Laserfiche WebLink
FIELD VERIFY ALL CONDITIONS <br />DESIGN DRAWINGS ARE SCHEMATIC. THIS CONTRACTOR SHALL VISIT THE SITE <br />PRIOR TO BIDDING OR AWARD OF CONTRACT TO INSPECT EXISTING FIELD <br />CONDITIONS. THIS CONTRACT SHALL INCLUDE ALL LABOR AND MATERIALS <br />NECESSARY FOR FIELD MODIFICATIONS DUE TO EXISTING CONDITIONS. <br />THE CONTRACTOR SHALL CONTACT THE ARCHITECT, ENGINEER OR OWNER <br />PRIOR TO BIDDING FOR INTERPRETATIONS AND CLARIFICATIONS OF THE <br />DESIGN AND INCLUDE IN HIS BID ALL COSTS TO MEET THE DESIGN INTENT. <br />CLARIFICATIONS MADE BY THE ARCHITECT, ENGINEER OR OWNER AFTER <br />BIDDING WILL BE FINAL AND SHALL BE IMPLEMENTED AT CONTRACTORS COST. <br />BIDDING CONTRACTORS SHALL HAVE A WORKING KNOWLEDGE OF LOCAL <br />CODES AND ORDINANCES AND SHALL INCLUDE IN THEIR BIDS THE COSTS FOR <br />ALL WORK INSTALLED IN STRICT ACCORDANCE WITH GOVERNING CODES, <br />THE PLANS AND SPECIFICATIONS NOT WITHSTANDING. THE CONTRACTOR <br />SHALL ALERT ARCHITECT, ENGINEER OR OWNER OF ANY APPARENT <br />DISCREPANCIES BETWEEN GOVERNING CODES AND DESIGN INTENT. <br />ALL WORK TO COMPLY WITH 2022 CALIFORNIA MECHANICAL CODE. <br />FOR INSTALLATION IN SUCH AREAS. <br />ALL EQUIPMENT AND WIRING (COMMUNICATION, POWER, FIRE ALARM, ETC.) INSTALLED IN A PLENUM SHALL BE LISTED <br />15. <br />14. <br />26. <br />25. <br />24. <br />CONTRACTOR SHALL OBTAIN AND PAY FOR ALL NECESSARY PERMITS, FEES AND LICENSED AS REQUIRED. <br />CONDITION OF FINAL PAYMENT BEING RELEASED. <br />CONTRACTOR SHALL PROVIDE A SCHEDULE OF MATERIAL AS-BUILT. SAID AS-BUILT SHALL BE PROVIDED PRIOR TO, AND AS A <br />23. <br />22. <br />21. <br />20. <br />19. <br />18. <br />NO WATER PIPING IS ALLOWED ABOVE THE ELEC. ROOM, TELEPHONE SWITCH ROOM AND DATA/COMMUNICATION ROOM. <br />TO OWNER, FOR A PERIOD OF ONE YEAR FROM THE DATE OF THE TENANT OCCUPANCY. <br />CONTRACTOR SHALL PROVIDE WRITTEN WARRANTY TO REPLACE ALL FAULTY MATERIALS AND/OR LABOR, AT NO COST <br />ALL DUCTWORK SHALL BE CONSTRUCTED, ERECTED AND INSTALLED IN ACCORDANCE WITH CMC CHAPTER 6. <br />1. <br />2. <br />3.DUCTWORK SHALL BE INSULATED IN ACCORDANCE WITH THE SPECIFICATIONS AND TITLE 24. <br />RUN ALL DUCTS AS TIGHT AS POSSIBLE TO THE STRUCTURE ABOVE UNLESS OTHERWISE NOTED. <br />4. <br />5. <br />6. <br />7. <br />8. <br />9. <br />TO ORDERING. <br />FOR A PERIOD OF ONE YEAR FROM DATE OF OWNER ACCEPTANCE. <br />OF IT. AREA SHALL BE LEFT IN A CONDITION ACCEPTABLE TO OWNER. <br />DUCT AND PIPE DIMENSIONS SHOWN ARE NET INSIDE CLEAR DIMENSIONS. <br />11. <br />12. <br />13. <br />SHALL BE APPROVED BY THE ARCHITECT PRIOR TO CONSTRUCTION. <br />OWNER AND ONE (1) SET OF HARD COPY TO MARS ENGINEERING. IN ADDITION TO THIS REQUIREMENTS, CONTRACTOR SHALL COMPLY <br />10. <br />CEILING SPACES USED AS RETURN AIR PLENUMS SHALL FULLY COMPLY WITH ALL THE PROVISIONS OF SECTIONS 601.1-601.2. <br />CONTRACTOR SHALL PROVIDE WRITTEN WARRANTY TO REPLACE ALL FAULTY MATERIALS AND/OR LABOR AT NO COST TO OWNER <br />CONTRACTOR SHALL COORDINATE VOLTAGE AND PHASE OF EACH PIECE OF EQUIPMENT WITH THE ELECTRICAL CONTRACTOR PRIOR <br />CONTRACTOR SHALL PROVIDE ACCESS PANELS FOR ALL NEW AND EXISTING EQUIPMENT LOCATED ABOVE HARD LID CEILING. <br />CONTRACTOR SHALL SEAL ALL UNUSED DUCT OPENINGS AND REPAIR ALL LEAKING DUCTS AS PART OF THIS WORK. <br />MATERIALS EXPOSED WITHIN DUCTS OR PLENUMS SHALL HAVE A FLAME-SPREAD INDEX OF NOT MORE THAN 25 AND A SMOKE <br />UPON COMPLETION OF WORK, CONTRACTOR SHALL CLEAN AND REMOVE ALL DEBRIS ASSOCIATED WITH HIS/HER WORK AND DISPOSE <br />DEVELOPED RATING OF NOT MORE THAN 50 WHEN TESTED IN ACCORDANCE WITH UNIFORM BUILDING CODE. <br />CONTRACTOR SHALL LAYOUT THE DRAWING PER CONTRACT DOCUMENT AS MUCH AS POSSIBLE. ANY SIGNIFICANT DEVIATION IN LAYOUT <br />CONTRACTOR SHALL SUBMIT THREE (3) SETS OF HARD COPIES AND ELECTRONIC CAD FILES OF AS-BUILTS TO THE BUILDING <br />16. <br />17. <br />THE DUCTWORK UNLESS APPROVED OTHERWISE. <br />ALL PENETRATIONS THROUGH NON-RATED CONSTRUCTION SHALL BE PROPERLY AND GENEROUSLY CAULKED WITH NON-SHRINKING TYPE <br />SOUND RESISTANT MATERIAL SUCH AS SILICONE. USE ACOUSTICAL SEALANT AROUND DUCTS INSTALLED INTO ACOUSTICAL PARTITIONS. <br />RUN ALL DUCTS AS TIGHT AS POSSIBLE TO STEEL BEAMS. ALL PIPING OTHER THAN FOR CONDENSATE SHALL BE ROUTED ABOVE <br />SEAL ALL DUCTS AND JOINTS WITH HIGH VELOCITY, WATER BASED, UL-FIRE RATED DUCT SEALER. <br />CONTRACTOR TO PROVIDE LINED TRANSFER DUCTS, SIZED PER OUR DETAIL, FOR ALL ROOMS ENCLOSED BY FULL HEIGHT WALL ON <br />ALL SIDES. ALL EXISTING INSULATION ON THE MAIN DUCTWORK THAT IS LOOSE OR DAMAGED SHALL BE REPLACED BY THE CONTRACTOR. <br />CONTRACTOR SHALL REPAIR OR REPLACE ALL DAMAGED DUCT SUPPORTS FOR THE MAIN DUCTWORK. <br />ALL SUPPLY CEILING DIFFUSERS AND RETURN GRILLES SHALL BE CLEARED OF MAIN HVAC DUCT LOOP. <br />WITH CLOSE-OUT REQUIREMENTS AS SPECIFIED UNDER GENERAL PROVISIONS AND DIVISION 15. <br />PROVIDE TEMPORARY FILTERS DURING CONSTRUCTION. REPLACE TEMPORARY FILTERS WITH PERMANENT FOR ALL A/C UNITS <br />INCLUDING THE BASE BUILDING MAIN AIR HANDLING UNIT SERVING EACH FLOOR. <br />ACCORDANCE WITH CHAPTER 6 OF THE MECHANICAL CODE. DUCT GAUGES SHALL BE PER TABLE 6-A, 6-B AND 6-C. <br />ALL DUCTWORK SHALL BE GALVANIZED STEEL AND GAUGE 26 MINIMUM. DUCTWORKS SHALL BE FABRICATED AND INSTALLED IN <br />GENERAL CONSTRUCTION NOTES <br />MECHANICAL NOTES <br />12. <br />11. <br />10. <br />9. <br />8. <br />7. <br />6. <br />5. <br />4. <br />3. <br />2. <br />AND SHALL BE TIED-IN TO THE BUILDING FIRE ALARM SYSTEM. CONNECTION TO FIRE ALARM FOR <br />SUPERVISION ONLY. <br />ALL DUCTWORK SHALL BE SUPPORTED AND SEISMICALLY RESTRAINED PER THE CALIFORNIA BUILDING <br />CODE, UNIFORM MECHANICAL CODE AND SMACNA STANDARD. <br />DUCT SMOKE DETECTORS SHALL BE INSTALLED PER MANUFACTURER'S WRITTEN RECOMMENDATIONS <br />SHALL BE PROVIDED WITH DUCT SMOKE DETECTORS THAT ARE INSTALLED WITHIN 5'-0" OF THE DAMPER. <br />PENETRATING RATED WALLS/CORRIDORS PER UBC AND UMC. EACH COMBINATION FIRE/SMOKE DAMPER <br />DOOR SCHEDULE AND SPECIFICATIONS. <br />FIRE / SMOKE DAMPERS AND RESET THEM FOR ITS DESIGN FUNCTION. TESTING PROCEDURES AND TEST <br />RESULTS SHALL BE WITNESSED AND APPROVED BY THE AUTHORITIES HAVING JURISDICTION. <br />IN CASES WHERE SHEET METAL DUCTS INTERSECT FIRE-RATED WALLS AT OTHER THAN RIGHT ANGLES, <br />PERPENDICULAR TO THE DUCT. FIRE DAMPER SHALL BE PROVIDED AT THE WALL ACCORDINGLY. <br />CONTRACTORS SHALL OFFSET THE RATED WALL ABOVE CEILING SUCH THAT THE OFFSET WALL WILL BE <br />COMBINATION FIRE/SMOKE DAMPERS SHALL BE PROVIDED FOR SUPPLY AND RETURN AIR DUCTS <br />ALL NON-RATED DOORS REQUIRING UNDERCUT SHALL BE 3/4 INCH MINIMUM, UNLESS NOTED OTHERWISE. <br />SINGLE DOORS NOT TO EXCEED 3/8". ALL UNDER CUTS TO BE COORDINATED WITH THE ARCHITECTURAL <br />ALL FIRE-RATED DOORS REQUIRING UNDERCUT SHALL BE: DOUBLE DOORS NOT TO EXCEED 1/4" AND <br />PROVIDED FOR ALL DUCTS PENETRATING FIRE AND/OR SMOKE PARTITIONS AS REQUIRED BY CODE. SEE <br />ARCHITECTURAL DRAWINGS FOR THE EXACT LOCATION OF FIRE AND/OR SMOKE RATED PARTITIONS. <br />FIRE DAMPERS, COMBINATION FIRE / SMOKE DAMPERS AND THE NECESSARY ACCESS PANELS SHALL BE <br />ARCHITECT IMMEDIATELY BEFORE PROCEEDING WITH THAT AREA. <br />SIGNIFICANTLY FROM THOSE SHOWN ON THE DRAWINGS AND AFFECT MECHANICAL WORK, INFORM <br />ALL DUCTWORK, PIPINGS, CABLE TRAY, BEAMS AND BUILDING STRUCTURE. IF FIELD CONDITIONS DIFFER <br />DESIGN INTENT ONLY. CONTRACTOR SHALL PREPARE FULLY COORDINATED SHOP DRAWINGS SHOWING <br />CONTRACTOR SHALL PROVIDE MATERIAL AND LABOR TO PHYSICALLY TEST ALL FIRE AND COMBINATION <br />LOCATION OF DUCTWORK IS APPROXIMATE. ALL DRAWINGS AND LAYOUTS ARE DIAGRAMMATIC TO SHOW <br />NO ADDITIONAL COSTS WILL BE PAID FOR ANY REQUIRED TRANSITIONS, BEAM BOXES OR OTHER SPECIAL <br />SHOWN COORDINATE CLOSELY WITH OTHER SECTIONS TO REDUCE NECESSITY OF TRANSITION TO A MINIMUM. <br />CONTRACTOR SHALL NOTE THE CRITICAL SPACE AVAILABLE ABOVE CEILINGS. PROVIDE TRANSITION PIECES <br />AND BEAM BOXES AT CROSSOVERS, UNDER BEAMS, OVER/UNDER PIPES AS REQUIRED TO ACCOMMODATE <br />TO ACCOMMODATE DUCTS WITHIN SPACE AVAILABLE. PROVIDE EQUIVALENT DUCT SIZE TO THE DIAMETER <br />CHANGE SHAPE PIECES. <br />WRITING 48 HOURS IN ADVANCE OF WORK ACTIVITY THROUGH THE BUILDING MANAGER. <br />ALL REQUEST FOR ACCESS OR CONNECTIONS, INCLUDING THOSE NOTED BELOW MUST BE MADE IN <br />CONSTRUCTION ACTIVITY. <br />PROTECT AND MAINTAIN ALL RETURN AIR DUCT OPENING WITH PROPER FILTER MEDIA DURING ALL <br />ALL SYMBOLS SHOWN ON SYMBOL LIST ARE NOT NECESSARILY USED ON THIS PROJECT.13. <br />14. <br />INDICATE CREDIT DUE TO OWNER, IF ANY, BECAUSE OF THE CHANGES. CONTRACTOR SHALL ALSO BE <br />AND ADDITIONS OR CHANGES IN THE WORK OF OTHER TRADES NECESSARY TO ACCOMMODATE THE <br />IF ANY EQUIPMENT SUBMITTED BY THE CONTRACTOR IS DIFFERENT FROM THAT SPECIFIED, OR REQUIRE <br />CHANGES IN MATERIAL OR LABOR FROM THAT REQUIRED IN THE CONTRACT DOCUMENTS AFFECTING THIS <br />AND/OR OTHER TRADES, SUCH CHANGES SHALL BE SUBMITTED AS SHOP DRAWINGS. SUBMITTALS SHALL <br />RESPONSIBLE FOR PAYMENT CHARGES RESULTING FROM THE REVIEW OF SUBSTITUTED EQUIPMENT <br />REQUESTED MODIFICATION. ALL CHANGES SHALL BE SHOWN ON RECORD AND ASBUILT DRAWINGS. <br />THESE DRAWINGS INDICATE THE FINISHED REQUIREMENTS FOR THE MECHANICAL AND PLUMBING SYSTEMS. <br />DUE TO THE STRUCTURAL CONDITIONS, MECHANICAL DUCT OR PIPING INTERFERENCE, RETAINED EXISTING <br />FACILITIES OR OTHER REASONS, THE CONTRACTOR MAY DESIRE TO INSTALL WORK IN A MANNER DIFFERENT <br />FROM THAT SHOWN. SUCH CHANGES SHALL BE PRESENTED TO THE OWNER/ENGINEER FOR APPROVAL <br />BEFORE PROCEEDING, AND THE RECORD DRAWINGS SHALL BE ACCURATELY REVISED TO SHOW THE <br />CHANGES AS COMPLETED. <br />15. <br />ALL WORK SHALL BE IN ACCORDANCE WITH, BUT NOT LIMITED TO, THE STATE OF CALIFORNIA, LOCAL <br />CITY, TITLE 24, UNIFORM MECHANICAL & PLUMBING CODES, LOCAL MECHANICAL CODE <br />AMMENDMENTS AND ALL OTHER GOVERNING CODES AND ORDINANCES. <br />1. <br />16. <br />SYSTEMS OR OTHER TENANT'S INPROVEMENTS. <br />ALL UNDER FLOOR CONDUIT AND PIPING SHALL BE INSTALLED AS NOT TO INTERFERE WITH BUILDING <br />17.THERE SHALL BE NO PLUMBING PIPING THROUGH ELECTRICAL AND OR COMMUNICATION ROOMS. <br />2. <br />DOCUMENT WILL BE APPROVED. <br />RELOCATION OF DUCTWORKS, PIPINGS AND EQUIPMENTS TO MEET THE INTENT OF THE CONTRACT <br />AND EQUIPMENTS TO ACHIEVE THE REQUIRED CEILING HEIGHTS. NO CHANGE ORDERS RELATED TO <br />SHALL INCLUDE IN HIS BID ALL THE WORK NECESSARY TO RELOCATE THE EXISTING PIPINGS, DUCTWORKS <br />INDICATED ON ARCHITECTURAL DRAWINGS AND WEATHER SHOWN ON THE DRAWINGS OR NOT. CONTRACTOR <br />PRIOR TO BIDDING, CONTRACTOR SHALL CAREFULLY EXAMINE ALL THE CEILING HEIGHT REQUIREMENTS <br />WORK AND DO NOT SHOW THE OFFSET AND EXACT LOCATION OF DUCTWORKS, PIPINGS AND EQUIPMENT. <br />ENGINEER DRAWINGS ARE DIAGRAMATIC. THEY ARE MEANT TO DESCRIBE THE INTEND OF THE REQUIRED <br />THE ENTIRE SCOPE OF WORK OF THE PROJECT. <br />STRUCTURAL DRAWINGS AND SPECIFICATIONS, AND PRIOR TO BIDDING CAREFULLY STUDY AND REVIEW <br />ARCHITECTURAL DRAWINGS AND SPECIFICATIONS, ELECTRICAL DRAWINGS AND SPECIFICATIONS, <br />CONTRACTOR SHALL OBTAIN THE ENTIRE CONTRACT DOCUMENTS INCLUDING BUT NOT LIMITED TO1. <br />SPECIAL NOTES <br />PART 1 - GENERAL <br />1.1 DESCRIPTION <br /> A. WORK UNDER THIS SECTION INCLUDES ALL LABOR, EQUIPMENT, MATERIAL, <br /> SERVICES, TRANSPORTATION, ETC. REQUIRED FOR AND REASONABLY INCIDENTAL <br /> TO THE COMPLETE AND SATISFACTORY INSTALLATION OF ALL OF THE HVAC <br /> SYSTEMS AS INDICATED ON THE DRAWINGS OR SPECIFIED HEREIN. <br /> B. VISIT THE SITE OF WORK. COMPARE THE EXISTING CONDITIONS WITH THE <br /> DRAWINGS AND SPECIFICATIONS AS TO THE CONDITIONS TO WHICH THE WORK IS <br /> TO BE PERFORMED. ASCERTAIN AND CHECK ALL CONDITIONS AND ELEVATIONS <br /> AND TAKE ALL MEASURMENTS WHICH MAY EFFECT THE WORK. NO ALLOWANCE <br /> SHALL SUBSEQUENTLY BE MADE FOR ANT ADDITIONAL EXPENSES OR CLAIMS DUE <br /> TO THE FAILURE OR NEGLECT UNDER THIS SECTION TO MAKE SUCH EXAMINATION, <br /> INCLUDING EXAMINATION OF CONFINED WORKING CONDITIONS OR SUCH OTHER <br /> DIFFICULTIES VISUALLY OBSERVED DURING THE SITE VISIT. <br />1.2 WORK INCLUDED IN THIS SECTION: <br /> A. METAL DUCTS AND ACCESSORIES INCLUDING AIR TERMINAL UNITS, DIFFUSERS, <br /> REGISTERS AND GRILLES. <br /> B. PIPE AND DUCT INSULATION. <br /> C. TEST AND BALANCE. <br /> D. SUBMITTALS AND SHOP DRAWINGS. <br /> E. RECORD DRAWINGS, OPERATION, AND MAINTENANCE MANUALS INCLUDING <br /> GUARANTEES. <br />1.3 RELATED WORK SPECIFIED ELSEWHERE <br /> A. ELECTRICAL SUPPLY TO UNITS. SEE ELECTRICAL DRAWINGS. <br />1.4 REFERENCES <br /> A. AABC - NATIONAL STANDARDS FOR FIELD MEASUREMENT AND INSTRUMENTATION, <br /> TOTAL SYSTEM BALANCE. <br /> B. CALIFORNIA MECHANICAL CODE - 2022 EDITION. <br /> C. SMACNA - HVAC DUCT CONSTRUCTION STANDARDS. <br />1.5 SUBMITTALS AND SHOP DRAWINGS <br /> A. PREPARE AND SUBMIT SHOP DRAWINGS (PLANS AND SECTIONS) OF ALL AREAS <br /> OF THE PROJECT. SHOP DRAWINGS SHALL BE COORDINATED, DIMENSIONED, AND <br /> INDICATE EQUIPMENT, DUCT, PIPE, AND ELECTRICAL IN RELATION TO <br /> ARCHITECTURAL AND STRUCTURE FEATURES. INDICATE EXACT LOCATIONS AND <br /> ELEVATIONS OF VALVES, PIPING SPECIALTIES, ACCESS DOORS, AIR OUTLETS, <br /> DAMPERS, ETC. HIGHLIGHT ANY DEVIATIONS IN WORK FROM WHAT IS INDICATED <br /> ON CONTRACT DOCUMENTS. MINIMUM SCALE: ¼" = 1'-0". <br /> B. MATERIALS AND EQUIPMENT: AS SOON AS POSSIBLE AFTER AWARD OF THE <br /> CONTRACT, AND BEFORE THEIR PURCHASE, THE CONTRACTOR SHALL SUBMIT TO <br /> THE ARCHITECT SEVEN BOUND BOOKLETS FOR APPROVAL CONTAINING A <br /> COMPLETE LIST OF MATERIALS, SPECIALTIES AND EQUIPMENT CONTRACTOR IS TO <br /> FURNISH FOR THE INSTALLATION. LITERATURE SHALL BE STANDARD <br /> MANUFACTURER'S CATALOG CUTS AND ITEMS TO BE INSTALLED SHALL BE <br /> CLEARLY INDICATED. ALL SUBMITTALS SHALL BE MADE AT ONE TIME. <br /> C. DETAILED PROCEDURES, AGENDA, SAMPLE REPORT FORMS, AND COPY OF AABC <br /> NATIONAL PROJECT PERFORMANCE GUARANTEE. <br />1.6 SUBSTITUTIONS <br /> A. THE ENTIRE COST OF ALL CHANGES OF ANY TYPE DUE TO SUBSTITUTION FOR <br /> MATERIALS SPECIFIED SHALL BE BORNE BY THE CONTRACTOR AT NO EXTRA COST <br /> TO THE OWNER. <br />1.7 RECORD DRAWINGS <br /> A. THE CONTRACTOR SHALL ARRANGE AND PAY FOR ONE SET OF WHITE PRINTS OF <br /> THE HVAC DRAWINGS, WHICH HE SHALL ALTER IN RED TO SHOW ALL CHANGES <br /> MADE TO THE ORIGINAL LAYOUT. THESE DRAWINGS SHALL BE KEPT CURRENT. <br />1.8 OPERATION AND MAINTENANCE DATA <br /> A. SUBMIT TWO SETS PRIOR TO FINAL INSPECTION, BOUND IN 8-1/2 X 11 INCH <br /> TEXT PAGES, BINDERS WITH DURABLE PLASTIC COVERS. PREPARE BINDER <br /> COVERS WITH PRINTED TITLE "OPERATION AND MAINTENANCE INSTRUCTIONS", AND <br /> TITLE OF PROJECT. INTERNALLY SUBDIVIDE THE BINDER CONTENTS WITH <br /> PERMANENT PAGE DIVIDERS, LOGICALLY ORGANIZED AS DESCRIBED BELOW; WITH <br /> TAB TITLING CLEARLY PRINTED UNDER REINFORCED LAMINATED PLASTIC TABS. <br />1.9 GUARANTEES <br /> A. THE CONTRACTOR, IN ACCEPTING THIS CONTRACT, BINDS HIMSELF TO REPLACE <br /> OR REPAIR AT HIS OWN EXPENSE ANY DEFECT IN WORKMANSHIP OR MATERIAL <br /> WHICH MAY APPEAR WITHIN A PERIOD OF ONE YEAR FROM THE DATE OF THE <br /> FINAL ACCEPTANCE OF THE TENANT SPACE, AND TO PAY FOR ALL RESULTING <br /> DAMAGE WHICH SHALL APPEAR WITHIN THE SAID PERIOD; PROVIDED ALWAYS THAT <br /> THE CONTRACTOR SHALL NOT BE LIABLE FOR ANYTHING ATTRIBUTABLE TO ACTS <br /> OF THE AGENTS OF THE OWNER, OR FOR ORDINARY WEAR. ALSO, GIVEN DATE <br /> OF WORK PERFORMED BY THE CONTRACTOR BE ACCEPTED AS COMPLETE, HE <br /> SHALL AGREE TO CORRECT ANY DEFICIENCIES OR OMISSIONS IN RESPECT TO THE <br /> PLANS OR SPECIFICATIONS WHICH MAY APPEAR IN THE AFORE-MENTIONED <br /> TWENTY-FOUR MONTH PERIOD. <br />1.10 RULES, REGULATIONS AND CODES <br /> A. ALL WORK AND MATERIALS SHALL BE IN FULL ACCORDANCE WITH THE LATEST <br /> CALIFORNIA MECHANICAL CODE, CALIFORNIA PLUMBING CODE, CALIFORNIA BUILDING <br /> CODE AND LOCAL RULES AND REGULATIONS, STATE FIRE MARSHAL REGULATIONS, <br /> THE SAFETY ORDERS OF THE DIVISION OF INDUSTRIAL SAFETY; THE NATIONAL <br /> ELECTRIC CODE; THE STANDARDS OF THE NATIONAL FIRE PROTECTION <br /> ASSOCIATION; AMERICAN GAS ASSOCIATION; OCCUPATION AND SAFETY ACT; <br /> AMERICAN NATIONAL STANDARDS INSTITUTE; AMERICAN SOCIETY OF MECHANICAL <br /> ENGINEERS; AMERICAN SOCIETY FOR TESTING AND MATERIALS; INSTALLATION <br /> STANDARDS PUBLISHED BY THE INTERNATIONAL ASSOCIATION OF PLUMBING AND <br /> MECHANICAL OFFICIALS (IAPMO) AND OTHER APPLICABLE LAWS, CODES, OR <br /> REGULATIONS. NOTHING IN THESE SPECIFICATIONS SHALL BE CONSTRUED TO <br /> PERMIT WORK NOT CONFORMING TO THESE CODES. <br /> B. THE CONTRACTOR SHALL FURNISH, WITHOUT EXTRA CHARGE, ANY ADDITIONAL <br /> MATERIAL AND LABOR WHEN AND WHERE REQUIRED TO COMPLY WITH THESE <br /> RULES AND REGULATIONS, THOUGH THE WORK BE NOT MENTIONED IN THESE <br /> SPECIFICATIONS OR SHOWN ON THE DRAWINGS. WHEN THESE SPECIFICATIONS OR <br /> DRAWINGS CALL FOR OR DESCRIBE MATERIALS OR CONSTRUCTION OF A BETTER <br /> QUALITY OR LARGER SIZES THAN REQUIRED BY THE ABOVE MENTIONED RULES <br /> AND REGULATIONS, THE PROVISIONS OF THESE SPECIFICATIONS AND <br /> ACCOMPANYING DRAWINGS SHALL TAKE PRECEDENCE. <br />1.11 FEES AND PERMITS <br /> A. THE CONTRACTOR MUST OBTAIN AND PAY ALL FEES FOR PERMITS, LICENSES, <br /> INSPECTIONS, ETC., WHICH ARE REQUIRED BY ANY LEGALLY CONSTITUTED <br /> AUTHORITY. COORDINATE EXACT REQUIREMENTS WITH THE OWNER PRIOR TO BID. <br />1.12 COORDINATION <br /> A. FOLLOWING THE GENERAL ARRANGEMENT INDICATED ON THE DRAWINGS AS <br /> CLOSELY AS POSSIBLE, THE CONTRACTOR SHALL COORDINATE WITH THE <br /> ARCHITECTURAL, STRUCTURAL, PLUMBING, FIRE SPRINKLER, ELECTRICAL AND ALL <br /> OTHER TRADES PRIOR TO INSTALLATION OF THE MATERIALS AND EQUIPMENT TO <br /> VERIFY ADEQUATE SPACE AVAILABLE FOR INSTALLATION OF THE WORK SHOWN. <br /> THE OWNER SHALL BE IMMEDIATELY NOTIFIED IF AN AREA OF CONFLICT OCCURS <br /> BETWEEN TRADES. <br />1.13 DRAWINGS <br /> A. THE WORK SHALL BE INSTALLED AS INDICATED ON DRAWINGS, HOWEVER, <br /> CHANGES TO ACCOMMODATE INSTALLATION OF THIS WORK WITH OTHER WORK, OR <br /> IN ORDER TO MEET ARCHITECTURAL OR STRUCTURAL CONDITIONS, SHALL BE <br /> MADE WITHOUT ADDITIONAL COST TO THE OWNER. <br /> B. FOR THE PURPOSE OF CLARITY AND LEGIBILITY, THE DRAWINGS ARE ESSENTIALLY <br /> DIAGRAMMATIC TO THE EXTENT THAT MANY OFFSETS, BONDS, UNIONS, SPECIAL <br /> FITTINGS AND EXACT LOCATIONS ARE NOT INDICATED. THE CONTRACTOR SHALL <br /> MAKE USE OF ALL DATA IN ALL OF THE CONTRACT DOCUMENTS, AND SHALL <br /> VERIFY THIS INFORMATION AT THE SITE. <br /> C. WHERE CHANGES IN INDICATED LOCATIONS OR ARRANGEMENTS ARE NECESSARY <br /> DUE TO CONDITIONS IN BUILDING CONSTRUCTION, REARRANGEMENT OF <br /> EQUIPMENT, OR CONFLICT IN LOCATION, MAKE SUCH CHANGES AT NO COST TO <br /> THE OWNER, PROVIDED THAT THE CHANGE IS ORDERED BEFORE PIPE, DUCTWORK <br /> AND/OR EQUIPMENT IS INSTALLED AND THAT THE LENGTH OF RUN IS NOT <br /> REVISED BY MORE THAN FIVE PERCENT (5%) OF THE INDICATED RUN. <br />1.14 INSPECTION <br /> A. THE CONTRACTOR SHALL NOT ALLOW OR CAUSE ANY OF HIS WORK TO BE <br /> COVERED UP OR CLOSED IN UNTIL IT HAS BEEN INSPECTED, TESTED, APPROVED <br /> BY ALL AUTHORITIES HAVE JURISDICTION, AND UNTIL PROJECT RECORD DRAWINGS <br /> HAVE BEEN PROPERLY ANNOTATED. <br /> B. SHOULD ANY OF HIS WORK BE COVERED UP OR CLOSED IN BEFORE SUCH <br /> INSPECTION, HE SHALL, AT HIS OWN EXPENSE, UNCOVER THE WORK TO THE <br /> SATISFACTION OF THE INSPECTION PARTY. ALL RELATED REPAIR WORK COST <br /> SHALL BE BORNE BY THE CONTRACTOR. <br />1.15 DELIVERY, STORAGE AND PROTECTION OF PROPERTY <br /> A. THE CONTRACTOR SHALL PROVIDE TEMPORARY STORAGE AND SHOP AREAS THAT <br /> ARE REQUIRED AT THE SITE FOR THE SAFE AND PROPER STORAGE OF <br /> MATERIALS, TOOLS, AND OTHER ITEMS USED. <br /> 1. FABRICATE IN ACCORDANCE WITH SMACNA DUCT CONSTRUCTION STANDARDS. <br /> 2. OPPOSED BLADE DAMPERS SHALL HAVE FACTORY-FABRICATED BLADES, WITH <br /> FACTORY ASSEMBLED LINKAGES, MOUNTED IN FRAMES. BLADES SHALL <br /> HAVE INTERLOCKING EDGES AND ENDS. RECTANGULAR DAMPERS 6" OR <br /> MORE WIDE, SHALL BE THE MULTI-BLADE TYPE. BLADES ON MULTI-BLADE <br /> TYPE DAMPERS MUST NOT BE OVER 6" WIDE. DAMPERS SHALL BE OF <br /> THE OPPOSED BLADE TYPE. DAMPERS SHALL HAVE BAR OR CHANNEL <br /> FRAMES AND CORNER BRACING. ALL BLADE AND LINKAGE BEARINGS SHALL <br /> BE SELF-LUBRICATING PLASTIC. DAMPER ASSEMBLY LEAKAGE NOT TO <br /> EXCEED 1% WITH 4.0 W.C. STATIC PRESSURE. <br /> 3. PROVIDE LOCKING, INDICATING QUADRANT REGULATORS ON SINGLE AND <br /> MULTI-BLADE DAMPERS. MOUNT QUADRANT REGULATORS ON STANDOFF <br /> MOUNTING BRACKETS, BASES, OR ADAPTERS. <br />2.6 CONTROLS <br /> A. THE MECHANICAL CONTRACTOR SHALL BE RESPONSIBLE FOR THE PROPER <br /> COORDINATION OF ALL CONTROL WORK AND ELECTRICAL WORK IN CONNECTION <br /> THEREWITH. <br /> B. THE ELECTRICAL CONTRACTOR SHALL FURNISH AND INSTALL ALL LINE VOLTAGE <br /> CONTROL WIRING, AND IN ALL CONDUIT. WIRE SIZING AND LENGTH OF RUN <br /> SHALL BE CO?ORDINATED WITH THE MANUFACTURER AND ELECTRICAL ENGINEER. <br /> ALL EMS CONTROLS, WIRING, AND CONDUIT SHALL BE BY EMS CONTRACTOR. <br /> C. CALIBRATION OF CONTROLS: THE EMS CONTRACTOR SHALL CAREFULLY CALIBRATE <br /> AND ADJUST ALL CONTROLS AS REQUIRED TO MAINTAIN COMFORT CONDITIONS <br /> AND MAXIMUM ENERGY CONSERVATION. <br />2.7 INSULATION <br /> A. GENERAL: <br /> 1. ALL INSULATION SHALL HAVE COMPOSITE (INSULATION, JACKET OR FACING, <br /> AND ADHESIVE USED TO ADHERE THE FACING OR JACKET TO THE <br /> INSULATION) FIRE SMOKE HAZARD RATINGS AS TESTED BY PROCEDURE <br /> ASTM E84, NFPA 255 AND UL 723 NOT EXCEEDING: <br /> FLAME SPREAD: 25 <br /> SMOKE DEVELOPED: 50 <br /> 2. THE INSULATION VALUES SHOWN ARE A MINIMUM. IF THE REQUIREMENTS <br /> OF TITLE 24 EXCEED THESE VALUES, THE AMOUNT OF AND/OR TYPE MUST <br /> BE INCREASED TO MEET THE TITLE 24 REQUIREMENTS. <br />2.8 SUPPORT AND HANGERS: <br /> A. GENERAL REQUIREMENTS FOR SUPPORTING ELEMENTS: PROVIDE DUCTING SYSTEM <br /> AND EQUIPMENT SUPPORTING ELEMENTS INCLUDING BUT NOT LIMITED TO <br /> BUILDING STRUCTURE ATTACHMENTS; SUPPLEMENTARY STEEL; HANGER RODS, <br /> HORIZONTAL DUCT ATTACHMENTS; ANCHORS; SUPPORTS. DESIGN SUPPORTING <br /> ELEMENTS FOR STRESSES IMPOSED BY SYSTEMS, WITH MINIMUM SAFETY FACTOR <br /> OF 4.0 BASED ON DUCT BEING 50 PERCENT FULL OF PARTICULATE CONVEYED. <br /> SUPPORTING ELEMENTS SHALL CONFORM TO SMACNA INDUSTRY PRACTICE, <br /> SMACNA RECTANGLE DUCT CONSTRUCTION, AS APPLICABLE, AND MODIFIED AND <br /> SUPPLEMENTARY REQUIREMENTS SPECIFIED HEREIN. DO NOT USE WELD STUDS <br /> AND POWDER ACTUATED ANCHORING DEVICES TO SUPPORT MECHANICAL SYSTEM <br /> COMPONENTS WITHOUT PRIOR APPROVAL. <br />PART 3 - EXECUTION <br />3.1 INSTALLATION <br /> A. EQUIPMENT: INSTALL IN ACCORDANCE WITH MANUFACTURER'S INSTRUCTIONS. <br /> B. DUCTWORK AND ACCESSORIES: <br /> 1. PROVIDE OPENINGS IN DUCTWORK WHERE REQUIRED TO ACCOMMODATE <br /> THERMOMETERS AND CONTROLLERS. PROVIDE PILOT TUBE OPENINGS WHERE <br /> REQUIRED FOR TESTING OF SYSTEMS, COMPLETE WITH METAL CAN WITH SPRING <br /> DEVICE OR SCREW TO ENSURE AGAINST AIR LEAKAGE. WHERE OPENINGS ARE <br /> PROVIDED IN INSULATED DUCTWORK, INSTALL INSULATION MATERIAL INSIDE A <br /> METAL RING. <br /> 2. LOCATE DUCTS WITH SUFFICIENT SPACE AROUND EQUIPMENT TO ALLOW NORMAL <br /> OPERATING AND MAINTENANCE ACTIVITIES. <br /> 3. INSTALL ACCESSORIES IN ACCORDANCE WITH MANUFACTURER'S INSTRUCTIONS. <br /> 4. HANGER STRAPS TO TURN UNDER BOTTOM OF RECTANGULAR DUCTS AND <br /> SHALL ATTACH WITH SHEET METAL SCREWS AT THIS POINT AS WELL AS <br /> MINIMUM TWO (2) ADDITIONAL SCREWS INTO SIDES OF DUCT FOR SIZES 18" <br /> AND UNDER; THREE (3) SCREWS FOR SIZES ABOVE 18". (TYPICAL FOR EACH <br /> STRAP). DUCTS IN SIZES ABOVE 48" SHALL RUN CONTINUOUS UNDER BOTTOM <br /> OF DUCT. STRAPS FOR ROUND DUCT SHALL RUN COMPLETELY AROUND <br /> UNDERSIDE OF DUCT AND SHALL BE SECURED IN PLACE WITH MINIMUM OF TWO <br /> (2) SHEET METAL SCREWS EACH SIDE. <br /> a. BRACE ALL DUCTWORK LATERALLY TO STRUCTURAL FRAMING TO <br /> PREVENT SWAYING OR LATERAL MOVEMENT IN ACCORDANCE WITH <br /> SMACNA "GUIDELINES FOR SEISMIC RESTRAINTS OF MECHANICAL <br /> SYSTEMS". WHERE GUIDELINES DO NOT ADDRESS THE SMALLER SIZE <br /> DUCTS AND FLEXIBLE DUCTS, THIS CONTRACTOR SHALL PROVIDE SWAY <br /> BRACING CONSISTING OF SHEET METAL STRAPS OR ANGLE IRON THAT <br /> WILL RESTRICT ANY SWAYING TO WITHIN 2 INCHES IN ANY DIRECTION. <br /> 5. ACCESS DOORS: <br /> a. AIRTIGHT SHEET METAL ACCESS DOORS SHALL BE INSTALLED IN DUCTS. <br /> DOORS SHALL BE OF SIZES SHOWN, OR AS DIRECTED WHERE NO SIZES <br /> ARE SHOWN. ALL DOORS SHALL BE CONSTRUCTED PER SMACNA <br /> STANDARDS OF AT LEAST THE SAME WEIGHT AS THE DUCT. <br /> REINFORCING SHALL BE INSTALLED, TO PREVENT DISTORTION AND <br /> VIBRATION. ALL DOORS SHALL BE FITTED WITH FELT STRIPS TO ENSURE <br /> AIR TIGHTNESS. <br /> b. EACH DOOR SHALL BE HUNG ON TWO (2) OR MORE HINGES. DOORS <br /> SHALL BE PROVIDED WITH VENTLOCK NO. 100 LATCHES, OR APPROVED <br /> EQUAL. <br /> 6. DUCT TAPE AND SEALER: <br /> a. ALL LONGITUDINAL SNAP LOCK JOINTS SHALL BE MADE AIRTIGHT WITH <br /> HIGH PRESSURE DUCT SEALANT TREMCO J.S. 773, GREY A.F., AND <br /> TRANSVERSE JOINTS SEALED WITH HARDCAST AFG NO. 1402 FOIL GRIP <br /> INSTANT TAPE SEALANT FOR RECTANGULAR DUCTS AND ROUND DUCTS, <br /> ALL U.L. CLASSIFIED. AT CONTRACTOR'S OPTION, ALL ROUND DUCT <br /> TRANSVERSE JOINTS MAY BE MADE WITH MIRACLE D-619 WATER BASED, <br /> DUCT SEALANT U.L. CLASSIFIED 309U AS MANUFACTURED BY MIRACLE <br /> ADHESIVES CORP. <br /> C. THERMOSTATS: INSTALL AT 48" ABOVE FINISHED FLOOR UNLESS OTHERWISE STATED. <br /> COORDINATE WITH OTHER TRADES. <br /> D. INSULATION: <br /> 1. DUCT INSULATION: <br /> a. FIBERGLASS DUCTWRAP: <br /> 1) SECURE INSULATION WITH VAPOR BARRIER WITH WIRES AND SEAL <br /> JACKET JOINTS WITH VAPOR BARRIER ADHESIVE OR TAPE TO <br /> MATCH JACKET. <br /> 2) SECURE INSULATION WITHOUT VAPOR BARRIER WITH STAPLES, <br /> TAPE, OR WIRES. <br /> 3) INSTALL WITHOUT SAG ON UNDERSIDE OF DUCTWORK. USE <br /> ADHESIVE OR MECHANICAL FASTENERS WHERE NECESSARY TO <br /> PREVENT SAGGING. LIFT DUCTWORK OFF TRAPEZE HANGERS <br /> AND INSERT SPACERS. <br /> 4) SEAL VAPOR BARRIER PENETRATIONS BY MECHANICAL <br /> FASTENERS WITH VAPOR BARRIER ADHESIVE. <br /> 5) STOP AND POINT INSULATION AROUND ACCESS DOORS AND <br /> DAMPER OPERATORS TO ALLOW OPERATION WITHOUT <br /> DISTURBING WRAPPING. <br /> b. DUCT (AND PLENUM) LINER APPLICATION: <br /> 1) ADHERE INSULATION WITH ADHESIVE FOR 100 PERCENT <br /> COVERAGE. SECURE INSULATION WITH MECHANICAL LINER <br /> FASTENERS. REFER TO SMACNA STANDARDS FOR SPACING. <br /> SEAL AND SMOOTH JOINTS. SEAL LINER SURFACE <br /> PENETRATIONS WITH ADHESIVE. <br /> 2) DUCT DIMENSIONS INDICATED ARE NET INSIDE DIMENSIONS <br /> REQUIRED FOR AIRFLOW. INCREASE DUCT SIZE TO ALLOW FOR <br /> INSULATION THICKNESS. <br />3.3 JOB COMPLETION <br /> A. ALL EQUIPMENT FURNISHED UNDER THIS SECTION SHALL BE PROVIDED WITH THE <br /> MANUFACTURER'S METAL IDENTIFICATION LABELS SECURELY ATTACHED AND <br /> SHOWING ALL PERTINENT DATA, INCLUDING PERFORMANCE CHARACTERISTICS, SIZE, <br /> MODEL, AND SERIAL NUMBER. LABELS SHALL NOT BE OBSCURED IN ANY <br /> MANNER. <br /> B. FINAL OPERATION: UPON COMPLETION OF THE INSTALLATION OF THE EQUIPMENT <br /> AND AFTER ALL SYSTEMS HAVE BEEN TESTED, CLEANED, THE CONTRACTOR SHALL <br /> PLACE A COMPETENT PERSON IN CHARGE WHO SHALL OPERATE THE EQUIPMENT <br /> FOR A PERIOD OF THREE EIGHT-HOUR DAYS. DURING THIS PERIOD OF <br /> OPERATION, ALL SAFETY AND OPERATING CONTROLS SHALL BE ACTUATED TO <br /> DEMONSTRATE PROPER OPERATION. DURING THIS OPERATING PERIOD, THE <br /> OWNER'S REPRESENTATIVE SHALL BE INSTRUCTED IN ALL DETAILS OF OPERATION <br /> AND MAINTENANCE. ALL REQUIRED INSTRUCTIONS FROM THE EQUIPMENT <br /> MANUFACTURER'S REPRESENTATIVE SHALL BE GIVEN DURING THE PERIOD. <br /> C. CLEAN-UP: <br /> 1. AFTER ALL HEATING, VENTILATING AND AIR CONDITIONING WORK HAS BEEN <br /> TESTED AND APPROVED, THE CONTRACTOR SHALL THOROUGHLY CLEAN ALL <br /> PARTS OF THE EQUIPMENT INSTALLATION. EXPOSED PARTS WHICH ARE TO <br /> BE PAINTED ARE TO BE THOROUGHLY CLEANED OF CEMENT PLASTER AND <br /> OTHER MATERIALS AND ALL GREASES AND OIL SPOTS REMOVED WITH <br /> SOLVENT. EXPOSED ROUGH METAL WORK TO BE CAREFULLY BRUSHED <br /> DOWN WITH STEEL BRUSHES TO REMOVE RUST AND OTHER SPOTS AND <br /> LEFT IN PROPER CONDITION TO RECEIVE PAINTER'S FINISH. <br /> 2. REMOVE ALL DEBRIS FROM THE JOB SITE, ALL CARTONS, BOXES, PACKING <br /> CRATES, EXCESS MATERIALS NOT USED OCCASIONED BY THE WORK AND TO <br /> THE SATISFACTION OF THE OWNER. <br /> 3. THE CONTRACTOR SHALL REMOVE ON A DAILY BASIS ALL DEBRIS FROM <br /> THE JOB SITE, TO THE SATISFACTION OF THE OWNER. <br /> 4. IF THE ABOVE REQUIREMENTS OF CLEAN-UP ARE NOT TO THE <br /> SATISFACTION OF THE OWNER, THE OWNER RESERVES THE RIGHT TO ORDER <br /> THE WORK DONE BY A THIRD PARTY AND THE COST OF WHICH SHALL BE <br /> BORNE BY THE CONTRACTOR. <br />DUCT SIZECFM <br />18"Ø <br />8"Ø <br />6"Ø <br />10"Ø OR 10X8 <br />16"Ø <br />14"Ø <br />12"Ø OR 12X10 OR 14X8 <br />ALL DUCTWORK SHALL BE PER 2022 C.M.C.7. <br />GENERAL NOTES <br />B. WHEN THE DRAWINGS CALL FOR MATERIALS OR CONSTRUCTION OF A <br />BETTER QUALITY OR LARGER SIZES THAN REQUIRED BY THE ABOVE <br />MENTIONED CODES AND RULES, WORK SHALL BE AS SPECIFIED OR SHOWN <br />RATHER THAN AS REQUIRED BY CODE. ALL ITEMS OR FEATURES OF THE <br />MECHANICAL SYSTEMS REQUIRED BY CODE SHALL BE INCLUDED, EVEN <br />THOUGH NOT SPECIFIED HEREIN. <br />C. INSTALLATION OF THE SYSTEMS SHALL BE IN ACCORDANCE WITH THE <br />ABOVE MENTIONED CODES AND REGULATIONS AND ALSO SHALL CONFORM <br />TO GOOD, ACCEPTED MECHANICAL PRACTICES. <br />1. CODES, RULES AND REGULATIONS- DESIGN OF SYSTEM <br />A. ALL WORK AND MATERIALS SHALL BE IN FULL ACCORDANCE <br />WITH ALL APPLICABLE FEDERAL, STATE, AND LOCAL LAWS, <br />ORDINANCES AND CODES. <br />2. CUTTING AND PATCHING: ALL CUTTING AND PATCHING REQUIRED OF <br />THE EXISTING STRUCTURE SHALL BE PROVIDED UNDER OTHER SECTIONS <br />OF THE WORK. PROVIDE NECESSARY REQUIREMENTS TO THE PROJECT <br />SUPERINTENDENT, (BY G.C.) . <br />0-110 <br />400-675 <br />675-1050 <br />1050-1500 <br />1500-2000 <br />17. DUCTS SIZE FOR CFM SHOWN SHALL BE PER FOLLOWING <br />SCHEDULE; UNLESS OTHERWISE NOTED ON PLAN. <br />15. CONCEALED BUILDING SPACES USED AS RETURN AIR PLENUMS SHALL BE OF <br />NON-COMBUSTIBLE MATERIAL. <br />14. A MAINTENANCE LABEL SHALL BE AFFIXED TO MECHANICAL EQUIPMENT AND A <br />MAINTENANCE MANUAL SHALL BE PROVIDED FOR THE OWNERS USE. <br />13. PROVIDE SEISMIC BRACING FOR ALL MECHANICAL EQUIPMENT STRUCTURE <br />MOUNTED, AS REQ'D. PER LOCAL CODE, (IF APPLICABLE). <br />12. APPLIANCES DESIGNED TO BE FIXED IN POSITION SHALL BE FASTENED IN PLACE. <br />11. ROOF MOUNTED EQUIPMENT SHALL BE LABELED AS TO THE SPACE IT SERVES. <br />10. AUTOMATIC TEMPERATURE CONTROL DEVICE FOR REGULATION OF SPACE <br />TEMPERATURE SHALL BE CAPABLE OF BEING SET FROM 55 TO 85°F, AND HAVE THE <br />ABILITY TO OPERATE THE HEATING AND COOLING IN SEQUENCE. CONTROL SHALL BE <br />ADJUSTABLE TO PROVIDE A RANGE OF UP TO 5°F BETWEEN FULL HEATING AND FULL <br />COOLING AND HAVE CAPABILITY OF TERMINATING ALL HEATING AT A TEMPERATURE <br />NO MORE THAN 70°F, AND COOLING AT A TEMPERATURE NOT LESS THAN 78°F. EACH <br />HVAC SYTEM THERMOSTAT SHALL BE EQUIPED WITH NIGHT SETBACK FEATUR. <br />9. WIRING DIAGRAM IS INTENDED TO INDICATE SEQUENCE OF CONTROL AND <br />DOES NOT NECESSARILY SHOW ALL CONNECTIONS REQUIRED BY LOCAL CODES. <br />8. DUCT INSULATION TO CONFORM TO LOCAL ENERGY CONSERVATION STANDARD <br />CODES. <br />6. PIPING: <br />A. CONDENSATE PIPING SHALL BE TYPE "M" COPPER. <br />B. REFRIGERANT PIPING SHALL BE TYPE "L" COPPER WITH WROUGHT <br />COPPER FILTTINGS. <br />5. INSULATION: <br />A. INSULATE ALL INTERIOR CONDITIONED SUPPLY AND RETERN AIR <br />DUCTWORK WITH 1" .60LB PER CU. FT. DENSITY FIBERGLASS <br />INSULATION WITH VAPOR BARRIER (MAX. CONDUCTANCE = .48). <br />B. CONDITIONED SUPPLY AND RETURN AIR DUCTWORK EXPOSED TO THE <br />WEATHER SHALL BE LINED WITH 1-1/2" THICK, 1.5 LB. PER CU. FT. <br />DENSITY FIBERGLASS DUCT LINER (MAX. CONDUCTANCE = .16) <br />C. CONDENSATE PIPING SHALL BE INSULATED WITH 3/8" FOAM PLASTIC. <br />D. REFRIGERANT PIPING SHALL BE INSULATED WITH FIBERGLASS BE <br />INSULATION (MIN. R = 4.0). INSULATION EXPOSED TO THE WEATHER <br />SHALL SECURELY FASTENED IN PLACE. <br />4. COORDINATION: THE DRAWING ARE DIAGRAMMIC AND INTENDED TO SHOW <br />SCOPE OF WORK. CONTRACTOR SHALL COORDINATE HIS WORK WITH OTHER <br />TRADES TO PROVIDE BEST ARRANGEMENT OF ALL DUCTS, CONDUIT, ECT... <br />LOCATION OF EXISTING PIPING AND DUCTWORK SHOWN IS APPROXIMATE, <br />CONTRACTOR SHALL VERIFY THEIR LOCATION PRIOR TO BEGINING WORK OF <br />THIS SECTION AND SHALL MAKE MODIFICATIONS AND ADJUSTMENTS REQUIRED <br />TO INSTALL THE WORK OF THIS SECTION. <br />3. CLEANUP: UPON COMPLETION OF THE WORK UNDER THIS SECTION. THE <br />CONTRACTOR SHALL REMOVE ALL SURPLUS MATRIALS, EQUIPMENT AND <br />DEBRIS INCIDENTAL TO THIS WORK AND LEAVE THE PREMISES CLEAN AND <br />ORDERLY. <br />16. PROVIDE ACCESS PANEL FOR ALL CEILING MOUNTED EQUIPMENT. <br />31. ALL APPLIANCES AND PLUMBING VENTS AND DISCHARGE OUTLET OF EXHAUST <br />FANS SHALL BE AT LEAST 10 FEET IN HORIZONTAL DIRECTION, OR 3 FEET ABOVE <br />THE OUTSIDE AIR INTAKE HAVC UNITS. <br />30. EXH. OUTLETS SHALL BE 3' FROM PROPERTY LINE, 3' FROM ANY OPENING INTO <br />THE BUILDING. EXH. DUCT SHALL BE EQUIPPED WITH BACK DRAFT DAMPERS. <br />29. GAS VENTS SHALL COMPLY WITH CHAPTER 8 OF THE MECHANICAL CODE. <br />28. ALL WIRING, CONDUIT & PIPING IN R.A. CEILING PLENUM SHALL BE <br />NON-COMBUSTABLE & APPROVED RA PLENUM. <br />27. PLUMBING CONTRACTOR TO FURNISH & INSTALL ALL CONDENSATE PIPING, <br />INCLUDING FINAL CONNECTIONS. <br />26. COORDINATE EXACT LOCATION OF ALL AIR OUTLETS AND INLETS <br />(DIFFUSERS AND REGISTERS) WITH G.C. . <br />25. RETURN REGISTERS TO BE EQUAL TO KRUEGER SERIES S580 OR <br />MATCH CLG. DIFFUSERS. <br />24. CEILING DIFFUSERS TO BE EQUAL TO KRUEGER SERIES 5800. <br />23. FILTER(S) SHALL BE U.L. APPROVED. <br />22. HIGH VOLTAGE CONDUITS AND WIRE AND LOW VOLTAGE CONDUIT <br />UNDER ELECTRICAL SECTION OF THE WORK. LOW VOLTAGE WIRING <br />UNDER THIS SECTION OF THE WORK. <br />21. IT SHALL BE THE CONTRACTORS RESPONSIBILITY TO VERIFY <br />AVAILIBLE SPACE FOR INSTALATION OF NEW WORK. <br />20. GENERAL CONTRACTOR TO PROVIDE FLASHING WHEREVER <br />DUCTWORK OR PIPING PENETRATES ROOF OR EXTEIOR WALLS. <br />19. GENERAL CONTRACTOR IS RESPONSIBLE FOR DETERMINING THE <br />ADEQUACY OF THE STRUCTURE TO SUPPORT THE EQUIPMENT <br />SPECIFIED. <br />18. THE MECHANICAL CONTRACTOR SHALL SECURE AND PAY FOR ALL <br />REQUIRED PERMITS AND FEES. <br />OUTDOOR CONDENSING UNITS SHALL BE INSTALL IN MATTER THAT THE <br />SOUND LEVEL SHALL NOT EXCEED 50 DBA PER SECTION 10.26.045 OF THE <br />NBMC. <br />HEATING, VENTILATION AND AIR CONDITIONING <br /> B. ALL WORK, EQUIPMENT AND MATERIALS SHALL BE PROTECTED AT ALL TIMES. <br /> CONTRACTOR SHALL CLOSE ALL PIPE AND DUCT OPENINGS WITH CAPS OR PLUGS <br /> DURING INSTALLATION. HE SHALL PROTECT ALL OF HIS EQUIPMENT AND <br /> MATERIALS AGAINST DIRT, WATER, CHEMICAL, AND MECHANICAL INJURY. UPON <br /> COMPLETION, ALL WORK SHALL BE THOROUGHLY CLEANED AND DELIVERED IN A <br /> NEW CONDITION. <br />1.16 DAMAGE BY LEAKS, ETC. <br /> A. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL DAMAGE TO ANY PART OF <br /> THE PREMISES OR WORK OF OTHER CONTRACTORS, CAUSED BY LEAKS OR <br /> BREAKS IN THE PIPING OR EQUIPMENT FURNISHED AND/OR INSTALLED UNDER <br /> THIS SECTION, DURING THE CONSTRUCTION AND GUARANTEE PERIOD. <br />PART 2 - PRODUCTS <br />2.1 GENERAL <br /> A. ALL MATERIALS AND EQUIPMENT SHALL BE NEW AND OF THE BEST OF THEIR <br /> RESPECTIVE GRADES, FREE FROM ALL DEFECTS AND OF THE MAKE, BRAND OR <br /> QUALITY HEREIN SPECIFIED OR AS ACCEPTED BY THE OWNER. <br /> B. EQUIPMENT AND MATERIALS DAMAGED DURING TRANSPORTATION, INSTALLATION <br /> OPERATION SHALL BE CONSIDERED AS "TOTALLY DAMAGED" AND SHALL BE <br /> REPLACED WITH NEW. ANY VARIANCE FROM THIS CLAUSE SHALL BE MADE ONLY <br /> WITH WRITTEN APPROVAL OF THE OWNER. <br /> C. WHERE NO SPECIFIC MAKE OF MATERIAL OR EQUIPMENT IS MENTIONED, ANY <br /> FIRST CLASS PRODUCT OF A REPUTABLE MANUFACTURER MAY BE USED, <br /> PROVIDED IT CONFORMS TO THE REQUIREMENTS OF THE SYSTEM AND MEETS <br /> WITH THE APPROVAL OF THE OWNER. <br />2.2 DUCTWORK AND ACCESSORIES <br /> A. GENERAL: NON-COMBUSTIBLE OR CONFORMING TO REQUIREMENTS FOR CLASS 1 <br /> AIR DUCT MATERIALS, OR UL 181. <br /> B. STEEL DUCTS: ASTM A525 OR ASTM A527 GALVANIZED STEEL SHEET, <br /> LOCK-FORMING QUALITY, HAVING ZINC COATING OF 1.25 OZ PER SQ FT FOR <br /> EACH SIDE IN CONFORMANCE WITH ASTM A90. ROUND DUCT SHALL BE SPIRAL <br /> SEAM CONSTRUCTION. <br /> C. INSULATED FLEXIBLE DUCTS: FLEXIBLE DUCT WRAPPED WITH FLEXIBLE GLASS <br /> FIBER INSULATION, ENCLOSED BY PRESSURE DUCTWORK: SEAMLESS ALUMINUM <br /> PIGMENTED PLASTIC VAPOR BARRIER JACKET; MAXIMUM 0.23 K VALUE AT 75 <br /> DEGREES F W/METAL CONNECTORS. <br /> D. SEALANT: NON-HARDENING, WATER RESISTANT, FIRE RESISTIVE, COMPATIBLE WITH <br /> MATING MATERIALS; LIQUID USED ALONE OR WITH TAPE, OR HEAVY MASTIC. <br /> E. HANGER ROD: STEEL, GALVANIZED; THREADED BOTH ENDS, THREADED ONE END, <br /> OR CONTINUOUSLY THREADED. <br /> F. METAL DUCTS: <br /> 1. FABRICATE AND SUPPORT IN ACCORDANCE WITH 2013 CMC, SMACNA ±4" <br /> W.G. STATIC PRESSURE CLASS AND SEAL CLASS A FOR SUPPLY AND ±2" <br /> W.G. STATIC PRESSURE CLASS AND SEAL CLASS A FOR RETURN DUCT <br /> CONSTRUCTION STANDARDS AND ASHRAE HANDBOOKS. <br /> 2. SIZE ROUND DUCTS INSTALLED IN PLACE OF RECTANGULAR DUCTS IN <br /> ACCORDANCE WITH ASHRAE TABLE OF EQUIVALENT RECTANGULAR AND <br /> ROUND DUCTS. NO VARIATION OF DUCT CONFIGURATION OR SIZES <br /> PERMITTED EXCEPT BY WRITTEN PERMISSION. <br /> 3. CONSTRUCT T'S, BENDS, AND ELBOWS WITH RADIUS OF NOT LESS THAN <br /> 1-1/2 TIMES WIDTH OF DUCT ON CENTERLINE. WHERE NOT POSSIBLE <br /> AND WHERE RECTANGULAR ELBOWS ARE USED, PROVIDE TURNING VANES. <br /> 4. INCREASE DUCT SIZES GRADUALLY, NOT EXCEEDING 15 DEGREES <br /> DIVERGENCE WHEREVER POSSIBLE. DIVERGENCE UPSTREAM OF EQUIPMENT <br /> SHALL NOT EXCEED 30 DEGREES; CONVERGENCE DOWNSTREAM SHALL NOT <br /> EXCEED 45 DEGREES. <br /> 5. USE DOUBLE NUTS AND LOCK WASHERS ON THREADED ROD SUPPORTS. <br />27. <br /> G. VOLUME CONTROL DAMPERS: <br />COMPATIBLE WITH WITH THE BASE BUILDING STANDARDS. <br />ALL SMOKE DETECTORS SHALL BE INSTALLED PER MANUFACTURER'S RECOMMENDATION AND SHALL BE <br />SHALL SHUT DOWN THE EXHAUST FANS OR AC UNITS AS DESCRIBED IN NOTE #1. <br />PROVIDE ALL WIRING AND CONDUIT TO SIGNAL THE LIFE SAFETY SYSTEM. THE LIFE SAFETY SYSTEM <br />CONTRACTOR SHALL FURNISH AND INSTALL THE SMOKE DETECTORS, THE ELECTRICAL CONTRACTOR <br />WHERE DUCT MOUNTED SMOKE DETECTORS FOR FANS AND AC UNITS ARE REQUIRED, THE HVAC <br />SAFETY SYSTEM FOR UNIT SHUT DOWN UPON A SIGNAL FROM THE LIFE SAFETY SYSTEM. <br />THE ELECTRICAL CONTRACTOR SHALL INTERCONNECT ALL FANS AND AC UNITS WITH THE BUILDING LIFE <br />3. <br />2. <br />1. <br />FIRE LIFE SAFETY NOTES <br />PERFORMED BY AN "AABC" CERTIFIED CONTRACTOR ACCORDING TO THE CURRENT "AABC" NATIONAL STANDARDS. <br />ALL EXHAUST SYSTEM, AC UNITS, DIFFUSERS AND GRILLES. BALANCING SHALL BE <br />AIR BALANCE SHALL BE PERFORMED FOR ENTIRE CORE AND CORE SPACE UNDER THIS CONTRACT, <br />REFER TO THE SPECIFICATION "START-UP, TESTING AND BALANCING FOR THE WORK TO BE PERFORMED BY THE AIR <br />CONTRACTOR AND COORDINATED BY THIS CONTRACTOR. <br />THE AIR BALANCE WORK AS DESCRIBED IN SPECIFICATION SHALL BE CONTRACTED DIRECTLY BY THE GENERAL <br />E. <br />D. <br />C. <br />B. <br />A. <br />CHECK THE OPERATION OF THE FIRE DAMPERS AND COMBINATION SMOKE/FIRE DAMPERS. <br />REPORTED TO THE MECHANICAL CONTRACTOR. <br />MAKE INSPECTION FOR INSTALLATION DURING CONSTRUCTION DEFICIENCIES SHALL BE NOTED AND <br />CHECK ALL MECHANICAL UNITS FOR CORRECT OPERATION. <br />VERIFY & DOCUMENT ACTUAL MOTOR AMPERAGES, RPM, AS WELL AS AIR PRESSURE ON ALL SUPPLY AND EXHAUST FANS. <br />COOLING SUPPLY AIR TEMPERATURE DURING AIR BALANCING & THE OUTSIDE AIR TEMPERATURE. <br />BALANCE THE INDIVIDUAL AIR OUTLETS TO DESIGN QUANTITIES. MEASURE & DOCUMENT THE ACTUAL <br />IN ADDITION, THE AIR BALANCE WORK SHALL CONSIST OF THE FOLLOWING: <br />2. <br />3. <br />1. <br />4. <br />AIR BALANCE NOTES <br />ARCHITECT/ OWNER MUST VERIFY WITH A SOUND ENGINEER THE <br />LOCATION AND THE REQUIREMENT OF ALL MECHANICAL UNITS <br />TO MAKE SURE THAT THE SOUND OF THE MECHANICAL UNITS DO <br />NOT EXCEED THE REQUIRED DB. <br />1.SOUND NOTES <br />AND WATER BALANCE CONTRACTOR." <br />ALL AIR FILTRATION MEDIA SHALL HAVE AT LEAST A MERV RATING OF 13. <br />MATERIALS USED SHALL HAVE VOC LIMITS IN COMPLIANCE WITH TABLE <br />5.504.1 OF THE CALIFORNIA BUILDING CODE. <br />CONTRACTOR SHALL PROVIDE TESTING AND BALANCING REQUIREMENTS <br />PER SECTION 5.410.4 OF THE CALIFORNIA GREEN BUILDING CODE. <br />3. <br />2. <br />1. <br />CAL GREEN NOTES <br />IN THE MAIN SUPPLY AIR DUCT DOWNSTREAM OF THE FILTERS OR THEY MAY BE INSTALLED IN EACH ROOM <br />MAIN RETURN DUCT (IF REQ'D. BY THE LOCAL CODE) AHEAD OF OSA INTAKE. SEE CODE FOR <br /> OR SPACE SERVED BY THE SUPPLY AIR DUCT. DETECTORS SHALL ALSO BE INSTALLED IN THE <br />EACH SINGLE SYSTEM PROVIDING HEATING OR COOLING AIR IN EXCESS OF 2000 CFM OR 54,000 BTUH <br /> EXEMPTIONS AND LOCAL AUTHORITY FOR CODE INTERPRETATION, OR AS INDICATED ON PLAN. <br />SHALL BE EQUIPPED WITH AN AUTOMATIC SHUT-OFF. THE SMOKE DETECTOR SHALL BE INSTALLED <br />4. <br />240-400 <br />110-240 <br />SHEET INDEX <br />M-1.1 <br />MECHANICAL COVER SHEET <br />MECHANICAL SCHEDULES <br />M-1.0 <br />M-2.0 MECHANICAL CEILING PLAN <br />M-3.0 MECHANICAL DETAILS <br />M-4.0 MECHANICAL ENERGY FORMS <br />M-2.1 MECHANICAL ROOF PLAN <br />TENANT IMPROVEMENT FOR NEW DENTAL OFFICE,UTILIZING EXISTING ROOF TOP <br />UNITS. INSTALLING NEW DUCTWORK, CEILING DIFFUSERS, RETURN AIR GRILLS, <br />SCOPE OF WORK <br />EXHAUST FANS. <br />32. MANDATORY REQUIREMENT FOR DUCTWORK AND PLENUMS TO BE <br />CONSTRUCTED TO SEAL CLASS A. SEE 2022 CEC 120.4(b). <br />33. MANDATORY REQUIREMENT CLARIFICATIONS TO SPACES FOR WHICH <br />OCCUPANT SENSOR VENTILATION CONTROL DEVICES ARE REQUIRED. <br />34. DUCT LEAKAGE TESTING IN NOW MANDATORY. <br />SEE 2022 CEC 120.4(g). <br />SEE 2022 CEC 120.1(d). <br />Scale <br />Date <br />Drawn By <br />Checked By <br />Project Number <br />REVISIONS <br />JOB SITE: <br />PLAN: <br />PHONE: <br />PLAN CHECK / JOB NO. <br />50 S DE LACEY AVE. STE. 210 <br />Pasadena, CA 91105 <br />THESE PLANS ARE FOR REVIEW ONLY AND NOT FOR CONSTRUCTION UNLESS THEY <br />INCLUDE THE STAMP AND SIGNATURE OF ARCHITECT/ENGINEER AND THE <br />APPROVAL OF THE APPROPRIATE GOVERNMENT AGENCY <br />C-38176 <br />MARC A. <br />ABDELSAYED <br />RENEWAL <br />DATE <br />LICENSED A R CHITECT <br />STATE OF C ALIFORNIA <br />07/31/2025 <br />369 <br />ARCHITECTS <br />As Noted <br />CA <br />N <br />A <br />M <br /> <br />D <br />E <br />N <br />T <br />A <br />L <br /> <br />- <br />SA <br />N <br />T <br />A <br /> <br />A <br />N <br />A <br />MARS <br />NASRIN.P. <br />07/29/2024 <br />MISC._24065 <br />No.Description Date <br />1414 W. EDINGER AVE, <br />SANTA ANA, CA. 92704 <br />.PERMIT 09/04/2024 <br />09 <br />/ <br />0 <br />4 <br />/ <br />2 <br />0 <br />2 <br />4 <br />_ <br />G <br />C <br /> <br />C <br />o <br />m <br />m <br />e <br />n <br />t <br />1 P.C.COMMENTS 02/01/2025 <br />M-1.0 <br />MECHANICAL NOTES <br />& SCHEDULES1 <br />1 <br />1