHOD: LOAD SIDE BREAKER <br />ROOF TYPE: CONCRETE W TILE <br />NUMBER OF STORIES: 1 <br />EXO ENERGY <br />1358 LA MIRADA DRIVE <br />SAN MARCOS, CA 92071 <br />(208) 351-4153 <br />ASCE 7-16 WIND SPEED: 95 MPH <br />EXPOSURE CATEGORY C <br />GROUND SNOW LOAD: 0 PSF <br />AHJ: SANTA ANA <br />2022 CALIFORNIA BUILDING CODE <br />2022 CALIFORNIA RESIDENTIAL CODE <br />2022 CALIFORNIA FIRE CODE <br />2022 CALIFORNIA PLUMBING CODE <br />2022 CALIFORNIA ELECTRICAL CODE <br />2022 CALIFORNIA MECHANICAL CODE <br />2022 CALIFORNIA ENERGY CODE <br />2022 CALIFORNIA GREEN BUILDING STANDARDS CODE <br />2022 CALIFORNIA HISTORICAL CODE <br />2022 CALIFORNIA EXISTING BUILDING CODE <br />2022 CALIFORNIA REFERENCED STANDARDS CODE <br />2022 CALIFORNIA ADMINISTRATIVE STANDARDS CODE <br />7/26/2024 <br />COVER SHEET <br />SHEET INDEX <br />PV-1 <br />PV-3 <br />PV-4 <br />S-1 <br />E-1 <br />E-2 <br />E-3 <br />SITE PHOTOS <br />PV LABELS <br />EQUIPMENT INFORMATION <br />ELECTRICAL DIAGRAM <br />STRUCTURAL DETAILS <br />MOUNTING PLAN <br />SITE PLAN-2 <br />COVER SHEET <br />PV-5 <br />MANUFACTURER'S SPECSSPECS 1-7 <br />INSTALL CHECKLISTPV-6 <br />E-4 PLACARD <br />76 N. MEADOWBROOK DRIVE <br />ALPINE, UTAH 84004 <br />DESIGN ENGINEER <br />SOLAR COMPANY/CLIENT <br />REVISIONS <br />NO. <br />1 <br />2 <br />DATE <br />swyssling@wysslingconsulting.com <br />(201) 874-3483 <br />COMMENTS <br />PV-2 SITE PLAN-1 <br />E-5 ELEVATION DETAILS <br />07/26/2024 ESS DISCONNECT LOCATION <br />Signed 7/26/2024 <br />Elec#: 20183254 <br /> <br /> <br />Revision to: <br />Elec# 20178963 & 20181798 <br /> <br />Approvals: <br />M Smith <br />The scope of the plans is for the installation of the solar photovoltaic system only and the approval is subject to compliance with all <br />applicable city and state codes and regulations regarding construction. The approval of the plans does not constitute any <br />certification of the accuracy, completeness, or building permit status of the existing buildings and structures as shown. <br />2307 N Towner St <br />8/23/2024