CALL TOLL FREE 1 (800) 227-2600 <br />TWO WORKING DAYS BEFORE YOU DIG <br />REVISIONS <br />NO.DATE DESCRIPTION NO.DATE DESCRIPTION <br />CONTRACTOR: <br />CORONA CONSTRUCTION CO. <br />615 E. ALLEN AVE. <br />SAN DIMAS, CA 91773 <br />PHONE: 626-926-7487 <br />CA. LIC. #797455 CLASS A-B-HAZ C10 <br />EXPIRES 07/31/2025 <br />UST INSTALLATION NOTES <br />SITE ADDRESS: <br />UNITED PACIFIC #5669 <br />1913 WEST EDINGER AVE. <br />SANTA ANA, CA 92704 <br />SCALE: <br />DRAWN BY: <br />DATE: <br />JOB NO. <br />DRAWING NO. <br />CHECKED BY: <br />AS NOTED <br />ETHAN BUI <br />7/19/2023 <br />5669 <br />F2 <br />ALVARO CORONA <br />SHEET <br />F2 <br />B <br />A <br />C <br />D <br />E <br />F <br />G <br />H <br />I <br />J <br />B <br />A <br />C <br />D <br />E <br />F <br />G <br />H <br />I <br />J <br />21 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 <br />21 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 <br />L <br />ICENSED CONTRACTOR <br />STATE OF CAL IFORNIA <br />CORONA CONSTRUCTION CO. <br />797455 <br />EXPIRES 07/31/2025 <br />TANK AND PIPING INSTALLATION NOTES <br />MATERIAL AND WORKMANSHIP <br />1.UNLESS OTHERWISE SPECIFICALLY PROVIDED IN THESE DOCUMENTS, ALL EQUIPMENT, MATERIAL, AND ARTICLES <br />INCORPORATED IN THE WORK COVERED BY THESE DOCUMENTS ARE TO BE NEW AND OF THE MOST SUITABLE GRADE <br />FOR THE PROCESS INTENDED. <br />CONTRACTOR SHALL NOT DEVIATE FROM MATERIALS OR PRODUCTS SPECIFIED UNLESS THROUGH MUTUAL AGREEMENT WITH THE OWNER'S <br />CONSTRUCTION MANAGER APPROVAL MUST BE IN WRITING, SIGNED BY OWNER'S CONSTRUCTION MANAGER SUBSTITUTE MATERIALS SHALL BE <br />DESCRIBED, SPECIFYING ANY DIFFERENCE IN COST AND PERFORMANCE. ONLY NEW MATERIALS SHALL BE USED. CONTRACTOR SHALL BE CERTIFIED <br />FOR THE INSTALLATION OF ALL EQUIPMENT AND MATERIALS CONTAINED IN THIS PROJECT. <br />3.THE CONTRACTOR SHALL FURNISH TO THE OWNER'S REPRESENTATIVE FOR HIS APPROVAL, THE NAME OF THE <br />MANUFACTURER, THE MODEL NUMBER, AND OTHER IDENTIFYING DATA AND INFORMATION RESPECTING THE <br />PERFORMANCE, CAPABILITY, NATURE, AND RATING OF THE MACHINERY, MECHANICAL AND OTHER EQUIPMENT, <br />MATERIAL OR ARTICLES WHICH THE CONTRACTOR CONTEMPLATES INCORPORATING IN THE WORK WHEN REQUIRED BY <br />THE OWNER'S REPRESENTATIVE. <br />4.MACHINERY, EQUIPMENT, MATERIAL, AND ARTICLES INSTALLED OR USED WITHOUT REQUIRED WRITTEN APPROVAL <br />SHALL BE AT THE RISK OF SUBSEQUENT REJECTION. <br />5.CONTRACTOR TO PROVIDE ALL MATERIALS NOT LISTED ON THE OWNER'S SUPPLIED EQUIPMENT LIST, BUT REQUIRED <br />FOR A COMPLETE AND OPERATING FUEL STORAGE AND DISPENSING SYSTEM. <br />6.CONTRACTOR IS RESPONSIBLE FOR COORDINATING, RECEIVING AND UNLOADING THE ENTIRE OWNER'S SUPPLIED <br />EQUIPMENT DELIVERED TO CONTRACTORS WAREHOUSE, OR JOB SITE. THE SECURING OF EQUIPMENT REMAINS THE <br />CONTRACTOR'S RESPONSIBILITY UNTIL THE PROJECT RETAINAGE IS PAID. CONTRACTOR TO DISTRIBUTE ALL RECEIVING <br />DOCUMENTS TO THE OWNER'S CONSTRUCTION MANAGER. <br />7.ALL WORK TO BE DONE IN ACCORDANCE WITH APPLICABLE CODES AND REGULATIONS. <br />8.ALL MATERIALS SHALL BE INSTALLED PER MANUFACTURER'S INSTRUCTIONS AND THESE DOCUMENTS. CONFLICTS SHALL <br />BE BROUGHT TO THE ATTENTION OF THE OWNER'S REPRESENTATIVE. <br />9.IF ANY OF THESE DOCUMENTS INDICATE A CONFLICT WITH THE STATE OR LOCAL REQUIREMENTS AS ARE CURRENTLY IN <br />EFFECT AT THE TIME OF THIS PROJECT, IT IS EXPECTED THAT THE MOST RESTRICTIVE CONDITION(S) WOULD APPLY. <br />GENERAL CONDITIONS <br />1.CONTRACTOR EMPLOYEES SHALL HAVE COMPLETED 40 HOURS OCCUPATIONAL SAFETY & HEALTH ADMINISTRATION <br />(OSHA) TRAINING COURSE PRIOR TO THE START OF WORK CERTIFICATION OF THIS MUST BE PROVIDED TO THE OWNER'S <br />REPRESENTATIVE PRIOR TO THE START OF WORK. <br />2.CONTRACTOR EMPLOYEES SHALL HAVE COMPLETED THE EQUIPMENT (INCLUDING, BUT NOT LIMITED TO, TANK, PIPING, <br />SUMPS, DISPENSERS, MONITORING) MANUFACTURER'S TRAINING REQUIREMENTS IN ACCORDANCE WITH, BUT NOT <br />LIMITED TO, CALIFORNIA UNDERGROUND STORAGE TANK (UST) REGULATIONS AND CALIFORNIA AIR RESOURCES BOARD <br />(CARB) REQUIREMENTS. CERTIFICATES SHALL BE PROVIDED TO OWNER. CONTRACTOR SHALL COMPLETE THE <br />INSTALLATION CHECKLISTS SUPPLIED BY MANUFACTURERS AND SHALL FURNISH THE CHECKLISTS TO OWNER. <br />3.CONTRACTOR SHALL HAVE THE FOLLOWING LICENSES: <br />A:GENERAL ENGINEERING (A) <br />B:HAZARDOUS MATERIAL SUBSTANCE HANDLING (HAZ) <br />4.CONTRACTOR SHALL HAVE THE FOLLOWING INSURANCE. CONTRACTOR SHALL HAVE PROOF OF SUCH INSURANCE ON FILE <br />WITH OWNER BY NAMING OWNER AS "ADDITIONAL INSURED." <br />A:STATUTORY WORKMAN'S COMPREHENSIVE LIABILITY <br />B:COMPREHENSIVE GENERAL LIABILITY, WITH A COMBINED SINGLE LIMIT OF NOT LESS THAN $1,000,000 PER OCCURRENCE FOR BODILY INJURY <br />AND PROPERTY DAMAGE. <br />C:AUTOMOBILE LIABILITY COVERING USE OF ALL OWNED OR HIRED VEHICLES WITH A COMBINED SINGLE LIMIT OF LIABILITY OF NOT LESS THAN <br />$1,000,000 PER OCCURRENCE FOR BODILY INJURY AND PROPERTY DAMAGE. <br />5.CONTRACTOR TO FURNISH ALL LABOR, MATERIAL, EQUIPMENT, AND SERVICES NECESSARY FOR OR REASONABLY <br />INCIDENTAL TO THE SATISFACTORY COMPLETION OF ALL WORK SHOWN ON, CALLED FOR OR REQUIRED BY THE <br />DRAWINGS, EXCEPT AS NOTED AS SUPPLIED BY OWNER OR OTHERS. <br />6.ALL WORK SHALL BE PERFORMED IN ACCORDANCE WITH THE CALIF. BUILDING CODE, CALIFORNIA FIRE CODE, CALIF. <br />ELECTRICAL CODE. CALIF. UNDERGROUND STORAGE TANK REGULATIONS. OSHA CONSTRUCTION SAFETY ORDERS, <br />NATIONAL FIRE PROTECTION ASSOC. (NFPA), UNDERWRITER'S LABORATORIES, INC. (UL), CARB EXECUTIVE ORDERS AND <br />GUIDANCE LETTERS AND ANY OTHER APPLICABLE STANDARD OR STATE REGULATION, COUNTY OR CITY ORDINANCES. <br />7.All PETROLEUM PERMITS TO BE SECURED BY OWNER OR OWNER'S AGENT AND SUPPLIED TO THE CONTRACTOR WHO IS <br />RESPONSIBLE FOR COMPLYING WITH All PERMIT CONDITIONS. CONTRACTOR SHALL SECURE MISCELLANEOUS ELECTRICAL <br />PERMIT UNLESS WORK IS COVERED BY OTHER BUILDING PERMITS FOR THE PROJECT. <br />8.CONTRACTOR SHALL VISIT SITE AND FAMILIARIZE HIMSELF OF ALL EXISTING CONDITIONS PRIOR TO START OF <br />CONSTRUCTION. <br />9.CONTRACTOR SHALL PROTECT ALL EXISTING FACILITIES TO REMAIN UNLESS NOTED OTHERWISE. CONTRACTOR SHALL <br />REPAIR OR REPLACE TO THE SATISFACTION OF THE OWNER'S REPRESENTATIVE ANY EXISTING FACILITIES THAT ARE <br />DAMAGED BV THE CONTRACTOR'S OPERATIONS. <br />10.CONTRACTOR SHALL KEEP THE SITE FREE OF WASTE AND RUBBISH AT ALL TIMES CONTRACTOR SHALL HAVE THE WORK <br />AREA PROFESSIONALLY CLEANED THE DAY BEFORE THE OWNER'S FINAL PROJECT INSPECTION. <br />11.WHEN AN INSTALLATION IS MADE AT AN EXISTING STORE, THE CONTRACTOR IS TO SCHEDULE ANO PERFORM HIS WORK <br />SO AS NOT TO INTERFERE WITH THE NORMAL STORE OPERATIONS. ALL DEBRIS, EXCESS EXCAVATION MATERIALS, <br />MACHINERY AND EQUIPMENT TO BE REMOVED AND MAINTAINED CLEAR OF THE DRIVEWAYS THAT ARE IN USE EACH <br />DAY & LIGHTED BARRICADES SHALL BE PROVIDED FOR THE PUBLIC'S PROTECTION. WHEN IT BECOMES NECESSARY TO <br />CLOSE A DRIVEWAY FOR MORE THAN 24 HOURS, THE CONTRACTOR Will PROVIDE TEMPORARY TRAVEL SERVICE FOR <br />TRAFFIC. <br />12.A COPY OF THE SPECIFICATIONS AND DRAWINGS, 4.LONG WITH APPROVED SITE PLAN, WITH AS-BUILT NOTATIONS, <br />SHALL BE ON SITE AT ALL TIMES. <br />13.CONTRACTOR 1S RESPONSIBLE FOR ANY PRODUCT IN TANKS AND IN LINES UNTIL LOCATION OPENS OR REOPENS FOR <br />GASOLINE BUSINESS. ANY PRODUCT LOSS DURING CONSTRUCTION SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR. <br />PA/QA TO PROJECT ACCEPTANCE, THE OWNER SHALL RECONCILE INVENTORY BY COMPARING PRODUCT IN TANKS AND <br />LINES TO AMOUNT DELIVERED SHORTAGES SHALL BE BILLED TO CONTRACTOR AT FULL RETAIL PRICE. <br />14.CONTRACTOR MUST PROVIDE ADEQUATE PROVISIONS TO MITIGATE RA.IN DAMAGE AND DELAYS (I E. PUMPS. TARPS. <br />ETC.) <br />15.UPON COMPLETION OF PROJECT, CONTRACTOR SHALL PROVIDE OWNER WITH "AS-BUILT" DRAWINGS OF ALL ITEMS <br />INSTALLED BY SAME. “AS-BUILT” SHALL BE COMPLETED ON-SITE WITH INFORMATION NOTED DIRECTLY ON APPROVED <br />JOB COPY. <br />16.CONTRACTOR TO WARRANTY ALL WORKMANSHIP AND CONTRACTOR SUPPLIED MATERIAL FOR 1 YEAR THE OWNER <br />SHALL PERFORM A 10 MONTH WARRANTY INSPECTION TO EVALUATE CONTRACTOR PERFORMANCE ANO QUALITY OF <br />WORKMANSHIP. CONTRACTOR MUST COMPLETE ALL PUNCH LIST ITEMS IDENTIFIED DURING THIS 10 MONTH <br />INSPECTION. <br />17.CONTRACTOR SHALL PROVIDE A LIST OF SUB-CONTRACTORS. IF ANY, WHO WILL BE USED ON THE PROJECT, IF REQUIRED. <br />18.CONTRACTOR IS TO SCHEDULE ALL SUBCONTRACTORS, INCLUDING THOSE CONTRACTED .DIRECTLY WITH THE OWNER'S <br />CONSTRUCTION MANAGER. THE OWNER WILL PROVIDE A LIST OF SUBCONTRACTORS, CONTACTS AND PHONE NUMBERS <br />FOR THOSE SUBCONTRACTORS THAT HAVE CONTRACTS DIRECTLY WITH THE OWNER. <br />19.CONTRACTOR SHALL COORDINATE ALL INSPECTIONS AND APPROVALS AND OBTAIN, AT THE COMPLETION OF THE <br />PROJECT, ALL CERTIFICATES REQUIRED TO RUN THE FACILITY. <br />20.CONTRACTOR SHALL PLACE THE HIGHEST PRIORITY ON SAFETY AND HEALTH DURING THE PROGRESS OF WORK <br />PERFORMED AT THE OWNER'S STORE LOCATIONS. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO PROVIDE <br />AND MAINTAIN A SAFE WORKING ENVIRONMENT FOR ITS EMPLOYEES DURING THE PROGRESS OF WORK AND TO <br />PROTECT THE HEALTH AND SAFETY OF CONTRACTOR'S AGENTS, SUBCONTRACTORS, THE PUBLIC AND ANY THIRD <br />PARTIES. ALL TOOLS, MATERIALS, EQUIPMENT, FACILITIES AND OTHER ITEMS USED BY THE CONTRACTOR AND PRACTICES <br />EMPLOYED BY THE CONTRACTOR IN ACCOMPLISHING THE WORK ARE CONSIDERED TO BE PART OF THE WORKING <br />ENVIRONMENT, <br />21.CONTRACTOR TO KEEP ON SITE MATERIAL SAFETY DATA SHEETS (MSOS) FOR CHEMICAL COMPOUNDS REGULATED <br />THROUGH USEPA THAT WILL BE USED ON-SITE OR HAS THE POTENTIAL FOR HUMAN CONTACT (I.E. GASOLINE, DAY ICE, <br />SOLVENTS.GLUES.ETC) <br />22.WHILE ON SITE AND DURING WORKING HOURS, CONTRACTOR'S PERSONNEL MUST WEAR SHIRTS, LONG PANTS, HARD <br />HATS WHEN REQUIRED, AND ACCEPTABLE FOOT WEAR PER OSHA REGULATIONS. <br />23.CONTRACTOR TO DEVELOP A SPECIFIC SITE SAFETY PLAN FOR TANK AND EQUIPMENT INSTALLATION PRIOR TO THE START <br />OF WORK, CONTRACTOR WILL CONDUCT WEEKLY JOB SITE SAFETY MEETINGS WITH ITS EMPLOYEES AND THE MEETING <br />MINUTES WILL BE SUPPLIED TO OWNER. <br />D: STEEL PIPE: ALL METAL PIPING SHALL BE BLACK IRON SCHEDULE 40, OR EXTRA STRONG GALVANIZED PIPE IS NOT ALLOWED. FITTING SHALL SE <br />300 PSI MALLEABLE IRON. <br /> ALL STEEL PIPE BELOW GRADE IS TO BE DOUBLE WRAPPED WITH 20 MIL PVC PIPE WRAP, OVER A PIPE WRAP PRIMER FOR USE WITH VINYL <br />TAPES, AND SHALL BE BY THE SAME MANUFACTURER AS THE WRAP. <br />E: ALL THREADED CONNECTIONS SHALL BE THREADED WITH SEALANT WHICH SHALL BE CURRENTLY WARRANTED BY MANUFACTURER FOR FULL <br />COMPATIBILITY WITH THE PIPING MATERIAL USED, AND FOR USE WITH PETROLEUM SOLVENTS, FUELS, OILS, DIESEL, AND 100 % METHANOL, WHICH <br />SHALL BE VERIFIED BY CURRENT MANUFACTURER'S PRODUCT DATA SHEET. <br />F: CONTRACTOR SHALL DEMONSTRATE TO OWNER'S REPRESENTATIVE THAT ALL MATERIALS ARE NEW AND CONFORM TO ABOVE SPECS, IF <br />REQUIRED. <br />19.DO NOT PLACE PRODUCT PIPING UNDER BUILDINGS. PIPING RUNS OVER TANKS SHALL BE MINIMIZED. MAINTAIN MINIMUM CLEARANCE AS <br />REQUIRED BY MANUFACTURER MINIMIZED CROSSING OTHER LINES AND CONDUIT. IF PIPING IS NOT SHOWN ON SITE PLAN, CONTRACTOR <br />SHALL RUN LINES THE MOST DIRECT ROUTE SUBJECT TO APPROVAL BY OWNER'S REPRESENTATIVE. <br />20.PROVIDE AND INSTALL CONDUIT & WIRING FOR PETROLEUM SYSTEM(S) AS INDICATED. <br />21.All CONDUIT IS TO BE ¾” (MINIMUM). <br />22.INSTALL NEW MONITORING COMPONENTS, AS REQUIRED. PER DRAWINGS AND EQUIPMENT LIST. <br />23.INSTALL DISPENSERS AND MISCELLANEOUS PETROLEUM SYSTEMS, AS INDICATED ON PLANS AND DESCRIBED IN THE EQUIPMENT LIST. <br />24.INSTALL NEW CONCRETE TANK AND DRIVE SLABS AND OTHER FUELING SYSTEM CONCRETE AS INDICATED ON SITE PLAN. CONCRETE SHALL HAVE <br />A MINIMUM COMPRESSIVE STRENGTH AT 28 DAYS OF 3000 PSI. CONCRETE DESIGN SHALL OTHERWISE COMPLY WITH CIVIL/ARCH DRAWINGS <br />DOCUMENTS. GC SHALL COORDINATE CONCRETE SLABS WORK W/ PETROLEUM CONTRACTOR OR PETROLEUM SUBCONTRACTOR. <br />DISPENSERS <br />PURGE THE AIR FROM THE PIPING SYSTEM USING INDUSTRY STANDARD PRACTICES AND A GROUNDED CONTAINER APPROVED FOR STORAGE AND <br />HANDLING CLASS I FLAMMABLE LIQUIDS. <br />2.DISPENSERS SHALL BE SECURELY ATTACHED TO ANCHOR BOLTS WHICH SHALL BE SET IN CONCRETE ISLANDS. EXPANSION BOLTS MAY ONLY BE <br />USED WITH THE WRITTEN APPROVAL OF THE OWNER'S CONSTRUCTION MANAGER. QUANTITY AND SIZE OF ANCHOR BOLTS SHALL BE AS <br />SPECIFIED IN DISPENSER MANUFACTURER'S INSTALLATION INSTRUCTIONS. THE DISPENSERS ARE TO BE INSTALLED LEVEL AND ARE TO BE <br />CAULKED WITH A GRAY SILICONE AT ISLAND/DISPENSER INTERFACE. <br />3.DISPENSERS SHALL BE ACTIVATED ONLY IN PRESENCE OF AN AUTHORIZED DISPENSER REPRESENTATIVE. CONTRACTOR HAS SOLE RESPONSIBILITY <br />FOR DAMAGE TO DISPENSER(S) IF THIS INSTRUCTION IS NOT FOLLOWED. <br />4.CONFIRM DISPENSER OPERATIONS (STP ISOLATION, BRAND PANELS, DECALS AND NOZZLES MATCH, ETC.) IF MISCONNECTIONS OR OTHER <br />PROBLEMS ARE DETECTED DURING CONFIRMATION OF DISPENSER OPERATIONS MAKE CORRECTIONS AND REPEAT DISPENSER CHEACK-OUT <br />PROCEDURE. <br />5.CALIBRATE AND SEAL METERS PER LOCAL REGULATIONS. ANY RE-CALIBRATION REQUIRED TO OBTAIN APPROVAL FROM LOCAL REGULATORS <br />SHALL BE CONTRACTOR'S RESPONSIBILITY. <br />6.CONTRACTOR TO FURNISH AND INSTALL NEW DISPENSER FILTERS AFTER COMPLETING ALL LIQUID TESTING AND PRODUCT LINE PURGING. <br />ACTIVATE EACH PRODUCT ON EACH DISPENSER AND INSPECT FILTER FOR LEAKS, RECHECK PRIMARY LINE CONNECTIONS AT DISPENSER BASE <br />AND STOP FOR LEAKS. <br />7.CONTRACTOR SHALL PERFORM START-UP IF APPROVED BY THE DISPENSER/POS MANUFACTURER. IF CONTRACTOR IS NOT APPROVED BY THE <br />DISPENSER/POS MANUFACTURER, THEN AN AUTHORIZED CONTRACTOR SHALL BE SUBCONTRACTED TO PERFORM START-UP. CONTRACTOR <br />SHALL ALSO PROVIDE AN AUTHORIZED SERVICE TECHNICIAN TO PROVIDE UP TO 8 HOURS OF ON-SITE TRAINING FOR STORE PERSONNEL. <br />CONTRACTOR IS RESPONSIBLE FOR START-UP AND CALIBRATION OF FUELING SYSTEMS. COST MUST BE INCLUDED IN CONTRACTOR'S BASE BID. <br />8.CONTRACTOR SHALL PROVIDE AND INSTALL PUMP NUMBERS, OCTANE DECALS. NO SMOKING DECALS AND EMERGENCY SHUT-OFF SIGNS, PER <br />THE OWNER'S IMAGE GUIDELINES AND ALL APPLICABLE CODES AND REGULATIONS. CONTRACTOR SHALL INSTALL ALL OWNER PROVIDED <br />DECALS, PUMP TOPPERS AND WINDSHIELD CADDIES/TRASH CANS PRIOR TO FINAL PROJECT ACCEPTANCE. <br />9.CONTRACTOR TO FURNISH AND INSTALL FIRE EXTINGUISHERS AND APPROPRIATE DECALS PER APPLICABLE REGULATIONS. <br /> TESTING <br />1.OWNER'S REPRESENTATIVE SHALL WITNESS ALL TESTING AT HIS/HER DISCRETION. CONTRACTOR SHALL NOTIFY THE OWNER'S REPRESENTATIVE <br />TWO DAYS PRIOR TO ANY TESTING, IN WRITING. <br />2.ALL TESTING SHALL COMPLY WITH MANUFACTURER'S INSTRUCTIONS AND REQUIREMENTS, TRADE STANDARDS AND GOVERNING RULES AND <br />CODES, INCLUDING THE USE OF CERTIFIED AND APPROVED INDEPENDENT THIRD PARTY TESTERS, WHEN REQUIRED. <br />3.FINAL TESTING SHALL BE CONDUCTED BY A THIRD PARTY TESTING COMPANY SUBCONTRACTED TO THE CONTRACTOR TESTING METHODS MUST <br />BE APPROVED BY THE OWNER'S CONSTRUCTION MANAGEMENT AND CONFORM TO ALL REGULATIONS AND CODES. CONTRACTOR SHALL <br />SCHEDULE AND COORDINATE THE TESTING CONTRACTOR ALONG WITH ANY LOCAL INSPECTIONS REQUIRED TO OPEN THE STORE. CONTRACTOR <br />SHALL HAVE A REPRESENTATIVE ON-SITE DURING ALL TESTING. <br />4.ANY COSTS ASSOCIATED WITH FAILED TESTS AND SUBSEQUENT REPAIRS/RE-TESTS WILL BE THE CONTRACTOR'S RESPONSIBILITY. CONTRACTOR <br />MUST USE AND PAY THE OWNER'S TESTING COMPANY FOR ANY RE-TESTS. <br />5.CONTRACTOR MUST OBTAIN A COPY OF ALL TEST REPORTS FROM TESTING COMPANY TO BE SUBMITTED WITH THE PROJECT CLOSE OUT <br />REQUIREMENTS. <br />6.FULLY TEST ALL SYSTEMS, AND REPAIR AS NECESSARY SECURE ALL REQUIRED TESTS, INSPECTIONS, AND APPROVALS OF THE COMPLETED <br />SYSTEM. MAKE ALL REQUIRED ADJUSTMENTS AND CORRECTIONS. DO NOT BACKFILL TRENCHES OR TANK TOP UNTIL AUTHORIZED BY OWNER'S <br />REPRESENTATIVE. <br />7.CONTRACTOR SHALL PROVIDE ENHANCED LEAK DETECTION (ELD) IOTA TEST ON SYSTEM AFTER PAVING IS COMPLETE AND PRIOR TO FINAL <br />PROJECT ACCEPTANCE TEST SHALL BE CONDUCTED BY A CERTIFIED TESTER CONTRACTOR SHALL PROVIDE WRITTEN REPORT ON ELD TEST TO <br />OWNER'S REPRESENTATIVE PRIOR TO OWNER'S ACCEPTANCE OF PROJECT. <br />8.PROVIDE A STATIC PRESSURE (LEAK DECAY) TEST. ACCORDING TO THE AIR QUALITY MANAGEMENT DISTRICT MANUAL OF PROCEDURES OR <br />SOURCE TEST PROCEDURE PER CARB PROCEDURE TP-201. <br />9.PROVIDE DOCUMENTATION OF A DYNAMIC BACKPRESSURE TEST OF ALL VAPOR RETURN LINES ACCORDING TO CARB PROCEDURE TP-201, OR AS <br />REQUIRED BY LOCAL REGULATIONS. <br />10.PROVIDE LIQUID REMOVAL TEST FOR BALANCE SYSTEMS (GASOLINE) WITH A LIQUID REMOVAL DEVICE REQUIRED BY A CARB EXECUTIVE ORDER, <br />IF MORE THAN 100 ML OF LIQUID IS FOUND IN THE VAPOR PATH. THIS SHALL BE DETERMINED BY LOWERING THE GASOLINE DISPENSING NOZZLE <br />INTO A CONTAINER AND DRAWING ALL LIQUID, THEN MEASURING THE AMOUNT OF LIQUID, USING A GRADUATED CYLINDER OR BEAKER. IF <br />REQUIRED, THE LIQUID REMOVAL TEST SHALL BE CONDUCTED AND PASSED ACCORDING TO CARB TEST PROCEDURE TP-201. <br />11.PROVIDE STATIC TORQUE TEST OF ROTATABLE PHASE I VAPOR ADAPTERS ACCORDING TO CARS PROCEDURE TP-201. <br />12.PROVIDE LEAK RATE TEST OF OVERFILL PREVENTION DEVICE ACCORDING TO CARB PROCEDURE TP-201. <br />13.PROVIDE LEAK RATE TEST OF PRESSURE/VACUUM VENT VALVES ACCORDING TO CARB PROCEDURE TP-201. <br />14.PROVIDE ALL OTHER TESTING AS REQUIRED BY STATE AND LOCAL REGULATIONS, MANUFACTURER REQUIREMENTS, AUTHORITIES TO <br />CONSTRUCT, EXECUTIVE ORDERS AND APPROVAL LETTERS, INCLUDING REQUIREMENTS OF VERIFICATION AND REVERIFICATIONS TESTING AFTER <br />SYSTEM OPERATION BEGINS AND AFTER STATUTORY OPERATIONAL INTERVALS REQUIRED AS PART OF THE INSTALLATION REQUIREMENTS OF <br />THE FUELING SYSTEM. INCLUDING (BUT NOT LIMITED TO): USTS, PIPING, DISPENSING, CONTAINMENT, MONITORING AND VAPOR RECOVERY <br />SUB-SYSTEMS. <br />24.SAFETY PLAN: CONTRACTOR SHALL DEVELOP AND MAINTAIN FOR THE DURATION OF THE CONTRACT A SITE HEALTH & SAFETY PLAN <br />(SAFETY PLAN) THAT WILL EFFECTIVELY INCORPORATE AND IMPLEMENT REQUIRED SAFETY PROVISIONS. AND: <br />A: APPOINT AN EMPLOYEE AS THE SAFETY OFFICER WHO IS QUALIFIED AND AUTHORIZED TO SUPERVISE AND <br />ENFORCE COMPLIANCE WITH THE SAFETY PLAN SUBMIT THE NAME AND OUALIF1CATIONS OF THE SAFETY OFFICER <br />TO THE OWNER'S REPRESENTATIVE PRIOR TO COMMENCING WORK ON THE SITE <br />B: THE SAFETY PLAN SHALL CONTAIN THE NAMES, ADDRESSES AND TELEPHONE NUMBERS OF THE SUPERVISORY <br />PERSONNEL, THE HOSPITAL FACILITIES NEAREST THE SITE, AND A MAP TO THE HOSPITAL. PROCEDURES SHALL BE <br />WRITTEN IN THE SAFETY PLAN FOR ACTIONS TO BE TAKEN SHOULD STRANGE ODORS OR HAZARDOUS SUBSTANCES BE <br />UNCOVERED. <br />C: IF, DURING THE COURSE OF THE WORK UNSAFE CONDITIONS DEVELOP OR ARE ENCOUNTERED, TAKE <br />IMMEDIATE MEASURE TO CORRECT THE CONDITION. IF THE REPRESENTATIVE, CONSTRUCTION WORK SHALL <br />CEASE UNTIL CORRECTIVE ACTION CAN BE IMPLEMENTED. <br />D: PROVIDE A MINIMUM OF TWO FIRE EXTINGUISHERS WITH A MINIMUM CLASS RATING OF 4A:40B:C DRY <br />CHEMICAL WITHIN 30 FEET OF THE OPERATION. <br />25.UNDERGROUND SERVICE ALERT (USA) - THE CONTRACTOR SHALL NOTIFY MEMBERS OF USA 2 FULL WORKING DAYS IN ADVANCE OF <br />PERFORMING ANY EXCAVATION WORK BY CALLING THE TOLL-FREE ONE-CALL PROGRAM NUMBER (8OO) 227-2600 (OFF-SITE <br />WORK). <br />EXCAVATION <br />20.ALL EXCAVATIONS SHALL BE PERFORMED IN COMPLIANCE WITH OSHA AND STATE REGULATIONS. THE CONTRACTOR IS REFERRED <br />TO THE OSHA BOOKLET, “EXCAVATING AND TRENCHING OPERATIONS," FOR A SAFE WORK PRACTICES GUIDE FOR PERFORMING <br />EXCAVATION WORK <br />21.EXCAVATION SHALL BE SIZED PER TANK MANUFACTURER'S GUIDELINES PIPELINE TRENCHING SHALL BE PER PIPELINE <br />MANUFACTURER'S GUIDELINES. <br />22.THE OWNER RESERVES THE RIGHT TO DESIGN AND/OR CONSTRUCT SHORING UNDER AN AMENDED AGREEMENT WITH <br />CONTRACTOR OR SEPARATELY WITH ANOTHER COMPANY. IF THE OWNER ENGAGES CONTRACTOR, CONTRACTOR SHALL SUBMIT <br />SHORING DESIGN TO THE OWNER'S CONSTRUCTION MANAGER FOR APPROVAL. SUPPLEMENTAL JOB SCOPE AND COST SHALL BE <br />AGREED TO IN TERMS OF A CONTRACT CHANGE ORDER PRIOR TO COMMENCING WORK, SHORING SHALL BE REMOVED PRIOR TO <br />INSTALLING PRODUCT PIPING UNLESS APPROVED BY THE OWNER'S CONSTRUCTION MANAGER TO ABANDON IN PLACE. <br />23.UNSTABLE SOILS MAY BE REQUIRED TO HAVE A FILTER FABRIC EXCAVATION LINER. CONSULT BID DOCUMENTS OR THE OWNER'S <br />CONSTRUCTION MANAGER FOR SPECIFIC INFORMATION REGARDING THIS ISSUE <br />24.MINIMIZE SURFACE WATER ENTERING EXCAVATIONS BY CONSTRUCTING 0I1/EASION DAMS AROUND TANK FIELD EXCAVATION AND <br />PIPING TRENCHES. <br />25.A CONTINGENCY PLAN SHALL BE DEVELOPED WITH THE OWNER'S CONSTRUCTION MANAGER OUTLINING EMERGENCY PROCEDURES <br />FOR OBTAINING THE NECESSARY EQUIPMENT AND/OR PERSONNEL TO HANDLE UNEXPECTED WATER ENTRY INTO TANK FIELD <br />EXCAVATION OR PIPING TRENCHES. WHEN WATER MAY CONTAIN HYDROCARBONS, CONSULT THE OWNER'S CONSTRUCTION <br />MANAGER PRIOR TO REMOVING IT FROM SITE. <br />FUEL SYSTEM <br />1.PRIOR TO THE START OF WORK, PROVIDE OWNER WITH WORK PLAN AND SCHEDULE THAT COORDINATES SCHEDULING WITH <br />OTHER PORTIONS OF THE PROJECT TO THE FULLEST EXTENT POSSIBLE. <br />2.CONTRACTOR SHALL COORDINATE DELIVERY DATE OF TANKS WITH THE MANUFACTURER, THE OWNER'S CONSTRUCTION MANAGER <br />AND THE PROJECT SCHEDULE. <br />3.CONTRACTOR TO PROVIDE 6' CHAIN LINK SECURITY FENCING AND BARRICADES DURING ALL CONSTRUCTION PHASES, OR AS <br />DIRECTED BY THE OWNER'S CONSTRUCTION MANAGER. POST “KEEP OUT” SIGNS ON FENCE EVERY 30 FEET. AT THE END OF EACH <br />WORK DAY, SECURE FENCING PANELS TOGETHER. <br />4.EXCAVATE AS NECESSARY FOR THE INSTALLATION OF NEW TANK EQUIPMENT, PIPING AND FUEL SYSTEM CONDUITS. <br />5.WHEN SOIL IS TO BE STOCKPILED ON SITE FOR SAMPLING PRIOR TO OFF-HAUL, PETROLEUM CONTRACTOR SHALL PLACE EXCAVATED <br />SOIL ON AND SHALL COVER WITH 4 MIL. PLASTIC UNTIL SOIL IS REMOVED, IN AN AREA TO BE APPROVED BY OWNER/GENERAL <br />CONTRACTOR (GC) GC SHALL PROVIDE FOR DISTRIBUTION OF ALL EXCAVATED SOIL, PER GENERAL PROJECT REQUIREMENTS <br />6.INSTALL "TYPAR" FILTER FABRIC LINER IN TANK HOLE AND TRENCHES. WHERE REQUIRED BY WET-HOLE OR UNSTABLE SOIL <br />CONDITIONS, INSTALL TANK HOLD-DOWNS <br />7.THE OWNER'S CONSTRUCTION MANAGER SHALL WITNESS PRE-INSTALLATION TANK TESTING. CONTRACTOR SHALL NOTIFY THE <br />OWNER'S CONSTRUCTION MANAGER TWO WORKING DAYS PRIOR TO TESTING AND TANK INSTALLATION. <br />8.TANK MANUFACTURER'S INSTALLATION PROCEDURE SHALL BE FOLLOWED, AND THE INSTALLATION CHECKLIST SHALL BE <br />INITIALED/SIGNED BY CONTRACTOR AND THE OWNER'S CONSTRUCTION MANAGER AS APPROPRIATE AS EACH STEP IS COMPLETED. <br />9.AN UNDERGROUND EQUIPMENT INSTALLATION AFFIDAVIT SHALL BE FILLED OUT BY CONTRACTOR AND SUBMITTED TO THE <br />OWNER'S CONSTRUCTION MANAGER IN BOUND PROJECT CLOSE OUT FOLDER. <br />10.CONTRACTOR TO PROVIDE TANK TEST MANIFOLDS PER MANUFACTURER'S INSTRUCTIONS AND SPECIFICATIONS. PRESSURE GAUGES <br />SHALL BE IN GOOD REPAIR AND HAVE A CALIBRATION DATE WITHIN 30 DAYS OF USE. PRESSURE GAUGES DAMAGED OR OUT OF <br />CALIBRATION WILL NOT BE PERMITTED. <br />11.THE CONTRACTOR ACCEPTS FULL RESPONSIBILITY FOR PROPER HANDLING AND INSTALLATION OF THE UNDERGROUND STORAGE TANKS AND <br />SHALL ENSURE THAT GOOD WORKMANSHIP PRACTICES AND CONSTRUCTION PROCEDURES ARE FOLLOWED REGARDLESS OF THE INCLUSION OR <br />OMISSIONS OF ANY APPLICABLE SUGGESTIONS IN THESE INSTRUCTIONS. <br />12.UNKNOWN SITUATIONS OR CONDITIONS NOT COVERED IN THESE SPECIFICATIONS AND THE MANUFACTURER'S INSTRUCTIONS ARE THE <br />RESPONSIBILITY OF THE CONTRACTOR. MANUFACTURER'S SPECIALISTS ARE AVAILABLE FOR CONSULTATION. THE PRESENCE OF THE OWNER'S <br />CONSTRUCTION MANAGER OR THE MANUFACTURER'S OBSERVER AT ANY INSTALLATION SITE DOES NOT RELIEVE THE CONTRACTOR OF HIS <br />RESPONSIBILITY FOR THE PROPER INSTALLATION OF THE TANKS OR OTHER EQUIPMENT. <br />13.TANKS SHALL BE PLACED ACCORDING TO THE TANK MANUFACTURER'S INSTALLATION MANUAL AND THE OWNER'S TANK DRAWINGS. PLEASE <br />NOTE THAT IF THE SOIL IS UNSTABLE. THE STANDARDS MAY BE INCREASED. DISTANCE BETWEEN TANKS SHALL BE GOVERNED BY <br />MANUFACTURER'S OR STATE AND LOCAL REQUIREMENTS, WHICHEVER IS GREATER. <br />14.TANKS ARE TO BE SET LEVEL AND BACKFILLED TO TOP OF TANK THE SAME DAY AS TESTING. <br />15.INSTALL TANK TRIM & EQUIPMENT PER DRAWINGS AND CURRENT MANUFACTURER'S INSTRUCTIONS, WHICH SHALL BE FOLLOWED AT ALL <br />TIMES, AND SHALL HAVE PRECEDENCE OVER OTHER INSTRUCTIONS. MANUFACTURER'S CHECKLISTS SHALL BE COMPLETED BY THE PETROLEUM <br />CONTRACTOR AS EACH STEP IS COMPLETED. TESTING SHALL CONFORM TD MANUFACTURER'S REQUIREMENTS OWNER'S REPRESENTATIVE <br />SHALL WITNESS ALL TANK TESTING AT HIS/HER DISCRETION. <br />16.PETROLEUM CONTRACTOR TO INSTALL NEW ELECTRICAL SYSTEMS PER PLANS AND MANUFACTURER'S REQUIREMENTS, ARRANGE FOR ALL <br />INSPECTIONS, PROVIDE CONDUITS/WAITNG, J-BOXES, ETC. REQUIRED FOR ELECTRICAL SYSTEMS. <br />17.INSTALL EQUIPMENT AS LISTED IN EQUIPMENT LIST AND PROVIDE AND INSTALL ALL OTHER EQUIPMENT AS REQUIRED TO PROVIDE A COMPLETE <br />AND WORKABLE FUELING SYSTEM. <br />18.PROVIDE AND INSTALL NEW PRODUCT, VENT, VAPOR, AND SECONDARY CONTAINMENT LINES PER DRAWINGS. CURRENT MANUFACTURER'S <br />INSTRUCTIONS SHALL BE FOLLOWED AT ALL TIMES, AND SHALL HAVE PRECEDENCE OVER OTHER INSTRUCTIONS. MANUFACTURER'S CHECKLISTS <br />SHALL BE COMPLETED BY THE PETROLEUM CONTRACTOR AS EACH STEP IS COMPLETED. <br />A: FIBERGLASS REINFORCED PLASTIC (FRP) PIPING: PRIMARY PIPING WITH CONTAINMENT SYSTEM SHALL BE RED THREAD 11A AND RED THREAD 11 WITH <br />FITTINGS AND DS-7000 AND DS-8000 SERIES ADHESIVE, OR AMERON DUALOY 300/LCX WITH ALCOHOL FITTINGS AND PSX34 ADHESIVE. DO NOT MIX DIFFERENT <br />MANUFACTURER'S MATERIALS. ALL PIPING AND CONTAINMENT SYSTEMS SHALL BE UL APPROVED FOR 100% METHANOL. CONTAINMENT SYSTEM SHALL BE BY THE <br />SAME MANUFACTURER WITH THE SAME SERIES ADHESIVES AND/OR FITTINGS. <br />B: VENT/VAPOR PIPING: SAME AS FRP PIPING. <br />C: PERSONS INSTALLING PIPING MUST BE CERTIFIED AS HAVING BEEN TRAINED BY MANUFACTURER, <br />SIGNED 5/14/24 <br />1913 W Edinger Ave - <br />101118671 & 201824107/2/2024