Laserfiche WebLink
4' <br /> <br />F <br />I <br />R <br />E <br /> <br />L <br />A <br />N <br />E <br />H CUSTOMER <br />DATE: <br />SCALE: <br />SHEET # <br />CUSTOMER <br />E-7.1 <br />APN <br />PLAN SET REVISIONS <br />399-031-24 / 399-031-23 <br />6/8/2023 <br />SAMUELI ACADEMY <br />1901/1919 N. FAIRVIEW ST. <br />SANTA ANA, CA. 92705 <br />CONTRACTOR SIGNATURE: <br />DAVID CLEVELAND <br />CO <br />N <br />T <br />R <br />A <br />C <br />T <br />O <br />R <br />' <br />S <br /> <br />L <br />I <br />C <br />E <br />N <br />S <br />E <br /> <br /># <br /> <br />1 <br />0 <br />8 <br />9 <br />1 <br />1 <br />7 <br /> <br />C <br />L <br />A <br />S <br />S <br /> <br />B <br />CON <br />T <br />R <br />A <br />C <br />T <br />O <br />R <br />' <br />S <br /> <br />L <br />I <br />C <br />E <br />N <br />S <br />E <br /> <br /># <br /> <br />1 <br />0 <br />8 <br />9 <br />1 <br />1 <br />7 <br /> <br />C <br />L <br />A <br />S <br />S <br /> <br />B <br />DRAWN BY: <br />CHECKED BY: <br />APPROVED BY: <br />ENGINEER STAMP <br />PROJECT NUMBER <br />1074220072 <br />C: <br />\ <br />U <br />s <br />e <br />r <br />s <br />\ <br />j <br />o <br />d <br />i <br />a <br />z <br />\ <br />A <br />p <br />p <br />D <br />a <br />t <br />a <br />\ <br />L <br />o <br />c <br />a <br />l <br />\ <br />T <br />e <br />m <br />p <br />\ <br />A <br />c <br />P <br />u <br />b <br />l <br />i <br />s <br />h <br />_ <br />2 <br />0 <br />1 <br />2 <br />8 <br />\ <br />S <br />a <br />m <br />u <br />e <br />l <br />i <br /> <br />A <br />c <br />a <br />d <br />e <br />m <br />y <br />_ <br />M <br />A <br />S <br />T <br />E <br />R <br /> <br />P <br />L <br />A <br />N <br /> <br />S <br />E <br />T <br />_ <br />1 <br />0 <br />- <br />2 <br />6 <br />- <br />2 <br />3 <br />. <br />d <br />w <br />g <br /> <br />N <br />o <br />v <br /> <br />0 <br />7 <br />, <br /> <br /> <br />2 <br />0 <br />2 <br />3 <br /> <br />- <br /> <br />3 <br />: <br />5 <br />7 <br />p <br />m <br />STRING LAYOUT FOR <br />ROOF MOUNT <br />OPTIMIZER STRING LAYOUT FOR ALL SOLAR PV ROOF MOUNTS <br />N <br />E <br />S <br />W <br />45° <br />135°225° <br />315° <br />GENERAL NOTES <br />1. (2)MODULES PER PV OPTIMIZER CIRCUIT. <br />2. SEE SECTION 3 OF SPECIFICATIONS ON E-000 FOR CONDUIT TYPES AND USES, AS WELL AS WHEN EXPANSION JOINTS ARE REQUIRED. <br />3. ALL EQUIPMENT REQUIRES ATTACHMENT DETAILS PER MANUFACTURER'S INSTRUCTIONS; EQUIPMENT THAT IS 400 LBS OR MORE <br />REQUIRE STRUCTURAL CALCULATIONS OF THE ATTACHMENTS. <br />4. WORKING CLEARANCES FOR ALL NEW ELECTRICAL EQUIPMENT SHALL BE PER CEC ART. 110.26(A) AND 110.34(A). CONTRACTOR <br />SHALL MAINTAIN WORKING AND MAINTENANCE CLEARANCES FOR EXISTING EQUIPMENT. <br />5. SWITCHES FOR CIRCUIT BREAKERS USED AS SWITCHES SHALL BE INSTALLED SUCH THAT THE CENTER OF THE GRIP OF THE <br />OPERATING HANDLE, WHEN IN ITS HIGHEST POSITION, IS NOT MORE THAN 6 FEET 7 INCHES ABOVE THE FLOOR OR WORKING <br />PLATFORM PER CEC ART. 404.8(A). <br />6. CONTRACTOR TO CONSULT INSTALLATION MANUALS OF NEW EQUIPMENT FOR PROPER MOUNTING METHODS AND CLEARANCES. <br />7. EXACT CONDUIT ROUTE TBD BY CONTRACTOR. <br />8. CONDUITS AND FITTINGS VISIBLE TO THE PUBLIC SHALL BE PAINTED TO MATCH THE EXISTING BUILDING IF REQUIRED BY THE <br />JURISDICTION OR OWNER. <br />9. ALL CONDUITS ROUTED ON ROOFTOPS SHALL BE INSTALLED A MINIMUM DISTANCE OF 7/8" ABOVE THE ROOF TO THE BOTTOM OF THE <br />CONDUIT TO MAINTAIN THE ACCURACY OF THE ELECTRICAL CALCULATIONS PER CEC ART. 310.15(B)(3)(C). LOCATE ATTACHMENT <br />POINTS NOT MORE THAN 10' ON CENTER AND MAXIMUM 3' FROM PULL POINT OR WALL PENETRATION. <br />STRING SUMMARY <br />BUILDING STRING NAME MODULES PER STRING OPTIMIZERS PER STRING INVERTER NUMBER <br />E 9-1 27 14 9 <br />E 9-2 27 14 9 <br />E 9-3 27 14 9 <br />E 9-4 27 14 9 <br />SOUTH E 9-5 27 14 9 <br />SOUTH E 9-6 29 15 9 <br />SOUTH E 10-1 32 16 10 <br />SOUTH E 10-2 32 16 10 <br />SOUTH E 10-3 32 16 10 <br />A 11-1 27 14 11 <br />A 11-2 27 14 11 <br />B 11-3 20 20 11 <br />B 11-4 20 20 11 <br />F 8-1 27 14 8 <br />F 8-2 27 14 8 <br />F 8-3 27 14 8 <br />F 8-4 27 14 8 <br />F 8-5 27 14 8 <br />F 8-6 27 14 8 <br />C 7-1 27 14 7 <br />C 7-2 27 14 7 <br />C 7-3 27 14 7 <br />N.T.S. <br />J.D. 10-27-23 <br />J.M. 10-27-23 <br />B.B. 10-27-23 <br />N <br />E <br />S <br />W <br />45° <br />135°225° <br />315° <br />INV8-1 <br />BUILDING A <br />BUILDING B <br />(N) ROOF MOUNT <br />ARRAY #4 <br />(N) ROOF MOUNT <br />ARRAY #3 <br />(N) ROOF MOUNT <br />ARRAY #2 <br />BUILDING F <br />BUILDING E <br />(N) ROOF MOUNT <br />ARRAY #5 <br />(N) ROOF MOUNT <br />ARRAY #1 <br />N <br />E <br />S <br />W <br />45° <br />135°225° <br />315° <br />N <br />E <br />S <br />W <br />45° <br />135°225° <br />315° <br />INV8-2 <br />INV8-3 <br />INV8-4 <br />INV8-5 <br />INV8-6 <br />INV9-1 <br />INV9-2 <br />INV9-3 <br />INV9-4 <br />INV9-5 INV9-6 <br />INV10-5 <br />INV10-4 <br />IN <br />V <br />7 <br />- <br />3 <br />IN <br />V <br />7 <br />- <br />2 <br />IN <br />V <br />7 <br />- <br />1 <br />(N) ROOF MOUNT <br />ARRAY #6 <br />INV10-1 <br />INV10-3 <br />INV10-2 <br />INV10-6 INV10-7 <br />BUILDING C <br />1901 N Fairview St & Bldg A, B, <br />C, F & 1919 N Fairview St Bldg E <br />4/11/2024