My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1913 W Edinger Ave - 101118671 & 20182410 - Plan
PBA
>
Building
>
ProjectDox
>
E
>
Edinger Ave
>
1913 W Edinger Ave
>
1913 W Edinger Ave - 101118671 & 20182410 - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/31/2025 9:32:48 AM
Creation date
6/9/2025 7:45:01 AM
Metadata
Fields
Template:
Plan
Permit Number
20182410
101118671
Full Address
1913 W Edinger Ave
Rectangle
ID:
1
Creator:
Import Agent
Created:
6/9/2025 7:45 AM
Modified:
6/4/2025 12:20 PM
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
NO <br />PARKING <br />CALL TOLL FREE 1 (800) 227-2600 <br />TWO WORKING DAYS BEFORE YOU DIG <br />REVISIONS <br />NO.DATE DESCRIPTION NO.DATE DESCRIPTION <br />CONTRACTOR: <br />CORONA CONSTRUCTION CO. <br />615 E. ALLEN AVE. <br />SAN DIMAS, CA 91773 <br />PHONE: 626-926-7487 <br />CA. LIC. #797455 CLASS A-B-HAZ C10 <br />EXPIRES 07/31/2025 <br />SITE PLAN & SCOPE OF WORK <br />SITE ADDRESS: <br />UNITED PACIFIC #5669 <br />1913 WEST EDINGER AVE. <br />SANTA ANA, CA 92704 <br />SCALE: <br />DRAWN BY: <br />DATE: <br />JOB NO. <br />DRAWING NO. <br />CHECKED BY: <br />AS NOTED <br />ETHAN BUI <br />7/19/2023 <br />5669 <br />F1 <br />ALVARO CORONA <br />SHEET <br />F1 <br />1 SETUP SAFETY BARRICADES AND FENCE. <br />EXCAVATE AS NEEDED FOR NEW TANKS AND PIPING. <br />BACKFILL TANK EXCAVATION TO TOP OF TANK WITH APPROVED BACKFILL MATERIAL. <br />ITEM <br />2 <br />3 <br />DRESS TRENCH EXCAVATION WITH APPROVED BACKFILL MATERIAL. <br />INSTALL NEW DOUBLE WALL FIBERGLASS SUMP RISERS ON TANK COLLARS PER MANUFACTURER SPECIFICATIONS. <br />INSTALL NEW BRAVO DOUBLE WALL UNDER DISPENSER CONTAINMENT SUMPS AT ALL DISPENSER LOCATIONS. <br />INSTALL NEW DOUBLE WALL BRAVO VENT TRANSITION SUMP (SEE DETAIL E ON SHEET F4) <br />B <br />A <br />C <br />D <br />E <br />F <br />G <br />H <br />I <br />J <br />B <br />A <br />C <br />D <br />E <br />F <br />G <br />H <br />I <br />J <br />21 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 <br />21 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 <br />L <br />ICENSED CONTRACTOR <br />STATE OF CAL IFORNIA <br />CORONA CONSTRUCTION CO. <br />797455 <br />EXPIRES 07/31/2025 <br />DESCRIPTION <br />PROVIDE OSHA SHIRED TANK HOLE. PREPARE EXCAVATION WITH FILTER FABRIC LINER AND APPROVED TANK BED MATERIAL PER MANUFACTURER <br />SPECIFICATIONS (SEE SHEET F3). <br />4 <br />INSTALL (3) NEW 12K GALLON XERXES DOUBLE WALL FIBERGLASS UNDERGROUND STORAGE TANKS PER THE MANUFACTURERS INSTALLATION <br />SPECIFICATIONS (SEE SHEET F3 FOR DETAILS). <br />5 <br />6 <br />7 <br />8 <br />9 <br />10 INSTALL NEW DOUBLE WALL PRODUCT, VENT AND VAPOR PIPING PER MANUFACTURER SPECIFICATIONS. <br />PROVIDE PRESSURE TESTING AND INSPECTION OF PRIMARY AND SECONDARY PIPING SYSTEMS. <br />INSTALL NEW TANK TOP EQUIPMENT (SEE DETAILS C & D ON SHEET F3). <br />INSTALL NEW UNDER DISPENSER CONTAINMENT EQUIPMENT (SEE SHEET F4). <br />INSTALL VENT TRANSITION SUMP EQUIPMENT (SEE DETAIL E ON SHEET F4). <br />11 <br />12 <br />13 <br />14 <br />INSTALL NEW RAISED CONCRETE ISLANDS AND BOLLARDS. <br />INSTALL NEW ELECTRICAL CONDUITS TO INSIDE TANK SUMPS, VENT SUMP AND TO UDC ELECTRICAL OFFSET AREAS. <br />15 <br />16 <br />19 <br />PROVIDE HYDROSTATIC TESTING AND INSPECTION OF NEW TANK SUMPS, UNDER DISPENSER CONTAINMENT SUMPS AND NEW VENT TRANSITION SUMP. <br />PROVIDE HELIUM (OR OTHER APPROVED) ENHANCED LEAK DETECTION PRE-TESTING. <br />17 <br />18 <br />INSTALL ELECTRICAL CONDUITS, FITTINGS, J-BOXES, SEALS AND CONDUCTORS. INSTALL NEW VEEDER ROOT TLS-350 PANEL. INSTALL TURBINE <br />CONTROLLER AND NEW BREAKERS AT FUEL SYSTEM ELECTRICAL PANEL (SEE SHEET F8). <br />INSTALL NEW STEEL VENT RISERS AND VAPOR SYSTEM MANIFOLD – USE EXISTING HEALY TANK.20 <br />22 <br />21 PROVIDE INSPECTIONS (ELECTRICAL, FIRE, AIR QUALITY AND DEH) AND BACKFILL EXCAVATIONS WITH APPROVED BACKFILL MATERIAL TO SUB CONCRETE <br />GRADE - SET STEEL MANWAYS. <br />CONNECT AND TEST ELECTRICAL AND FUEL SYSTEM PIPING CONNECTIONS.23 <br />24 <br />PLACE AND FINISH CONCRETE AT NEW TANK SLAB AND DRIVE SLABS.25 <br />COORDINATE FUEL DROP – PRIME AND PURGE FUEL SYSTEM PIPING.26 <br />CALIBRATE, PROGRAM, TEST FOR FUEL SYSTEM PROPER OPERATION AND CERTIFY ALL FUEL SYSTEM COMPONENTS.27 <br />PROVIDE ENHANCED LEAK DETECTION TESTING PER ORANGE COUNTY ENVIRONMENTAL HEALTH.28 <br />INSTALL NEW DISPENSER DECALS AND FUEL SYSTEM SIGNAGE.29 <br />PROVIDE FINAL INSPECTIONS AND DEMONSTRATE FUEL SYSTEM OPERATION.30 <br />REMOVE CONSTRUCTION DEBRIS AND CLEAN SITE.31 <br />32 <br />33 <br />34 <br />35 <br />36 <br />37 <br />38 <br />39 <br />40 <br />41 <br />NOTE:TANK ANNULARS, SUMP RISERS, UNDER DISPERNSER CONTAINMENT SUMPS AND VENT TRANSITION SUMP ARE HYDROSTATICALLY MONITORED. <br />SCOPE OF WORK <br />VAPOR RETURN LINE – 4”/3” PART <br />91 UL PRODUCT PIPE – 3”/2” <br />91 UL VENT PIPE – 3”/2” <br />LINE LENGTH <br />2 <br />91 UL VAC TUBE CONDUIT BETWEEN SUMPS – 3”/2” <br />87 UL PRODUCT PIPE – 3”/2” <br />87 UL VENT PIPE – 3”/2” <br />87 UL VAC TUBE CONDUIT BETWEEN SUMPS – 3”/2” <br />VAPOR RETURN LINE – 3”/2” PART <br />VACUUM ZONE TABLE <br />SS MODULE <br />CHANNEL <br />7 <br />8 <br />9 <br />3 <br />4 <br />6 <br />VAC SENSOR MONITORED ZONE <br />30' <br />210’ <br />175’ <br />110’ <br />30’ <br />190’ <br />100' <br />30' <br />VOL. GAL/FT <br />0.23 GAL/FT <br />0.276 GAL/FT <br />0.23 GAL/FT <br />0.23 GAL/FT <br />0.23 GAL/FT <br />0.23 GAL/FT <br />0.23 GAL/FT <br />0.23 GAL/FT <br />CALCULATED ZONE VOLUME <br />6.9 GAL. <br />58 GAL. <br />40.25 GAL. <br />25.3 GAL. <br /> 6.9 GAL. <br />437 GAL. <br />23 GAL. <br /> 6.9 GAL. <br />THE WORK, IN GENERAL, IS THE INSTALLATION OF NEW UNDERGROUND STORAGE TANKS, NEW FUEL SYSTEM PIPING AND NEW FUEL DISPENSERS AS FOLLOWS: <br />1 <br />10 <br />11 <br />12 <br />DIESEL UL PRODUCT PIPE – 3”/2” <br />DIESEL UL VENT PIPE – 3”/2” <br />DIESEL UL VAC TUBE CONDUIT BETWEEN SUMPS – 3”/2” <br />200’ <br />90' <br />30’ <br />0.23 GAL/FT <br />0.23 GAL/FT <br />0.23 GAL/FT <br />46 GAL. <br />20.7 GAL. <br />6.9 GAL. <br />SITE PLAN <br />SCALE: 3/32" = 1' - 0" <br />0'5'10'20' <br />GRAPHIC SCALE <br />NORTH <br />2A:20BC FIRE EXTINGUISHERS <br />(2 LOCATIONS) <br />COLUMN, CANOPY SUPPORTS <br />EXISTING IMPACT PROTECTORS <br />( 6 LOCATIONS) <br />S <br />R <br />A <br />I <br />T <br />T <br /> <br />S <br />T <br />. <br />(E) <br />DIESEL <br />12K <br />PLANTER <br />W EDINGER AVE. <br />(E) 87 <br />12K <br />(E) 91 <br />12K <br />12 <br />10 <br />11 <br />9 <br />8 <br />6 <br />7 <br />5 <br />4 <br />2 <br />3 <br />1 <br />PLANTER <br />PLANTER <br />BUILDING <br />EXISTING TRASH ENCLOSURE <br />INSTALL 5 NEW GILBARCO ENCORE 700 3+0 AND (1) GILBARCO ENCORE 700 3+1 DISPENSERS (BLENDING GASOLINE). <br />INSTALL NEW DISPENSER HOSES, NOZZLES AND BREAKAWAYS – (SEE DETAIL G ON SHEET F4). <br />EXISTING REMEDIATION COMPOUND <br />CANOPY COLUMN <br />EXISTING HEALY TANK <br />NEW VENTS <br />NEW VENT BOX <br />CROSS OVER <br />EXISTING ACCESSIBLE <br />PATH OF TRAVEL <br />EXISTING ACCESSIBLE PATH OF TRAVEL <br />SCOPE OF WORK <br />NOT TO AFFECT <br />EXISTING ACCESSIBLE <br />PATH OF TRAVEL <br />1 5/14/24 NOTED EXISTING ACCESSIBLE PATH OF TRAVEL <br />SIGNED 5/14/24 <br />1913 W Edinger Ave - <br />101118671 & 201824107/2/2024
The URL can be used to link to this page
Your browser does not support the video tag.