Laserfiche WebLink
CALL TOLL FREE 1 (800) 227-2600 <br />TWO WORKING DAYS BEFORE YOU DIG <br />REVISIONS <br />NO. DATE DESCRIPTION NO. DATE DESCRIPTION <br />CONTRACTOR: <br />CORONA CONSTRUCTION CO. <br />615 E. ALLEN AVE. <br />SAN DIMAS, CA 91773 <br />PHONE: 626-926-7487 <br />CA. LIC. #797455 CLASS A-B-HAZ C10 <br />EXPIRES 07/31/2025 <br />TITLE SHEET <br />SITE ADDRESS: <br />UNITED PACIFIC #5669 <br />1913 W EDINGER AVE. <br />SANTA ANA, CA 92704 <br />SCALE: <br />DRAWN BY: <br />DATE: <br />JOB NO. <br />DRAWING NO. <br />CHECKED BY: <br />AS NOTED <br />ETHAN BUI <br />7/19/23 <br />5669 <br />TITLE <br />ALVARO CORONA <br />SHEET <br />T1 <br />UNITED PACIFIC #5669 <br />UNDERGROUND STORAGE TANK INSTALLATION <br />(SEE SHEET F-1 FOR SCOPE OF WORK) <br />1913 W EDINGER AVE. <br />SANTA ANA, CA 92704 <br />T1 <br />DRAWING NAME <br />TITLE SHEET <br />SITE PLAN & SCOPE OF WORK <br />UST INSTALLATION NOTES <br />UST AND SUMP DETAILS <br />DETAILS AND LIST OF EQUIPMENT <br />DRAWING INDEX <br />SHEET # <br />F1 <br />F2 <br />F3-1 <br />F4-2 <br />SITE ELECTRICAL CONDUIT PLANF5 <br />ELECTRICAL NOTESF6 <br />VEEDER ROOT ELECTRICALF7 <br />ELECTRICAL DETAILSF8 <br />B <br />A <br />C <br />D <br />E <br />F <br />G <br />H <br />I <br />J <br />B <br />A <br />C <br />D <br />E <br />F <br />G <br />H <br />I <br />J <br />2 1 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 <br />21 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 <br />LICENSED CONTRACTOR <br />STATE OF CALIFORNIA <br />CORONA CONSTRUCTIONCO. <br />797455 <br />EXPIRES 07/31/2025 <br />GENERAL NOTES <br />SUMMARY: <br />1. PROVIDE ALL LABOR. MATERIAL EQUIPMENT AND SYSTEMS REQUIRED FOR FULL PERFORMANE AND COMPLETION OF WORK AS SHOWN ON THE <br />DRAWINGS, SPECIFIED HEREIN AND AS REQUIRED FOR THE CONSTRUCTION OF A COMPLETE, OPERATIONAL, SERVEABLE TURN-KEY PROJECT. <br />2. THESE GENERAL REQUIERMENTS APPLY TO ALL SECTIONS OF THESE SPECIFICATIONS AS IF STATED SEPARATELY IN EACH SECTION. <br />CONSTRUCTION DOCUMENTS: <br />1. EXAMINE THE CONSTRUCTION DOCUMENTS INCLUDING THESE NOTES, THE DRAWINGS, DETAILS, PERMITS, ALL EQUIPMENT MANUFACTURER <br />SPECIFICATIONS/INSTALLATION INSTRUCTIONS AND BID DOCUMENTS. <br />2. READ THE SPECIFICATOINS. <br />3. VISIT THE SITE OF THE WORK. <br />4. ADDRESS ANY AND ALL QUESTIONS REGARDING THE CONSTRUCTION DOCUMENTS TO THE OWNER FOR INTERPRETATION. <br />5. BECOME THOROUGHLY ACQUAINTED WITH ALL REQUIREMENTS OF THE PROJECT, EXISTING CONDITIONS, AND LIMITATIONS UNDER WHICH THE <br />WORK SHALL BE EXECUTED, BIDS SHALL REFLECT A SUM TO COVER THE COST OF ALL ITEMS REQUIRED TO PERFORM THE WORK AS SET FORTH IN <br />THE CONSTRUCTION DOCUMENTS. NO ALLOWANCE WILL BE MADE FOR THE LACK OF EXAMINATION OR KNOWLEDGE OF THE PROJECT. SUBMISSION <br />OF A BID SHALL BE CONSIDERED AS CONCLUSIVE EVIDENCE THAT THE BIDDER HAS MADE A THOROUGH EXAMINATION. CHANGE ORDERS FOR <br />DISCREPANCIES ONCE CONSTRUCTION HAS STARTED WILL NOT BE ALLOWED. <br />6. CONSTRUCTION DOCUMENTS CONSIST OF THE PERMIT SET OF PLANS (DRAWINGS), SPECIFICATIONS AND SUPPLEMENTAL DOCUMENTS ISSUED TO <br />DEFINE THE NATURE AND SCOPE OF THE PROJECT. <br />7. THESE CONSTRUCTION DOCUMENTS (DRAWINGS AND SPECIFICATIONS) HAVE BEEN PREPARED TO DEFINE THE INSTALLATION OF NEW <br />UNDERGROUND STORAGE TANKS, PIPING AND DISPENSERS. SEE SHEET F1 FOR COMPLETE SCOPE OF WORK. <br />8. WRITTEN DIMENSIONS AND NOTATIONS SHALL TAKE PRECEDENCE OVER SCALED DIMENSIONS AND DRAWING CONFIGURATIONS. DO NOT SCALE <br />DRAWINGS. <br />9. WORK NOT DETAILED OR SPECIFIED SHALL BE SAME QUALITY AND TYPE AS WORK DETAILED OR SPECIFIED AS REQUIRED FOR THE CONSTRUCTION <br />OF A COMPLETE AND SERVICEABLE PROJECT. <br />10. ALL INSTRUCTIONS NOTED IN THE CONSTRUCTION DOCUMENTS ARE ADDRESSED DIRECTLY TO THE GENERAL CONTRACTOR AND ARE THE <br />RESPONSIBILITY OF THE GENERAL CONTRACTOR. <br />11. VERIFY ALL DIMENSIONS AND CONDITIONS ON THE SITE. <br />12. REPORT IMMEDIATELY IN WRITING TO THE OWNER ANY AND ALL DISCREPANCIES FOUND OR PERCEIVED TO EXISTING BETWEEN DRAWINGS, <br />SPECIFICATIONS, AND SITE CONDITIONS EITHER EXISTING OR CREATED. <br />13. THE CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS AND THE CONTRACTOR SHALL INFORM THE OWNER IN WRITING OF ALL DISCREPANCIES <br />AND DEVIATIONS FROM INFORMATION PRESENTED ON THESE DRAWINGS AND SPECIFICATIONS. EXAMINE THE AREAS AND CONDITIONS UNDER <br />WHICH WORK WILL BE PERFORMED. CORRECT CONDITIONS DETRIMENTAL TO TIMELY AND PROPER COMPLETION OF THE WORK. DO NOT PROCEED <br />UNTIL UNSATISFACTORY CONDITIONS ARE CORRECTED. THE BUILDER AND ALL SUBCONTRACTORS SHALL FAMILIARIZE THEMSELVES WITH THESE <br />DOCUMENTS. IT IS THE INTENT OF THESE PLANS THAT THE CONTRACTOR PROVIDE A COMPLETE “TURN-KEY” PROJECT AND THAT NO CHANGE <br />ORDERS WILL BE ISSUED FOR DISCREPANCIES ONCE CONSTRUCTION HAS STARTED. <br />14. WHERE A DISCREPANCY IS NOTED PRIOR TO BIDDING, THE OWNER SHALL RENDER A DECISION AND ESTABLISH THE PRECEDENCE OF THE <br />INFORMATION IN QUESTION PRIOR TO CONSTRUCTION. <br />15. MAINTAIN A COMPLETE SET OF CONSTRUCTION DOCUMENTS, AS-BUILT INSTALLED. CHANGES IN DESIGN, INCLUDING DIMENSIONS AND <br />PHOTOGRAPHS OF ALL UNDERGROUND INSTALLATIONS. <br />16. RETURN MARKED UP CONSTRUCTION DOCUMENTS, AS-BUILT DOCUMENTS TO THE OWNER AT SUBSTANTIAL COMPLETION. <br />17. RETURN ALL DRAWINGS AND SPECIFICATIONS FURNISHED BY OWNER AT COMPLETION OF WORK. DRAWINGS AND SPECIFICATIONS ARE OWNERS' <br />PROPERTY AND SHALL BE RETURNED. <br />18. THE TERM “PRODUCT” INCLUDES MATERIALS, SYSTEMS, AND EQUIPMENT. THE TERM “PROVIDE” INCLUDES FURNISHING AND INSTALLING A PRODUCT, <br />COMPLETE IN PLACE, OPERATING, TESTED, AND APPROVED. THE TERM “BUILDING CODE” AND THE TERM “CODE” REFER TO PUBLISHED <br />REGULATIONS OF GOVERNMENTAL AGENCIES HAVING JURISDICTION. THE TERMS “APPROVED”, “REQUIRED” AND “AS DIRECTED” REFER TO AND <br />INDICATE THE WORK OR MATERIALS THAT MAY BE APPROVED, REQUIRED OR DIRECTED BY THE ARCHITECT ACTING AS THE AGENT OF THE OWNER. <br />THE TERM “SIMILAR”, MEANS IN ITS GENERAL SENSE AND NOT NECESSARILY IDENTICAL. THE TERMS “SHOWN”, “INDICATED”, “NOTED”, “SCHEDULED”, <br />AND TERMS OF SIMILAR IMPORT, REFER TO REQUIREMENTS CONTAINED IN THE CONTRACT DOCUMENTS. <br />19. COMPLY WITH ALL LAWS, CODES, ORDINANCES AND REGULATIONS WHICH APPLY TO THIS PROJECT. <br />20. RESOLVE ALL DEVIATIONS BETWEEN DRAWINGS AND SPECIFICATIONS AND ANY LAWS, CODES, ORDINANCES, OR REGULATIONS OF GOVERNMENTAL <br />AGENCIES HAVING JURISDICTION BEFORE INSTALLATION OF WORK IN QUESTION PRIOR TO THE START OF CONSTRUCTION. <br />CONTROL OF SITE: <br />1. THE SITE WILL BE AVAILABLE TO THE CONTRACTOR SUBSEQUENT TO RECEIPT OF THE OWNER'S WRITTEN NOTICE TO PROCEED. CARE, CUSTODY, <br />AND CONTROL OF THE SITE WITHIN THE LIMITS SET FORTH ON THE DRAWINGS ARE THE RESPONSIBILITY OF THE CONTRACTOR FOR THE DURATION <br />OF THE AGREEMENT. <br />2. ORGANIZE AND PERFORM WORK SO THAT THE OPERATIONS OF EXISTING FACILITIES AND ADJOINING PROPERTY OWNERS CAN CONTINUE <br />NORMALLY AND WITH A MINIMUM OF INTERRUPTIONS. <br />3. PROTECT EXISTING CONSTRUCTION IDENTIFIED TO REMAIN INCLUDING, BUT NOT NECESSARILY LIMITED TO EXISTING LANDSCAPING, EARTHWORK, <br />ADJOINING PROPERTY, STREET, ETC... FROM DAMAGE AND GIVE PROPER WRITTEN NOTICE OF PROPOSED WORK TO ADJOINING PROPERTY <br />OWNERS. <br />4. REPAIR ALL DAMAGE TO ADJOINING PROPERTIES CAUSED BY OPERATIONS OF THIS PROJECT TO THE SATISFACTION OF THE OWNER'S <br />REPRESENTATIVE. <br />5. PROTECT COMPLETED WORK FROM DAMAGE UNTIL ACCEPTED BY OWNER. <br />6. PROVIDE SITE BARRIERS AND SECURITY FENCING TO ISOLATE THE SITE FORM THE GENERAL PUBLIC AND CONTROL SITE ACCESS AT ALL TIMES. <br />7. PROVIDE ALL SAFETY SIGNAGE POSTED IN CONSPICUOUS LOCATIONS AS REQUIRED BY ALL GOVERNMENTAL AGENCIES HAVING JURISDICTION, <br />INCLUDING BUT NOT NECESSARILY LIMITED TO OSHA, U.S. DEPT. OF LABOR, CITY BUILDING DEPARTMENT, LOCAL FIRE AND FOR TRAFFIC CONTROL. <br />8. PROVIDE DEMOLITION AND CLEAR THE SITE IN COMPLIANCE WITH LOCAL BEST MANAGEMENT PRACTICES. <br />9. MAINTAIN SITE IN ACCESSIBLE CONDITION FOR ALL SUBCONTRACTORS. <br />ACCESSIBLITY NOTES: <br />1. WALKS AND SIDEWALKS SUBJECT TO THESE REGULATIONS SHALL HAVE A CONTINUOUS COMMON SURFACE, NOT INTERRUPTED BY STEPS AND <br />SHALL BE A MINIMUM OF 48 INCHES IN WIDTH. <br />2. SURFACES WITH A SLOPE OF LESS THAN 6 PERCENT GRADIENT SHALL BY AT LEAST AS SLIP-RESISTANT AS THAT DESCRIBED AS A MEDIUM SALTED <br />FINISH. <br />3. SURFACES WITH A SLOPE OF 6 PERCENT GRADIENT OR GREATER SHALL BE SLIP RESISTAN. <br />4. SURFACE CROSS SLOPES SHALL NOT EXCEED ¼ INCH PER FOOT. <br />5. ABRUPT CHANGES IN LEVEL ALONG ANY ACCESSIBLE ROUTE SHALL NOT EXCEED ½ INCH. WHEN CHANGES IN LEVEL DO OCCUR, THEY SHALL BE <br />BEVELED WITH A SLOPE NO GREATER THAN 1:2 EXCEPT THAT LEVEL CHANGES NOT EXCEEDING ¼ INCH MAY BE VERTICAL. <br />6. ALL ACCESSIBLE ENTRANCES SHALL BE IDENTIFIES WITH AT LEAST ONE STANDARD SIGN AND WITH ADDITIONAL DIRECTIONAL SIGNS AT <br />INACCESSIBLE, AS REQUIRED, VISIBLE FROM APPROACHING PEDESTRIAN WAYS. <br />7. EVERY REQUIRED ENTRANCE OR PASSAGE DOORWAY SHALL BE OF A SIZE AS TO PERMIT THE INSTALLATION OF A DOOR NOT LESS THAN 6 FEET, 8 <br />INCHES IN HEIGHT. DOORS SHALL BE CAPABLE OF OPENING AT LEAST 90 DEGREES AND SHALL BE SO MOUNTED THAT THE CLEAR WIDTH OF THE <br />DOORWAY ISN'T LESS THAN 32 INCHES, ALL DOORS SHALL SWING OUTWARD IN THE PATH OF TRAVEL TO EXIT. <br />8. THE MAXIMUM SLOPE OF ACCESSIBLE PARKING AND PASSENGER LOADING ZONE SURFACE AND ANY DIRECTION SHALL NOT EXCEED 2% PER ADA <br />ACCESSIBILITY STANDARDS. THE MAXIMUM SLOPE AT THE PASSENGER LOADING ZONE SHALL NOT EXCEED 2%. <br />9. NEW SCOPE OF WORK NOT TO AFFECT EXISTING ACCESSIBLE PATH OF TRAVEL. SEE SHEETS F1 & F5. <br />CODES AND STANDARDS: <br />APPLICALBE CODES, STANDARDS AND SPECIFICATIONS INCLUDE, BUT ARE NOT LIMITED TO, THE FOLLOWING: <br />1. NATIONAL FIRE PROTECTION ASSOCIATION, VOL. 30, “FLAMMABLE AND COMUSTIBLE LIQUIDS CODE”. <br />2. FEDERAL CODE OF REGULATIONS (CFR), PARTS 280-281 <br />3. CALIFORNIA HEALTH & SAFETY CODE, CHAPTER 6.7. <br />4. CALIFORNIA CODE OF REGUALTIONS (CCR) TITLE 23 (CALIFORNIA UST REGULATIONS) <br />5. NATIONAL INSTITUTE FOR OCCUPATIONAL SAFETY AND HEALTH, NIOSH, “WORKING IN CONFINED SPACE”. <br />6. <br />7. DEPARTMENT OF TRANSPORTATION REGULATIONS 49 CFR, PARTS 171 THROUGH 180. <br />8. TITLE 22 CALIFORNIA CODE OF REGULATIONS, DIVISION 4.5, CHAPTER 32, SECTION 67383. <br />9. SOUTH COAST AIR QUALITY MANAGEMENT DISTRICT REGULATIONS - RULES 1166 AND 1149. <br />10. NATIONAL FIRE PROTECTION ASSOCIATION, NFPA 70, NATIONAL ELECTRICAL CODE, ARTICLES 500 THROUGH 516. <br />11. ORANGE COUNTY ENVIRONMENTAL DIVISION (CUPA) REQUIREMENTS. <br />12. REQUIREMENTS OF THE CITY OF SANTA ANA BUILDING AND SAFETY DEPARTMENT. <br />13. ASTM STANDARD DOCUMENT D4021-92. <br />14. FACTORY MUTUAL SYSTEMS APPROVAL FOR DOUBLE WALL J.I. IM7A0.AF. <br />15. THE LATEST EDITION OF THE CALIFORNIA FIRE CODE. <br />16. THE EQUIPMENT MANUFACTURERS INSTALLATIONS INSTRUCTIONS AND SPECIFICATIONS. <br />17. CAL OSHA REGULATIONS FOR EXCAVATIONS AND CONFINED SPACE. CAL OSHA PERMIT IS REQUIRED FOR EXCAVATION 5' OR DEEPER. <br />18. LATEST EDITION OF THE CALIFORNIA BUILDING CODE. <br />19. CALIFORNIA CODE OF REGULATIONS, TITLE 23, DIVISION 3, CHAPTER 16, UNDERGROUND TANK REGULATIONS. <br />20. CALIFORNIA HEALTH AND SAFTEY COD, CHAPTER 6.7, UNDERGROUND STORAGE OF HAZARDOUS SUBSTANCES. <br />21. PEDESTRIAN PROTECTION DURING CONSTRUCTION SHALL BE PROVIDED PER CBC SEC. 3306. <br />22. DISPENSERS SHALL COMPLY WITH 2013 CBC, CHAPTER 1, SECTION 111B-220.2. <br />QUALITY ASSURANCE AND WARRANTIES: <br />1. MAINTAIN A COPY OF APPROVED DRAWINGS, CUPA PERMIT AND FIRE PERMIT WITH ADDENDA AT THE JOB SITE DURING ALL CONSTRUCTION <br />ACTIVITIES THROUGH RECEIPT OF FINAL INSPECTION. <br />2. PROVIDE WRITTEN GUARANTEE AGAINST DEFECTS IN MATERIALS, EQUIPMENT, OR WORKMANSHIP OF THIS CONTRACTOR FOR ONE YEAR FROM <br />DATE OF SUBSTANTIAL COMPLETION AS ESTABLISHED BY RECEIPT OF CERTIFICATE OF OCCUPANCY, ITEMS CARRYING MANUFACTURERS' <br />WARRANTEES OF LONGER DURATION SHALL COMMENCE CONCURRENT WITH THE CONTRACTORS GUARANTEE. <br />3. PROVIDE MATERIALS AND EQUIPMENT OF BRANDS AND GRADES WHICH ARE SPECIFIED AND INCLUDED TO ESTABLISH TYPE AND QUALITY <br />REQUIREMENT. THESE BRANDS AND GRADES SHALL BE APPROVED BY THE OWNER AS SPECIFIED. <br />4. IT IS THE RESPONSIBILITY OF THE PARTY REQUESTING SUBSTITUTION TO PROVIDE PRODUCTS REPRESENTED AS EQUAL WITH DOCUMENTATION <br />OF EQUALITY. <br />5. PROVIDE QUALIFIED, RESPONSIBLE REPRESENTATIVE ON SITE AT ALL TIMES THROUGH SUBSTANTIAL COMPLETION, WHO UNDERSTANDS, <br />SPEAKS, AND WRITES ENGLISH FLUENTLY. <br />6. UTILIZE ADEQUATE NUMBERS OF SKILLED PERSONNEL WHO ARE THOROUGHLY TRAINED AND EXPERIENCED IN THE NECESSARY CRAFTS AND <br />WHO ARE COMPLETELY FAMILIAR WITH THE SPECIFIED REQUIREMENTS AND THE METHODS NEEDED FOR PROPER PERFORMANCE OF THE WORK <br />OF THIS SECTION. <br />7. PROVIDE WORKMANSHIP OF GOOD QUALITY, ACCEPTABLE TO THE OWNER OR THE OWNER'S REPRESENTATIVE AND MEETING THE “INDUSTRY <br />STANDARD” FOR THE TYPE OF WORK SHOWN ON THE DRAWINGS OR SPECIFIED HEREIN. <br />8. THE CONTRACTOR IS SOLELY RESPONSIBLE FOR CONSTRUCTION LAYOUT AND SCHEDULING, AND COORDINATING ALL PORTIONS OF THE WORK, <br />AND SHALL REQUIRE HIS SUBCONTRACTORS TO PROMPTLY NOTIFY HIM OF THEIR LAYOUT AND SCHEDULING NEEDS. <br />9. EMPLOY SKILLED PERSONNEL TO PERFORM BUILDING LAYOUT INCLUDING OVERALL WIDTH, LENGTH, AND HEIGHT AND SUCH SPECIFIC GRADES, <br />LINES, AND LEVELS AS SHOWN ON THE PROJECT DOCUMENTS. <br />10. ESTABLISH AND MAINTAIN ALL LINES, LEVELS, AND GRADES SHOWN ON DRAWINGS OR OTHERWISE REQUIRED. <br />11. ELEVATIONS NOTED ARE REFERENCED TO BENCHMARKS SHOWN ON BUILDING PLANS. <br />12. COORDINATE THE SCHEDULING OF ALL INSTALLATIONS TO FACILITATE THE TIMELY PROCESS OF THE WORK WITHOUT REMOVAL OF ANY <br />INSTALLED CONSTRUCTION. <br />TESTING, SAFETY AND INSPECTIONS: <br />1. PROVIDE TESTS AND/OR INSPECTIONS AS SPECIFIED ON THE DRAWINGS AND SPECIFICATIONS AND AS MAY ADDITIONALLY BE REQUIRED DURING <br />THE COURSE OF CONSTRUCTION. <br />2. PROVIDE TESTING BY A RECOGNIZED REPUTABLE TESTING AGENCY. <br />3. MAKE SUBMITTALS OF ALL MATERIAL SAFTEY DATA SHEETS (MSD'S) FOR ALL MATERIALS AND PRODUCTS IN OR ON THIS PROJECT. <br />4. SUBMITTALS SHALL BE MADE FOR AS MANY MATERIALS AS POSSIBLE BEFORE THE START OF THE WORK. <br />5. MAINTAIN A COMPLETE THREE RING BINDER AT THE JOB SITE CONTAINING MANUFACTURER INSTALLATION, OPERATION, AND MAINTENANCE <br />MANUALS. BINDER SHALL BE PROVIDED TO THE OWNER AT COMPLETION OF THE PROJECT. <br />6. MAKE THE BINDER AVAILABLE TO ALL WORKERS, SAFETY PERSONNEL, INSPECTORS, SUBCONTRACTORS AND THE OWNER. <br />7. CONDUCT REGULAR SAFETY MEETINGS AND DISCUSS WITH PERSONNEL THE SPECIFICS RELATIVE TO ALL ON GOING MATERIALS AND PRODUCT <br />USAGE. <br />8. SCAQMD TESTING SHALL BE PROVIDED IN ACCORDANCE WITH EXECUTIVE ORDER VR-204-Q. <br />9. PROVIDE SB-989 TESTING AND PROVIDE A NEW MONITORING SYSTEM CERTIFICATION PRIOR TO FINAL INSPECTION. <br />MATERIALS AND EQUIPMENT: <br />1. COORDINATE AND EXPEDITE PROCUREMENT OF MATERIALS AND EQUIPMENT. <br />2. STORE MATERIALS BLOCKED OR ON PLATFORMS ABOVE GROUND AND STORE IN A MANNER THAT WILL PROTECT UNITS FROM CONTACT WITH <br />SOIL AND EXPOSURE TO WEATHER. <br />3. EXERCISE CARE IN HANDLING MATERIALS AND OPERATION OF EQUIPMENT TO PREVENT DAMAGE. <br />4. LOCATE STORAGE AREAS WHERE THEY WILL NOT BE DISTURBED OR DAMAGED BY CONSTRUCTION OPERATIONS. <br />5. STOCKPILE MATERIALS SUFFICIENTLY IN ADVANCE OF NEED TO ASSURE THEIR AVAILABILITY IN A TIMELY MANNER FOR THIS WORK. <br />6. MAKE AS MANY TRIPS TO THE JOB SITE AS ARE NEEDED TO DELIVER MATERIALS FOR THIS PROJECT IN A TIMELY MANNER TO ENSURE ORDERLY <br />PROGRESS OF THE WORK. <br />7. DO NOT PERMIT MATERIALS NOT COMPLYING WITH THE PROVISIONS OF THESE SPECIFICATIONS TO BE BROUGHT ONTO OR TO BE STORED AT <br />THE JOB SITE. <br />8. REMOVE PROMPLTY NON-COMPLYING MATERIALS FROM THE JOB SITE AND REPLACE WITH MATERIALS MEETING THE REQUIREMENTS OF THIS <br />SECTION. <br />9. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO PROVIDE SECURE, LOCKABLE STORAGE FOR ALL CONSTRUCTION MATERIALS AND <br />EQUIPMENT. REPLACEMENT AFTER RECEIPT SHALL BE BY THE CONTRACTOR. <br />10. THE CONTRACTOR SHALL TAKE RECEIPT OF ALL OWNER SUPPLIED EQUIPMENT, CONFIRM MADEL AND QUANTITY AND NOTIFY OWNER OF ANY <br />DISCREPANCIES. <br />CLEAN UP AND ADJUSTMENT: <br />1. CLEAN ALL AREAS OF THE FACILITY AFFECTED BY THE PROJECT. <br />2. REMOVE ALL DEBRIS AND LEAVE PREMISES BROOM CLEAN. <br />3. CLEAN AND POLSIH ALL GLASS AND PLUMBING, INCLUDING FIXTURES. <br />4. WIPE CLEAN AND POLISH FACILITY EQUIPMENT (PUMPS/DISPENSERS, SIGNS, SHELVING, COOLERS, LIGHTS, AND NEW EQUIPMENT IN <br />CONSTRUCTION DISTRUVED AREAS, ETC.). <br />5. EXERCISE CAUTION TO AVOID DAMAGING OR STAINING PAINT, CONCRETE, TILE, ETC. <br />6. THE CONTRACTOR IS RESPONSIBLE FOR CORRECTIONG ALL DAMAGE UP TO SUBSTANTIAL COMPLETION. <br />DETAILS AND LIST OF EQUIPMENTF4-1 <br />F3-2 UST AND SUMP DETAILS <br />ELECTRICAL DETAILSF9 <br />1 5/14/24 UPDATED DRAWING INDEX. ADDED CAL OSHA NOTE. <br />1 <br />1 <br />SIGNED 5/14/24 <br />1 <br />1 <br />ADDED DISABLED ACCESS COMPLIANCE DOCUMENT <br />SHORING DETAILSF10 <br />Bldg# 101118671 <br />Elec# 20182410 <br /> <br />APPROVALS: <br />PLNG - ASevilla <br />BLDG - CSG Consultant <br />ELEC - CSG Consultant <br />1913 W Edinger Ave - <br />101118671 & 201824107/2/2024