My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1901 N Fairview St & Bldg A, B, C, F & 1919 N Fairview St Bldg E - Plan
PBA
>
Building
>
ProjectDox
>
F
>
Fairview St
>
1901 N Fairview St Bldg# B
>
1901 N Fairview St & Bldg A, B, C, F & 1919 N Fairview St Bldg E - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/6/2025 1:23:16 PM
Creation date
6/6/2025 1:22:19 PM
Metadata
Fields
Template:
Plan
Permit Number
20180424
20180427
20180439
20180441
20180444
101116031
101119651
Full Address
1901 N Fairview St Bldg# B
1901 N Fairview St Bldg# C
1919 N Fairview St Bldg# E
1901 N Fairview St Bldg# F
1901 N Fairview St
Permit Number (Not in SAPIN)
2018049
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
694
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
BWB – Longitudinal bracing wind force applied parallel to the building length to the right <br />EQR – Seismic force applied perpendicular to the building length to the right <br />EQL – Seismic force applied perpendicular to the building length to the left <br />EQB – Longitudinal bracing seismic force applied parallel to the building length to the right <br />EQF – Longitudinal bracing seismic force applied parallel to the building length to the left <br />C1OL – Crane 1 vertical live load without impact when crane is positioned near left column <br />C1OR – Crane 1 vertical live load without impact when crane is positioned near right column <br />C1LL – Crane 1 lateral load applied perpendicular to the building length to the left <br />C1LR – Crane 1 lateral load applied perpendicular to the building length to the right <br />CUPL – Bracing uplift force due to crane longitudinal load parallel to the building length <br />CDOW – Bracing downward force due to crane longitudinal load parallel to the building length <br />CSUP – Bracing uplift force due to crane stop load parallel to the building length <br />CSDO – Bracing downward force due to crane stop load parallel to the building length <br /> <br /> <br /> <br /> <br />8 1901 N Fairview St & Bldg A, B, <br />C, F & 1919 N Fairview St Bldg E <br />4/11/2024
The URL can be used to link to this page
Your browser does not support the video tag.